Loading...
2026.06.16 Work Session Packet 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov Posted: June 12, 2026 City Council Work Session Agenda Tuesday, June 16, 2026 | 6:30 p.m. Upper Community Room/Zoom Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the Crystal City Council work session was held on Tuesday, June 16, 2026, at _____ p.m. electronically via Zoom and in the upper community room at city hall, 4141 Douglas Dr. N., Crystal, Minnesota. If the agenda items are not completed in time for the regular city council meeting at 7 p.m., the meeting will be continued and resumed immediately following the city council meeting. I. Attendance Council members Staff ____ Onesirosan ____ Bell ____ Sutter ____ Budziszewski ____ Tierney ____ Serres ____ Cummings ____ Therres ____ Deshler ____ Elholm ____ Eidbo ____ Hubbard ____ Kamish ____ Kunde ____ Kiser ____ Struve II. Agenda The purpose of the work session is to discuss the following agenda items: 1) West Metro Fire-Rescue District 2027 budget. 2) TIF-funded public improvement near Wells Fargo site. 3) Decorative concrete options for Douglas Drive medians (2027 project). 4) Holiday lighting update. 5) Council liaison reports.* 6) Constituent issues update.* 7) City manager update.* 8) New business.* 9) Council comments and announcements.* III. Adjournment The work session adjourned at ______ p.m. * Denotes no supporting information included in the packet. Auxiliary aids are available upon request to individuals with disabilities by calling the city clerk at (763) 531-1145 at least 96 hours in advance. TTY users may call Minnesota Relay at 711 or 1-800-627-3529. 2027 WMFRD Budget Work Session GENERAL OPERATING BUDGET & CAPITAL PLAN WEST METRO FIRE-RESCUE DISTRICT Work Session Objectives Review preliminary 2027 operating and capital budgets Discuss key financial changes from 2026 Identify operational and strategic priorities Review long-term capital sustainability Prepare for formal budget adoption process West Metro Fire-Rescue District 2027 Budget Overview Total 2027 Revenue: $4,231,226 General Operating Budget: $3,610,300 Capital Contribution reduced from $400,000 to $100,000 Engine Lease increased to $287,326 Overall increase over 2026: $216,718 West Metro Fire-Rescue District Key Operating Budget Drivers Personnel remains the largest operational expense Regular Salaries increase tied to staffing and operational demands Part-time staffing increase supports response model continuity Communications and technology expenses continue to rise Health insurance and benefit costs continue trending upward West Metro Fire-Rescue District Personnel & Staffing Investments Regular Salaries: $1,530,000 Part-Time Salaries: $760,000 PERA Contributions: $267,000 Continued focus on response reliability and staffing consistency Supports firefighter recruitment, retention, and operational readiness West Metro Fire-Rescue District Capital Plan Overview Beginning Capital Fund Balance: $1,758,689 Total 2027 Capital Expenditures: $439,825 Committed Capital Funds: $1,019,744 Projected Non-Committed Fund Balance: $299,120 Continued focus on maintaining operational readiness and long-term sustainability West Metro Fire-Rescue District Major 2027 Capital Investments Staff Vehicle Replacement: $65,000 Rescue Vehicle Program Saving: $45,000 Turnout Gear Replacement: $60,000 SCBA Replacement Program Saving: $50,000 Station 3 Apparatus Floor Improvements $20,000 Technology & computer upgrades $20,000 West Metro Fire-Rescue District Communication & Equipment Investments Radio replacement and lifecycle management continues $20,000 Thermal imaging camera replacement program maintained $5,000 Hydraulic rescue tool replacement schedule continues $10,000 West Metro Fire-Rescue District Strategic Discussion Points Balancing operational needs with long-term sustainability Maintaining reserve balances and capital replacement schedules Impact of SAFER funding changes Future apparatus and facility planning Continued investment in staffing and firefighter wellness West Metro Fire-Rescue District Next Steps Discussion and feedback Refinement of preliminary budget assumptions City review and approval process Fire board adopts in July 2026 Continued monitoring of revenue and expenditure trends City formal adoption process later in 2026 West Metro Fire-Rescue District 2027 Revenue Summary Category 2026 2027 General Operating $3,038,583 $3,610,300 Capital Contribution $400,000 $100,000 Pension Fund $180,000 $80,000 Engine Lease $252,325 $287,326 Total Revenue $4,014,508 $4,231,226 Source: Preliminary 2027 WMFRD Budget Documents Cost Sharing Formula West Metro Fire-Rescue District Preliminary 2027 General Operating Budget, Capital, Special Pension, Insurance, and Compensated Absences Funds Approved by the WMFRD Board of Directors on Approved by the City of Crystal Council on Approved by the City of New Hope Council on 2026 2026 2027 2027 Approved Line Totals Preliminary Changes Minus SAFER from 2026 Revenue 50100 - City Contribution General Operating 3,421,000 3,038,583 3,610,300 571,717 City Contribution Special Revenue Pension Fund 180,000 180,000 80,000 -100,000 City Contribution Capital 400,000 400,000 100,000 -300,000 Other Capital 0 City Contribution Special Revenue Insurance Fund 20,000 20,000 20,000 0 Other Special Revenue Insurance 0 City Contribution Special Revenue Compensated Absences Fund 20,000 20,000 30,000 10,000 Other Special Revenue Compensated Absences 0 Tower Lease 103,600 103,600 103,600 0 Engine Lease 252,325 252,325 287,326 35,001 51000 - Misc Income General Operating 0 0 Total Revenue 4,396,925 4,014,508 4,231,226 216,718 Expenditures 0 Personnel 0 61500 - Regular Salaries 1,415,000 1,171,640 1,530,000 358,360 62000 - Part - Time Salaries 700,000 700,000 760,000 60,000 62200 - PERA 250,000 206,925 267,000 60,075 62800 - Social Security & Medicare 75,000 71,431 80,000 8,569 65500 - Uniforms 12,000 12,000 12,000 0 Insurance 0 63500 - Health Savings Account - HSA 8,500 6,000 10,000 4,000 63600 - Dental Insurance 0 63800 - Health Insurance 200,000 157,298 220,000 62,702 63900 - Long Term Disability 7,000 5,095 8,000 2,905 64000 - Life Insurance 1,500 1,194 1,800 606 64500 - Workers Comp Insurance 150,000 120,000 120,000 0 Supplies 0 70500 - Office Supplies 3,000 3,000 3,000 0 72500 - Cleaning 3,000 3,000 3,000 0 74000 - Operating 9,000 9,000 9,000 0 75500 - Tools & Equipment 3,000 3,000 5,000 2,000 76000 - Motor Fuels 31,000 31,000 30,000 -1,000 77000 - Turn Out Gear 18,000 18,000 18,000 0 79000 - Fire Prevention Supplies 2,000 2,000 2,000 0 Service 0 80600 - Legal Fees 7,000 7,000 6,000 -1,000 80800 - Medical Exams 40,000 40,000 35,000 -5,000 Communication and Delivery 0 81800 - Communications 180,000 180,000 190,000 10,000 Utilities 0 83200 - Electric 25,000 25,000 26,500 1,500 83400 - Water/Sewer 10,000 10,000 12,000 2,000 83600 - Gas 35,000 35,000 37,000 2,000 Contract Maintenance 0 84000 - Building Maintenance & Cleaning 18,000 18,000 18,000 0 84200 - Building Repairs 13,000 13,000 13,000 0 84400 - Equipment Repairs 27,000 27,000 27,000 0 84600 - Vehicle Repairs 33,000 33,000 33,000 0 Rent 0 85400 - Office Equipment Rent 5,000 5,000 5,000 0 Dues, Subscriptions, & Training 0 86200 - Dues & Subscriptions 4,000 4,000 4,000 0 86400 - Awards 1,000 1,000 1,000 0 86600 - Books 0 86800 - Training 30,000 30,000 30,000 0 86900 - Licenses & Permits 5,000 5,000 0 -5,000 Miscellaneous 0 87200 - Advertising - Employee 1,000 1,000 87700 - Financial Services 85,000 85,000 92,000 7,000 Total General Operating Expenditures 3,406,000 3,038,583 3,610,300 204,300 (367,417) 3,038,583 4.93 % Increase over 2026 216,718 Increase over 2026 2027 Capital Plan 2027 Committed Capital Funds Year of 2026 Fund Balance 1,371,363 Expenditure Revenue 2027 Contribution 100,000 BUILDING 88002 2027 Engine Lease Contribution 287,326 Bathroom Project (2014)38,000 Bathroom Project (2015)29,000 Total 1,758,689 Bathroom Project (2015)5,000 Expenditure 2028 Station 3 Apparatus Floor (2025)20,000 2027 Expenditures 152,500 Station 3 Apparatus Floor (2026)20,000 2027 Engine Lease District 35,000 Station 3 Apparatus Floor (2027)20,000 2027 Engine Lease Cities 252,325 Total 132,000 Total 439,825 RESPIRATORY PROTECTION EQUIPMENT 88003 ADMIN/TECH 88001 2033 SCBA (2024)50,000 Computers/LOGIS 20,000 SCBA (2025)50,000 SCBA (2026)50,000 Total 20,000 SCBA (2027)50,000 BUILDING 88002 Total 200,000 Overhead Door Maintenance 5,000 Station 3 Apparatus Floor 20,000 POWER EQUIPMENT TOOLS 88005 2033 Thermal Cameras (2024)5,000 Total 25,000 Thermal Cameras (2025)5,000 Thermal Cameras (2026)5,000 RESPIRATORY PROTECTION EQUIPMENT 88003 Thermal Cameras (2027)5,000 SCBA 50,000 2034 Hydraulic Tools (2024)10,000 Hydraulic Tools (2025)10,000 Total 50,000 Hydraulic Tools (2026)10,000 Hydraulic Tools (2027)10,000 PERSONAL PROTECTIVE EQUIPMENT 88004 Power Tools (2025)10,000 Turnout Gear 60,000 Power Tools (2026)10,000 Power Tools (2027)10,000 Total 60,000 Total 90,000 POWER EQUIPMENT TOOLS 88005 Thermal Camera 5,000 COMMUNICATION EQUIPMENT 88006 Hydraulic Tools 10,000 Telephone (2017)10,000 Radios (2019)20,000 Total 15,000 Radios (2020)20,000 Radios (2021)20,000 COMMUNICATION EQUIPMENT 88006 Radios (2023)20,000 Radios 20,000 Radios (2024)20,000 Radios (2025)20,000 Total 20,000 Radios (2026)20,000 Radios (2027)20,000 TECHNICAL RESCUE EQUIPMENT 88007 Total 0 Total 170,000 MEDICAL EQUIPMENT 88008 FIRE SUPPRESSION EQUIPMENT 88009 AED 2,500 Hose (2024)10,000 Hose (2025)10,000 Total 2,500 Hose (2026)10,000 Hose (2027)10,000 FIRE SUPPRESSION EQUIPMENT 88009 Nozzles (2024)10,000 Hose 10,000 Nozzles (2025)10,000 Nozzles 10,000 Nozzles (2026)10,000 Nozzles (2027)10,000 Total 20,000 Total 80,000 HAZARDOUS MATERIALS EQUIPMENT 88010 Total 0 PREVENTION 88011 Public Education Props (2023)5,000 PREVENTION 88011 Public Education Props (2024)5,000 Public Education Props 5,000 Public Education Props (2025)5,000 Public Education Props (2026)5,000 Total 5,000 Public Education Props (2027)5,000 TRAINING 88012 Total 25,000 Total 0 VEHICLES - Staff/Utility/Rescue 88013 VEHICLE 88013 Major Apparatus Tires (2022)10,000 Staff Vehicle 65,000 Rescues (3) (2026)45,000 Rescues (3) 45,000 Rescues (3) (2027)45,000 Total 110,000 Total 100,000 MAJOR APPARATUS 88014 PA Grant (2021)200,000 Sale of E One Engine (2022)100,990 Sale of (3) E One Engines (2023)383,750 2024 Expenditure District Contribution to Engine Lease -75,000 2025 Expenditure District Contribution to Engine Lease -75,000 2026 Expenditure District Contribution to Engine Lease -35,000 Balloon Payment Tower Lease -241,996 2027 Expenditure District Contribution to Engine Lease -35,000 Total 222,744 Total Committed Funds 1,019,744 Beginning Fund 1,758,689 Committed 1,019,744 Expenditures 439,825 Ending Non-Committed Fund Balance 299,120 Fund Balance 1,318,864 Expenditures Expenditures from Committed Capital Funds Committed/Saved Capital Funds COUNCIL STAFF REPORT DATE: June 11, 2026 FROM: John Sutter, Community Development Director TO: Mayor and City Council City Manager Adam R. Bell RE: TIF-funded public improvement near Wells Fargo site. Staff has been working with Bolton and Menk to develop preliminary construction plans and a cost estimate for TIF-eligible public improvements that would serve the new apartment building on the Wells Fargo site. The project has three main elements: 1. Close a small sidewalk gap between 57th and 58th Ave. N. 2. Replace the pedestrian ramps, crossing signal system and related items at the intersection of 57th and West Broadway. 3. On the south side of 57th from Kentucky to West Broadway, replace the sidewalk, add pedestrian-scale lighting, and replace the turf boulevard with decorative concrete. Bolton and Menk has prepared plans at a 60% level of detail, so now is a good time to check in with the Council. At this time, the estimated costs are approximately $500,000 including construction engineering costs. This equates to roughly one year of increment in addition to the ten years going to the developer. Project elements #1 and #2 are straightforward engineering solutions. However, project element #3 (the south side of 57th) provides more opportunities for variation in materials and style: Pedestrian-scale lighting: • Staff’s initial proposal is to install the same lighting we use in Becker Park. • There are many other styles available, If the Council prefers a different style. • Generally, we would not recommend old-style lighting (like Robbinsdale uses) because this is not (and never will be) an historic downtown. • The 60% plans show only five lights along the south side of 57th, but if photometrics show more lighting is needed, then that change would be reflected in the next step (90% plans). Decorative concrete: • Staff recommends either replicating the existing multicolor red-gray concrete pattern from the Bass Lake Road streetscape, or using a patterned, sandstone-colored concrete. • There are other options of course, but staff is suggesting these two options because the red-gray pattern would provide continuity with the nearby streetscape area, while a sandstone pattern would come closer to simulating a natural appearance. • We can of course get more creative, but that would likely increase costs. Lighting examples and three sandstone colored concrete options are attached, along with excerpts from the 60% plans. Staff is requesting Council feedback and discussion. City of Crystal - TIF District Sidewalk & Lighting Upgrades LIGHTING BEGA, Indirect pole-top luminaire Lumenpulse, Lumenalta - Directional light columnForms+Surfaces, Vao light BEGA, Edge-lit pole-top luminaire UOUOUOUGGGGGGGGREVERE 8745 PARTNERS LLC 5701 WEST BROADWAY PID: 0511821420035 NEW HORIZON RL EST DEV 6 LLP 7000 57TH AVE N PID: 0511821420063 57TH AVE N AVE NA A X GGGGGGGGGGGGGD D S S GGGGGGGGGGGGGGGC C C C C C C C C C C C D S F F F F F LEASE BROADWAY NAO LLC 5747 WEST BROADWAY PID: 0511821420081 5755 W BROADWAY LLC 5755 WEST BROADWAY PID: 0511821420060 SFR II BORROWER 2021-3 LLC 5762 WEST BROADWAY PID: 0511821420053 NYSSA ANN JORENBY & KYLE SKELLENGER 5756 WEST BROADWAY PID: 0511821420001 JOSEPH SQUIRES 5744 WEST BROADWAY PID: 0511821420014 E E U E VF VC U E E E E C E C E E E E O U O UOUOU OUOUOUOUOUOUOUEEEE E E E E E E E E GGGGGGGGS DDD GGGGGGGGGGGGC C C C C C C C CC C C C C C C C C C C C C C C C C C S D D F F F F F F F F F F F F F F E E E E E E E E E E E E E E E E E E EEE E E E E CRYSTAL STATE BANK 7000 56TH AVE N PID: 0511821420032 SCHUMEISTER PRO HOLDINGS LLC 6918 56TH AVE N PID: 0511821420075 CNL FUNDING 200O-A L P 6830 56TH AVE N PID: 0511821420069 F L BAER & F M BAER TRUSTEES 5629 WEST BROADWAY PID: 0511821420064 BASS LK RD RETAIL ASSOC LLC 5600 WEST BROADWAY PID: 0511821420078 BASS LK RD RETAIL ASSOC LLC 5640WEST BROADWAY PID: 0511821420077 REVERE 8745 PARTNERS LLC 5701 WEST BROADWAY PID: 0511821420035 NEW HORIZON RL EST DEV 6 LLP 7000 57TH AVE N PID: 0511821420063 SHEET Bolton & Menk, Inc. 2026, All Rights ReservedcH:\CRYS\26X142444000\CAD\C3D\142444C601.dwg 6/8/2026 4:45:06 PM Plotted by: Karth WhitesideDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.CITY OF CRYSTAL, MINNESOTA 2026 SIDEWALK & LIGHTING UPGRADE 26X.142444.000DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PHILIP J. SCHRUPP 54198 05/XX/2026 KJW KJW PJS R 2638 SHADOW LANE, SUITE 200 CHASKA, MN 55318 Phone: (952) 448-8838 Email: Chaska@bolton-menk.com www.bolton-menk.comDRAFT R R C6.01 CONSTRUCTION PLANFEETSCALE 0 10 20 HORZ. 57TH AVE N W BROADWAY / C SAH 8W BROADWAY / C SAH 8 KENT U C KY A VE NJERSEY AVE N58TH AVE N 4" CONCRETE WALK SPECIAL CONSTRUCTION LEGEND BITUMINOUS PATCH SPECIAL CONSTRUCTION LIMITS 4" CONCRETE WALK B618 CONCRETE CURB & GUTTER 6" CONCRETE WALK 8" CONCRETE PAVEMENT LEGEND A CONSTRUCT PEDESTRIAN CURB RAMP (SEE MnDOT STANDARD PLAN 5-297.250) NOTE: 1.CONSTRUCT ALL SIDEWALK AT W BROADWAY/CSAH 8 HALF AT A TIME. COORDINATE WITH ENGINEER IN THE FIELD. A A A A A A A A A DDD CRYSTAL STATE BANK 7000 56TH AVE N PID: 0511821420032 SCHUMEISTER PRO HOLDINGS LLC 6918 56TH AVE N PID: 0511821420075 CNL FUNDING 200O-A L P 6830 56TH AVE N PID: 0511821420069 0"0"0"0" FF F 0+00 0 BP: 0+00.00PC: 0+12.06PT: 0+43.43 EP: 0+48.45 0+000 BP: 0+00.00 PC: 0+02.46 PT: 0+34.24EP: 0+42.56F 865 870 875 880 865 870 875 880 0+00 0+50872.2871.6872.25871.56865 870 875 880 865 870 875 880 0+00 0+50872.1871.4872.08871.38-1.90%1.68%VPI: 0+00.00EL: 872.25VPI: 0+28.37EL: 871.71VPI: 0+48.45EL: 872.05-1.63%VPI: 0+00.00EL: 872.08VPI: 0+42.56EL: 871.38SHEET Bolton & Menk, Inc. 2026, All Rights ReservedcH:\CRYS\26X142444000\CAD\C3D\142444C603.dwg 6/8/2026 4:45:17 PM Plotted by: Karth WhitesideDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.CITY OF CRYSTAL, MINNESOTA 2026 SIDEWALK & LIGHTING UPGRADE 26X.142444.000DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PHILIP J. SCHRUPP 54198 05/XX/2026 KJW KJW PJS R 2638 SHADOW LANE, SUITE 200 CHASKA, MN 55318 Phone: (952) 448-8838 Email: Chaska@bolton-menk.com www.bolton-menk.comDRAFT R C6.02 INSTERSECTION DETAIL 57TH AVE N JERSEY AVE NCONSTRUCT CONCRETE CURB & GUTTER LEGEND DRAINAGE GRADE SPOT ELEVATION PROPOSED DRAINAGE STRUCTURE PROPOSED HYDRANT PROPOSED VALVE EXISTING DRAINAGE STRUCTURE EXISTING VALVE X.X% XXX.XX STREET LIGHT X" TRUNCATED DOMES (SEE MnDOT STANDARD PLATE 7038) CURB HEIGHT LANDING AREA - 4' X 4' MIN. DIMENSIONS AND 1.0% OPTIMUM (2.0% MAXIMUM) SLOPE IN ALL DIRECTIONS PEDESTRIAN RAMP SLOPE SHALL BE 7.0% OPTIMUM (5.0% MIN. AND 8.3% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) PEDESTRIAN RAMP SLOPE SHALL BE 4.0% OPTIMUM (2.0% MIN. AND 5.0% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) TRANSITION PANEL(S) - TO BE USED FOR TRANSITIONING THE CROSS-SLOPE OF A RAMP TO THE EXISTING WALK CROSS-SLOPE. RATE OF TRANSITION SHOULD BE 0.5% PER 1 LINEAR FOOT OF WALK. F S T PEDESTRIAN RAMP LEGEND PROFILE LOCATION & ELEVATION AT BACK OF CURB 57TH AVE & JERSEY AVE SW QUAD 57TH AVE & JERSEY AVE SE QUAD 57TH AVE & JERSEY AVE SW QUAD 57TH AVE & JERSEY AVE SE QUAD FEETSCALE 0 10 20 HORZ. FEETSCALE 25 50 HORZ. FEETSCALE 0 5 10 VERT. E E E VF E E E E C E C E E E O U O U OUOUOU OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUS D D F L BAER & F M BAER TRUSTEES 5629 WEST BROADWAY PID: 0511821420064 BASS LK RD RETAIL ASSOC LLC 5640WEST BROADWAY PID: 0511821420077 REVERE 8745 PARTNERS LLC 5701 WEST BROADWAY PID: 0511821420035 0"0"0"0"0"0"0 " 0 " 0" 0" 6" 6 " 6 "6"6"6" 6 " F F F S S S F F F 0+00 0 BP: 0+00.00EP: 0 + 5 3. 6 7 0 + 0 0 0 BP: 0 + 0 0. 00 PC: 0+1 7.40PT: 0+41.36EP: 0+51.100+00 0 BP: 0+00 .00 PT: 0+ 1 6. 2 5 EP: 0+ 2 6. 5 4 0 PC: 0 + 43. 7 5EP: 0+86.54865 870 875 880 865 870 875 880 0+00 1+00871.3871.2871.1871.30871.17871.120.32%VPI: 0+25.00EL: 871.30VPI: 0+86.54EL: 871.50865 870 875 880 865 870 875 880 0+00 1+00871.1871.1870.9871.14871.05870.92-0.44%VPI: 0+00.00EL: 871.14VPI: 0+53.67EL: 870.91865 870 875 880 865 870 875 880 0+00 0+50871.8871.4871.84871.38-1.73%VPI: 0+00.00EL: 871.84VPI: 0+26.54EL: 871.38865 870 875 880 865 870 875 880 0+00 1+00871.2871.1871.9871.18871.10871.921.60%VPI: 0+00.00EL: 871.18VPI: 0+51.10EL: 872.00SHEET Bolton & Menk, Inc. 2026, All Rights ReservedcH:\CRYS\26X142444000\CAD\C3D\142444C603.dwg 6/8/2026 4:45:08 PM Plotted by: Karth WhitesideDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.CITY OF CRYSTAL, MINNESOTA 2026 SIDEWALK & LIGHTING UPGRADE 26X.142444.000DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PHILIP J. SCHRUPP 54198 05/XX/2026 KJW KJW PJS R 2638 SHADOW LANE, SUITE 200 CHASKA, MN 55318 Phone: (952) 448-8838 Email: Chaska@bolton-menk.com www.bolton-menk.comDRAFT R C6.03 INTERSECTION DETAIL 57TH AVE N W BROADWAY / C SAH 8 CONSTRUCT CONCRETE CURB & GUTTER LEGEND DRAINAGE GRADE SPOT ELEVATION PROPOSED DRAINAGE STRUCTURE PROPOSED HYDRANT PROPOSED VALVE EXISTING DRAINAGE STRUCTURE EXISTING VALVE X.X% XXX.XX STREET LIGHT X" TRUNCATED DOMES (SEE MnDOT STANDARD PLATE 7038) CURB HEIGHT LANDING AREA - 4' X 4' MIN. DIMENSIONS AND 1.0% OPTIMUM (2.0% MAXIMUM) SLOPE IN ALL DIRECTIONS PEDESTRIAN RAMP SLOPE SHALL BE 7.0% OPTIMUM (5.0% MIN. AND 8.3% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) PEDESTRIAN RAMP SLOPE SHALL BE 4.0% OPTIMUM (2.0% MIN. AND 5.0% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) TRANSITION PANEL(S) - TO BE USED FOR TRANSITIONING THE CROSS-SLOPE OF A RAMP TO THE EXISTING WALK CROSS-SLOPE. RATE OF TRANSITION SHOULD BE 0.5% PER 1 LINEAR FOOT OF WALK. F S T PEDESTRIAN RAMP LEGEND PROFILE LOCATION & ELEVATION AT BACK OF CURB 57TH AVE & W BROADWAY NW QUAD 57TH AVE & W BROADWAY NE QUAD 57TH AVE & W BROADWAY SE QUAD 57TH AVE & W BROADWAY SW QUAD 57TH AVE & W BROADWAY NW QUAD 57TH AVE & W BROADWAY NE QUAD 57TH AVE & W BROADWAY SW QUAD 57TH AVE & W BROADWAY SE QUAD FEETSCALE 0 10 20 HORZ. FEETSCALE 25 50 HORZ. FEETSCALE 0 5 10 VERT. XXXXDDSSDSLEASE BROADWAY NAO LLC 5747 WEST BROADWAY PID: 05118214200815755 W BROADWAY LLC 5755 WEST BROADWAY PID: 0511821420060 0+001+00 1 BP: 0+00.00 PT: 0+31.12PC: 1+00.26EP: 1+32.36 0"0"0" 0"6"6" 865 870 875 880 865 870 875 880 0+00 1+00 1+50872.9873.0872.9872.9872.9873.5872.87872.98872.95872.91872.85873.470.52%VPI: 0+00.00EL: 872.87VPI: 1+32.36EL: 873.56SHEET Bolton & Menk, Inc. 2026, All Rights ReservedcH:\CRYS\26X142444000\CAD\C3D\142444C603.dwg 6/8/2026 4:44:45 PM Plotted by: Karth WhitesideDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.CITY OF CRYSTAL, MINNESOTA 2026 SIDEWALK & LIGHTING UPGRADE 26X.142444.000DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PHILIP J. SCHRUPP 54198 05/XX/2026 KJW KJW PJS R 2638 SHADOW LANE, SUITE 200 CHASKA, MN 55318 Phone: (952) 448-8838 Email: Chaska@bolton-menk.com www.bolton-menk.comDRAFT RC6.04 INTERSECTION DETAIL FEETSCALE 0 10 20 HORZ. W BROADWAY / CSAH 8 KENTUCKY AVE NCONSTRUCT CONCRETE CURB & GUTTER LEGEND DRAINAGE GRADE SPOT ELEVATION PROPOSED DRAINAGE STRUCTURE PROPOSED HYDRANT PROPOSED VALVE EXISTING DRAINAGE STRUCTURE EXISTING VALVE X.X% XXX.XX STREET LIGHT X" TRUNCATED DOMES (SEE MnDOT STANDARD PLATE 7038) CURB HEIGHT LANDING AREA - 4' X 4' MIN. DIMENSIONS AND 1.0% OPTIMUM (2.0% MAXIMUM) SLOPE IN ALL DIRECTIONS PEDESTRIAN RAMP SLOPE SHALL BE 7.0% OPTIMUM (5.0% MIN. AND 8.3% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) PEDESTRIAN RAMP SLOPE SHALL BE 4.0% OPTIMUM (2.0% MIN. AND 5.0% MAX.) IN THE DIRECTION SHOWN AND CROSS SLOPE SHALL BE 1.5% OPTIMUM (2.0% MAX.) TRANSITION PANEL(S) - TO BE USED FOR TRANSITIONING THE CROSS-SLOPE OF A RAMP TO THE EXISTING WALK CROSS-SLOPE. RATE OF TRANSITION SHOULD BE 0.5% PER 1 LINEAR FOOT OF WALK. F S T PEDESTRIAN RAMP LEGEND PROFILE LOCATION & ELEVATION AT BACK OF CURB FEETSCALE 25 50 HORZ. FEETSCALE 0 5 10 VERT. FF U E VF VC U E E C E C E E E >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lllllO U O UOUOU OUOUOUOUOUOUOUXOUEEEE E E E E E E E E GGGGGGGGGGGGGGGGGGGl l S DD S D DGGGGGGGGG GGC C C C C D D > > > > > > > > > l l l l l l l l l l l F F F F > > > > > > > > > > > > > > > > > > > > E E E E E E E E E CRYSTAL STATE BANK 7000 56TH AVE N PID: 0511821420032 SCHUMEISTER PRO HOLDINGS LLC 6918 56TH AVE N PID: 0511821420075 SCHUMEISTER PRO HOLDINGS LLC 6918 56TH AVE N PID: 0511821420074 CNL FUNDING 200O-A L P 6830 56TH AVE N PID: 0511821420069 F L BAER & F M BAER TRUSTEES 5629 WEST BROADWAY PID: 0511821420064 TKG III ACQUISTION LP 5702 WEST BROADWAY PID: 0511821420082 REVERE 8745 PARTNERS LLC 5701 WEST BROADWAY PID: 0511821420035 NEW HORIZON RL EST DEV 6 LLP 7000 57TH AVE N PID: 0511821420063 B A SHEET Bolton & Menk, Inc. 2026, All Rights ReservedcH:\CRYS\26X142444000\CAD\C3D\142444E102.dwg 6/8/2026 4:45:00 PM Plotted by: Karth WhitesideDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.CITY OF CRYSTAL, MINNESOTA 2026 SIDEWALK & LIGHTING UPGRADE 26X.142444.000DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PHILIP J. SCHRUPP 54198 05/XX/2026 KJW KJW PJS R 2638 SHADOW LANE, SUITE 200 CHASKA, MN 55318 Phone: (952) 448-8838 Email: Chaska@bolton-menk.com www.bolton-menk.comDRAFT R E1.08 LIGHTING PLANFEETSCALE 0 10 20 HORZ. 57TH AVE N W BROADWAY / C SAH 8JERSEY AVE N2" NON-METALLIC CONDUIT (UNLESS NOTED OTHERWISE) F&I HANDHOLE F&I SERVICE CABINET TYPE - L1 F&I EQUIPMENT PAD B LEGEND LIGHTING UNIT TYPE SPECIAL 1 LIGHT FOUNDATION DESIGN E MOD PERMANENT GROUND ROD (25 OHMS OR LESS) A 5 A 4 A 3 A 2 A 1 SOURCE OF POWER: GROUND MOUNTED TRANSFORMER (EXCEL ENERGY) 2" NMC FROM SOP WITH: 3-1/C#2 A FEED POINT "A" TYPE L2 SERVICE CABINET DOOR TO FACE AWAY FROM KENTUCKY AVE 120/240V (METERED) 2" NMC 1-3/C #2 THWN WITH GROUND TO S.O.P. B HH 1 HH 2 12-1/C #8 2-1/C #8 INS. GR. 6-1/C #8 1-1/C #8 INS. GR. 6-1/C #8 1-1/C #8 INS. GR. 6-1/C #8 1-1/C #8 INS. GR. Page 1 of 5 COUNCIL STAFF REPORT DATE: June 11, 2026 FROM: John Sutter, Community Development Director TO: Mayor and City Council City Manager Adam R. Bell RE: Decorative concrete options for Douglas Drive medians (2027 project) Hennepin County will be improving Douglas Drive over the next several years: • In 2027, the county will upgrade pedestrian ramps at several intersections, remove right turn lanes at 36th Ave. N. and 42nd Ave. N., replace existing medians at 36th and 42nd, add medians near the pedestrian crossings at 32nd Ave. N., 38th Ave. N., and Fairview Ave. N., and add an RRFB pedestrian crossing warning light at Fairview Ave. N. • In approximately 2028-2030, concurrent with a Joint Water Commission watermain replacement project, the pavement will be reclaimed, which in terms of project scope is more extensive than a mill & overlay but less than a full reconstruction project. The city has previously identified these Douglas Drive projects as opportunities for beautification. While the removal of the right turn lanes will create space for landscaping near the 36th and 42nd intersections, actual installation of the landscaping should wait until during or after completion of the 2028-2030 project. However, the 2027 project does provide an opportunity to use decorative concrete instead of standard concrete on the medians. Staff proposes to use the same decorative concrete on Douglas that will be used for the TIF- funded improvements along 57th Avenue. The options suggested by staff are to replicate the existing multicolor red-gray concrete pattern from the Bass Lake Road streetscape, or use a patterned, sandstone-colored concrete. There are other options of course, but staff is suggesting these two options because the red-gray pattern would provide continuity with another area of the city, and patterned sandstone would come closer to simulating a natural appearance. Staff requests Council feedback on these two median treatment options and discussion of other options as applicable to the Douglas Drive medians. Page 2 of 5 Location Map - 2027 HSIP Project Page 3 of 5 32nd Avenue - New Median Enhancement Opportunity (orange) 36th Avenue - Median Enhancement Opportunity (orange) (Future landscaping opportunity in green) Page 4 of 5 38th Avenue - New Median Enhancement Opportunity (orange) 42nd Avenue - Median Enhancement Opportunity (orange) (Future landscaping opportunity in green) Page 5 of 5 Fairview Avenue - New Median Enhancement Opportunity (orange) Page 1 of 3 COUNCIL STAFF REPORT DATE: June 11, 2026 FROM: John Sutter, Community Development Director TO: Mayor and City Council City Manager Adam R. Bell RE: Holiday lighting update A. BACKGROUND In 2025, Public Works wrapped two of the city’s decorative street light poles with holiday lights. This was intended as a demonstration to help the Council determine whether it would enhance the appearance of downtown Crystal and create a more welcoming environment. The Council’s reaction was positive and additional lighting was included in the 2026 EDA work plan (excerpt below with status updates). Page 2 of 3 B. PROPOSED PROJECT Staff proposes to wrap all of the decorative street light poles in the Bass Lake Road/West Broadway area (downtown Crystal). There are 50 poles in this area, although two are being temporarily removed by Yellow Tree for their redevelopment of 7000 56th, so the contractor would wrap 48 poles. The strands used for the 2025 demonstration project would be installed on the two poles by the Yellow Tree site once they are reinstalled. Page 3 of 3 Staff recommends year-round lighting instead of seasonal holiday lighting. The area could use a more festive vibe year-round, not just in November-January. And because the circuits are controlled by the street light photocells, they would only be on from dusk to dawn. At two 70-bulb strands per pole and 4.8 watts per strand, and an average of 12 hours of operation per day, the annual power consumption would be 2,018 kilowatt hours which would cost $273 at current Xcel rates. C. PROPOSALS RECEIVED So far, only one proposal has been received. The amount would be approximately $5,000 and the lights would have an estimated average life span of five years. In addition, city staff would check each of the receptacles to verify that they are functional. Any that have failed would be replaced by the city’s electrical contractor at a cost of approximately $140 per replacement. Staff is seeking at least one other proposal but it is unlikely that it will be lower than the one already received. D. COUNCIL DISCUSSION REQUESTED Because the cost would be less than $25,000 and it’s in the EDA work plan for 2026, staff can proceed without additional Council or EDA authorization. That said, staff would like feedback from the Council on the following questions before proceeding: Are you comfortable with this being a permanent, year-round installation instead of seasonal set up and take down? Should we proceed with wrapping all 48 decorative light poles, or a smaller number of poles? Do you have any other questions or concerns before we proceed?