Loading...
2026.05.19 Council Meeting Packet 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov Posted: May 15, 2026 City Council Meeting Schedule Tuesday, May 19, 2026 Time Meeting Location 6:30 p.m. City council work session to discuss: 1. Commission candidate interviews: • Alex Willard – Employee Review Board. • Daniel Hron – Sustainability Commission. 2. Draft Climate Action Plan follow-up discussion. 3. Council liaison update.* 4. Constituent issues update.* 5. City manager update.* 6. New business.* 7. Council comments and announcements.* Upper Community Room/Zoom 7 p.m. City council meeting Council Chambers/Zoom Immediately following the city council meeting Continuation of city council work session, if necessary Upper Community Room/Zoom Per the requirements of Minnesota Statutes, Section 13D.02, council members may participate by interactive technology. The public may attend the meetings via Zoom by connecting through one of the methods identified below. Topic: Crystal City Council work session and regular meeting Time: May 19, 2026, 6:30 p.m., Central Time (US and Canada) Join Zoom meeting: https://us02web.zoom.us/j/84934029300?pwd=nXwZbjiFkVB5xq5ENLeIOka0abTyYU.1 Meeting ID: 849 3402 9300 | Passcode: 4141 Find your local number: https://us02web.zoom.us/u/km5Q3UcXP Auxiliary aids are available upon request to individuals with disabilities by calling the city clerk at (763) 531-1145 at least 96 hours in advance. TTY users may call Minnesota Relay at 711 or 1-800-627-3529. 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov Posted: May 15, 2026 City Council Work Session Agenda Tuesday, May 19, 2026 | 6:30 p.m. Upper Community Room/Zoom Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the Crystal City Council work session was held on Tuesday, May 19, 2026, at _____ p.m. electronically via Zoom and in the upper community room at city hall, 4141 Douglas Dr. N., Crystal, Minnesota. If the agenda items are not completed in time for the regular city council meeting at 7 p.m., the meeting will be continued and resumed immediately following the city council meeting. I. Attendance Council members Staff ____ Kamish ____ Bell ____ Kunde ____ Kiser ____ Tierney ____ Struve ____ Onesirosan ____ Therres ____ Sutter ____ Budziszewski ____ Elholm ____ Serres ____ Cummings ____ Hubbard ____ Deshler ____ Eidbo II. Agenda The purpose of the work session is to discuss the following agenda items: 1) Commission candidate interviews: • Alex Willard – Employee Review Board. • Daniel Hron – Sustainability Commission. 2) Draft Climate Action Plan follow-up discussion. 3) Council liaison reports.* 4) Constituent issues update.* 5) City manager update.* 6) New business.* 7) Council comments and announcements.* III. Adjournment The work session adjourned at ______ p.m. * Denotes no supporting information included in the packet. Auxiliary aids are available upon request to individuals with disabilities by calling the city clerk at (763) 531-1145 at least 96 hours in advance. TTY users may call Minnesota Relay at 711 or 1-800-627-3529. DATE: TO: FROM: SUBJECT: May 15, 2026 Mayor and City Council Adam R. Bell, City ManagerSarah Nissen, Administrative Program Specialist Draft Climate Action Plan Strategies and Actions for Council Review Overview Attached for your review is a draft of the proposed strategy statements and supporting actions for the City’s Climate Action Plan, prepared in coordination with the City’s climate action plan consultant, paleBLUEdot. The attached draft is intended to provide a high-level overview of the proposed direction, themes, and organizational structure of the Climate Action Plan. The strategies and supporting actions are still being refined and will continue to evolve based on Council feedback, community input, and ongoing staff and consultant review. The consultant team is currently working toward completion of the full draft Climate Action Plan. A preview of the draft plan was presented at the May 14th Council work session summarizing the overall framework, major themes, and recommended actions. That presentation is also attached. At this stage of the process, staff is seeking Council review and initial feedback on the draft strategies and supporting actions. Each of the 119 Action Items needs to be prioritized into four categories: 1)The city should prioritize this strategy in the next 10 years. 2)The city should consider this strategy if feasible and resources are or become available. 3)The city should consider this strategy as aspirational, but may not be feasible within the proposed time frame. 4)The city should not consider this strategy due to policy, fiscal, or feasibility challenges. Staff will provide its perspective and feedback as well for each of the strategies. The final list will become part of the final Climate Action Plan. Memorandum TL 1: Decrease community wide Vehicle Miles Traveled (VMT) by 5% by 2035 TL 1- 1 Adopt a Complete Streets policy to formalize the City’s commitment to safe, accessible streets for people of all ages and abilitfes, with flexible guidance that considers network and surrounding context to balance all travel modes in street projects. TL 1- 2 Following adoptfon of a Complete Streets Policy, conduct a community-wide assessment to determine current compliance, set improvement targets, and prioritfze upgrades. TL 1- 3 Identffy streets where a “road diet" (a reductfon in the number of travel lanes and/or effectfve street width, replacement of car lanes with bike lanes) would achieve systemic improvements and establish a tfmeline to implement road diets. TL 1- 4 Offer incentfves—such as density bonuses, or reduced parking requirements—for mixed-use developments that commit to sustainable transportatfon practfces, including pedestrian and bicycle priority, enhanced bike parking, EV charging, discounted transit passes, and appropriately priced parking. TL 1- 5 Adopt or strengthen antf-idling measures for City operatfons and public educatfon on antf-idling requirements and benefits. TL 2: Increase bicycle commuting and bike lane miles within the city by 100% by 2035. (Goal represents incresing bicycle commutfng from 0.04% to at least 0.08%according to US Census 5 year estfmates and increasing bike lanes from 8.9 to at least 18 miles in the city) TL 2- 1 Develop a City of Crystal Bike and Pedestrian Plan to guide the development of a more connected network of protected and dedicated bike and pedestrian facilitfes with increased safe road crossings, prioritfzing safe connectfons to schools, parks, transit, and commercial areas. Implement recommended infrastructure chagnes by 2035. TL 2- 2 Explore partnerships to create a Crystal Bike Hub offering mentorship, bike loans or earn-a-bike programs, guided rides, and opportunitfes for residents to learn about effectfve bike commutfng in Crystal, and connect through cycling. TL 2- 3 Collaborate with Robbinsdale Area Public Schools to conduct Safe Routes to Schools audits for all schools to identffy infrastructure improvements that enhance pedestrian and bicycle safety, expand bike safety educatfon for students through public workshops and web content, and explore "walking school buses." TL 2- 4 Collaborate with Xcel Energy and other partners to promote and expand incentfves for eBike adoptfon, including low-cost loan or bulk-purchase programs to reduce costs. TL 2- 5 Host community challenges, events, or incentfve programs each year that encourage and celebrate walking and biking. TL 2- 6 Create financial and zoning incentfves to expand convenient bike parking at commercial and multffamily developments and encourage sitfng near existfng transit and bike share statfons where feasible. TL 3: Increase public transit commuter ridership from 3.5% to 7% by 2035. TL 3- 1 Explore opportunitfes to expand use of Transit Oriented Development (TOD) overlays to increase transit-friendly mixed use development, such as 42nd Avenue, and the node at Douglas and 36th Street. TL 3- 2 Preserve and expand affordable housing, especially near bus service, to prevent displacement of vulnerable populatfons through equity-focused TOD overlays, community benefits agreements, or other zoning and land use tools. TL 3- 3 Contfnue to improve availability and safety of first- and last-mile transit access through sidewalks, crossings, bike connectfons, shared mobility, and supportfve land use around transit corridors. TL 3- 4 Partner with Metro Transit, Robbinsdale Area Public Schools, Hennepin County and others to increase availability of educatfonal materials and promotfon of public transit optfons and resources. TL 3- 5 Advocate for better bus frequency, reliability, efficiency, and shelters (especially on streets without sidewalks). Work with Metro Transit and Hennepin County to expand dedicated lanes, routes, and high-frequency service that improves travel-tfme equity with driving, prioritfzing routes serving low-income areas, employment centers, and people with mobility challenges. TL 3- 6 Collaborate with partners and service providers to introduce EV car share, e-bike share, or scooter share near retail and business areas, prioritfzing locatfons near transit to support first- and last-mile connectfons. Require programs to provide proper use and safety educatfon resources. TL 4: Increase average population per developed acre 4% by 2035 (from 8.5 to 8.85 ppl/acre) TL 4- 1 Use the Comprehensive Plan process to identffy vacant or underused land and assess opportunitfes for higher-density development, improved walkability, better transit access, or additfonal greenspace. TL 4- 2 Contfnue and increase awareness of Accessory Dwelling Units (ADU) to encourage their use, such as by establishing an example ADU library to promote their use. TL 4- 3 Explore ordinance changes such as eliminatfon or reductfon of R-1 zoning and other barriers that limit compact, walkable, and transit- supportfve development. TL 4- 4 Contfnue to evaluate parking minimums/maximums to reduce the underutflized surface parking and impervious surfaces throughout the city. TL 4- 5 Explore Cluster Development zoning ordinance revisions to support flexible, compact residentfal development that preserves open space, strengthens environmental protectfon, and reduces infrastructure costs. Transportation and Land Use TL 5: Increase battery electric vehicle (BEV) use to 15% of vehicles on the road by 2035 (from approximately 146 vehicles to 2,555 vehicles citywide). TL 5- 1 Develop a citywide EV Roadmap that assesses charging needs, including e-bikes and e-scooters, forecasts demand, identffies priority locatfons, and guides expansion across public, residentfal, multffamily, and commercial areas using emerging technologies. Include a City EV infrastructure master plan for municipal propertfes with a phased installatfon tfmeline. TL 5- 2 Implement an "EV Ready" building ordinance that requires new developments to have wiring capacity to charge electric vehicles and establish minimum EV parking requirements. TL 5- 3 Collaborate with Xcel Energy and other partners to promote and expand incentfves for electric vehicles (EVs), and charging infrastructure for residents and businesses, including low-cost loan or bulk-purchase programs to reduce costs. TL 5- 4 Promote existfng, or develop, equitable incentfve programs to replace gas-powered lawn equipment with electric alternatfves for residentfal and non-residentfal users. TL 5- 5 Use waste hauler licensing or organized collectfon agreements to encourage, or require, the use of zero-emission waste hauler fleet vehicles serving Crystal, targetfng 10% or greater zero emission fleets by 2035. TL 6: Reduce City fleet vehicle emissions and fuel use by achieving 20% EV conversion of non -emergency gasoline vehicles, converting 50% of diesel use to renewable fuels, and increasing remaining combustion fleet fuel efficiency by 5% by 2035. TL 6- 1 Conduct an Electric Vehicle Suitability Assessment (EVSA) for the City fleet to identffy viable electric and alternatfve-fuel replacements in the near, mid, and long term to meet the goals of this plan. Include City lawn and snow equipment in assessment.. TL 6- 2 Update City vehicle purchasing policies to default all purchases to zero emission electric/alternatfve fuels, with combustfon (ICE) vehicles allowed only with documented need and emissions impacts considered. TL 6- 3 Implement an EV pilot project to evaluate vehicle use for police vehicles. EV pilot projects may be implemented through short-term vehicle trials provided by vehicle supply partners, term lease vehicles, or purchase. Example: City of Edina and City of Roseville EV police patrol vehicle TL 6- 4 Develop a diesel transitfon plan that prioritfzes renewable diesel or other lower-carbon fuels where electrificatfon is not yet feasible. TL 6- 5 Install fleet telematfcs monitoring on all City of Crystal fleet vehicles (or at a minimum one vehicle for each vehicle class and use case within the fleet). Use the telematfcs data to identffy on-going zero emission vehicle conversion optfons as well as fuel efficiency improvement opportunitfes and targets. Transportation and Land Use BE 1: Improve total Citywide building energy efficiency 5% for electricity and 15% for natural gas by 2035. BE 1- 1 Develop an energy benchmarking and reportfng program for commercial and multffamily buildings using ENERGY STAR Portiolio Manager or B3 Benchmarking. Explore benefits of making program voluntary or required. BE 1- 2 Explore optfons to further discount the cost of Xcel Home Energy Squad visits for all households or offer free for income-qualified households. BE 1- 3 Contfnue to partner with Xcel Energy to promote household partfcipatfon in the Home Energy Squad program. Goal: 100 households annually. BE 1- 4 Establish an annual "Crystal Energy Challenge" competftfon, or actfvely promote partfcipatfon in Hennepin County challenges, to motfvate partfcipatfon in energy efficiency programs. Establish annual targets of households/businesses to reach and award incentfves for top efficiency achievements. Collaborate with Xcel energy for the program and tracking engagement. BE 1- 5 Explore ordinance modificatfons, such as density bonuses, to incentfvize high performance or net zero constructfon. BE 1- 6 Partner with groups such as Citfzens Utflity Board to host regular utflity bill clinics that help residents understand their bills, find savings, apply for rebates, connect to energy and weatherizatfon assistance, and access discounted efficiency products. BE 2: Increase adoption of high performance building construction technology, achieving 1/2% Net Zero buildings citywide by 2035. (Net Zero buildings are energy efficient buildings that produce as much energy on -site as they consume in a year) BE 2- 1 After adoptfon of the 2026 State Building Code, establish and promote a voluntary Crystal Stretch Energy Code to encourage high-efficiency constructfon. Provide informatfon about the stretch code with all zoning and building applicatfons, encourage voluntary adoptfon, and consider requiring projects receiving City financial incentfves to meet or exceed it. Goal: by 2032, 15% of new residentfal and non-residentfal building permits are Net Zero or Net Zero Ready. BE 2- 2 Create a Net Zero Energy Building Guide, or compile existfng resources, to help building owners, renters, developers, designers, and contractors plan new constructfon and renovatfons that achieve Net Zero Energy or are Net Zero Energy ready. Include a project checklist for identffying and documentfng sustainable design and constructfon strategies. BE 2- 3 Consider development guidance, incentfves, or policy updates that encourage high-performance buildings beyond minimum code. BE 2- 4 Incorporate clean energy standards and requirements into the planned unit development (PUD) ordinance. BE 3: Achieve "fuel switching" of 20% of buildings using on -site fossil fuel combustion to electrification or renewable fuels by 2035. (13.2% of existfng households use electric heat according to census and natural gas utflity data. Goal would result in 33.2% of households using electric heat). BE 3- 1 Launch an annual Electrificatfon & Energy Efficiency Group Purchase Campaign to lower costs and increase adoptfon. This actfon may be combined with a renewable energy group purchase program. Target: 50 households and 5 businesses per year. BE 3- 2 Partner with Xcel Energy, Hennepin County and others to develop programs or incentfves that reduce electrificatfon barriers for income- qualified households and rental propertfes. BE 3- 3 Collaborate with the Electrify Everything Minnesota campaign to educate community and promote the benefits of electrificatfon. BE 4: Increase customer owned or purchased renewable electricity to 20% of citywide building electric use by 2035 (10% on-site and 10% green source purchase - existfng is 1.5% on-site and 1.5% green source purchase). BE 4- 1 Collaborate with Xcel Energy to increase awareness of available renewable energy purchasing optfons for customers. BE 4- 2 Establish a Solar Ready Home Certfficatfon, or a Solar Ready Ordinance to require all commercial, instftutfonal, and multf-family buildings to be solar-ready. Support actfon with Solar-Ready Guide and checklist. Goal 100% solar ready new constructfon by 2035. BE 4- 3 Coordinate an annual Solar Group Purchase Campaign to reduce installatfon costs through bulk buying, designed with an equity focus and support for small local installers. Goal: 40 households annually; may be combined with electrificatfon and efficiency group purchase programs. BE 4- 4 Increase solar permitting ease by becoming a SolSmart Silver or Gold level city. Collect and maintain data on solar array name plate capacitfes and estfmated annual generatfon to support community-wide goal progress tracking. BE 4- 5 Partner with Xcel Energy, Hennepin County and other local organizatfons to provide informatfon, resources, and technical assistance on renewable energy systems and available incentfves and distribute them through print, realtors, and an online hub. BE 5: Improve total municipal building energy efficiency 5% for electricity and 15% for natural gas by 2035. (including City-owned water and wastewater infrastructure). BE 5- 1 Adopt a policy requiring municipal buildings to meet energy efficiency standards that support plan goals, such as a designated ENERGY STAR scores, SB 2030 or LEED. Apply the standards to new constructfon and major renovatfons, and incorporate Net Zero Energy goals into design, constructfon, and request for proposal (RFP) processes. BE 5- 2 Based on the City’s 2026 City Facility Solar Feasibility Assessment and Master Plan, conduct detailed energy assessments for all Energy Benchmark Priority 1 facilitfes within 1–2 years and Priority 2 facilitfes within 4 years, identffying upgrades needed to meet or exceed Minnesota energy code and achieve an ENERGY STAR score of 75 or higher. Implement upgrades within 5 years. BE 5- 3 Contfnue conversion of City-owned streetlights and signals to LED. Complete 100% conversion by 2035. Encourage electric utflitfes to convert all utflity-owned streetlights to LED. BE 6: Achieve 50% municipal building renewable electricity use and 30% "fuel switching" from on -site fossil fuel combustion to electrification by 2035. (renewable electricity to include on-site and green source purchase) BE 6- 1 Adopt a policy for all new municipal buildings to meet a zero on-site fossil fuel combustfon standard. BE 6- 2 Based on the City’s 2026 City Facility Solar Feasibility Assessment and Master Plan, issue one or more design-build RFPs for Priority 1 and Priority 2 solar sites using a competftfve process. Request proposals for direct purchase, financing, and third-party delivery models, and consider bundling sites to reduce costs through bulk procurement. Require all optfons to preserve City ownership of the renewable energy credits generated by installed systems. BE 6- 3 Conduct an Electrificatfon Assessment and Actfon Plan to prioritfze electrifying all City facilitfes, including new and existfng buildings, address energy storage needs, and implement recommendatfons by 2036. Share results as a case study highlightfng challenges, solutfons, and lessons learned. BE 6- 4 Explore microgrid opportunitfes centered around municipal facilitfes. Buildings and Energy WM 1: Decrease total annual municipal solid waste handled 10% by 2035. WM 1- 1 Explore establishing organized waste hauling. WM 1- 2 Use waste hauler licensing or organized collectfon agreements to encourage customer educatfon on recycling, waste reductfon, and diversion, and to establish rate structures that incentfvize greater diversion such as Pay-As-You-Throw. WM 1- 3 Establish a Towards Zero Waste policy for City operatfons with annual reductfon targets. Update event permits to include recycling and organics collectfon, and apply the policy to outside facility users. Encourage local schools and public agencies to adopt similar policies. Resources: https://www.zerowaste.com/blog/zero-waste-policy-and-legislatfon/ https://ecocycle.org/our-programs/boulder-county-model/zero-waste-programs/schools-programs/schools-guide/ http:// www.zerowastechallenge.org/curriculum.html WM 1- 4 Collaborate with partners to establish a Library of Things and host regular Repair Cafes and stuff swaps to reduce consumptfon and extend product life. Explore Hennepin County Community Zero-Waste Grant to support implementatfon and promotfon. WM 1- 5 Explore partnerships to establish a Resilient Crystal to-go food container program to offer Crystal restaurants a viable, re-useable to-go food packaging optfon. WM 1- 6 Consider an ordinance requiring either recyclable or compostable single-use containers or reusable containers for to-go food packaging. WM 1- 7 Consider requiring constructfon and demolitfon projects to submit waste management plans that meet plan-aligned diversion targets, with higher standards for City-funded or incentfvized projects. WM 2: Increase solid waste diversion to 34% for recycling and 20% for organics by 2035. (existfng is 21.8% recycle diversion and 14.4% organic diversion). WM 2- 1 Collaborate with Hennepin County Community Recycling Ambassadors and other partners to increase partfcipatfon in recycling and organics collectfon through a branded outreach campaign, trusted community messengers, and starter kits such as bins and bags. Explore Hennepin County’s Community Zero-Waste Grant to support program launch and promotfon. WM 2- 2 Promote use of Hennepin County's Business Recycling grant program to increase business and non-profit organics diversion partfcipatfon. WM 2- 3 Increase promotfon of backyard compostfng and increased offerings of free or low-cost bins and educatfonal materials. Share guidance on proper methods to reduce odor and visual impacts. WM 2- 4 Partner with Hennepin County and the Recycling Ambassador program to reduce barriers to recycling partfcipatfon at multffamily and commercial propertfes. Waste Management W 1: Promote reduced water consumption and wastewater generation Citywide with a targeted per capita reduction of 5% each by 2035. W 1- 1 Explore changes to water rates, such as progressive billing rates, to encourage and promote water conservatfon. W 1- 2 Explore modificatfons to the City's lawn watering restrictfons to strengthen water conservatfon, including restrictfons on private well irrigatfon, incentfves or requirements for rain and soil sensors on manual systems, rain barrel rebates or exemptfons, and fewer allowable watering days per week. W 1- 3 Increase promotfon of Hennepin Recycling Group’s discounted rain barrel sale. W 1- 4 Collaborate with partners to establish a branded community water conservatfon program focused on adoptfon of low-flow water fixtures in homes and businesses, prioritfzing low-income residents. Goal: achieve 50 households and 5 businesses upgraded annually. W 1- 5 Explore opportunitfes for pressure management systems to decrease water distributfon water loss. Goal: 40% loss reductfon by 2035. W 1- 6 Require rainwater collectfon for irrigatfon and WaterSense-certffied fixtures in new City projects and City-funded developments, and provide guidance and technical assistance to support implementatfon. W 2: Strengthen and implement climate-ready stormwater, flood-mitigation, and watershed protection standards to improve groundwater, stream, river, and wetland health. W 2- 1 Establish a Green Streets policy to guide integratfon of green stormwater infrastructure into street projects to reduce flooding and improve water quality. W 2- 2 Increase natfve plantfngs and install stormwater best management practfces (BMP) on City-managed property. Goal: 100% of all impervious surfaces on City propertfes flowing to a BMP water quality practfce by 2035. Explore opportunitfes to partner with watershed districts. W 2- 3 Establish a program, or collaborate with partners, to inspect, maintain, and repair existfng rain gardens and stormwater practfces. W 2- 4 Explore opportunitfes for stormwater utflity credits to incentfvize increased adoptfon of green infrastructure strategies. W 2- 5 Encourage, incentfvize, or require new development and redevelopment projects to incorporate low-salt site design practfces that reduce winter maintenance needs, such as orientfng buildings and parking areas to maximize winter sun exposure, improve drainage, reduce icy conditfons, and limit reliance on deicing salt. Water GE 1: Increase tree cover, particularly in the priority neighborhoods, 20% over the existing tree canopy coverage by 2040. (from 32% to 38% of community-wide ground cover - an estfmated 1,820 new trees planted annually) GE 1- 1 Expand tree plantfng in priority neighborhoods, parks, schools, and rights-of-way, focusing on areas with lower canopy cover and higher heat exposure and emphasizing shade equity, species diversity, and long-term maintenance. GE 1- 2 Contfnue and expand the annual program offering free or discounted trees to residents. Goal: 150 trees per year. GE 1- 3 Adopt a No Net Loss policy requiring that any removed public street or park tree be replaced and maintained. If on-site replacement is not feasible, the tree should be planted nearby or within a City-designated tree bank. GE 1- 4 Update the City’s landscape ordinance to increase minimum tree coverage and new tree size for new development and expansions and strengthen tree protectfons. Explore optfons to minimize or eliminate burdens on low-income property owners such as flexible mitfgatfon for income-qualified single family homes or establishing "Green Zone" incentfves. GE 2: Increase pollinator supportiveness and achieve a 10% turf replacement with native grasses and wildflowers citywide by 2035 (approximately 12 acres annually) GE 2- 1 Conduct a turf analysis of parks and City facilitfes to identffy public lawn areas suitable for conversion to pollinator-friendly natfve grasses or forested landscapes based on soil and topography. Develop an implementatfon plan and carry out priority conversions. GE 2- 2 Collaborate with partners to a branded climate-friendly yards initfatfve with educatfon, demonstratfon sites, incentfves, and accessible technical support for natfve landscaping across renter, homeowner, and multffamily propertfes. GE 2- 3 Publish a preferred plant list and transitfon City landscaping areas to natfve species. GE 2- 4 Revise City ordinances to reduce or remove lawn and turf requirements and establish clear standards for natfve plantfngs and prairie-style landscapes and reduced barriers to prairie-style landscaping wtfhing right-of-ways, while maintaining appropriate nuisance enforcement. GE 2- 5 Promote existfng and future turf replacement programs across the city such as Lawns to Legumes and watershed district program s. GE 3: Reduce heat island effect through citywide “dark” impervious surface coverage reduction of 5% by 2035, particularly in neighborhoods identified with higher heat island impacts (approximately 5 acres annually - goal intent is to retain safe accessibility for pedestrians and alternatfve modes of transportatfon). GE 3- 1 Revise parking lot guidelines to require plantfng islands with a mix of canopy trees, shrubs, and groundcovers suited to the site to support long- term growth and reduce heat-island effects. GE 3- 2 Explore opportunitfes to promote green roof adoptfon through the City's stormwater utflity fee through fee incentfvized fee and credit structure. GE 3- 3 Evaluate underutflized paved areas citywide and incentfvize conversion to more beneficial uses such as sustainable green space or redevelopment for commercial or residentfal purposes. GE 3- 4 Encourage City-funded projects, and encourage approved planned unit development (PUD), and Conditfonal Use commercial projects to include heat island mitfgatfon strategies such as cool surfaces, solar-friendly shading, reduced impervious surfaces, and breeze capture. Greenspace and Ecosystems HS 1: Assist the City's climate vulnerable population in preparing for and mitigating climate change impacts (prioritfzed based on elevated risk sensitfvitfes as outlined in the City’s Climate Vulnerability Assessment) HS 1- 1 Collaborate with Hennepin County, Robbinsdale Area Public Schools and other partners to identffy climate-vulnerable residents and connect them with preparedness resources, emergency communicatfons, and resilience support. HS 1- 2 Explore opportunitfes for establishing Resilience Hubs where community members could gather for emergency shelter, cooling, heatfng, and essentfal services. HS 1- 3 Collaborate with partners to create and promote a Home and Neighborhood Resilience Checklist that provides guidance and resources for supportfng social connectfons, resource-sharing, mutual aid, and household resilience during climate-related challenges. HS 1- 4 Collaborate with partners to launch a branded "Resilient Crystal Together" public climate health and safety educatfon campaign using workshops, recurring communicatfons, a podcast, video series, or neighborhood-based events HS 2: Increase resilience of infrastructure, mission critical, emergency services and health care facilities within the City are prepared for impacts of climate change. HS 2- 1 Assess climate risks to mission-critfcal facilitfes and emergency services and implement priority resilience upgrades, prioritfzing public-serving facilitfes in highly vulnerable areas. HS 2- 2 Install or plan for backup power, flood protectfon, cooling improvements, and emergency communicatfons upgrades at critfcal facilitfes, prioritfzing sites used as shelters, response hubs, or service centers. HS 2- 3 Evaluate opportunitfes for deployable solar microgrids and battery storage that can power public facilitfes during normal operatfons and be moved as needed for emergency or disaster response. (https://www.footprintproject.org/) Health and Safety Economy E 1: Develop the equitable workforce and entrepreneur opportunities of Climate Action in the economy to achieve 75 new sustainability careers within Crystal by 2035. E 1- 1 Focus the City's economic development actfvitfes and prioritfes on attractfng green businesses that advance plan goals, especially those focused on renewable energy, energy efficiency, repair and reuse, resilience, and quality of life for vulnerable residents. E 1- 2 Explore partnerships to develop a green workforce initfatfve that supports training, internships, and career pathways in climate-related fields, with expanded access for lower-income residents, youth, and underrepresented communitfes. E 1- 3 Explore partnerships to increase support green Crystal businesses such as technical assistance, informatfon on leveraging state and regional resources, etc E 1- 4 Explore partnerships to strengthen Crystal’s repair and reuse networks. Work with reuse organizatfons and provide scholarships or training to grow repair and reuse businesses, reduce waste, and create job opportunitfes, especially for underrepresented entrepreneurs. E 2: Support local businesses operations in building climate resilience. E 2- 1 Create a Crystal green business assistance program connectfng businesses to energy assessments, incentfves, technical assistance, and resilience planning support. Prioritfze small businesses and those with fewer internal resources. E 2- 2 Create a community-wide sustainability award to recognize and promote businesses that complete energy, electrificatfon, resilience, or waste- reductfon improvements. Explore potentfal of Sustainability Commission managing and promotfng program. E 2- 3 Explore partnerships to establish a Resilient Crystal project grant program to incentfvize and support sustainability initfatfves that align with the Resilient Crystal plan. E 2- 4 Make sure key business infrastructure such as internet, telecommunicatfons, are recognized in the City’s general hazard mitfgatfon plan and emergency response plan. E 3: Establish sustainable financing for the City’s climate action implementation. E 3- 1 Establish a policy that accounts for all energy efficiency and renewable energy operatfonal cost savings of City buildings and fleets. All savings to be invested into a Resilient Crystal Fund as one source of financing for the City's environmental sustainability efforts. E 3- 2 Establish a utflity franchise fee and commit funds to supportfng the street and transportatfon infrastructure in support of plan goals, such as complete streets, green streets, and bike infrastructure needs, etc. E 3- 3 Establish a policy that requires City infrastructure projects and capital budgets to incorporate climate risk and vulnerability analysis and adaptatfon plans to ensure that future spending contributes to resilience and achieving this plan's goals. E 3- 4 Explore a dedicated sustainability and resilience funding mechanism, such as a “resilience penny” sales tax or a property tax increase of $0.01 per $100 of assessed value. Revenue could fund strategies directly or serve as a repayment source for bond financing. FA 1: Increase and support local food production and access —especially programs and initiatives that serve low- income and food-insecure residents. FA 1- 1 Identffy City-owned land, park space, and other suitable sites to increase opportunitfes for community gardens, orchards, edible landscaping, and small-scale food productfon. Prioritfze locatfons that serve low-income and food-insecure communitfes and develop an implementatfon plan. Explore partnership with Robbinsdale Area Public Schools for use of outdoor classrooms. FA 1- 2 Partner with gardening groups, schools, food shelves, and community organizatfons to expand local food-growing opportunitfes. Explore partnership with Robbinsdale Area Public Schools for use of outdoor classrooms. FA 1- 3 Create incentfves for developers and large property owners to include space in new constructfon, or for the removal of underutflized paved and turf grass areas to establish community gardens. FA 1- 4 Establish a locally-sourced food procurement policy for City of Crystal operatfons. Explore inclusion of a plant-based requirement. Encourage school districts, hospitals, and other government agencies in Crystal to adopt similar policies. FA 2: Reduce food waste and hunger, achieve a 25% reduction in food insecurity Citywide by 2035. FA 2- 1 Expand partnerships to rescue edible food from businesses, schools, and instftutfons and redirect it to residents in need. FA 2- 2 Promote annual partfcipatfon in Hennepin County's "Stop Food Waste Challenge". FA 2- 3 Explore partnerships with Hennepin County and others to increase community partfcipatfon in available food security programs. FA 2- 4 Explore partnerships to establish programs that connect locally grown food and culturally relevant food resources with residents experiencing food insecurity. Food and Agriculture Implementation I 1: Organize for Resilient Crystal 2035 plan implementation. I 1- 1 Provide clear guidance for how all City of Crystal departments will support and partfcipate in Sustainability and Resilience Plan implementatfon, and encourage ongoing staff training aligned with plan goals and actfons. I 1- 2 Establish a cross-departmental SRP Implementatfon Team to coordinate and prioritfze actfons, track and report progress, and work with City Administratfon to prepare annual implementatfon plans for City Council approval through the budget process, including tfmelines, funding, capital improvement plan (CIP) integratfon, staffing, and accountability. I 1- 3 Work with the Sustainability Commission to develop annual work plans that identffy committee prioritfes for plan implementatfon and support. I 1- 4 Adopt a policy requiring all existfng and future City policies and ordinances to be reviewed for alignment with the Resilient Crystal 2035 plan and included in commission and council review materials. Resource: paleBLUEdot Plan Alignment Memo I 1- 5 Adopt a policy requiring all development proposals to be reviewed for alignment with the Resilient Crystal 2035 plan. Resource: paleBLUEdot CAP-Aligned Development Review Checklist I 1- 6 Maintain and support sustainability staffing needed for plan implementatfon efforts. I 1- 7 Establish a coordinated communicatfon and educatfon campaign annually supportfng the communicatfon and educatfonal needs of each of the Resilient Crystal plan sectfons and illustratfng implementatfon of the plan as a community priority. Explore use of existfng, expanded, and new communicatfon channels. I 1- 8 Regularly evaluate plan progress and impacts (every 1–2 years), including updated community-wide and municipal greenhouse gas (GHG) inventories, present progress to City Council, and adjust strategies and actfons as needed. Consider establishing a progress dashboard on the city's website. City of Crystal Draft Climate Action Plan City Council Presentation 5/14/26 Vulnerability Assessment GHG Inventory and Forecast Ground Cover Renewable Energy Potential This was a process document to help the planning team and have a place to start the conversation! Baseline Studies+Community Survey/Input Our Process City Facility Solar Master Plan Our Process –What We Heard Our Process –What We Heard Our Process Resilient Crystal 2035 Diary –Collective Visioning •Globally, 25 of the 26 hottest years on record have occurred since the year 2000 •The hottest years of all have been the last 12years Plan Components Achieving the Climate Action and Plan goals will lower city-wide GHG emissions to 75,089 metric tons by 2035, a 49.2% reduction from 2016 levels. Totaling an 8-year cumulative reduction of over 399,654 metric tons, equal to eliminating 7.8 billion cubic feet of human-made greenhouse gas atmosphere. Impacts Impacts Community Input Session 5/23 Location: City Hall Draft Plan for public review available onlineAvailable May 20th through July 6th , 2026 https://palebluedot.llc/resilient-crystal-draft-menu Q+A Next Steps Bring Final Draft Back to Council Anticipated July 21 st Shared PDF File of Full Draft Plan to Council 5/18 Sustainability Commission Review June 18 th Page 1 of 3 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov Posted: May 15, 2026 City Council Meeting Agenda Tuesday, May 19, 2026 7 p.m. Council Chambers/Zoom Meeting The city manager’s comments are in bold. 1. Call to Order, Roll Call, and Pledge of Allegiance 2. Approval of Agenda The council will consider approval of the agenda. 3. Appearances 3.1 Chief Hubbard will introduce Officer Frank Deblieck, who has completed probation.* 4. Consent Agenda The council will consider the following items, which are routine and non-controversial in nature, in a single motion: 4.1 Approval of the minutes from the following meetings: a. The city council meeting on May 5, 2026. b. The city council work session on May 5, 2026. 4.2 Approval of disbursements over $25,000 submitted by the finance department. 4.3 Approval of the list of license applications submitted by the city clerk. 4.4 Adoption of a resolution accepting donations. 4.5 Adoption of a resolution approving the purchase of a street sweeper for the Public Works Department. 4.6 Adoption of a resolution authorizing agreements with Metropolitan Council for light rail transit. 4.7 Approval of the appointment of Lilliana Hawthorne to the Parks and Recreation Commission. 4.8 Approval of the appointment of Jordan Pinneke to the Inclusion and Diversity Commission. 4.9 Adoption of a resolution declaring several diseased trees on private properties as public nuisances and ordering them abated. 4.10 Adoption of a resolution approving the Construction Cooperative Agreement with Hennepin County for the Douglas Drive safety improvement project. 4.11 Adoption of a resolution recognizing June as Pride Month. Page 2 of 3 5. Open Forum (The city council appreciates hearing from citizens about items of concern and desires to set aside time during each meeting for open forum. To provide ample opportunity for all, speaking time is limited to three minutes, and topic discussion is limited to ten minutes. The mayor may, as presiding officer, extend the total time allowed for a topic. By rule, no action may be taken on any item brought before the council during open forum. The council may place items discussed during open forum onto subsequent council meeting agendas.) 6. Regular Agenda 6.1 The council will consider a resolution approving a conditional use permit for a religious institution at 4801 Welcome Ave. N. Islamic Education and Cultural Center proposes renovating the vacant building at 4801 Welcome Ave. N. for use as a mosque and related uses. The property is zoned Neighborhood Commercial, and religious institutions are allowed in that district as a conditional use. The Planning Commission held the public hearing on May 11, and several residents spoke in opposition to the project, citing traffic and parking as primary concerns. Among the conditions recommended by staff are a 75-person limit based on 25 off-street parking spaces, and that the applicant will pay the city’s costs for no parking signs on the Welcome and 48th Avenue street frontages abutting the property. The Commission unanimously recommended approval with the staff-recommended conditions, plus an additional condition requiring at least 30 minutes between the end of one worship service and the start of the next, and recommended that the City Council adopt resident parking only for the surrounding neighborhood. Because a resident parking-only restriction would not be based on a known, actual problem, but instead would be speculative, based on assumptions about how the facility will operate, staff does not recommend exploring such a restriction at this time. If an actual on-street parking problem emerges in the future, the City Council could consider imposing such a restriction. Council action on the CUP approval resolution is requested. 6.2 The council will consider a resolution modifying parking restrictions on 48th and Welcome Avenues N. If the Conditional Use Permit is approved for 4801 Welcome Ave. N., City Council action would be required to establish no-parking zones on the Welcome and 48th Avenue street frontages abutting the property. Council action on the resolution is requested. 7. Council Comments and Announcements a. The city’s second Climate Action Plan Community Meeting is Saturday, May 23, from 3:30 – 5 p.m., at city hall. b. City offices will be closed on Monday, May 25 in observance of the Memorial Day holiday. c. The city will be hosting a public meeting to present an overview of infrastructure funding needs and potential solutions on Wednesday, May 27, at 6 p.m. at city hall. d. The Sustainability Commission is accepting submissions of sustainable home and garden practices for its Sustainable Tour of Crystal until June 1. Visit crystalmn.gov to learn more. e. The next city council meeting is Tuesday, June 2, at 7 p.m., in the council chambers at city hall and via Zoom. Page 3 of 3 f. To accommodate Crystal residents practicing No Mow May, the city waits until June 1 to begin long grass enforcement. g. The city’s Kick Off to Summer Celebration is Saturday, June 13, from 11 a.m. - 2 p.m., at Becker Park. h. The Crystal Airport Open House and Fly-in is Sunday, June 21, from 8 a.m. – 3 p.m. i. Metro Transit will have a community update meeting about the Blue Line Extension project on Thursday, June 25, from 5 – 7 p.m., at the Crystal Community Center. j. The city is accepting applications for several volunteer positions on our boards and commissions. For more information, please visit go.crystalmn.gov/volunteer. k. City council meetings and work sessions are open to the public. Current and previous meetings are available to view and listen to at www.crystalmn.gov. 8. Adjournment * Denotes no supporting information included in the packet. Have a great weekend; stay healthy. See you at Tuesday’s meeting. Crystal City Council meeting minutes May 5, 2026 Page 1 of 2 1.Call to Order Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the Crystal City Council meeting was held on May 5, 2026, at 7 p.m. in the council chambers at city hall, 4141 Douglas Dr. N. in Crystal, MN, and via Zoom. Mayor Deshler called the meeting to order. Roll Call Mayor Deshler asked the city clerk to call the roll for elected officials. Upon roll call, the following attendance was recorded: Council members present: Eidbo, Kamish, Kiser, Onesirosan, Cummings, and Deshler. Council Member Budziszewski was absent. City staff present: City Manager A. Bell, City Attorney R. Tierney, Police Chief B. Hubbard, Deputy Police Chief P. Underthun, Recreation Director J. Elholm, Public Works Director/City Engineer J. Struve, Recreation Services Manager M. Margo, and City Clerk C. Serres. Pledge of Allegiance Mayor Deshler led the council and audience in the Pledge of Allegiance. 2.Approval of Agenda The council considered approval of the agenda. Moved by Council Member Cummings and seconded by Council Member Kiser to approve the agenda. Motion carried. 3.Proclamations 3.1 The Mayor proclaimed May 6, 2026, as Arbor Day in the City of Crystal. 3.2 The Mayor proclaimed May 10–16, 2026, as National Police Week and May 15, 2026, as Peace Officers Memorial Day in the City of Crystal. 3.3 The Mayor proclaimed May 17–23, 2026, as Public Works Week in the City of Crystal. 4.Consent Agenda The council considered the following items, which are routine and non-controversial in nature, in a single motion: 4.1 Approval of the minutes from the following meetings: a.The city council meeting on April 21, 2026. b.The city council work session on April 21, 2026. 4.2 Approval of disbursements over $25,000 submitted by the finance department. 4.3 Approval of the list of license applications submitted by the city clerk. 4.4 Adoption of Resolution No. 2026-57, approving the 2026 Infrastructure Improvement Project New Hope – Crystal Joint Powers Agreement. 4.5 Adoption of Resolution No. 2026-58, authorizing the purchase of a router for the Public Works Department. 4.6 Adoption of Resolution No. 2026-59, authorizing a Hennepin County Youth Activities Grant application for Cavanagh Park. 4.1(a) Crystal City Council meeting minutes May 5, 2026 Page 2 of 2 4.7 Adoption of Resolution No. 2026-60, canceling special assessments at 5416 51st Ave. N. Moved by Council Member Kiser and seconded by Council Member Kamish to approve the consent agenda. Motion carried. 5. Open Forum No public comment was given during open forum. 6. Regular Agenda There was no Regular Agenda business. 7. Council Comments and Announcements The council and staff made announcements about upcoming events. 8. Adjournment Moved by Council Member Cummings and seconded by Council Member Kamish to adjourn the meeting. Motion carried. The meeting adjourned at 7:14 p.m. ___________________________________ Julie Deshler, Mayor ATTEST: _____________________________________ Chrissy Serres, City Clerk 4.1(a) Crystal City Council work session minutes May 5, 2026 Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the Crystal City Council work session was held at 6:30 p.m. on May 5, 2026, in the upper community room at city hall, 4141 Douglas Dr. N., Crystal, MN, and via Zoom. Mayor Deshler called the meeting to order. I.Attendance The city manager recorded the attendance for city council members and staff: Council members present: Eidbo, Kamish, Kiser, Onesirosan, Cummings and Deshler. Council Member Budziszewski was absent. City staff present: City Manager A. Bell, City Attorney R. Tierney, Police Chief B. Hubbard, Deputy Police Chief P. Underthun, Public Works Director/City Engineer J. Struve, Recreation Director J. Elholm and Recreation Program Manager M. Margo. II.Agenda The council and staff discussed the following agenda item: 1)Commission candidate interviews: •Lilliann Henthorne – Inclusion and Diversity, Parks and Recreation (Ward 1). •Jordan Pinneke – Inclusion and Diversity (Ward 3). At 6:58 p.m., Mayor Deshler recessed the work session. Mayor Deshler reconvened the work session at 7:19 p.m. to continue discussion of the following agenda items: 2)Crystal Frolics. 3)Tobacco/Kratom follow-up. 4)Constituent issues update. 5)New business. 6)Council comments and announcements. Mayor Deshler left the work session at 8:34 p.m. Council Member Kamish served as Mayor Pro Tem. III.Adjournment The work session adjourned at 9:12 p.m. Julie Deshler, Mayor ATTEST: Adam R. Bell, City Manager 4.1(b) DATE: May 12, 2026 TO: Adam R. Bell, City Manager City of Crystal City Council FROM: Jodi Bursheim, Contracted Finance Director RE: Expenditures over $25,000 Payee Amount Center for Energy & Environment Home Improvement Grants $29,697.19 LOGIS Software & IT Services $185,510.18 WSB LLC 2026 Reconstruction, GIS Migration, & Park Design $53,114.95 Continua Interiors Desk Installations at Public Works & City Hall $28,122.47 Core & Main LP Radios for City Wide Radio Upgrade Project $131,220.00 Harris St Paul Inc Public Works Mechanic Heater Upgrade $65,088.00 Laketown Electric Corporation City Hall Generator Upgrade $119,650.00 IRS - EFTPS Federal & FICA Withholding Taxes for 5/8/26 Pay Date $89,706.42 $702,109.21 Description 4.2 Page 1 of 1 City of Crystal Council Meeting May 19, 2026 Applications for City License Rental (new) 5608 Vera Cruz Ave. N. – Jacob and Blessing Juetten (Conditional) 8017 33rd Pl. N. – Sara Ryan and Alex Gerdes (Conditional) Rental (renewal) 5936 Elmhurst Ave. N. – Barbara Clark (Conditional) 2709-2711 Hampshire Ave. N. – Joshua Breitung and Martin Kosto 3109 Hampshire Ave. N. – Rent it LLC (Conditional) 5330 Idaho Ave. N. – Anil Patel (Conditional) 5001 Jersey Ave. N. – Invitation Homes 3970 Kentucky Ave. N. – Brian Bona 3524 Kyle Ave. N. – Fowzia Omar (Conditional) 6719 Lombardy Ln. – Pro Operam Sub II LLC 5733 Pennsylvania Ave. N. – Pedro Herrera 5640 Perry Ave. N. – Invitation Homes 5202 Quail Ave. N. – Jay Bawar (Conditional) 5409 Scott Ave. N. – New Covenant Properties LLC (Conditional) 5542 Toledo Ave. N. – Kathrin Long 3232 Welcome Ave. N. – Tanesha Roundtree (Conditional) 5230 Welcome Ave. N. – Afton Hughes (Conditional) 3832 Yates Ave. N. – Cindy Brausen 6901-6903 36th Ave. N. – Carl Hobus 5908 38th Ave. N. – Lauren Hannan 6825 46th Ave. N. – Stella Iwuchukwu 5101 56th Ave. N. – Kohl Bailey (Conditional) 6001 56th Ave. N. – R&G Housing (Conditional) 6017 56th Ave. N. – R&G Housing (Conditional) 4824 59th Ave. N. – HPA II Borrower 2019-1 LLC (Conditional) Tree Trimmer Birch Tree Care, LLC dba Birch Tree Care, 4343 White Bear Pkwy, Vadnais Heights, 55110 (pre-approved by City Manager Bell on May 8, 2026) Crystal Tree Service, 1000 Ladyslipper Lane N.E., Hanover, MN 55341 4.3 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026 – ___ RESOLUTION ACCEPTING DONATIONS WHEREAS, Minnesota Statutes §465.03 requires that all gifts and donations of real or personal property be accepted only with the adoption of a resolution; and WHEREAS, said donations must be accepted by a resolution adopted by the City Council. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Crystal to accept the following donations: Donor Purpose Amount Rick Hendrickson General Park Improvements $10 Rick Hendrickson Youth Scholarship Fund $25 Melanie Yackley General Park Improvements $10 BE IT FURTHER RESOLVED, that the Crystal City Council sincerely thanks the above-named for their generous donations. Adopted by the Crystal City Council this 19th day of May 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Chrissy Serres, City Clerk 4.4 COUNCIL STAFF REPORT DATE: May 19, 2026 FROM: Jesse Struve, PE, Director of Public Works / City Engineer TO: Mayor and City Council City Manager Adam R. Bell CC: RE: Approve Purchase of Street Sweeper Background The 2026 Long Term Plan includes funding for the replacement of our Elgin broom street sweeper funding is currently allocated for $320,000 for this purchase. The state contract for replacement of broom sweeper is $340,210 but does not include the trade in value of the existing sweeper. The trade-in for our old sweeper is $25,000 which will bring us into budget ($315,210). Staff also obtained a quote for upgrading the broom sweeper to a regenerative air sweeper in the amount of $376,180. This utilizes air compression and a vacuum to provide better removal of leaves and fine particles. These have been proven to have much better removal efficiencies of fine particles that impair downstream water sources. Staff submitted funding reimbursement from both watershed districts. The additional cost to upgrade to the regenerative air sweeper is approximately $36,000. The watershed districts agreed to reimburse the city approximately $30,000 of that upcharge. The total cost of new regenerative air sweeper after the trade-in and subtracting what the watershed districts will fund is $321,325. Requested City Council Action Staff recommend approval of the purchase of the upgraded regenerative air sweeper in the amount of $376,180. Attachments •Resolution •Quote for Regenerative Air Sweeper 4.5 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026- APPROVE PURCHASE OF A CASE LOADER #117 WHEREAS, the maintaining and reconstructing City infrastructure is an essential service in the City of Crystal; and WHEREAS, the City has developed a long-term plan for the replacement and maintenance of vehicles and equipment in the fleet; and WHEREAS, the City solicited quotes for the replacement of the sweeper; and WHEREAS, the purchase of this upgraded sweeper improves operational capabilities while maintaining the existing budget. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Crystal as follows: 1. The Crystal City Council hereby approves the purchase of the Regenerative Air Sweeper in the amount of $376,180. Adopted this 19th day of May 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Chrissy Serres, City Clerk 4.5 4.5 4.5 COUNCIL STAFF REPORT DATE: 5/5/2026 FROM: Christopher Jao, Transit Project Coordinator TO: Mayor and City Council City Manager Adam R. Bell CC: Jesse Struve, Public Works Director John Sutter, Community Development Director RE: Consider a resolution regarding the authorization of the Cooperative Construction Agreement and Subordinate Funding Agreements between METRO Blue Line Extension and the City of Crystal Background Metropolitan Council is proposing to extend the existing METRO Blue Line light rail transit (LRT) facility from Target Field station in Minneapolis through the cities of Robbinsdale, Crystal, and Brooklyn Park to the vicinity of Highway 610 and Oak Grove Parkway. The extension would be 13.4 miles long and have 12 stations. Heavy construction would start in 2028, with the line opening after 2030. To apply for federal funding, the Federal Transit Administration (FTA) requires that key agreements be reached with corridor cities and independent agencies. Crystal Segment The Crystal segment spans 2 miles long with a station at Bass Lake Road. The LRT tracks would be built in the median of Bottineau Blvd (commonly called County Road 81), which will be reduced from six lanes to four to accommodate the new infrastructure. A major interchange would be constructed at Bass Lake Road, allowing traffic on Bottineau Blvd. to pass over via bridges without stopping. The Bass Lake Road station will be located at grade between the bridges with pedestrian access provided from both the north (Bass Lake Road) and the south (dedicated path passing under the bridges). Additionally, a part and ride lot will be constructed on the west side of Bottineau Blvd., south of the existing telecom tower. Anticipated property impacts include three total acquisitions: Cities Auto (5630 Lakeland), the Schrader office building (5501 Lakeland), and U-Haul (5465 Lakeland). Regarding traffic, the only major access change will be southbound Elmhurst Avenue, which will be limited to right turns at Bass Lake Road. All other access movements will remain in approximately their existing locations 4.6 Contractual Agreements Minnesota Statutes 473.3994 requires the Metropolitan Council and the City to enter into Cooperative agreements to exercise their respective authorities in support of the project. The Cooperative Construction Agreement defines the roles, responsibilities, and obligations for the construction phase. The Subordinate Funding Agreement authorizes the design and associated design fees for “local work” or city-funded work that will be included as part of the project. Below is a list of the locally funded improvements. Attachment H & I define these in more detail. A. Sanitary Improvements between Wilshire Blvd. and Bass Lake Road B. Watermain Improvements along Lakeland Ave N (Near the Airport) C. Watermain Lining on Bass Lake Road (W of Bottineau Blvd.) D. Median Irrigation on Bass Lake Road While color-changing lighting was originally explored for this SFA, both parties have agreed to move this item to a future, standalone agreement. This will allow City staff additional time to fully vet the specific equipment and operations and maintenance (O&M) details. Staff will only bring a separate lighting SFA to the Council for consideration once a complete analysis is finalized. Requested City Council Action Drafted copies of the Cooperative Construction Agreement, the Subordinate Funding Agreement, and their associated exhibits are attached. City Staff have exhaustively reviewed the contract in detail and extensively negotiated with the Project, including 7 revisions of the CCA, and ensured utilities and O&M meet the long-term infrastructure and financial interests of the City. City staff therefore recommend that the City Council authorize the City Manager to execute the Cooperative Construction Agreement and Subordinate Funding Agreement. Attachments E. Draft Cooperative Construction Agreement (CCA) F. Draft (CCA Exhibits) G. Draft Subordinate Funding Agreement (SFA) H. Draft Subordinate Funding Exhibits 4.6 Council: 24I047 City: Crystal COOPERATIVE CONSTRUCTION AGREEMENT THIS COOPERATIVE CONSTRUCTION AGREEMENT (Agreement) is made and entered into by and between the Metropolitan Council, a public corporation and political subdivision of the State of Minnesota (“Council”), and the City of Crystal, a municipal corporation under the laws of the State of Minnesota (“City”), individually “Party” and collectively “Parties”. RECITALS 1. The Council plans to construct the METRO Blue Line Light Rail Extension Project, an approximately 13.4-mile extension of the METRO Blue Line which will operate from downtown Minneapolis through the cities of Robbinsdale, Crystal, Minneapolis, and Brooklyn Park (“the Council Project”). 2. As part of the Council Project, certain infrastructure, such as sidewalks, roadways, and utilities, will be improved in the corporate boundaries of the City (“the Project Funded Improvements”). 3. The City has requested that certain local improvements be added to the Council Project to achieve efficiency and minimize community impacts (“the Locally Funded Improvements”). 4. The Project Funded Improvements and Locally Funded Improvements are collectively referred to as “City Improvements.” The Council Project and City Improvements are collectively referred to as the “Combined Project.” 5. The City Improvements identified in Exhibit A, which may be modified as set forth herein, will be constructed with the Council Project and will be owned and maintained according to this Agreement. 6. Under Minnesota statutory law and administrative rule, including Minn. Stat. § 237.163 and Minn. R. 7819.0050, et seq., the City has rights-of-way management authority and has adopted a right-of-way management ordinance, Crystal City Code Chapter VIII Public Right- of-ways, Section 800-Public Right-Of-Ways et seq. In furtherance of the Project, if requested by the Council, the City will exercise its rights-of-way management authority. 7. The Parties entered into a Master Funding Agreement Council Contract No. 18I010 to provide a mechanism for the transfer of funds from the Council to the City for activities undertaken by the City for the Combined Project, and for the transfer of City funds to the Council for the Locally Funded Improvements. 8. The Council and City intend to enter into (a) separate Subordinate Funding Agreement(s) (“SFA”) to address the cost and scope of the Locally Funded Improvements and to 4.6 2 reimburse the City for certain obligations set forth in this Agreement. 9. The Council and City desire to define the rights and responsibilities of the Parties with respect to the construction of the Combined Project. AGREEMENT ARTICLE 1. PURPOSE The purpose of this Agreement is to establish the terms and conditions under which the Council and the City will cooperate in the design, construction, and implementation of the Combined Project. This Agreement outlines the respective roles, responsibilities, and obligations of each Party to ensure the successful and coordinated delivery of the Combined Project in a timely, cost- effective, and efficient manner. The Combined Project may include design review, permitting, utility coordination, construction management, inspection, and other activities. ARTICLE 2. SUBORDINATE FUNDING AGREEMENTS 2.01 Transfer to Funds from the Council to the City. The Council will transfer funds to the City for the Combined Project activities performed by the City according to SFAs which will state the specific purpose for the funds and the City’s responsibility with respect to those funds. Reimbursable activities performed by the City include, but are not limited to, staff support, utility locating, surveying and development of as-built plans, and other construction activities which can only be performed by City staff. 2.02 Transfer of Funds from the City to the Council. The City will transfer funds to the Council for Locally Funded Improvements according to SFAs which will state specific purpose for the funds, the Council’s responsibility with respect to those funds, and establish who will own any constructed or remaining assets upon completion of the work. SFAs for Locally Funded Improvements will be executed prior to the award of the construction contract for the Combined Project. Subsequent City requests for Locally Funded Improvements or modifications to City infrastructure will be addressed through construction Change Order Subordinate Funding Agreement (“Change Order SFA”) or other change orders. 2.03 Change Order SFA. Prior to the start of construction, the City will execute a Change Order SFA”) to address any change in scope of the Combined Project requested by the City that results in an increased cost. The Change Order SFA will authorize designated City staff to review and approve individual change order up to the stated dollar thresholds. 2.04 Other Change Orders. City-requested change orders exceeding the authorized dollar limits in the executed Change Order SFA will need a new SFA or an amendment to the associated SFA. The City is responsible for all costs associated with its requested changes and will provide timely funding and written authorization to avoid delays or disruption to the Combined Project. 4.6 3 ARTICLE 3. EASEMENTS, PERMITS, AND ACCESS 3.01 Property Required for Locally Funded Improvements. Prior to the Council’s construction solicitation, the City will acquire, at its own cost, all property for Locally Funded Improvements. The Council will not acquire or fund any property interest on the City’s behalf for Locally Funded Improvements and is not obligated to include the Locally Funded Improvements in the construction solicitation if the necessary property interest is not acquired prior to issuance of the bid. 3.02 Permits Required for Locally Funded Improvements. The City is solely responsible, at its own cost, for obtaining all permits, approvals, and licenses required for the construction, reconstruction, or installation of Locally Funded Improvements. This includes, but is not limited to, grading permits, utility permits, stormwater permits, right-of-way use permits, and any other local, state, or federal authorizations necessary to complete the Locally Funded Improvements. The City will obtain such permits in a timely manner to avoid delay to the overall Combined Project schedule and will ensure that all work performed under such permits for the Locally Funded Improvements complies with applicable laws, regulations, and permit conditions. The City will provide copies of all issued permits to the Council upon request. The Council will not fund or acquire any permits on the City’s behalf for Locally Funded Improvements and is not obligated to include the Locally Funded Improvements in the construction solicitation if the permits are not issued prior to issuance of the bid. 3.03 Limited Right to Occupy. The Council and the City each grant the other, along with their respective contractors, consultants, and agents, a limited, non-exclusive right to enter and occupy portions of property owned or controlled by the granting Party as reasonably necessary to perform construction, inspection, utility coordination, or related activities associated with the Combined Project. This limited right to occupy is temporary in nature, conveys no property interest or easement, and will be exercised in a manner that does not unreasonably interfere with the granting Party’s operations, facilities, or ongoing activities. Each Party will ensure its personnel and contractors comply with all applicable safety protocols, site-specific requirements, and operational procedures established by the property-owning Party. Each Party is responsible for restoring any portion of the other Party’s property that it disturbs or damages to a condition reasonably acceptable to the property-owning Party. Restoration will comply with the standards set forth in City’s right-of-way restoration policies and specifications, as may be updated from time to time, or as otherwise agreed in writing. Upon completion of its activities, the occupying Party will promptly vacate the property and remove any materials, equipment, or debris unless otherwise agreed in writing. Nothing in this section limits either Party’s right to suspend or restrict access in the event of an emergency, safety concern, or conflict with ongoing operations, provided that reasonable notice is given where practicable. 4.6 4 3.04 Right-of-way Management Powers. The City will exercise and utilize its right-of- way management powers, authorities, ordinances, and policies in furtherance of the Combined Project. This includes, but is not limited to, issuing permits, regulating access, and coordinating utility work. Such coordination includes notifying and requiring permitted utilities and unpermitted encroachments located in City right of way to relocate as necessary to avoid conflict with or to accommodate the design, construction, operation, or maintenance of the Combined Project. The City will further enforce restoration standards and manage public use of the right-of- way as necessary to support the timely and coordinated implementation of the Combined Project. The City will exercise its right-of-way management powers over City rights-of-way necessary for the construction of the Project. This includes but is not limited to those powers pertaining to the relocation of utilities within the City rights-of-way or utility easements. The City agrees to promptly require private utilities to relocate from City rights-of-way or city utility easements, if required for the Project. The Council agrees to coordinate the relocation process with the private utilities and agrees to work with the City to facilitate any relocation. By exercising its right-of-way management powers on behalf of the Project, the City is not agreeing to assume financial responsibility for the relocation costs. The City agrees to administer its right-of-way authority in a manner that facilitates Combined Project delivery, minimizes conflicts, and supports the mutual objectives of the Parties consistent with this provision and Section 3.06. Nothing in this Agreement will be construed to limit or impair the City’s lawful exercise of its right-of-way management powers, provided that such authority is exercised consistently with the goals and commitments set forth in this Agreement. Nothing in this Agreement will be construed as creating a joint powers agreement under Minn. Stat. § 471.59 or any similar legal structure. 3.05 Commissioner’s Orders. The Parties acknowledge that certain roadways constructed or reconstructed as part of the Combined Project may be taken under the jurisdiction of the Minnesota Commissioner of Transportation through Commissioner’s Orders in accordance with applicable state law. The City agrees that, upon opening of the roadways under City’s jurisdiction to public use and prior to the termination or rescission of any applicable Commissioner’s Orders, the City will continue to perform or enforce routine maintenance of impacted City streets and sidewalks, including but not limited to snow and ice removal, street sweeping, pothole patching, and signage, to ensure safe and continuous use by the traveling public. This Agreement may be modified or superseded by other agreements, including but not limited to the forthcoming operations and maintenance agreement, which may include provisions that allow for exceptions. Any such modifications or supersession must be documented and agreed upon by all parties to be enforceable. 3.06 Utility Relocation. The Parties acknowledge that utility facilities located within the Combined Project area may require protection, adjustment, or relocation to accommodate the construction and operation of the Combined Project. The Council will coordinate with the City during design and construction to identify potential public utility conflicts and will incorporate necessary relocations into the Combined Project. 4.6 5 Each Party agrees to cooperate in good faith to minimize delays and conflicts associated with utility relocation and to share relevant plans, schedules, and field data to support effective coordination. If relocation delays are anticipated, the responsible Party will promptly notify the other in writing and propose mitigation measures. 3.07 Right-of-way Transfer to the City. Upon completion of construction and in accordance with the terms of this Agreement, the Council will transfer to the City jurisdiction or ownership of any portion of the Combined Project right-of-way intended for City operation and maintenance, as identified in the final plans or as otherwise agreed in writing by the Parties. Any such transfer will be conducted in compliance with all applicable Federal Transit Administration (“FTA”) requirements, including but not limited to real property disposition and continuing control obligations under 2 C.F.R. Part 200 and FTA Circular 5010.1F. The City agrees to accept such right-of-way subject to any conditions or restrictions required by the FTA, and to use, operate, and maintain the transferred right-of-way in a manner consistent with the purposes for which federal funds were used. The Council will coordinate with the FTA, as necessary, to secure any required approvals or documentation for the transfer. The Parties agree to cooperate in good faith to complete any documentation required to effectuate the transfer, including deeds, jurisdictional transfer agreements, and maintenance commitments, and to ensure continued compliance with all applicable federal, state, and local requirements. ARTICLE 4. PROCEDURE FOR ACCEPTANCE OF BIDS 4.01 Council Responsibility for Bidding. The Council will have sole responsibility for conducting the bidding process for the Combined Project, including but not limited to, preparing bid documents, advertising for bids, responding to bidder inquiries, evaluating bid submissions, and awarding the contract(s). The Council also has sole discretion to accept or reject bids, provided such decisions are made according to all applicable laws, regulations, and procurement policies. The Council agrees to keep the City reasonably informed throughout the bidding process and will provide the City with copies of the final bid documents and the selected bid prior to contract execution. 4.02 Subordinate Funding Agreement Requirement. The parties agree to enter into a SFA for each Locally Funded Improvement prior to the Council’s construction solicitation. Each SFA will include funding for the estimated cost of the applicable Locally Funded Improvement, plus a 10% contingency to account for potential change orders or other unforeseen costs. 4.03 City Review and Right to Accept or Reject Locally Funded Improvements Bids. The Parties acknowledge that the not-to-exceed amount in the SFA is an estimate and is subject to change based on the unit prices set forth in the contract with the successful bidder, and the final quantities as determined by the Council's Authorized Representative. If the successful bidder’s price for the Locally Funded Improvements is 120% or less of the not- to-exceed amount in the SFA, the bid will be deemed accepted by the City and will be incorporated in the Combined Project. The budget exhibit to the SFA may be revised to reflect 4.6 6 the unit prices in the successful bid, and the final quantities as determined by the Council’s designated representative, plus a 10% contingency. Such revisions will be completed no later than 30 days prior to contract award, in accordance with the process for exhibit revisions set forth in the SFA. If the bid exceeds 120% of the SFA not-to-exceed amount, the Council will provide the City with the bid tabulations and the City will have 10 business days from receipt to provide notice of acceptance or rejection of the Locally Funded Improvement bid(s). Such notice shall include the date by which the City must respond. If the City does not respond within this period, acceptance is deemed granted. For all approved Locally Funded Improvements, the Parties will amend the applicable SFAs to increase the SFA’s not-to-exceed amount reflecting the unit prices in the successful bid, and the final quantities as determined by the Council’s Authorized Representative, plus a 10% contingency no later than 30 days prior to contract award. 4.04 Descope and Cost Responsibility upon Rejection. If the City rejects the bid(s) for the Locally Funded Improvements, the Council may proceed with awarding the contract excluding the portion of the work rejected by the City. In such event, the City is responsible for all design, engineering, and administrative costs incurred by the Council in connection with the removal (descope) of the Locally Funded Improvements from the Combined Project. These costs will be based on the estimate prepared by the Council’s Advanced Design Consultant and will include an administrative fee equal to 3% of the estimated amount. The City agrees to enter into an SFA with the Council to reimburse such costs within 30 calendar days of receiving a notice of the City’s rejection of the Locally Funded Improvement bid(s). If the City fails to execute the descope SFA within the required timeframe, the Parties will meet and confer in good faith within ten 10 business days to resolve the issue. If the matter remains unresolved, either Party may initiate dispute resolution as set forth in Article 14 of this Agreement. 4.05 Non-Award of Combined Project. In the event the Council elects not to award the Combined Project for any reason, the Council will consult with the City regarding the potential for rebidding the Combined Project. If the Council proceeds with a rebid, the City is responsible for the cost of any redesign, re-engineering, or modification to the Locally Funded Improvements portion of the Combined Project required in connection with the rebid. Such costs will be documented in an SFA executed prior to the commencement of any redesign work. 4.06 Termination Upon Non-Award of Contract. If the Council elects not to award a construction contract for the Combined Project, this Agreement will terminate without further obligation or liability between the Parties. However, such termination does not relieve either Party of its financial obligations under any executed SFAs. The City remains responsible for its share of design costs incurred for Locally Funded Improvements, and the Council remains responsible for reimbursing the City for any eligible costs incurred according to executed SFAs. ARTICLE 5. CONSTRUCTION AND CONTRACT ADMINISTRATION 4.6 7 5.01 Construction Administration. Except as otherwise set forth in this Agreement, the Council will perform, direct, and supervise all construction, contract administration and inspection it deems necessary or appropriate for the Combined Project. Where such work involves City infrastructure, the Council will ensure that the City has had an opportunity to inspect the work according to Article 10 of this Agreement. All work will be performed by the Council or the Council’s Contractors, as directed by the Council, according to the Contract Documents for the Combined Project. 5.02 Contract Documents. The Contract Documents will be maintained and made available for review at the METRO BLE Project Office, located at 6465 Wayzata Boulevard, St. Louis Park, Minnesota during construction. After construction, the Contract Documents will be retained at the Metropolitan Council offices located at 390 Robert Street North, St. Paul, Minnesota, or at such other location as the Council may designate and advise the City from time to time. For the purposes of this Agreement, “Contract Documents” means the complete set of documents governing the procurement and performance of construction work for the Combined Project, including, but not limited to, the invitation for bids, instructions to bidders, bid forms, general and special provisions, technical specifications, drawings and plans, addenda, executed construction contracts, approved change orders, work orders, and any other documents incorporated by reference into the construction contract(s) awarded by the Council. 5.03 Council’s Authorized Representative. The Council will assign a representative (“Council’s Authorized Representative”), reflected in Section 15.13, to serve as the main point of contact for implementing this Agreement. This person is responsible for coordinating with the City, overseeing design and construction, reviewing submittals, managing contracts, and carrying out other Council obligations related to the Combined Project. The Council’s Authorized Representative is also responsible for sending notices, coordinating reviews and approvals, keeping internal Council teams informed, and helping resolve issues that arise during the Combined Project. The Council may change its representative by providing notice to the City. 5.04 City’s Authorized Representative. The City will assign a representative (“City’s Authorized Representative”), reflected in Section 15.13, to serve as the main point of contact for the City’s responsibilities. This person is responsible for coordinating with the Council, responding to submittals, participating in inspections, approving change orders affecting City infrastructure, and carrying out other City obligations related to City infrastructure and the Combined Project. The City’s Authorized Representative will attend regular Combined Project meetings and other meetings as reasonably requested by the Council and ensure City staff are available to support construction observation, inspections, and other duties under this Agreement or any executed SFAs. 4.6 8 The City’s Authorized Representative is also responsible for sharing notices, keeping internal City departments informed, and supporting timely decisions. The City may change its representative by providing notice to the Council. City staff time dedicated to the Combined Project is reimbursable, subject to the terms and funding limits of any applicable SFA between the Parties. 5.05 Field Conflicts and Emergency Conditions. The Council is responsible for coordinating the resolution of field conflicts involving City infrastructure during construction, including directing the contractor to implement necessary modifications. The Council will promptly notify the City’s Authorized Representative of any such conflicts and consult with the City in good faith to determine an appropriate solution. The contractor will not proceed with any modifications to City infrastructure without the Council’s direction and, where applicable, the City’s prior written approval, including but not limited to Sections 2.03, 6.02, and 6.03. Despite the provisions of Article 6, and in the event of an emergency or latent condition that requires immediate action to protect public safety or prevent damage to property, the Council may direct the contractor to take necessary temporary measures without prior City approval. The Council will notify the City’s Authorized Representative as soon as practicable and consult with the City regarding any permanent modifications or follow-up actions required. All such actions will be documented in writing and included in the Combined Project record. ARTICLE 6. MODIFICATIONS TO CONSTRUCTION DOCUMENTS 6.01 Council Authority and City Review. The Council has authority to modify the Contract Documents for the Combined Project; however, the City has the right to review and provide comments on any proposed modifications that affect City Improvements. The Council will provide notice to the City’s Authorized Representative of such proposed modifications. The City has 7 business days from receipt of the notice to provide written response comments. The Council will consider the City’s comments in good faith and will not implement modifications affecting City Improvements without such input. If the City does not respond within the specified timeframe, the Council may determine how to proceed in its discretion, consistent with the overall goals of the Combined Project. For changes arising from field conflicts or emergency conditions during construction, refer also to Section 5.05 of this Agreement regarding resolution procedures and the applicability of City approval. 6.02 Approval Required for Locally Funded Improvements. The Council will not approve any changes to Locally Funded Improvements without the prior written approval of the City’s Authorized Representative, which will not be unreasonably withheld or delay. Any change that results in additional cost impacts to the Locally Funded Improvements require the execution of an SFA or work order in accordance with Sections 2.03 and 2.04 of this Agreement. 6.03 Timing for City Review and Effect of Non-Approval. The Council will provide notice to the City’s Authorized Representative when approval is required for a proposed change to Locally Funded Improvements. The City will respond in writing within 7 business days of receiving such notice. If the City does not provide written approval or an objection within that 4.6 9 timeframe, the Council may deem the change disapproved and proceed without including the proposed modification in the Combined Project scope. ARTICLE 7. SURVEYING AND UTILITY LOCATING 7.01 Surveying Responsibilities. The Parties agree that the Council will require its contractor to survey and document all City Improvements constructed or installed as part of the Combined Project. This includes providing accurate as-built drawings, horizontal and vertical location data, and other survey deliverables as applicable. As-built deliverables will be provided to the Parties in both PDF and digital CAD or GIS-compatible file formats, including DWG and shapefiles, as applicable, unless otherwise agreed in writing by the Parties. 7.02 Locating Services. The City shall be responsible for locating all City-owned utilities existing as of the commencement of construction for the Combined Project. Upon notice following commencement of construction, the Council, or its contractor, shall assume responsibility for locating all new or replaced utilities installed as part of the Combined Project during construction and shall continue such responsibility until 15 business days after the City’s formal acceptance of complete as-built survey data necessary for the City to perform ongoing utility locating services, which acceptance shall be a prerequisite to transfer of responsibility. Thereafter, responsibility for locating all City-owned utilities shall transfer to the City, which shall coordinate in a timely manner with Gopher State One Call and maintain accurate records of such utilities, providing them to the Council upon request. 7.03 Liability for Errors or Omissions. The City is solely responsible for any errors, omissions, or inaccuracies in the utility location markings it provides pursuant to this Article 7. The City will, at its sole expense, correct any such errors or omissions and is liable for any costs or damages directly resulting from its failure to accurately locate its infrastructure. 7.04 Compliance with Standards. All surveying and utility locating activities conducted by the City will comply with applicable laws, regulations, and recognized industry standards and will be performed in a manner that does not interfere with or delay the Combined Project. ARTICLE 8. MAINTENANCE OF TRAFFIC 8.01 MOT Development and Cooperation. Control of traffic on City roadways shall remain subject to coordination during the development of traffic control parameters in the plans and specifications, and approval from the City. Such approval will not be unreasonably delayed or withheld. The Council will require its construction contractor(s) to prepare Maintenance of Traffic (MOT) plans for any work that impacts public rights-of-way within the City’s jurisdiction. The Council and the City will cooperate in the review of MOT plans to ensure the safe and effective movement of the traveling public and to minimize disruptions to local transportation systems. 8.02 Applicable Standards and Submittal Process. All MOT plans will conform to applicable standards and requirements, including the Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD). MOT plans will be submitted to the Council for initial review, and the Council will provide copies to the City for concurrent review and comment. 8.03 City Review and Local Considerations. Final approval of MOT plans are the 4.6 10 responsibility of the Council, in coordination with the applicable road authority. The Council will notify the City once MOT plans are approved and prior to their implementation. 8.04 Field Inspection and Corrective Action. The Council and the City may conduct field inspections of MOT installations. If any traffic control measures are determined to be unsafe or inconsistent with the approved plan, the City will notify the Council of the required corrective action. The Council will ensure the contractor promptly implements the necessary corrections. ARTICLE 9. WORK HOURS 9.01 Standard Work Hours. The standard construction schedule for the Project will be based on a 7-day workweek, Monday through Sunday, between 7:00 AM and 9:00 PM on weekdays and between 8:00 AM and 8:00 PM on weekend days or holidays (“Standard Work Hours”). 9.02 Requests for Special Work Hours. If construction activities require work outside of Standard Work Hours, including evenings, weekends, or holidays, the City will review and, as appropriate, provide notice of the approval for such special work hours upon request (“Special Work Hours”). The City will coordinate promptly with the Council and the Council’s contractor(s) to evaluate and authorize these requests, provided the extended hours are necessary to maintain the Combined Project schedule, reduce traffic or community impacts, or address safety or emergency conditions. 9.03 Timely Review and Reasonableness. The City will treat the Special Work Hour requests from the Council and its contractors no more restrictively than it treats similar requests from other public agencies. The City may, at its discretion, give special consideration to requests from the Council where such consideration supports the timely, efficient, and coordinated delivery of the Combined Project. Any conditions, limitations, or restrictions imposed on Special Work Hours will be clearly stated in writing at the time of approval. 9.04 Suspension or Revocation of Approvals. The City may suspend or revoke previously granted Special Work Hours authorizations if construction is performed in a manner that creates an unreasonable, in the sole discretion of the City, disturbance, violates applicable laws or permit conditions, or poses a threat to public safety. The City will notify the Council of any such revocation as soon as reasonably practicable. ARTICLE 10. INSPECTION, INITIAL ACCEPTANCE, CERTIFICATE OF COMPLETION, AND FINAL COMPLETION 10.01 Inspection. The Council will provide the City with an opportunity to participate in the ongoing inspections of work involving infrastructure to be owned, operated, or maintained by the City. The City may attend and such inspections and raise concerns regarding conformance with applicable standards, plans, or specifications. The Council will maintain records of all inspections and make these records available to the City upon request. 10.02 Initial Acceptance. Upon the Council’s determination that construction of a project element or construction segment of the City Improvements is suitable for its intended use, the Council will require a joint inspection with the City. The Council will prepare a punch list of items 4.6 11 requiring correction or completion. Initial Acceptance by the City will occur once the punch list items have been addressed to the City’s reasonable satisfaction and the infrastructure is suitable for its intended use; however, the City can place utilities, roadways, and trails into service even if certain non-critical punch list items remain open, provided such items do not materially impair the safe and functional use of the infrastructure. If the City fails to provide notice of Initial Acceptance, or a written explanation of any remaining concerns, within 30 calendar days of receiving notice from the Council that punch list items have been completed, the work will be deemed initially accepted by the City. 10.03 Certificate of Completion. Following Initial Acceptance, the Council will issue a Certificate of Completion for the applicable work. The Certificate will serve as confirmation that construction has been completed in accordance with the approved plans and specifications, subject to final acceptance and any applicable warranties. A copy of the Certificate will be provided to the City. 10.04 Final Acceptance. The Council will notify the City when all conditions for Final Acceptance have been met. If the City does not provide notice of Final Acceptance or a written statement of outstanding issues within 15 business days of receiving Council’s notice, the work will be deemed finally accepted by the City. ARTICLE 11. MAINTENANCE 11.01 Maintenance During Construction. The Council, including through its contractors, will be responsible for maintaining the Combined Project work site and any newly constructed infrastructure during the construction period until Initial Acceptance of City Improvements. This includes temporary repairs, site cleanup, erosion and sediment control, traffic control, and temporary restoration measures as required for public safety and Combined Project continuity. 11.02 Maintenance After Initial Acceptance. Following Initial Acceptance or placement of utilities, roadways, and trails into service in accordance with section 10.02, the City will assume responsibility for routine maintenance of City Improvements that will be owned or operated by the City, as identified in Exhibit A or otherwise solely used by and for the benefit of the City, unless otherwise agreed in writing. Despite this transfer of routine maintenance responsibilities, the Council remains responsible for coordinating and completing any corrective work covered under the construction contractor’s warranty. 11.03 Final Transfer of Maintenance Responsibilities. Upon Final Acceptance and the expiration of all applicable warranty periods (see Section 12.01), the City will assume full responsibility for all remaining maintenance obligations associated with City-owned infrastructure. The Council will ensure that all warranty-related repairs have been completed to the City’s reasonable satisfaction prior to Final Acceptance. 11.04 Maintenance Access Procedures. The City, including its employees, agents, contractors, and invitees, will have access to Council property as necessary to operate, maintain, and repair City infrastructure located on or within Council property. For any maintenance or repair work within 12 feet of the nearest track centerline or 20 feet of the nearest overhead catenary system wire (“LRT Work Zone”), the City will: 4.6 12 a. The City will follow the procedures below based on the timing of the work: i. prior to Revenue Service: Contact the Council’s Authorized Representative; and ii. after Revenue Service: Contact the Metro Transit Rail Control Center at 612- 341-5710. b. Ensure all personnel performing work within the LRT Work Zone complete any required safety training established by the Council or Metro Transit. 11.05 Emergency Access to the LRT Work Zone. If the City requires immediate access to the LRT Work Zone to address an emergency condition that poses a clear and immediate risk of injury, death, or property damage (“Emergency Work”), the City will notify the appropriate contact as soon as practicable: a. Prior to Revenue Service: Contact the Council’s Authorized Representative. b. After Revenue Service: Contact the Metro Transit Rail Control Center at 612-341- 5710. 11.06 Future Operations and Maintenance Agreement. The Parties acknowledge and agree that they intend to enter into a separate, mutual Operations and Maintenance Agreement (“OMA”) to define the ongoing responsibilities of both Parties for the operation, maintenance, and coordination of infrastructure associated with the Combined Project following the term of this Agreement. The OMA will align with the maintenance obligations established herein and be consistent with the operational, maintenance, and safety standards established for the overall Metro Transit light rail transit (LRT) system. The OMA will provide a coordinated framework for the long-term performance of maintenance activities by both Parties for infrastructure located on Council property, City property, or shared areas affected by the Combined Project. ARTICLE 12. CORRECTIVE WORK AND WARRANTY CLAIMS 12.01 Warranty Coverage. The Council will ensure that all work performed is covered by warranty obligations consistent with the Contract Documents. Unless otherwise specified, a minimum one-year warranty period will apply to all labor, materials, equipment, and workmanship, beginning on the date of the Certificate of Completion for each discrete portion of the work. 12.02 Council Responsibility for Warranty Claims. The Council is responsible for managing and administering all warranty claims related to the Combined Project in accordance with the construction contract documents. This includes coordinating with contractors to address and complete any required corrective work during the warranty period. 12.03 Notification by the City. If the City becomes aware of a defect or condition in the City Improvements that may be subject to warranty, it will provide notice to the Council’s Authorized Representative as soon as reasonably practicable. 12.04 Coordination with the City. For warranty-related corrective work involving City Improvements or infrastructure to be maintained by the City, the Council will coordinate with the 4.6 13 City prior to initiating the repair. The City has the right to observe this work and to review completion for conformance with applicable standards. 12.05 Contractor Obligation to Correct. The Council is responsible for requiring the contractor to correct, at the contractor’s sole expense and within a reasonable period of time, any defects or deficiencies covered under the warranty. The Council will take all necessary actions to enforce the contractor’s warranty obligations and ensure that all corrective work is completed in a timely and satisfactory manner, in accordance with the construction contract documents. 12.06 City Review Prior to Final Acceptance. Subject to the provisions of Section 10.04, the Council will ensure all warranty-related repairs to City Improvements have been completed to the City’s reasonable satisfaction prior to Final Acceptance, and the City will provide notice to the Council whether this work has been accepted. ARTICLE 13. LIABILITY 13.01 Mutual Responsibility and Liability. To the extent authorized by law each party is responsible only for its own acts and the results of its acts. Each Party’s liability is governed by the provisions of Minnesota Statutes, Chapter 466. For purposes of determining total liability of damages, the parties will be considered a single governmental unit pursuant to Minn. State. 471.59, subd. 1a (b) and the total liability of the parties shall not exceed the limits on governmental liability for a single governmental unit as specified in Minn. Stat. 466.04. 13.02 Insurance and Liability Protections. The Parties each warrant that they have an insurance or self-insurance program with minimum coverage consistent with the liability limits in Minnesota Statutes, Ch. 466. Nothing in this Agreement will be construed as a waiver of any tort liability limitations conferred on either Party by Minn. Stat § 466.01, et seq., or other liability limitations or immunities conferred on them by state or federal law. 13.03 Contractor Risk Management Provisions. The Council will ensure that the construction contract for the Combined Project includes provisions requiring the contractor to: a. defend, indemnify, and hold harmless the City, its officers, agents, and employees from any claims, suits, demands, damages, judgments, costs, interest, and expenses (including reasonable attorney’s fees, witness fees, and disbursements) arising from the acts or omissions of the contractor, its officers, employees, agents, or subcontractors; b. provide and maintain insurance coverage and name the City as an additional insured; and c. act as an independent contractor with respect to the City infrastructure and related work. This indemnity obligation is limited as required by Minn Stat § 337.02, and does not apply to the extent any injury or damage is attributable to the negligence or other wrongful act or omission of the City. 4.6 14 ARTICLE 14. DISPUTE RESOLUTION 14.01 Obligation to Use Dispute Resolution Process. The Parties agree to use the dispute resolution process set forth in this section to resolve any dispute, claim, or controversy before pursuing any legal or equitable remedies, including litigation or termination of this Agreement. The Parties will use their best efforts to informally resolve any and all disputes. 14.02 Mediation Requirement Prior to Legal Action. In the event the Parties are unable to resolve a dispute concerning the interpretation of their respective rights or obligations, the Parties will participate in good faith in non-binding mediation prior to initiating any other form of dispute resolution, including legal action. Mediation will be conducted according to the Minnesota Civil Mediation Act, as amended (currently codified at Minn. Stat. §§ 572.31–572.40), and will occur within a reasonable time after either Party provides notice requesting mediation. The Parties agree to complete this mediation process in good faith before pursuing any other legal process or remedy. 14.03 Designated Representatives. The Parties designate the following individuals as their dispute resolution representatives, who may be replaced by notice to the other Party: For the Council: Alicia Vap, or Successor Project Director, Blue Line Ext Project Office 612-349-7079 Alicia.Vap@metrotransit.org For the City: Adam Bell, or successor City Manager 763-531-1000 adam.bell@crystalmn.gov 14.04 Good Faith Participation. The Parties agree to participate in the dispute resolution process in good faith and to provide relevant information reasonably necessary for meaningful discussion and resolution at each level. If a Party’s act(s) or omission(s) creates an imminent threat of irreparable harm to human health or the environment, the affected Party will be entitled to immediately take all actions necessary to mitigate the harm without engaging in the processes set forth above. ARTICLE 15. GENERAL PROVISIONS 15.01 Records. All records kept by the Parties with respect to the Combined Project are subject to examination by representatives of each party. All data collected, created, received, maintained or disseminated for any purpose by either Party are governed by Minnesota Statutes, Chapter 13 (“Act”), and the Minnesota Rules implementing the Act. 15.02 Legal Compliance. The Parties agree to comply with all applicable laws relating to nondiscrimination, affirmative action, public purchases, contracting, employment, workers’ 4.6 15 compensation, and surety deposits required for construction contracts. Minnesota Statutes, Section 181.59 and any applicable local ordinance relating to civil rights and discrimination and the Affirmative Action Policy statement of the City is considered a part of this Agreement. 15.03 Independent Contractors. The employees of the Parties, and all other persons engaged by each Party will not be considered employees of the other Party. Each Party is solely responsible for all claims arising from its employees including claims under the Worker’s Compensation Act, the Minnesota Economic Security Law and all third-party claim resulting from an act or omission of an employee. 15.04 Entire Agreement. This Agreement is the entire agreement between the Parties and supersedes all oral agreements and negotiations between the parties relating to this Agreement. All exhibits and attachments to this Agreement are incorporated into the Agreement. If there is a conflict between the terms of this Agreement and any of the exhibits or attachments, the Agreement governs. 15.05 Severability. The provisions of this Agreement are severable. If a court finds any part of this Agreement void, invalid, or unenforceable, it will not affect the validity and enforceability of the remainder of this Agreement. A waiver by a party of any part of this Agreement is not a waiver of any other part of the Agreement or of a future breach of the Agreement. 15.06 Modification of Exhibits. The Parties may modify the exhibits or attachments to this Agreement by mutual written agreement of their respective authorized representatives, without the need for a formal amendment to this Agreement. Any modifications will be documented in writing, signed by both authorized representatives, and maintained with the official project records. These modifications will be deemed incorporated into and enforceable as of the date of mutual execution. 15.07 Amendments. The terms of this Agreement may be changed only by mutual agreement of the Parties. These changes will be effective only upon the execution of written amendments signed by the Parties. 15.08 Binding Effect; No Third-Party Beneficiaries. This Agreement is binding upon and for the benefit of the Parties and their successors and assigns. This Agreement is not intended to benefit any third-party. 15.09 Effective Date and Termination. This Agreement will be effective when all Parties have signed it (the “Effective Date”). The date of this Agreement will be the date this Agreement is signed by the last party to sign it (as indicated by the date associated with that Party’s signature). Except as otherwise provided for in this Agreement, this Agreement will terminate upon the earliest of: a. The Final Acceptance by the City and execution of the OMA; b. A determination by the Council that the Combined Project should not proceed; or c. A determination by the Council that sufficient funds do not exist, or are not reasonably projected to exist, in order to complete the Combined Project. 4.6 16 Termination of this Agreement, whether for cause or convenience, does not release either Party from any obligations, responsibilities, or liabilities arising under any prior agreements between the Parties, including but not limited to those obligations that expressly survive termination or that relate to events, acts, or omissions occurring prior to the effective date of termination. Each Party remains responsible for fulfilling any such outstanding obligations in accordance with the terms of those prior agreements. 15.10 Force Majeure. If a force majeure event occurs, neither Party is responsible for a failure to perform or a delay in performance due to the force majeure event. A force majeure event is an event beyond a party’s reasonable control, such as, unusually severe weather, fire, floods, other acts of God, labor disputes, acts of war or terrorism, or public health emergencies. 15.11 Applicable Law and Venue. This Agreement will be construed and interpreted in accordance with the laws of the State of Minnesota or federal law where applicable. 15.12 Record-Keeping. Under Minnesota Statutes, Section 16C.05, subdivision 5, the Parties agree that the books, records, documents, and accounting procedures and practices relevant to this Agreement are subject to examination by either Party, the state auditor, or legislative auditor, as appropriate, for at least six years from the end of this Agreement. 15.13 Notice and Authorized Representatives. Provisions under this Agreement requiring a Party to provide notice will be considered fulfilled when the party performs one the following: a. certified mail; b. e-mail, as long as the recipient acknowledges receipt by e-mail or otherwise in writing; c. documented correspondence through construction management software; or d. delivered in person to the other party authorized representatives. The authorized representatives for each Party are as follows: Council’s Authorized Representative Alicia Vap, or successor Project Director, Blue Line Ext Project Office Metro Transit 6465 Wayzata Boulevard, Suite 600 St. Louis Park, MN 55426 Alicia.Vap@metrotransit.org City’s Authorized Representative Adam Bell City Manager City of Crystal 4141 Douglas Dr. N Crystal, MN 55422 adam.bell@crystalmn.gov The Parties may update the contact information above by notice to the other Party according to this section. IN WITNESS WHEREOF, the Parties have caused this Agreement to be effective as of the Effective Date. Furthermore, this Agreement may be executed in counterparts, each of which is deemed to be an original, but all of which, taken together, constitute one and the same agreement. [SIGNATURE PAGES FOLLOW] 4.6 17 METROPOLITAN COUNCIL, A public corporation and political subdivision of the State of Minnesota By: Regional Administrator Date: CITY OF CRYSTAL A municipal corporation of the State of Minnesota By: Name, Title Date: and Name, Title Date: RECOMMENDED FOR APPROVAL: By: Name, Title Date: 4.6 18 LIST OF EXHIBITS Exhibit Title A City Improvements 4.6 LAKESIDE AVE NLAKELAND AVE N 48TH AVE NLAKELAND AVE N 48TH AVE NBYRON AVE N℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) BALLAST CURB BALLAST CURB 1:15 1:15 B424 C&G B424 C&G +35.24 +83.70 +33.70 B424-R C&G 11.0' 11.0' 12.0' BOTTINEAU BLVD (CR 81) 13.0' 13.0'4254+004280+00EP: 4280+00.003280+00 B618 C&G 13.0' 11.0' 13.0' 11.0' EX ROW (TYP) EX PROPERTY LINE (TYP) 13.0' 1401+34 1402+00 1403+00 1404+00 1405+00 1406+00 1407+00 1408+00 2401+34 2402+00 2403+00 2404+00 2405+00 2406+00 2407+00 2408+00 3280+00 3281+00 3282+00 3283+00 3284+00 3285+00 3286+00 4280+00 4281+00 4282+00 4283+00 4284+00 4285+00 4286+00 4287+00 B618 C&G B618 C&G ℄ TRACK 2 B424-R C&G ℄ TRACK 1 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 HORIZONTAL SCALE IN FEET 0 15 30 60 106 202SEE CIVIL PACKAGE SEGMENT BSEE SHEET 107S3-CIV-PLN-A-001 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025STA. BACK 3254 + 34.77STA. AHEAD 3280+00.00STA. BACK 4254 + 11.65STA. AHEAD 4280+00.00May, 12 2025 02:11 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements Project-Funded Improvements 4.6 BOTTINEAU BLVD (CR 81) LAKELAND AVE N 49TH AVE NFAIRVIEW AVE N49TH AVE NLAKELAND AVE NLAKESIDE AVE N℄ NB BOTTINEAU BLVD (CR 81) ℄ SB BOTTINEAU BLVD (CR 81) BALLAST CURB BALLAST CURB B424 C&G 1:15 +82.05 +48.05 FAIRVIEW AVE NSC BUNGALOW (NIC) 13.0' 13.0' 13.0' 13.0' 8' WALK 13.0' 11.0' B424 C&G B618 C&G EX ROW (TYP) EX PROPERTY LINE (TYP)XXXXXX X X X B424 C&G 1408+00 1409+00 1410+00 1411+00 1412+00 1413+00 1414+00 1415+00 2408+00 2409+00 2410+00 2411+00 2412+00 2413+00 2414+00 2415+00 3287+00 3288+00 3289+00 3290+00 3291+00 3292+00 3293+00 4287+00 4288+00 4289+00 4290+00 4291+00 4292+00 4293+00 4294+00 TPSS-BL-408 (NIC) B424-R C&G B424-R C&G ℄ TRACK 1 ℄ TRACK 2 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 107 202SEE SHEET108SEE SHEET 106HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-A-002 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025May, 12 2025 02:11 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 50TH AVE NFAIRVIEW AVE NBOTTINEAU BLVD (CR 81) LAKELAND AVE N CORVALLIS AVE NV E R A C R U Z A V E N ℄ NB BOTTINEAU BLVD (CR 81) ℄ SB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP)50TH AVE NB424 C&G +93.00 +33.00 +93.44 +58.44FAIRVIEWAVE N℄ TRACK 2 BALLAST CURB 13.0' 11.0' 11.0' 16.0' 13.0' 13.0' 13.0' 13.0' 8' WALK B618 C&G 8' TRAIL 8' TRAIL BALLAST CURB B424 C&G 1416+00 1417+00 1418+00 1419+00 1420+00 1421+00 1422+00 2416+00 2417+00 2418+00 2419+00 2420+00 2421+00 2422+00 3294+00 3295+00 3296+00 3297+00 3298+00 3299+00 3300+00 3301+00 4294+00 4295+00 4296+00 4297+00 4298+00 4299+00 4300+00 4301+00 R280.0' B424-R C&G B424-R C&G ℄ TRACK 1 13.0' 13.0' 11.0' NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 108 202SEE SHEET 109SEE SHEET 107HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-A-003 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025May, 12 2025 02:11 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 V E R A C R U Z A V E N BOTTINEAU BLVD (CR 81)51ST AVE NL A K E L A N D A V E N 55+0051+0052+0053+0054+00℄ CORVALLIS AVE N ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP)BERNARDAVE N8' TRAIL BALLAST CURB B424 C&G B424 C&G B424 C&G B424 C&G B424 C&G B424 C&G +95.70 +30.70 +58.58 +85.47 21.6' R30.0' 6' WALK 6' WALK ℄ TRACK 2 8.0' 11.0' 13.0' 13.0' 11.0' 8.0' 14.5' 11.0' 11.0' 13.0' R280.0' R40.0' R25.0' R40.0' 28.6' 12.0'12.0'13.3' R5.0'CORVALLIS AVE N14.3'12.0'12.0' ℄ SB BOTTINEAU BLVD (CR 81) EX. MSE WALL EX. MSE WALL 8' WALK 1:15 23.0' 8' TRAIL 11.0' 13.0' R5.0' 22.0' +66.30+52.53 EX. PROPERTY LINE (TYP) 1:15 2 2 2 1 1 BALLAST CURBB624-R C&G BALLAST CURB 14.2'12.0'11.5' 1423+00 1424+00 1425+00 1426+00 1427+00 1428+00 1429+00 1430+002423+00 2424+00 2425+00 2426+00 2427+00 2428+00 2429+00 2430+00 3301+00 3302+00 3303+00 3304+00 3305+00 3306+00 3307+00 3308+00 4301+00 4302+00 4303+00 4304+00 4305+00 4306+00 4307+00 4308+00 LAKELAND AVE N B624-R C&G BALLAST CURB 8' WALK B618 C&G STORMWATER BMP B424-R C&G 13.0' 13.0' B424-R C&G 1 ℄ TRACK 1 15.0' 8 8 8 8 R2.0' R2.0' 1 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 50+00STORMWATER BMP 109 202SEE SHEET 110SEE SHEET 108HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-A-004 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025May, 12 2025 02:12 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTIONMATCH LINE A SEE MATCH LINE A Crystal Lake Regional Trail Crystal Lake Regional Trail Project-Funded Improvements 4.6 BALLAST CURB CPKC RAILROADBOTTINEAU BLVD (CR 81) LAKELAND AVE N ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP) B424 C&G B424 C&G B424 C&G B424 C&G PROPOSED BRIDGE NO. R0991 11.0' 13.0' 13.0' 11.0' 8.0' EX. MSE WALL EX. MSE WALL EX. MSE WALL EX. MSE WALL 8.0' 8.0' 11.0' 13.0' GUARDRAIL POST SEAT STANDARD PLATE 8316 BALLAST CURB GUARDRAIL POST SEAT STANDARD PLATE 8316 BALLAST CURB ℄ SB BOTTINEAU BLVD (CR 81) 11.0' 13.0' 8.0' 1430+00 1431+00 1432+00 1433+00 1434+00 1435+00 1436+00 1437+00 2430+00 2431+00 2432+00 2433+00 2434+00 2435+00 2436+00 2437+00 3309+00 3310+00 3311+00 3312+00 3313+00 3314+00 3315+00 3316+00 4309+00 4310+00 4311+00 4312+00 4313+00 4314+00 4315+00 4316+00 MODIFY APPROACH PANEL MODIFY APPROACH PANEL 1:15 1:15 BALLAST CURB MODIFY EXISTING BRIDGE NO. 27B58 MODIFY EXISTING BRIDGE 27B59 1:15 1:15 B624-R C&G B624-R C&G B624-R C&G B624-R C&G ℄ TRACK 1 ℄ TRACK 2 PROPOSED BRIDGE NO. 27B58A & PROPOSED BRIDGE NO. 27B59A NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 110 202SEE SHEET 111SEE SHEET 109HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-A-005 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025May, 12 2025 02:12 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 LAKELAND AVE N BOTTINEAU BLVD (CR 81) 4330+00 3330+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP) BALLAST CURB BALLAST CURB B424 C&G B424 C&G 13.0' 8.0' 8.0' 13.0' EX. MSE WALL EX. MSE WALL 11.0' 11.0' 1438+00 1439+00 1440+00 1441+00 2438+00 2439+00 2440+00 2441+00 3330+003316+00 3317+00 3318+00 3319+00 4317+00 4318+00 4319+00 4330+00 B624-R C&G B624-R C&G ℄ TRACK 1 ℄ TRACK 2 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 111 202SEE SHEET 112SEE SHEET 110HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-A-006 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY 60% SUBMITTAL - R00 - 05/21/2025STA. BACK 3319 + 85.45STA. AHEAD 3330+00.00STA. BACK 4319 + 97.70STA. AHEAD 4330+00.00May, 12 2025 02:12 pm C:\pw\kh1\d0345547\S3-CIV-PLN-A.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 FLAGEX ROW (TYP) EX PROPERTY LINE (TYP)WILSHIRE BLVDBOTTINEAU BLVD (CR 81) LAKELAND AVE N 3330+00 4330+00 ℄ SB BOTTINEAU BLVD (CR 81) 11.0' 11.0' 12.3' BALLAST CURB BALLAST CURB B424 C&G B424 C&G 6' WALK 7' WALK 8' WALK 7' WALK 6' WALK 8' TRAIL BALLAST CURB BALLAST CURB 13.0' 10.3' B424 C&G 11.0' 13.0' B424 C&G B424 C&G 13.0' 11.0' 16.0' 15.0' 11.0' 11.0' 25.2' 19.8' R3.0' R25.0' 13.0' 7' WALK 11 . 0 ' 15.0' 11.0' 15.0' +28.37 +08.37 +74.95 +29.45 +54.31 113+29110+00111+00112+00113+00℄ WILSHIRE BLVD ℄ NB BOTTINEAU BLVD (CR 81)V-4V-3 V-2V-1 TM C 1:10 1:20 1:45 1 1:15 1:20 1:45 1:45 +34.74 30+00 31+00 32+ 0 0 33+0 0 ℄ LAKELAND AVE N +29.93 +69.93 +52.21 +39.64 R3.0' R30.0' R3.0' R1.0' 2 B618 C&G B618 C&G 12.2' 13 . 0 ' 18.0' 15.5' 11.0' 1442+00 1443+00 1444+00 1445+00 1446+00 1447+00 1448+00 3330+00 3331+00 3332+00 3333+00 3334+00 3335+00 3336+00 3337+00 4330+00 4331+00 4332+00 4333+00 4334+00 4335+00 4336+00 4337+00 +25.70 22.8' +50.70 12.0'12.0'13.0'13.0' B424-R C&G 8.0' B424 C&G 8 8 8 2442+00 2443+00 2444+00 2445+00 2446+00 2447+00 2448+00 B624-R C&G B624-R C&G B424-R C&G ℄ TRACK 1 ℄ TRACK 2 B618 C&G CURB TRANSITION STA 2442+00 2 1 8 2 R25.0' NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:13 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 112 S3-CIV-PLN-B-C-007 CIVIL PACKAGE - SEGMENT C VOLUME 2 - ROADWAY ROADWAY PLANS 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 113SEE SHEET 111HORIZONTAL SCALE IN FEET 0 15 30 60 STA. BACK 3319 + 85.45STA. AHEAD 3330+00.00STA. BACK 4319 + 97.70STA. AHEAD 4330+00.00Crystal Lake Regional Trail Crystal Lake Regional Trail Project-Funded Improvements 4.6 FLAGFLAGFLAGFLAGFLAGFLAGEX ROW (TYP) EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81) LAKELAND AVE N ℄ SB BOTTINEAU BLVD (CR 81) ℄ TRACK 2℄ TRACK 1 ℄ CR 81 NB OFF RAMP RTW-315 RTW-320 RTW-325 +01.53 0+00 B424 C&G 15.0' 15.0' 11.0' 11.0' B612 C&G B624 C&G TYP. PARKING LOT B612 C&G 8' TRAIL B618 C&G B612 C&G R2.0'R2.0' R15.0' R20.0' R8.0' R2.0' R2.0' R2.0' R5.0' R5.0' R2.0' R20.0' R8.0' R41.0' R41.0' +02.57 ℄ CLRT 1 EX ROW (TYP) ℄ NB BOTTINEAU BLVD (CR 81) ℄ CR 81 SB ON RAMP37+2934+00 35+00 36+00 37+00℄ LAKELAND AVE N B618 C&G 1:45 1:45 +00.74 +31.15 R3.0' R2.0' R3.0' BALLAST CURB B424 C&G CONCRETE BARRIER TYPE 36 A STEP STEP BARRIER TYPE 36 A-A IMPACT ATTENUATOR IMPACT ATTENUATOR B618 C&G 8' TRAIL IMPACT ATTENUATOR 4.0' 15.0' 4.0' 4.0' 4.0' 4.0' 11.0' 4.5' 11.0' 6.0' 11.0' 6.0' 11.0' 4.0' 11.0' 11.0' 11.0' 11.0' 4.0' 11.0' 5.5' 6.0' 11.0' 5.0'5.3'5.4' B424-R C&G 1449+00 1450+00 1451+00 1452+00 1453+00 1454+00 1455+00 1456+00 3338+00 3339+00 3340+00 3341+00 3342+00 3343+00 3344+00 3345+00 400+00 401+00 402+00 403+00 404+00 4338+00 4339+00 4340+00 4341+00 4342+00 4343+00 4344+00 4345+00 7.9' WALK R3.0' 300+00 301+00 302+00 303+00 10' TRAIL 2449+00 2450+00 2451+00 2452+00 2453+00 2454+00 2455+00 2456+00 B612 (TYP) BNSF RR ROW (TYP) CONCRETE BARRIER TYPE 36 A (TYP) STEP BARRIER TYPE 36 A-A R20.0' R20.0'RTW-310 CONCRETE BARRIER TYPE 36 A (TYP) NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:13 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 113 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 114SEE SHEET 112HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-008 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:13 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Crystal Lake Regional Trail Project-Funded Improvements 4.6 FLAGFLAGFLAGRR RR RREX PROPERTY LINE (TYP) BASS LAKE ROAD STATION BOTTINEAU BLVD (CR 81) 100+00 101+00 102+00 ℄ TRACK 1 ℄ TRACK 2 BASS LAKE RD (CR 10)4+301+00 2+00 3 + 0 0 4 + 0 0 B624 C&G TYP. PARKING LOT R41.0' +02.57 ℄ CR 81 NB OFF RAMP ℄ CR 81 SB ON RAMP ℄ SB BOTTINEAU BLVD (CR 81) 157 + 0 0 EX ROW (TYP) ℄ NB BOTTINEAU BLVD (CR 81) ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) ℄ CR 81 NB ON RAMP4+610+22 1+00 2+00 3+00 4+00℄ BECKER PARK WALK 1:15+31.15 +05.20 200+00 201+00 ℄ CR 81 SB OFF RAMP 1:15 PROPOSED BRIDGE NO. 27C79 PROPOSED BRIDGE NO. 27C78 R5.5' R15.0' B618 C&G (TYP) 14' WALK 2+590+001+00 2+00 11.0' 4.0' 11.0' 6.0' 11.0' 6.0' 11.0' 4.0' 11.0' 4.0' 11.0' 6.0' ℄ BLR PLAZA 11.0' 6.0' 11.0' 4.0' 15.0' 4.0' 4.0' 1457+00 1458+00 1459+00 1460+00 1461+00 1462+00 1463+00 3345+00 3346+00 3347+00 3348+00 3349+00 3350+00 3351+00 3352+00 409+02404+00 405+00 406+00 407+00 408+00 409+00 4345+00 4346+00 4347+00 4348+00 4349+00 4350+00 4351+00 4352+00XXXX X X XXX℄ CLRT 1 0 + 0 0 1 + 0 0 2+ 0 0 ℄ CLRT 2 10' TRAIL 24.0' 4.0' 4.0' 309+08304+00 305+00 306+00 307+00 308+00 309+00 10' TRAIL R25.0' 2457+00 2458+00 2459+00 2460+00 2461+00 2462+00 2463+00 B612 C&G (TYP) TPSS-BL-409 (NIC) RTW-340 14' WALK BNSF RR ROW (TYP) RTW-345 BNSF RAILWAY RTW-330 RTW-335 PROPOSED BRIDGE NO. 27C77 PROPOSED BRIDGE NO. 27C80 BALLAST CURB BALLAST CURB CONCRETE BARRIER TYPE 36 A (TYP) CONCRETE BARRIER TYPE 36 A (TYP) NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:41 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 114 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 115SEE SHEET 113HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-009 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAYSEE SHEET 127May, 12 2025 02:41 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTIONSEE SHEET 124SEE SHEET 124SEE SHEET 124SEE SHEET 124SEE SHEET 124SHEET OVERLAP AREA. REFER TO SHEETS REFERENCED FOR ADDITIONAL DETAIL. Crystal Lake Regional Trail Project-Funded Improvements 4.6 EX ROW (TYP) EX ROW (TYP) EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81) 107+13 102+00 103+00 104+00 105+00 106+00 107+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ CR 81 NB ON RAMP RTW-370 RTW-375 RTW-360 RTW-365 RTW-380 +23.30 B424 B&G 15.0' 11.0' BALLAST CURB ℄ TRACK 1 ℄ NB BOTTINEAU BLVD (CR 81) GUARDRAIL +40.201:15 206+48 202+00 203+00 204+00 205+00 206+00 ℄ CR 81 SB OFF RAMP 1:15 +11.18 +11.18 1:50 R75.0' BALLAST CURB BALLAST CURB B424-R B&G B424 B&G B424 B&G B424 C&G 11.0' 13.0' 4.0' 11.0' 6.0' 11.0' 4.2' 11.0' 4.0' 11.0' 6.0' 17.5' 4.0' 11.0' 4.0' 14.5' 11.0' 13.8' IMPACT ATTENUATOR 11.0' 4.0' 11.0' 6.0' 11.0' 6.0' 11.0' 4.0' 1464+00 1465+00 1466+00 1467+00 1468+00 1469+00 1470+00 3353+00 3354+00 3355+00 3356+00 3357+00 3358+00 3359+00 4353+00 4354+00 4355+00 4356+00 4357+00 4358+00 4359+00 GUARDRAIL +47.80 1:50 STORMWATER BMP 2464+00 2465+00 2466+00 2467+00 2468+00 2469+00 2470+00 8 GUARDRAIL 1 ℄ TRACK 2 BNSF RR ROW (TYP) BNSF RAILWAY CONCRETE BARRIER TYPE 36 A (TYP) CONCRETE BARRIER TYPE 36 A (TYP) NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 115 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 116SEE SHEET 114HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-010 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY SEE SHEET 127 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 SECEX ROW (TYP) EX PROPERTY LINE (TYP) L A K E L A N D A V E N BOTTINEAU BLVD (CR 81)LAKELAND AVE N℄ SB BOTTINEAU BLVD (CR 81) B424 C&G RTW-380 +34.85 +34.85 11.0'14.0'11.0' 13.0' 13.0' B618 C&G +78.31 +43.31 12.0'501+77500+00501+00174+86 172+00173+00174+0 0 AIRPORT RD℄ NB BOTTINEAU BLVD (CR 81) ℄ AIRPORT RD ℄ BRUNSWICK AVE N GUARDRAIL 1:50 1:15 R7.0' B424 C&G 214.0'B618 C&G 10' TRAIL 13.0'13.0'BALLAST CURB BALLAST CURB B424 C&G GUARDRAIL R60.0' R75.0' 13.0' 13.0' 13.0' 11.0' 4.0' 6.0' 13.0' 1471+00 1472+00 1473+00 1474+00 1475+00 1476+00 1477+00 1478+00 3360+00 3361+00 3362+00 3363+00 3364+00 3365+00 3366+00 3367+00 4360+00 4361+00 4362+00 4363+00 4364+00 4365+00 4366+00 1:50 +34.94 +34.94 174+86 172+00173+00174+0 0 2471+00 2472+00 2473+00 2474+00 2475+00 2476+00 2477+00 2478+00 8 ℄ TRACK 1 ℄ TRACK 2 13.0' BNSF RR ROW (TYP)AIRPORT RDVALLEY GUTTER BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 116 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 117SEE SHEET 115SE E S H E E T 128 HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-011 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTIONCrystal Lake Regional TrailProject-Funded Improvements 4.6 EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81) LAKELAND AVE N 3371+00 3372+00 3373+00 3374+00 3375+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) B424 C&G 13.0' 13.0' 13.0' B424 C&G 13.0' 4370+00 4371+00 4372+00 4373+00 4374+00 4375+00BALLAST CURB BALLAST CURB 174+86 STA. BACK 3368+07.21 STA. AHEAD 3370+00.00 STA. BACK 4367+95.66STA. AHEAD 4370+00.00EX ROW (TYP) B424 C&G B424 C&G 13.0' 13.0' 13.0' 13.1' 1478+00 1479+00 1480+00 1481+00 1482+00 1483+00 1484+00 1485+00 3367+00 3368+00 4370+004367+00 174+86 2478+00 2479+00 2480+00 2481+00 2482+00 2483+00 2484+00 2485+00 BNSF RR ROW (TYP) ℄ TRACK 1 ℄ TRACK 2 BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 117 S3-CIV-PLN-B-C-012 CIVIL PACKAGE - SEGMENT C VOLUME 2 - ROADWAY ROADWAY PLANS 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 118SEE SHEET 116HORIZONTAL SCALE IN FEET 0 15 30 60 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Crystal Lake Regional Trail Project-Funded Improvements 4.6 EX ROW (TYP) EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81)60TH AVE NLAKELAND AVE N 3376+00 3377+00 3378+00 3379+00 3380+00 3381+00 3382+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) 13.0' 13.0' 13.0' B424 C&G 13.0' 13.0' 13.0' 4376+00 4377+00 4378+00 4379+00 4380+00 4381+00 4382+00 BALLAST CURB BALLAST CURB 13.0' 13.0' B424 C&G 1485+00 1486+00 1487+00 1488+00 1489+00 1490+00 1491+00 2485+00 2486+00 2487+00 2488+00 2489+00 2490+00 2491+00 BNSF RR ROW (TYP) ℄ TRACK 1 ℄ TRACK 2 BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 118 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 119SEE SHEET 117HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-013 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 28IN"16" 8STUMP"STUMP" DECORATIVE10"12" 12STUMP"STUMP"EX ROW (TYP) EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81)LOMBARDY LNELMHURST AVE LAKELAND AVE N 3383+00 3384+00 3385+00 3386+00 3387+00 3388+00 3389+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) 13.0' 13.0' 13.0' B424 C&G 13.0' 13.0' 13.0' 13.0'4383+00 4384+00 4385+00 4386+00 4387+00 4388+00 4389+00BALLAST CURB BALLAST CURB 13.0' TPSS-BL-410 (NIC) B424 C&G B424 C&G 1492+00 1493+00 1494+00 1495+00 1496+00 1497+00 1498+00XXXXXXXX 2492+00 2493+00 2494+00 2495+00 2496+00 2497+00 2498+00 BNSF RR ROW (TYP) ℄ TRACK 2℄ TRACK 1 BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 119 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 120SEE SHEET 118HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-014 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81) LAKELAND AVE N 3390+00 3391+00 3392+00 3393+00 3394+00 3395+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) B424 C&G 13.0' 13.0' 13.0' 13.0' 13.0' 13.0' 13.0' 13.0' 4390+00 4391+00 4392+00 4393+00 4394+00 4395+00BALLAST CURB BALLAST CURB EX ROW (TYP) B424 C&G 1499+00 1500+00 1501+00 1502+00 1503+00 1504+00 2499+00 2500+00 2501+00 2502+00 2503+00 2504+00 BNSF RR ROW (TYP) ℄ TRACK 1 ℄ TRACK 2 BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 120 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 121SEE SHEET 119HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-015 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 EX ROW (TYP) EX PROPERTY LINE (TYP) BOTTINEAU BLVD (CR 81)62ND AVE NLAKELAND AVE N 3540+003396+00 3397+00 3398+00 3399+00 3400+00 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) B424 C&G 13.0' 13.0' B424 C&G 13.0'13.0' 13.0' 4396+00 4397+00 4398+00 4399+00 4400+00 4640+00BALLAST CURB BALLAST CURBCITY OF CRYSTALCITY OF BROOKLYN PARK13.0' 13.0'13.0' 1505+00 1506+00 1507+00 1508+00 1509+00 1509+95 2509+952505+00 2506+00 2507+00 2508+00 2509+00 BNSF RR ROW (TYP) ℄ TRACK 1 ℄ TRACK 2 BNSF RAILWAY NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 121 60% SUBMITTAL - R00 - 05/21/2025 202SEE CIVIL PACKAGE SEGMENT DSEE SHEET 120HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C-016 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAYSTA. BACK 3400 + 69.66STA. AHEAD 3540+00.00STA. BACK 4400 + 69.66STA. AHEAD 4640+00.00May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements Project-Funded Improvements 4.6 BIK E RACKBENCH BENCH BENCHSHERBURNE AVEBASS LAKE RD (CR 10) 120+00 121+00 122+00 123+00 124+00 125+00 +52.82 +02.82 EX PROPERTY LINE (TYP) EX ROW (TYP) ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) 1:10 B624 C&G R35.0' 220+00 221+00 222+00 223+00 224+00 225+00 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 122 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 1231:10 S3-CIV-PLN-B-C - 017A CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 RRRRRRRRRRELMHURST AVEBASS LAKE RD (CR 10) B624 C&G 11.0' 13.0' B624 C&G 13.0' 13.0' 11.0' 15.0' 126+00 127+00 128+00 129+00 130+00 131+00 +20.02 11.0' 11.0' R2.0' R30.0' EX PROPERTY LINE (TYP) EX ROW (TYP) ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) 1 2 1 BUS STOP PAD ℄ CR 81 SB OFF RAMP 1:10 1:10 +21.22 1:5 +50.21 +05.21 14.4' 13.0'2 B624 C&G R25.0' 13.0' 12.8' 46.0' +01.22 226+00 227+00 228+00 229+00 230+00 231+00 +11.21+31.21 1:10 +88.22 15.0' 9 19 BNSF RR ROW(TYP)BNSF RAILWAYR200.0' 13.0' NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 123 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 124S3-CIV-PLN-B-C-017 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAYSEE SHEET 122May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 FLAGROOF DRAIN ROOF DRAIN OS 6FT ROOF DRAIN RRRRRRBASS LAKE RD (CR 10)BASS LAKE ROAD STAT ION B624 C&G RTW-34515.0'13.0'11.0'11.0'11.0'13.0'B424 C&G 15.0'11.0'11.0'13.0'16.0'132+00 133+00 134+00 135+00 136+00 137+00 138+0013.0' 11.0' 11.0' 13.0' 15.0' 13.0' 13.0' 13.0' 11.0' 11.0' 13.0' 13.0' 13.0' EX ROW (TYP) EX PROPERTY LINE (TYP)BOTTINEAU BLVD (CR 81 ) ℄ SB BOTTINEAU BLVD (CR 81) ℄ CR 81 SB ON RAMP ℄ NB BOTTINEAU BLVD (CR 81) ℄ CR 81 NB OFF RAMP ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) ℄ TRACK 2 ℄ CR 81 NB ON RAMP 1 BUS STOP PAD ℄ TRACK 1 1 1 1 1 +28.26 ℄ CR 81 SB OFF RAMP 1:5 1:5 1:5+95.84 +50.84 +16.08 +55.07 +08.69 +56.89 14.4' 13.0' 13.0' 13.0' 15.0' B624 C&GB624 C&G B624 C&G B624 C&G B624 C&G 10' WALK 6' WALK 7' BIKE PATH 10' TRAIL 6' WALK 6' WALK 7' WALK 6' WALK 10' WALK R5.0' R25.0' R25.0' R45.0' R3.0' R2.0' R25.0' R20.0' R5.0' R50.0' R55.0' R60.0' B624 C&G B424 C&G B624 C&G 10' TRAIL +61.08 13.0' 13.0' 11.0' 11.0'13.0'6.3'11.0'11.0'4.0'11.0'13.0'4.0'1459+001460+001461+001462+001463+001464+001465+0011.2' 11.0' 13.0' 232+00 233+00 234+00 235+00 236+00 237+00 238+00 155+00156+00 15 7 + 0 0 LAKELAND AVE N 0+001+002+00℄ CLRT 2 ℄ BECKER PARK WALK ℄ CLRT 1 R5.2'R5.0' R41.0' R1.5' R28.0'1:15B618 B&G B618 B&G B624 C&G 6' WALK B424 C&G R75.0' R5.0' R18.0' R24.0' R50.0' R50.0' R3.0' RTW-340 R75.0'2459+002460+002461+002462+002463+002464+002465+009 9 9 8 88 8 VALLEY GUTTER B624 C&G 1 8' TRAIL STORMWATER BMP R50.0' 1 BNSF RA ILWAY BNSF RR ROW (TYP) 5 5 5 5 5 5 5 5 5 55 R2.0' R2.0' NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 124 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 123SEE SHEET 125S3-CIV-PLN-B-C-018 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:14 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION SEE SHEET 114 SEE SHEET 114 SHEET OVERLAP AREA. REFER TO SHEETS REFERENCED FOR ADDITIONAL DETAIL.Crys ta l Lake Reg iona l T ra i l Crystal Lake Regional Trail Project-Funded Improvements 4.6 B624 C&G B624 C&G B624 C&G BASS LAKE RD (CR 10)ADAIR AVE NZANE AVE NLAKELAND AVE N13.0' 11.0' 13.0' 139+00 140+00 141+00 142+00 143+00 144+00 R25.0' R25.0' ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) EX ROW (TYP) EX PROPERTY LINE (TYP) 2 1:10 +33.94 11.0' B624 C&G B624 C&G 7' BIKE LANE 2' BUFFER 11.0' 12.5' R30.0' R25.0' 6' WALK 7' BIKE PATH 10' WALK (TYP) R45.0' R30.0' 35.0'11.0' 11.0' 13.0' 11.7' 12.3' 29.3' 25.3' 25.3' 239+00 240+00 241+00 242+00 243+00 244+00 R28.0' +22.94 NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 125 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 124SEE SHEET 126S3-CIV-PLN-B-C-019 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 ROOF DRAIN BASS LAKE RD (CR 10)YATES AVE NXENIA AVE NWELCOME AVE N151+86 145+00 146+00 147+00 148+00 149+00 150+00 151+00R25.0' ℄ WB BASS LAKE RD (CR 10) ℄ EB BASS LAKE RD (CR 10) EX PROPERTY LINE (TYP) 11.0' 11.0' B624 C&G 10' WALK 5' BIKE LANE 2' BUFFER 5' BIKE LANE 2' BUFFER 13.0' 11.0' 25.3' 251+85 245+00 246+00 247+00 248+00 249+00 250+00 251+00 BUS STOP PAD R25.0' NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 126 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 125S3-CIV-PLN-B-C-020 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Project-Funded Improvements 4.6 B618 C&G 57TH AVE NB R U N S W I C K A V E N 157 + 0 0 158 + 0 0 1 5 9 + 0 0 1 6 0 + 0 0 1 6 1 + 0 0 162 + 0 0 163+ 0 0 164+00165 + 0 0 ℄ BRUNSWICK AVE N EX ROW (TYP) EX PROPERTY LINE (TYP) R10.0' R10.0' R10.0' R10.0' R25.0' R25.0'R25.0' R25.0'13.0'13.0'1 3 . 0 ' 8' TRAIL (TYP) B618 C&G B618 C&G B618 C&G R15.0' R15.0' 26 . 5 ' R2.0' R6.0' 26.8' 4 + 8 8 2+ 0 0 3 + 0 0 4 + 0 0 ℄ CLRT 2 R18.0'R24.0'R50.0'R50.0'R25.0' VALLEY GUTTER VALLEY GUTTER VALLEY GUTTER 11 . 0 ' 8. 0 ' STREET PARKING NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS.May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 127 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 128HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C - 021 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY SEE SHEET 115 SEE SHEET 114May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Cr y s t a l L a k e R e g i o n a l T r a i l Project-Funded Improvements 4.6 SECEX PROPERTY LINE (TYP) EX ROW (TYP) B618 C&G C O L O R A D O A V E N LAKELAND AVE NAIRPORT RDB R U N S W I C K A V E N B618 C&G B618 C&G 501+77166+00 16 7 + 0 0 16 8 + 0 0 169+00 170+00 171+00172+00℄ BRUNSWICK AVE N ℄ AIRPORT RD ℄ BRUNSWICK AVE N 2 2 B618 B&G 13 . 0 ' 13.0' 13.0'13.0'R40.0'13.0'R40.0' R55.0' 8' TRAIL (TYP) R40.0' R7.0' R15.0' R10.0' 214.0'13.0'13.0'25.2' R10.0' R10.0'AIRPORT RDVALLEY GUTTER VALLEY GUTTER 11 . 0 ' 8. 0 ' STREET PARKING NOTES: 1.ROADWAY DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 2.SEE SITE AND GRADING PLANS FOR ADJACENT PROPOSED PARKING LOT RECONSTRUCTION INFORMATION. 3.SEE LANDSCAPE AND URBAN DESIGN PLANS FOR FENCE TYPES. 4.SEE STATION PLANS FOR STATION DETAILS. 5.SEE INTERSECTION AND PED RAMP DETAILS FOR PEDESTRIAN RAMP DETAILS. SPECIFIC NOTES: APPROACH NOSE STANDARD PLATE 7113 10’ CURB TYPE TRANSITION – SEE CIVIL DETAIL SHEETS BUS STOP CONCRETE DRIVEWAY APRON – SEE CIVIL DETAIL SHEETS CURB END TAPER - SEE CIVIL DETAIL SHEETS WIDE GUTTER PAN – SEE CIVIL DETAIL SHEETS PARALLEL DRIVEWAY - SEE MNDOT STANDARD PLAN 5-297.254 BALLAST AND ROADWAY CURB TRANSITION– SEE CIVIL DETAIL SHEETS MEDIAN CUT THROUGH - SEE CIVIL DETAIL SHEETS 1 2 3 4 5 6 7 8 9 May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 128 60% SUBMITTAL - R00 - 05/21/2025 202SEE SHEET 127HORIZONTAL SCALE IN FEET 0 15 30 60 S3-CIV-PLN-B-C - 022 CIVIL PACKAGE - SEGMENT C ROADWAY PLANS VOLUME 2 - ROADWAY SEE S H E E T 116 May, 12 2025 02:15 pm C:\pw\kh1\d0345547\S3-CIV-PLN-B-C.dwg By: etroudtSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION Cr y s t a l L a k e R e g i o n a l T r a i l Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 29 S3-UTL-SWP-001 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE CIVIL PACKAGE SEGMENT BSEE SHEET 30Project-Funded Improvements 4.6 XXXXXX X X X SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 30 S3-UTL-SWP-002 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 31SEE SHEET 29Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 31 S3-UTL-SWP-003 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 32SEE SHEET 30Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 32 S3-UTL-SWP-004 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 33SEE SHEET 31Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 33 S3-UTL-SWP-005 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 34SEE SHEET 32Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 34 S3-UTL-SWP-006 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 35SEE SHEET 33Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 35 S3-UTL-SWP-007 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 36SEE SHEET 34Project-Funded Improvements Locally-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 36 S3-UTL-SWP-008 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 37SEE SHEET 35Project-Funded Improvements 4.6 XXXX X X XXXSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 37 S3-UTL-SWP-009 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 38SEE SHEET 36SEE SHEET 46SEE SHEET 46SEE SHEET 46SEE SHEET 46SEE SHEET 46SEE SHEET 38SEE SHEET 47 Project-Funded Improvements Tee & Line to Fire Hydrant 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 38 S3-UTL-SWP-010 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 39SEE SHEET 37SEE SHEET 37SEE SHEET 49 Project-Funded Improvements 4.6 SECSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 39 S3-UTL-SWP-011 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 40SEE SHEET 38SEE SHEET 50 Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 40 S3-UTL-SWP-012 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 41SEE SHEET 39Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 41 S3-UTL-SWP-013 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 42SEE SHEET 40Project-Funded Improvements 4.6 XXXXXXSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 42 S3-UTL-SWP-014 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 43SEE SHEET 41Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 43 S3-UTL-SWP-015 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 44SEE SHEET 42Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 44 S3-UTL-SWP-016 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE CIVIL PACKAGE SEGMENT DSEE SHEET 43Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 45 S3-UTL-SWP-017 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 46Project-Funded Improvements 4.6 ROOF DRAIN ROOF DRAIN OS 6FT ROOF DRAIN SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 46 S3-UTL-SWP-018 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 45SEE SHEET 47SEE SHEET 37 SEE SHEET 37 SEE S H E E T 38 Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 47 S3-UTL-SWP-019 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 46SEE SHEET 48SEE SHEET 37 Project-Funded Improvements 4.6 ROOF DRAIN SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 48 S3-UTL-SWP-020 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52SEE SHEET 47Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 49 S3-UTL-SWP-021 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52 SEE SHEET 38 SEE SHEET 50SEE SHEET 46SEE SHEET 38 Project-Funded Improvements 4.6 SHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECK DESIGN DRAFT-NOT FOR CONSTRUCTION 50 S3-UTL-SWP-022 CIVIL PACKAGE - SEGMENT C VOLUME 6 - UTILITIES UTILITY PLAN 60% SUBMITTAL - R00 - 05/21/25 52 SEE SHEET 39 SEE SHEET 49Project-Funded Improvements 4.6 Page 1 of 4 Reference Numbers: BLE Project: 61403 Metropolitan Council: 18I010B City: ___________ PROJECT: BLUE LINE EXTENSION LIGHT RAIL TRANSIT MASTER AGREEMENT: Master Funding Agreement – City of Crystal PARTIES TO AGREEMENT: • Metropolitan Council (“Council”) • City of Crystal (“City”) SUBORDINATE FUNDING AGREEMENT City of Crystal - SFA #02 (Local Work Design) This Subordinate Funding Agreement (“SFA”) Number #02 with the City of Crystal is entered into by and between the above named Parties. WHEREAS: 1. The Parties entered into a METRO Blue Line Extension Light Rail Transit Project (“Project”) Master Funding Agreement (“MFA”), effective May 30, 2018 (Council Agreement #18I010). 2. The Parties provided in the MFA that certain aspects of funding for the Project would be determined in subsequent SFAs. 3. The Parties desire to enter this SFA to transfer City funds to reimburse the cost for Council activities for professional services and the Council’s administrative costs of designing local improvements requested by the City related to, but not part of the Project, referred to as Local Work. 4. The Parties acknowledge that the planning of the Project will require numerous federal, state and local processes, approvals and funding commitments. The processes for the Project are ongoing and the Project is subject to change to address those processes. The outcomes of those processes may affect whether the components requested in this SFA will ultimately be constructed. 4.6 Page 2 of 4 NOW, THEREFORE, in reliance on the statements in these recitals, the Parties agree as follows: 1. Maximum Amount of Authorized Funding. The activities authorized by this SFA will not exceed $26,733, unless authorized in a subsequent amendment to this SFA. 2. Project Budget. The budget for the activities described in this SFA is provided as Exhibit A. Funds provided in this SFA may only be used for reimbursing the Council’s costs for activities directly incurred within the described Specific Description of Funding Authorization below, and as detailed in the MFA. 3. Specific Description of Funding Authorization. The activities to be performed by the Council and reimbursed by the City include the development of design plans and engineer’s construction cost estimates for various Local Work identified in Exhibit A. If authorized by the City, the Local Work are anticipated to be constructed by the Project. Reimbursement payments made by the City for the Council professional staff costs will be based on actual costs incurred following receipt of invoices from the Council’s consultant and in accordance with Exhibit A. The Council will incorporate the design plans for the Local Work in the proposed Project construction bid documents if: a) the environmental review of the Project allows for construction; and b) the Project is permitted to proceed to construction. The construction specifications for the Local Work will be incorporated in the overall specifications within the Project construction bid documents; no separate or standalone specifications will be created. 4. Local Work Construction SFA. In order for the Local Work to be included in the Project bid documents, the Parties must execute a construction SFA at least one (1) month prior to bid opening, authorizing construction and reimbursement. At least three (3) months prior to the Council opening the bids, the Council will provide the City with the final draft SFA for City review. If the City elects to proceed with construction authorization through a construction SFA, the Parties acknowledge that construction pricing and bid acceptance procedures will be governed by the terms of the Cooperative Construction Agreement (Council Contact No. 24I047). 5. Property Acquisition. It is not anticipated that property rights will need to be acquired to construct the proposed Local Work. However, if acquisition of property rights are needed to construct any of the Local Work a subsequent agreement must address property access, acquisition, disposition, and other real property matters needed for the Local Work, beyond what is required to construct the Project. 6. Project Activity Periods. The project activity period for the purposes of this SFA shall be effective upon execution to December 31, 2032, and will terminate on the date all costs under this SFA have been reimbursed, unless terminated earlier consistent with the terms of the MFA. 7. No Guarantee of Construction. This SFA describes terms requiring the City to reimburse the Council’s cost for design activities associated with the Local Work. The Council shall not be required to construct Local Work that is precluded by subsequent state or federal environmental review or specific legal constraints. The City and the Council acknowledge that nothing in this Agreement shall require the Council to take any action or make any decision that will prejudice or compromise any review or decision-making processes required under state and federal 4.6 Page 3 of 4 environmental review laws, regulations or rules. The Parties intend this Agreement to be interpreted consistent with statutory and other legal authorities, including but not limited to the Minnesota Environmental Policy Act and the National Environmental Policy Act. The Parties agree that this SFA does not limit the alternatives or mitigative measures that the Council may undertake in the development and construction of the Project. The Council retains the right to make decisions and necessary approvals associated with Project requirements. 8. Authorized Representatives. Each party’s Authorized Representative and successor is responsible for administrating this SFA and is authorized to give and receive any notice required or permitted under this SFA. a. City’s Authorized Representative is Adam Bell, or successor City Manager, City of Crystal 4141 Douglas Dr. N. Crystal, MN 55422-1696 Adam.Bell@crystalmn.gov b. Council’s Authorized Representative is Alicia Vap, or successor Project Director, Blue Line Extension 6465 Wayzata Boulevard, Suite 600 St. Louis Park, MN 55426 Alicia.Vap@metrotransit.org 9. Incorporation. The terms, conditions, and definitions of the MFA are expressly incorporated into this SFA. 10. Electronic Signatures and Counterparts. This SFA may be executed in counterparts, each of which has the effect of an original, but all of which, taken together, will constitute one and the same agreement. An electronic signature will be deemed an original signature. CITY OF CRYSTAL METROPOLITAN COUNCIL By: By: Its: Its: Date: Date: By: Its: Date: 4.6 Page 4 of 4 Exhibit A – Local Work Design Local Work (LW) # LW Name LW Description Total Design + Administrative Costs1 C-1 Sanitary Sewer Removal and replacement of city-owned sanitary (8-12" diameter) from Wilshire Blvd to Lakeland Ave (330 LF). Removal under CR81, and replacement under Lakeland Ave N. $6,329 C-2 Watermain Replacement of city owned watermain (12") under Lakeland Ave N near Crystal Airport from the existing 12"x8" cross east of CR81 to Crystal Airport Road (290 LF). $7,640 C-3 Water Lining Lining of city owner watermain under Bass Lake Road generally centered at the BNSF RR crossing, valve to valve (150 LF). $6,167 C-4 Irrigation in median Installation of city owned irrigation in Bass Lake Road in medians directly east and west of CR-81. $6,597 Total: $ 26,733 1 Estimated cost includes the Design Fees of 10% and Council’s 2% contract administration fee (the Council’s contract administration fee is reduced from the fee agreed in Section 5.06 of the Master Funding Agreement). 4.6 FLAGDDDDDDDDDDUUUUEUUUUUUUUUEEEESSSSNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPT2441+00 2442+00 2443+00 2444+00 2445+00 2446+00 2447+00 2448+00 1441+00 1442+00 1443+00 1444+00 1445+00 1446+00 1447+00 1448+00 4330+00 4331+00 4332+00 4333+00 4334+00 4335+00 4336+00 4337+00 3330+003330+00 3331+00 3332+00 3333+00 3334+00 3335+00 3336+00 3337+00 4330+00 WILSHIRE BLVDBOTTINEAU BLVD (CR 81) LAKELAND AVE N ℄ TRACK 1 ℄ TRACK 2 ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP) PROFILE W-C19 PROFILE X 8" X 8" TEE 1 2 8" GATE VALVEC2 1 8" GATE VALVEC2 1 8" GATE VALVEC2 CONSTRUCTION LIMITS CONSTRUCTION LIMITS 9 9 9 9 8" GATE VALVEC2 SAN7072 SAN7073 SAN7074 PROFILE 7072-7074 Dec, 05 2025 11:27 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION 34 S3-UTL-SWP-007 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60SEE SHEET 35SEE SHEET 33HORIZONTAL SCALE IN FEET 0 15 30 60 PROFILE REFERENCE PROFILE 7072 - SEE SHEET 51 PROFILE W-C19 - SEE SHEET 57 PROFILE W-C3 - SEE SHEET 50 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES. 4.6 FLAGFLAGFLAGFLAGFLAGFLAGDDSSSSSSTTNMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPT2449+00 2450+00 2451+00 2452+00 2453+00 2454+00 2455+00 2456+00 1449+00 1450+00 1451+00 1452+00 1453+00 1454+00 1455+00 1456+00 4338+00 4339+00 4340+00 4341+00 4342+00 4343+00 4344+00 4345+00 3338+00 3339+00 3340+00 3341+00 3342+00 3343+00 3344+00 3345+00 400+00 401+00 402+00 403+00 404+00 300+00 301+00 302+00 303+00 BOTTINEAU BLVD (CR 81) LAKELAND AVE N ℄ SB BOTTINEAU BLVD (CR 81) ℄ TRACK 2 ℄ TRACK 1 ℄ NB BOTTINEAU BLVD (CR 81) ℄ CR 81 NB OFF RAMP EX ROW (TYP) EX PROPERTY LINE (TYP) 8" X 6" TEE C1 PROFILE W-C4 8" DIP 8" GATE VALVEC2 8" GATE VALVEC2 6" DIP PROFILE W-C7 8" DIP CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS BNSF R A I L W A Y ℄ CR 81 SB ON RAMP Dec, 05 2025 11:27 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION 35 S3-UTL-SWP-008 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60SEE SHEET 36SEE SHEET 34HORIZONTAL SCALE IN FEET 0 15 30 60 PROFILE REFERENCE PROFILE W-C7 - SEE SHEET 53 PROFILE W-C4 - SEE SHEET 52 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES. 4.6 SECEVAULTELECNMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPTNMH-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTTWELECTRANS.GASMETERTCOCOCO2471+00 2472+00 2473+00 2474+00 2475+00 2476+00 2477+00 2478+00 1471+00 1472+00 1473+00 1474+00 1475+00 1476+00 1477+00 1478+00 4360+00 4361+00 4362+00 4363+00 4364+00 4365+00 4366+00 4367+00 3360+00 3361+00 3362+00 3363+00 3364+00 3365+00 3366+00 3367+00 BOTTINEAU B L V D ( C R 8 1 ) LAKELAND AVE N CRYSTAL AIRPORT RD℄ SB BOTTINEAU BLVD (CR 81) ℄ TRACK 1 ℄ TRACK 2 ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP) 12" X 8" CROSS 6' DIP 6" X 8" TEE 6' DIP SEE PROFILE W-C18 8" DIP (2) 6" PROPOSED SERVICES PROFILE 7080-7083 15" PVCSAN7081 SAN7083 2 8" X 8" TEE SEE PROFILE W-C18 8" GATE VALVE C21 C1 C1 (2) 6" GATE VALVESC2 15" PVC 172+00173+00174+00 174+89 8 8 CONSTRUCTION LIMITS CONSTRUCTION LIMITS SAN7080 8 8" DIP CONSTRUCTION LIMITS 1 (2) 6" GATE VALVESC21 (2) 6" DIP SERVICES 15" PVC 12' CIP SAN70828 CRYSTAL AIRPORT RDPROFILE 7079-7080 BNSF RAILWAY CRYSTAL AIRPORT SEE PROFILE W-C18 SEE PROFILE W-C15 SEE PROFILE W-C18 Dec, 05 2025 11:28 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION 38 S3-UTL-SWP-011 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60SEE SHEET 39SEE SHEET 37HORIZONTAL SCALE IN FEET 0 15 30 60 SEE SHEET ## PROFILE REFERENCE PROFILE 7079-7080 - SEE SHEET 50 PROFILE 7080-7083 - SEE SHEET 50 PROFILE W-C18 - SEE SHEET 56 PROFILE W-C15 - SEE SHEET 56 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES. 4.6 SECDSSSSCOCOCOC O L O R A D O A V E N CRYSTAL AIRPORT RDLAKELAND AVE NCRYSTAL AIRPORT RDB R U N S W I C K A V E N EX ROW (TYP) SEE PROFILE W-C18 8" DIP 8" X 8" TEE SEE PROFILE W-C12 8" DIP 6" GATE VALVEC21 166+00 16 7 + 0 0 16 8 + 0 0 169+00 170+00 171+00172+00B R U N S W I C K A V E N CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS 9 8" X 12" TEE 1 1 1 C1 12" DIP 12" DIP 6" DIP 6" DIP CRYSTAL AIRPORT RDCRYSTAL AIRPORT SEE PROFILE W-C21 SEE PROFILE W-C18 Dec, 05 2025 11:29 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 50 S3-UTL-SWP - 023 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60 SEE SHEET 38 SEE SHEET 49PROFILE REFERENCE PROFILE W-C21 - SEE SHEET 57 PROFILE W-C12 - SEE SHEET 55 PROFILE W-C18 - SEE SHEET 56 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES. 4.6 FLAGFLAGFLAGDDDEEEEESSVAULTELECVAULTELECEEEEEEEEEEEEETVAULTELECVAULTELECVAULTELECVAULTELECEEVAULTELECEEMETERELECMETERELECEVAULTELECEEEMETERELECMETERELECVAULTELECVAULTELECVAULTELECVAULTELECGASMETERTVAULTELECNMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FIB-OPT NMH-FI B - O P T NMH - F I B - O P T NMH-FIB-O P T NMH-F I B - O P T NMH-FIB-OPT HC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTHC-FIB-OPTGASTXXXX X X XXXCOCO2457+00 2458+00 2459+00 2460+00 2461+00 2462+00 2463+00 1457+00 1458+00 1459+00 1460+00 1461+00 1462+00 1463+00 4345+00 4346+00 4347+00 4348+00 4349+00 4350+00 4351+00 4352+00 3345+00 3346+00 3347+00 3348+00 3349+00 3350+00 3351+00 3352+00 100+00 101+00 102+00 200+00 201+00 409+02404+00 405+00 406+00 407+00 408+00 409+00 309+08304+00 305+00 306+00 307+00 308+00 309+00 232+00233+00234+00235+00236+00237+00238+00132+00133+00134+00135+00136+00137+00138+00BOTTINEAU BLVD (CR 81) ℄ CR 81 NB OFF RAMP ℄ TRACK 2 ℄ CR 81 SB ON RAMP ℄ SB BOTTINEAU BLVD (CR 81) ℄ NB BOTTINEAU BLVD (CR 81) EX ROW (TYP) EX PROPERTY LINE (TYP)BASS LAKE RD (CR 10)PROFILE X PROFILE W-C10 8" DIP 8" DIP 2 8" GATE VALVEC21 8 8 8" GATE VALVEC2 SAN70758" GATE VALVEC21 SAN7077 18" PVC 8" DIP 157 + 0 0 CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS REMOVE EXISTING WATER MAIN TEE. INSTALL SPOOL PIECE AND SLEEVE. 1 PROFILE 7075-7077 SAN7076 8 ℄ CR 81 SB OFF RAMP ℄ EB BASS LAKE RD (CR 10) ℄ CR 81 SB ON RAMP ℄ SB BOTTINEAU BLVD (CR 81) ℄ SB CR 81 NB ON RAMP ℄ WB BASS LAKE RD (CR 10) ℄ CR 81 NB OFF RAMP ℄ TRACK 1 BNSF RAILWA Y ADAIR AVE NBASS LAKE ROAD STATION SEE PROFILE W-C5 Dec, 05 2025 11:27 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION 36 S3-UTL-SWP-009 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60SEE SHEET 37SEE SHEET 35HORIZONTAL SCALE IN FEET 0 15 30 60 SEE SHEET ##SEE SHEET ##SEE SHEET ##SEE SHEET ##SEE SHEET ##SHEET OVERLAP AREA. REFER TO SHEETS REFERENCED FOR ADDITIONAL DETAIL.SEE SHEET 37SEE SHEET ## PROFILE REFERENCE PROFILE W-C5 - SEE SHEET 52 PROFILE W-C10 - SEE SHEET 54 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES. 4.6 D D D EEEEES VAULTELEC VAULTELEC E E E E E E E E E E E EE E E E T VAULTELEC VAULTELEC VAULTELECVAULTELEC E E VAULTELEC E E METER ELEC METERELEC E VAULTELEC E E E METER ELEC METERELEC VAULTELEC VAULTELEC VAULTELEC VAULTELEC GASMETER VAUL TELEC NMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTNMH-FIB-OPTHC-F IB -OPTHC-F IB -OPTHC-F IB -OPTHC-FIB-OPTHC-F IB -OPTHC-FIB-OPTHC-F IB -OPTHC-FIB-OPTHC-FIB- O P T HC-FIB- O P T HC-FIB-OPT HC-FIB-OPT HC-FIB-OPT HC-FIB-OPT HC-FIB-O P T HC-FIB- O P T HC-FIB-OPT HC-FIB-O P T HC-FIB - O P T HC-FIB-OPT HC-FIB-OPT HC-FIB-OPT H C - F I B -O P T HC-F IB -OPTHC-F IB -OPTHC-F IB -OPT H C - F I B - O P T HC-F IB -OPTHC-F IB -OPTHC-F IB -OPT T CENT. AIR CENT. AIR CENT. AIR CENT. AIR CENT. AIR CENT. AIR GAS T E COCO 2459+002460+002461+002462+002463+002464+002465+001459+001460+001461+001462+001463+001464+001465+004347+004348+004349+004350+004351+004352+004353+003348+003349+003350+003351+003352+003353+003354+00100+00101+00102+00103+00200+00201+00202+00203+00409+02406+00407+00408+00409+00309+08307+00308+00309+00232+00 233+00 234+00 235+00 236+00 237+00 238+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 LAKELAND AVE N ℄ TRACK 2 EX ROW (TYP) EX PROPERTY LINE (TYP)BASS LAKE ROAD STAT ION 155+00156+00 15 7 + 0 0 CONSTRUCTION LIMITS CONSTRUCTION LIMITS ℄ CR 81 SB OFF RAMP ℄ EB BASS LAKE RD (CR 10) ℄ CR 81 SB ON RAMP ℄ SB BOTTINEAU BLVD (CR 81)BNSF RA ILWAY ℄ SB CR 81 NB ON RAMP BOTTINEAU BLVD (CR 81 ) BASS LAKE ROAD (CR 10) ℄ WB BASS LAKE RD (CR 10) ℄ CR 81 NB OFF RAMP SEE PROFILE W-C5 Dec, 05 2025 11:28 am C:\pw\kh1\d0345567\S3-UTL-SWP.dwg By: amalokuSHEET OF SHEET NAME: NO. DATE BY REVISION / SUBMITTALCHECKDESIGN DRAFT-NOT FOR CONSTRUCTION HORIZONTAL SCALE IN FEET 0 15 30 60 46 S3-UTL-SWP - 019 CIVIL/SYSTEMS CONSTRUCTION VOLUME 6C - UTILITIES UTILITY PLAN 90% SUBMITTAL - R00 - 02/27/26 60SEE SHEET 45SEE SHEET 47SEE SHEET 36 SEE SHEET 36 SHEET OVERLAP AREA. REFER TO SHEETS REFERENCED FOR ADDITIONAL DETAIL. SEE S H E E T 37 PROFILE REFERENCE PROFILE W-C5 - SEE SHEET 52 XX NOTES: 1.SEE SHEET 4 FOR PROPOSED UTILITY LEGENDS. 2. = CONSTRUCTION NOTE. REFER TO SHEET 4 FOR NOTES 3.SEE UTILITY PLAN SHEET 36 - S3-UTL-SWP-009 FOR UTILITY DESIGN NOTES IN THIS AREA . 4.6 BASS LAKE ROAD MEDIAN 1/5/2026 BROOKLYN PARK CRYSTAL ROBBINSDALE MINNEAPOLIS 4.6 DRAFT - WORK IN PROCESS January 5, 2026 Existing Bass Lake Road Median LandscapeSherburne AvenueBo t t i n e a u B o u l e v a r d Lakeland Avenue Bass Lake RoadElmhurst Avenue 4.6 DRAFT - WORK IN PROCESS January 5, 2026 Existing Bass Lake Road Median Landscape Sherburne Ave to Bottineau Blvd Lakeland Ave to Bottineau Blvd 4.6 DRAFT - WORK IN PROCESS Bass Lake Road Median Landscape Plan Example January 5, 2026 Sheet 01 Bass Lake Road Becker Park 1.5’ Maintenance Strip MATCH LINE4.6 DRAFT - WORK IN PROCESS Bass Lake Road Median Landscape Plan Example January 5, 2026 Sheet 02 Bass Lake RoadElmhurst AvenueBecker Park BNSF Ra i lway Section 1 1 1 MATCH LINE4.6 DRAFT - WORK IN PROCESS Bass Lake Road Median Landscape Plan Example January 5, 2026 Sheet 03 Bass Lake Road Adair AvenueLakeland AvenueNB B o t t i n e a u B o u l e v a r d O n -R am p NB B o t t i n e a u B o u l e v a r d Of f- Ra m p Lotus Pointe Development NB LR T G u i d ew a y SB LR T G u i d ew a y CLRTColored Concrete Colored Concrete Section 2 2 2 4.6 DRAFT - WORK IN PROCESS Bass Lake Road Median Landscape Plan Example January 5, 2026 Sections Section 1 - Facing East Section 2 - Facing East 4.6 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026 – ___ RESOLUTION RECOMMENDING AUTHORIZATION OF BLUE LINE EXTENSION AGREEMENTS WHEREAS, the Metropolitan Council, an agency of the State of Minnesota, is proposing to build the METRO Blue Line Extension ( the “ Project”), light rail transit infrastructure, through the City of Crystal ( the “ City”); and WHEREAS, the Project has now reached the 90% Design phase, requiring the execution of a Cooperative Construction Agreement (CCA) to define construction responsibilities and a Subordinate Funding Agreement (SFA) to manage the design and construction of local municipal infrastructure; and WHEREAS, the City Staff finds that execution of these agreements is in the interest of the City, provided that the technical protections and financial safeguards identified by City Staff are fully incorporated into the final document; and WHEREAS, those discussions have yielded certain commitments from the Project or Hennepin County, as applicable; and NOW, THEREFORE, BE IT RESOLVED, that the City Council elects to authorize the City Manager to execute the Cooperative Construction Agreement (CCA) and the Subordinate Funding Agreement (SFA) with the Metropolitan Council and Hennepin County; and BE IT FURTHER RESOLVED that the City Council approval to authorize the signature of the named agreements is based on commitments made by the Project or Hennepin County, as follows: 1. This authorization is contingent upon the Project’s written commitment to resolve the technical items identified by the City’s letter on April 28, 2026, to the satisfaction of the City Engineer, Community Development Director, and the Transit Project Coordinator, including but not limited to: 2. Finalizing the SFA to ensure all local work is appropriately funded and designed to the City standards 4.6 BE IT FURTHER RESOLVED that this resolution does not preclude the City from taking future actions within its authority to ensure the Project is built and maintained in a way that protects Crystal’s municipal infrastructure and quality of life. Adopted by the Crystal City Council this ___ day of ___________________, 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Christina Serres, City Clerk 4.6 Memorandum DATE: May 19, 2026 TO: Mayor and City Council FROM: Sarah Nissen, Administrative Program Specialist SUBJECT: Consider Appointment of Lilliann Henthorne to the Parks & Recreation Commission ____________________________________________________________________ BACKGROUND The City Council interviewed Lilliann Henthorne for appointment to the Parks & Recreation Commission on May 5. Following the interview, Lilliann is recommended for appointment to the Parks & Recreation Commission to fill a vacant At-large seat, with a term expiring on December 31, 2028. RECOMMENDATION Recommend a new appointment of Lilliann Henthorne to the Parks & Recreation Commission for an At-large seat for a term to expire 12/31/28. ATTACHMENT Commission Application – Lilliann Henthorne (Redacted) 4.7 4.7 4.7 4.7 4.7 Memorandum DATE: May 19, 2026 TO: Mayor and City Council FROM: Sarah Nissen, Administrative Program Specialist SUBJECT: Consider Appointment of Jordan Pinneke to Inclusion & Diversity Commission ____________________________________________________________________ BACKGROUND The City Council interviewed Jordan Pinneke for appointment to the Inclusion & Diversity Commission on May 5. Following the interview, Jordan is recommended for appointment to the Inclusion & Diversity Commission to fill a vacant At-large seat, with a term expiring on December 31, 2027. RECOMMENDATION Recommend a new appointment of Jordan Pinneke to the Inclusion & Diversity Commission for an At-large seat for a term to expire 12/31/27. ATTACHMENT Commission Application – Jordan Pinneke (Redacted) 4.8 4.8 4.8 4.8 Memorandum Memorandum DATE: May 19, 2026 TO: City Council FROM: Jesse Struve, Public Works Director Brad Fortin, Parks Superintendent SUBJECT: Declare disease trees public nuisances and order them abated Summary City Code Section 2015 states that the City has determined that the health of the shade trees within the city limits is threatened by shade tree diseases. It has further determined that the loss of shade trees growing upon public and private property would substantially depreciate the value of property within the city and impair the safety, good order, general welfare and convenience of the public. Over the last few years the City has been working with around a hundred property owners to get diseases trees removed. Of the properties contacted over the last two years, 6 properties with confirmed shade tree diseases have not responded to any City correspondence or removed the diseased tree(s). As of May 15, 2026, the trees had not been removed. Since the City has contacted the properties multiple times over the last 12 months and received no action, they are coming to Council for abatement consideration. City Code provides a process for which the Council needs to declare these diseased trees to be nuisances so that the City can remove them. The process states that the City must notify the property owner, provide the property owner the opportunity to speak directly to the Council at the Council meeting, after which point the Council may take action to declare the tree a nuisance and order it abated. Attached to this memo is the notification letter of the Council meeting. This property has received other correspondence from the City prior to the attached letter. Attachment •3224 Welcome Ave. N. •3242 Adair Ave. N. •3048 Wisconsin Ave. N. •3032 Utah Ave. N. •3101 Florida Av. N. •3160 Welcome Ave. N Recommended Action Motion declaring the diseased trees a public nuisance and ordering them abated. 4.9 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026- RESOLUTION DECLARING THE DISEASED TREES PUBLIC NUISANCES AND ORDERING THEM ABATED AT SEVERAL PRIVATE PROPERTIES WHEREAS, Crystal City Code 2015 governs shade tree diseases in the city of Crystal and provides a process to declare them public nuisances and order them abated; and WHEREAS, the trees on the property at the properties listed below have been inspected by the City’s certified tree inspectors; and WHEREAS, the certified tree inspectors confirmed the trees to be diseased with Emerald Ash Borer disease; and NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Crystal as follows: 1. The City of Crystal declares the diseased trees at the properties listed below a public nuisance, orders them to be abated, and directs the cost of such abatement to be assessed against the property in accordance with the Crystal City Code and Minnesota Statutes, Section 429.101. List of properties with diseased trees to be declared a nuisance: 3224 Welcome Ave. N. 3048 Wisconsin Ave. N. 3242 Adair Ave. N. 3101 Florida Ave. N. 3032 Utah Ave. N. 3160 Welcome Ave. N. Adopted this 19th day of April 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Chrissy Serres, City Clerk 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 ERIK & KIMBERLY WALTER 3032 UTAH AV N CRYSTAL MN 55427 This is a courtesy notice to inform you that the property 3032 Utah Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/17/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 MICHAEL J SYBRANT 3048 WISCONSIN AV N CRYSTAL MN 55427 This is a courtesy notice to inform you that the property 3048 Wisconsin Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/17/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 MARK A SHERVA 3101 FLORIDA AV N CRYSTAL MN 55427 This is a courtesy notice to inform you that the property 3101 Florida Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/17/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 DOMINIC NZARA 8243 TYLER ST NE SPRING LAKE PARK MN 55432 This is a courtesy notice to inform you that the property 3160 Welcome Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/18/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 ROBERT E COSTIGAN 5800 SAINT CROIS AV N #627 GOLDEN VALLEY MN 55422 This is a courtesy notice to inform you that the property 3224 Welcome Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/18/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 4141 Douglas Drive North • Crystal, Minnesota 55422-1696 Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov 5/11/26 JAMES & MELISSA ROUSE 3242 ADAIR AV N CRYSTAL MN 55422 This is a courtesy notice to inform you that the property 3242 Adair Av N is set to be on the agenda for the Crystal City Council meeting on 5/19/26 to have the one (1) diseased tree on the property named a nuisance. After the tree is formally named a nuisance, the tree will be put on a list for the City’s tree removal contractor to be removed as soon as possible. The property owner will receive an invoice for the full cost of the work, including administrative fees and sales tax. If the invoice goes unpaid, the cost plus an additional administrative fee, will be assessed to the property taxes to be paid off over 5 years, with an interest rate of 12%. The original violation notice was mailed on 11/18/25 and then mailed on 2/24/26 with a physical copy also being hand delivered to the property that same week and posted on the front door. If you have any questions, please reach out to our Parks Superintendent – Brad Fortin 763-531-1158 public.works@crystalmn.gov 4.9 COUNCIL STAFF REPORT DATE: May 19, 2026 FROM: Jesse Struve, Public Works Director / City Engineer TO: Mayor and City Council City Manager Adam R. Bell CC: RE: Approve Construction Cooperative Agreement (CCA) with Hennepin County for Douglas Drive Safety Improvement Project Background Hennepin County approached us in 2025 about a safety project that would impact Douglas Drive at specific intersections between 32nd Ave. and Fairview Ave. This project was not in the long-term plan (LTP) because it was originally included in the EDA. There will be Federal Funds and other grants applied to the project to where the anticipated city’s contribution will be $417,392.62. This will be funded utilizing some EDA funds and our Municipal State Aid (MSA) funds. Hennepin County will be making several improvements at intersections in this area. The project will move curb lines and add in medians to shorten crossing distances. The project will also install a new RRFB at Fairview to help stop cars when people are crossing into the Community Center and pool campus. These medians will likely have a secondary impact of helping to slow traffic in the vicinity of these crossings. With this type of joint project, the agencies enter a CCA which outlines responsibilities and costs for each agency. Budget Impacts The total estimated construction cost for Crystal is approximately $417,392.62. While this was not in the LTP, this will be funded utilizing MSA and EDA funds. Requested City Council Action •Staff recommend approval of CCA with the Hennepin County Attachments •Resolution Approving CCA with Hennepin County •CCA with Hennepin County •90% Construction Plans 4.10 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026- APPROVE CONSTRUCTION COOPERATIVE AGREEMENT (CCA) WITH HENNEPIN COUNTY FOR DOUGLAS DRIVE SAFETY IMPROVEMENT PROJECT WHEREAS, the maintaining and reconstructing city infrastructure is an essential service in the City of Crystal; and WHEREAS, the City has developed a long-term plan for the replacement and maintenance of city infrastructure including the roads, utilities, and fleet; and WHEREAS, Hennepin County approached staff with a safety improvement project on Douglas Dr; and WHEREAS, this project is in our best interest to participate in jointly with Hennepin County. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Crystal as follows: 1. The Crystal City Council hereby approves the CCA with the Hennepin County. Adopted this 19th day of May 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Chrissy Serres, City Clerk 4.10 Agreement No. PW 02-09-26 County Project No. 2211300 County State Aid Highway 102 City of Crystal County of Hennepin CONSTRUCTION COOPERATIVE AGREEMENT This Agreement is made between the County of Hennepin, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the “County”, and the City of Crystal, a Minnesota home-rule charter city, under the laws of the State of Minnesota, hereinafter referred to as the “City.” The County and the City collectively are referred to as the “Parties.” Recitals The following Recitals are incorporated into this Agreement. 1.The County is leading a safety improvement project along County State Aid Highway (CSAH) 102 (Douglas Drive) from 32nd Avenue to Fairview Avenue, which includes upgrading pedestrian ramps to the current Americans with Disabilities Act (ADA) standards, installation of Accessible Pedestrian Signals (APS), and replacement of two traffic signal systems, and other improvements as shown in County Project (CP) 2211300, and as further illustrated in the attached Exhibit B (Project Plan Title Sheet), and which shall hereinafter be referred to as the “Project”. 2. The Parties have agreed to enter into this Agreement to memorialize the partnership and to outline each Party’s ownership and financial responsibilities, maintenance responsibilities, and associated costs for the Project. 3.The County shall be the lead agency in Project designs, engineering, and construction administration, and shall be responsible for acquiring all necessary right of way and/or permits required by other governmental agencies for the Project. 4.The County Engineer has prepared an Engineer’s Estimate of quantities and unit prices for the above described Project, and a copy of the Engineer’s Estimate and an estimated Division of Cost Summary, marked Exhibit A, is attached hereto. 5.The Project will be carried out by the Parties under the provisions of Minnesota Statutes, Section 162.17, Subdivision 1, and Section 471.59. 1 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 Agreement NOW, THEREFORE, the Parties agree as follows: 1. Term of Agreement, Survival of Terms, and Exhibits. Effective Date. This Agreement is effective as of the date of the final signature. Expiration Date. This Agreement will expire after the date in which all obligations have been satisfactorily fulfilled. Survival of Terms. Provisions that by their nature are intended to survive the term, cancellation or termination of this Agreement do survive such term, cancellation or termination. Such provisions include but are not limited to: Maintenance Responsibilities, Records/Audits, Indemnification, Insurance, Worker Compensation Claims, Cancellation, Termination, and Minnesota Laws Govern. Exhibits. All exhibits are attached and incorporated into this Agreement. 1.4.1 Exhibit A (Division of Cost Summary) 1.4.2 Exhibit B (Project Plan Title Sheet) 1.4.3 Exhibit C (Drainage Ownership and Maintenance Responsibilities) 2. Project Construction. Contract Award and Administration. The County or its agents shall prepare the necessary plans, specifications, and proposal; obtain approval of the plans and specifications from the Minnesota Department of Transportation (MnDOT) and the City; advertise for bids for the work and construction; receive and open bids pursuant to the advertisement; enter into a contract with the successful bidder at the unit prices specified in the bid of such bidder; administer the contract; and perform the required engineering and inspection; all in accordance with the plans and specifications set forth below. Plans and Specifications. 2.2.1 Design Work. All design work performed by the County and its agents that is to be incorporated into the bidding documents for the Project shall be prepared and certified by a Professional Engineer licensed in the State of Minnesota. All designs which affect County facilities shall conform to MnDOT Design Standards applicable to County State Aid Highways and to the requirements of the Americans with Disabilities Act (ADA) standards, and be approved by the County Engineer. 2 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 2.2.2 Plan Numbers (S.A.P.#/S.P.#). The plans and specifications are referenced and identified as S.P.# 027-702-023 and shall be approved by MnDOT before Project construction. 2.2.3 Request for Copies of Plans. At the request of the City, the County or its agents shall furnish the City with any working copies of any plans, designs or reports at any time during the Project design process. Construction Supervision and Inspection. The County or its agents will administer the construction contract, and perform all necessary engineering, inspection and testing of all the contract work. All work for the Project shall be completed in compliance with the MnDOT and City approved plans and specifications. The City Engineer or a designated representative shall have the right, as the work progresses, to enter upon the job site to make any inspections deemed necessary and shall cooperate with the County Engineer and staff at their request to the extent necessary, but will have no responsibility for the supervision of the work. Plan Changes and Additional Construction. 2.4.1 Plan Changes. The City agrees that the County may make changes in the plans or in the character of the contract construction that are reasonably necessary to cause the construction to be in all things performed and completed in a satisfactory manner. It is further agreed by the City that the County may enter into any change orders or supplemental agreements with the County’s contractor for the performance of any additional construction or construction occasioned by any necessary, advantageous or desirable changes in plans, within the original scope of the Project. 2.4.2 Review Proposed Changes. The City shall have the right to review any proposed changes to the plans and specifications as they relate to the City's cost participation prior to the work being performed, except in emergencies, and in those instances where the proposed changes necessitate a re-engineering of the design and/or specifications, the County shall submit the re-engineered design and/or specifications to the City. The City Engineer or designated representative shall respond to the County’s request for approval to authorize the issuance of any negotiated change orders or supplemental agreements prepared by the County that affect the City's share of the construction cost within a reasonable time frame. Right of Way/Permits. 2.5.1 Right of Way Acquisition. The County or its agents shall acquire all additional right of way, permits and/or easements required for the construction of the Project. 2.5.2 Access Rights and Permits. To the extent permitted by law, the City shall transfer, convey, permit, or otherwise allow the use of, property rights controlled 3 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 or maintained by the City, including but not limited to easements or access rights, that may be required by the County for the Project. The Parties understand that any such access rights shall be subject to the City Council approval and will be granted at no cost to the County. Any and all permits required by the City for the Project shall be granted at no cost or expense to the County or its contractors. These permits include but are not limited to the following: obstruction permits, after hours work permits, and permits related to City water and sanitary infrastructure. The County shall also obtain, and comply with, any and all permits and approvals required from other governmental or regulatory agencies to accomplish the Project. 2.5.3 Right of Way Cost. The City shall participate in the right of way cost for the Project as provided herein. The Parties understand and agree that the City’s share of the Project right of way cost is fifty percent (50%) of the total Project right of way cost (“City’s Right of Way Cost”). As further described in Exhibit A, the City’s Right of Way Cost is currently estimated to be $62,000.00, which shall be paid to the County as a part of the City’s total cost participation in the Project. Traffic Signal. The Project will replace two traffic signal systems on Douglas Drive (CSAH 102) at the intersections of 36th Avenue (System ID# 8008600), and 42nd Avenue (CSAH 9) (System ID# 8000300), collectively (the “Signal Systems”). The Project will require new signal cabinets equipped with controllers, detection equipment, and required accessories to be installed as part of the Project. The County will furnish the cabinets, and the City agrees to reimburse the County for the City’s portion of the cabinet cost (“City’s Cabinet Cost”) currently estimated at $15,000.00, which will be paid to the County as part of the City’s total cost participation in the Project, as shown in Exhibit A. 2.6.1 Electrical Power. The City, at no cost to the County, shall: (1) install, cause the installation of, or perpetuate the existence of an adequate three wire, 120/240 volt, single phase, alternating current electrical power connection to the permanent traffic control signal systems and integral streetlights included in the Project; and (2) provide the electrical power for the operation of all permanent and temporary traffic control signal systems and integral traffic signal pole mounted luminaires installed as part of the Project. 2.6.2 Emergency Vehicle Preemption (EVP). The EVP systems shall be managed and maintained by the County. The City shall report malfunctions of EVP systems to the County immediately after discovery of the malfunction. 2.6.3 Accessible Pedestrian Signal (APS). The County will install APS pushbuttons and associated components, and integrate the components to the traffic signal system at the intersections as described in the construction plans. 2.6.4 Rectangular Rapid Flashing Beacon (RRFB). The Project will install one RRFB and associated components as described in the construction plans. The City, at no cost to the County, shall provide the electrical energy for the operation of the RRFB installed as part of the Project. 4 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 Street Lighting. Not applicable. Asbestos. The Project may include the removal of asbestos containing electrical conduit. Only firms licensed to conduct asbestos abatement shall be used for the safe removal of asbestos containing electrical conduit with proper shipping manifest prepared and submitted to appropriate agency. The lead agency in the Project construction shall be responsible for the oversight of the removal of asbestos containing electrical conduit and compliance with the above-mentioned specifications. Detours. The Project may require limited detouring of traffic onto the City’s streets. The Parties agree that there will be no compensation to the City for detours onto its streets required to construct the Project. 3. Cost Participation. In addition to the City’s Right of Way Costs for the Project as stated in Subsection 2.5.3 and the City’s Cabinet Cost in Subsection 2.6, the City shall participate in the Project contract construction costs (“Contract Construction Costs”), associated design engineering fees (“Design Engineering Costs”), and Project construction administration fees (“Construction Engineering Costs”), collectively (“City’s Cost Participation”) as provided herein. Contract Construction Costs and Exhibit A Unit Prices. The City’s Cost Participation shall include the Contract Construction Costs for the Project as set forth in the estimated Division of Cost Summary shown in Exhibit A. For informational purposes only, the City’s share in Contract Construction Costs is currently estimated to be $157,757.00. The respective proportionate shares of the pro-rata pay items included in Exhibit A shall remain unchanged throughout the life of this Agreement. The Parties each understand and agree that the amount as shown in Exhibit A is an estimate of the Contract Construction Costs on the Project and the unit prices set forth in the contract with the successful bidder and the final quantities as measured by the County Engineer's designated representatives shall govern in computing and apportioning the Parties’ total final Contract Construction Costs for the Project. The final quantities as measured by the County Engineer's designated representatives for contract pay items in which the City is participating shall be subject to the review and approval by the City Engineer. Design Engineering and Construction Engineering Costs. The City’s Cost Participation shall include reimbursement to the County for the City’s proportionate share of the Design Engineering Costs and the Construction Engineering Costs for the Project. The City’s share of the Design Engineering Costs shall be equal to twelve percent (12%) of the total final amount of the City’s share of the Contract Construction Costs for the Project. For informational purposes only, the City’s share in Design Engineering Costs is currently estimated to be $68,488.00. The City’s share of the Construction Engineering Costs shall be equal to ten percent (10%) of the total final amount of the City’s share of the Contract Construction Costs for the Project as specified in Subsection 3.1 above. For informational purposes only, the City’s share in Construction Engineering Costs is currently estimated to be $57,074.00. The Parties understand and agree that the City’s proportionate shares of the Design Engineering and Construction Engineering Costs as listed in Exhibit A are estimated, and the City’s 5 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 actual proportionate shares will be computed using the total final amount of the City’s share of the Contract Construction Costs for the Project. 4. Payment. Amount Due. The City agrees to pay the City’s Cost Participation amount as described herein. When to Invoice. After an award by the County to the successful bidder on the Project, the County shall invoice the City for ninety-five percent (95%) of the City’s Cost Participation for the Project. The City’s Cost Participation shall be based on actual contract unit prices applied to the estimated quantities shown in the plans. Pay to the Order of. Payments shall be made to the County, in the name of the Hennepin County Treasurer, by the City for the full amount due stated on the invoices within forty-five (45) days of the invoice date. Where to Send Payment. The payment should include the date, the name of the County’s Project manager (Nariman Vanaki, P.E.), Project name and County Project number (C.P. 2211300). Payment and supporting documentation should be mailed to the following address: Hennepin County Accounts Receivable Mail Code 131 300 South 6th St Minneapolis, MN 55487 Supplemental Agreement or Change Order. In the event the County Engineer or the County's staff determines the need to amend the construction contract with a supplemental agreement or change order which results in an increase in the contract amount for the Project, the City hereby agrees to remit within forty-five (45) days of notification by the County of the change an amount equal to ninety five percent (95%) of the estimated City’s share as documented in the supplemental agreement or change order. Final Amount Due. The remainder of the City’s Cost Participation including additional costs resulting from supplemental agreements and change orders, will be due the County upon acceptance by the County’s construction engineer of all the construction work performed by the County’s construction contractor and submittal of the County Engineer's final estimate for the Project to the City. Remaining Balance. Upon final payment to the Project contractor by the County, any amount remaining as a balance in the deposit account will be returned to the City within forty-five 45 days, on a proportionate basis based on the City’s initial deposit amount and the City’s final proportionate share of the Project costs. Likewise, any amount due the County from the City upon final payment by the County shall be paid by the City as its final payment for the construction and engineering costs of the Project within forty- five (45) days of receipt of an invoice from the County. 6 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 5. County Permit Issuance. The County reserves the right not to issue any permits for a period of five (5) years after completion of the Project for any service cuts in the roadway surfacing of the County Highways included in the Project for any installation of underground utilities which would be considered as new work. Service cuts shall be allowed for the maintenance and repair of any existing underground utilities. 6. No Parking. Not applicable. 7. The City’s Maintenance Responsibilities. Upon completion of the Project, the City shall provide year-round maintenance at its sole cost as outlined below. Roadways. Not applicable. Traffic Signals and Components. 7.2.1 Electrical Service Costs. The City, at its sole cost and expense, shall provide electrical energy for the operation of the Signal Systems and shall maintain fuses and wires to the load side of the meter socket of the traffic Signal Systems and integral streetlights/luminaires. 7.2.2 Traffic Signal System Adjustment. The City shall not revise by addition or deletion, nor alter or adjust any component, part, sequence, or timing of the Signal Systems, however, nothing herein shall prohibit prompt, prudent action by properly constituted authorities in situations where a part of such Signal Systems may be directly involved in an emergency. 7.2.3 Signal Luminaires. The City shall provide all required maintenance for the lamps on the luminaire extensions above the signals. Maintenance includes but is not limited to replacing burned out luminaire lamps, replacing fixtures, replacing other lighting components, and replacing fuses and wires from the luminaire lamps to load side of meter sockets of the Signal Systems. 7.2.4 Signal Cleaning. The City shall be responsible for general cleaning and graffiti removal from the Signal System equipment and components. 7.2.5 Rectangular Rapid Flashing Beacon (RRFB). The City shall own and maintain the RRFBs installed as part of the Project according to City practices at no cost to the County. 7.2.6 Blocking County Roadways. When performing the Signal System maintenance work under this Agreement, the City may partially block affected County roadways within its corporate limits if needed. In cases of emergency, such County roadways may be wholly blocked and the passage of traffic thereon prevented by the City. At no time, however, shall the City continue to obstruct the free passage of traffic on the County roadways for a longer period of time than is reasonably required for making the necessary traffic signal repairs. The City shall not cause any portions of the County roadways on which traffic control 7 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 signals are to be maintained to be closed to traffic for any reason other than those above without receiving prior written approval from Hennepin County and in no event for a time longer than shall be necessary. In the event of the total blocking or closing of any such County roadways, the City shall provide a suitable detour during such time. 7.2.7 Materials. When performing the Signal System maintenance work under this Agreement, the City shall be responsible for proper signing, marking, barricading and such other warning devices as may be required to adequately protect the pedestrian and vehicular traffic. All materials used by the City in the performance of the maintenance work shall conform to the requirements of the current edition of the MnDOT "Standard Specifications for Highway Construction" and all amendments and supplements thereto. All traffic signs, pavement markings and warning devices shall comply with the current Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD). Sidewalks and Pedestrian Ramps. The City shall own and maintain the sidewalks and pedestrian ramps constructed as part of the Project according to City practices at no cost to the County. Maintenance includes but is not limited to repairing faulted or broken panels or surfaces, vegetation control, and snow and ice removal. Pedestrian Refuges. The City shall maintain pedestrian refuges constructed/revised as part of the Project according to City practices at no cost to the County. Crosswalk Markings. The City shall assume maintenance of all crosswalk markings for roadway users installed as part of the Project. Storm Sewers. The City shall own and maintain catch basins, manholes, and trunk lines serving areas beyond the County right of way constructed or reconstructed under the Project at no cost to the County. Maintenance includes but is not limited to repairs to structures, casting, and adjacent curb section repairs along with removal of sediments, vegetation, and ice. Storm sewer ownership and maintenance responsibilities are further illustrated in the attached Exhibit C. Landscaping. The City shall own and maintain landscape/streetscape features (including those added to pedestrian bumpouts/curb extensions and medians) installed as part of the Project according to City practices at no cost to the County. Examples include trash removal, trimming, mowing, watering, irrigation maintenance, and replanting or replacing. 8. The County’s Maintenance Responsibilities. Upon completion of the Project, the County shall provide year-round maintenance at its sole cost as outlined below. Roadways. Maintenance of CSAH 102 reconstructed under the Project. Maintenance includes, but is not limited to, sweeping, debris removal, resurfacing and sealcoating, and any other maintenance activities according to accepted County maintenance practices. 8 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 Traffic Signals and Components. 8.2.1 Locating Traffic Signal Electrical Power Service Drop Lines. The County will be responsible for performing all underground location of electrical service drop from source of power (wood pole or other transformer location) to the service cabinet of the Signal Systems for the purpose of various design and construction projects or other projects which may be required through the Gopher State One Call system, and furnishing all labor, materials, supplies, tools and other necessary items. 8.2.2 Locating Traffic Signal Cable. The County will be responsible for performing all underground location of signal equipment, conduit, wiring and related equipment for the purpose of various design and construction projects or other projects which may be required through the Gopher State One Call system, and furnishing all labor, materials, supplies, tools and other necessary items without cost to the City. 8.2.3 Locating Traffic Signal Fiber Optic Lines. The County will be responsible for performing all underground location of fiber optic lines and related equipment for the purpose of various design and construction projects or other projects which may be required through the Gopher State One Call system, and furnishing all labor, materials, supplies, tools and other necessary items without cost to the City. 8.2.4 Traffic Signal Components. The County shall be responsible for maintenance and repair of all traffic signal system components, including cabinets, controllers, control equipment, conduit system and interconnect cable, signal poles, mast arms, pushbutton posts, wiring, detection, EVP, signal heads, pedestrian pushbuttons, Pan Tilt and Zoom (PTZ) cameras, and mast-arm mounted street signs. 8.2.5 Signal Head Indications. The County shall provide all required maintenance for the signal head indications. Maintenance includes but is not limited to replacement of vehicular and pedestrian signal indications. 8.2.6 Traffic Signal Interconnect. The County shall be responsible for maintenance and repair of all communication lines (primarily fiber optic lines) between the Signal Systems, other infrastructure, and the County’s traffic management center. 8.2.7 Signal Timing and Coordination. The County shall be responsible for signal timing and coordination. Timing and coordination include but are not limited to front page timing, coordination timing, EVP timing, pedestrian timing, and preemption timing. 8.2.8 Traffic Signal Component Knockdowns. The County shall be responsible for responding to signal and component knockdown calls and repairing or replacing 9 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 associated components damaged as a result of minor or major knockdowns to ensure proper functioning of traffic signals. County Road Pavement Striping. The County shall thereafter maintain and repair all pavement striping for CSAH 102 installed as part of the Project, at the expense of the County. Storm Sewers. The County shall own and maintain culverts, catch basins and leads, manholes, trunk lines and all other components that serve only County right of way constructed or reconstructed under the Project, at no cost to the City. Maintenance includes repairs to structures, casting, and adjacent curb section repairs along with removal of sediments, vegetation, and ice. Storm sewer ownership and maintenance responsibilities are further illustrated in the attached Exhibit C. 9. Authorized Representatives. In order to coordinate the services of the County with the activities of the City and vice versa so as to accomplish the purposes of this Agreement, the Hennepin County Highway Engineer or designated representative and the City Engineer or designated representatives shall manage this Agreement on behalf of the County and the City. County of Hennepin: Carla Stueve County Highway Engineer Hennepin County Public Works 1600 Prairie Drive, Medina, MN 55340 Office: 612-596-0356 Carla.Stueve@hennepin.us City of Crystal: Name: Jesse Struve Public Works Director/City Engineer Address: 4141 Douglas Dr. N Office: 763-531-1160 Email: Jesse.Struve@crystalmn.gov 10. Assignment, Amendments, Default, Waiver, Agreement Complete, Cancellation or Termination. Assignment. The City shall not assign, subcontract, transfer or pledge this Agreement and/or the services to be performed hereunder, whether in whole or in part, without the prior written consent of the County. Amendments. Any alterations, variations, modifications or waivers of provisions of this Agreement shall only be valid when they have been reduced to writing as an amendment to this Agreement and signed by the Parties hereto. Default. If the City fails to perform any of the provisions of this Agreement or so fails to administer the work as to endanger the performance of the Agreement, this shall constitute a default. Unless the City's default is excused by the County, the County may 10 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 upon written notice immediately cancel this Agreement in its entirety. Waiver. The County's failure to insist upon strict performance of any provision or to exercise any right under this Agreement shall not be deemed a relinquishment or waiver of the same, unless consented to in writing. Such consent shall not constitute a general waiver or relinquishment throughout the entire term of the Agreement. Agreement Complete. The entire Agreement between the Parties is contained herein and that this Agreement supersedes all oral agreements and negotiations between the Parties relating to the subject matter hereof. All items referred to in this Agreement are incorporated or attached and are deemed to be part of this Agreement. Cancellation or Termination. This Agreement may be terminated or cancelled by each party by mutual agreement with or without cause by either party upon thirty (30) day written notice. This Agreement shall be terminated or cancelled by any party upon a material breach by the other party. In the event of a termination or cancellation, the Parties will remain responsible for cost participation as provided in this Agreement for obligations incurred up through the effective date of the termination or cancellation, subject to any equitable adjustment that may be required to account for the effects of a breach. 11. Indemnification. The City Indemnifies the County. The City agrees to defend, indemnify and hold harmless the County, its officials, officers, agents, volunteers, and employees from any liability, claims, causes of action, judgments, damages, losses, costs or expenses, including reasonable attorneys’ fees, resulting directly or indirectly from any act or omission of the City or the City’s consultant or sub consultant, anyone directly or indirectly employed by them, and/or anyone for whose acts and/or omissions they may be liable in the performance of the services required by this Agreement, and against all loss by reason of the failure of the City to perform fully, in any respect, all obligations under this Agreement. The City’s liability shall be governed by the provisions of Minnesota Statutes, Chapter 466 or other applicable law. The County Indemnifies the City. The County agrees to defend, indemnify and hold harmless the City, its officials, officers, agents, volunteers, and employees from any liability, claims, causes of action, judgments, damages, losses, costs or expenses, including reasonable attorneys’ fees, resulting directly or indirectly from any act or omission of the County or the County’s consultant or sub consultant, anyone directly or indirectly employed by them, and/or anyone for whose acts and/or omissions they may be liable in the performance of the services required by this Agreement, and against all loss by reason of the failure of the County to perform fully, in any respect, all obligations under this Agreement. The County’s liability shall be governed by the provisions of Minnesota Statutes, Chapter 466 or other applicable law. 12. Insurance. The County and the City agree that any future contract let by the Parties for the performance of any of the work included hereunder shall include clauses that will: 1) Require the contractor to indemnify and hold the County and the City, their commissioners, officers, 11 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 agents and employees harmless from any liability, claim, demand, judgments, expenses, action or cause of action of any kind or character arising out of any act or omission of the contractor, their officers, employees, agents or subcontractors; 2) Require the contractor to be an independent contractor for the purposes of completing the work provided for in this Agreement; and 3) Require the contractor to provide and maintain enough insurance so as to assure the performance of its indemnification and hold harmless obligation: Limits (1) Commercial General Liability on an occurrence basis with contractual liability coverage: General Aggregate $2,000,000 Products - Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $1,500,000 Each Occurrence - Combined Bodily Injury and Property Damage $1,500,000 Hennepin County shall be named as an additional insured for the Commercial General Liability coverage with respect to operations covered under this Agreement. (2) Automobile Liability: Combined Single limit each occurrence coverage or the equivalent covering owned, non-owned, and hired automobiles: $1,500,000 (3) Workers’ Compensation and employer’s Liability: Workers’ Compensation: Statutory If the contractor is based outside the State of Minnesota, coverage must apply to Minnesota laws. Employer’s Liability. Bodily injury by: Accident – Each Accident $500,000 Disease – Policy Limit $500,000 Disease - Each Employee $500,000 (4) Professional Liability – Per Claim and Aggregate: $2,000,000 The above listed Professional Liability insurance will not be required in any construction contract let by the City if the City’s contractors are not required to perform design engineering as part of the construction contract. An umbrella or excess policy over primary liability coverages is an acceptable method to provide the required insurance limits. 12 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 The above subparagraphs establish minimum insurance requirements. It is the sole responsibility of the City’s contractors to determine the need for and to procure additional insurance which may be needed in connection with the Project. All insurance policies shall be open to inspection by the County and copies of policies shall be submitted to the County upon written request. 13. Worker Compensation Claims. City’s Employees. Any and all employees of the City and all other persons engaged by the City in the performance of any work or services required or provided for herein to be performed by the City shall not be considered employees of the County, and any and all claims that may or might arise under the Workers' Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of the employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of the employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the County. County’s Employees. Any and all employees of the County and all other persons engaged by the County in the performance of any work or services required or provided for herein to be performed by the County shall not be considered employees of the City, and any and all claims that may or might arise under the Workers' Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of the employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of the employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the City. 14. Records/Audits. The City agrees that the County, the State Auditor or any of their duly authorized representatives at any time during normal business hours, and as often as they may reasonably deem necessary, shall have access to and the right to examine, audit, excerpt and transcribe any books, documents, papers, records, etc., which are pertinent to the Project and the accounting practices and procedures of the City which involve transactions relating to this Agreement. 15. Nondiscrimination. The provisions of Minnesota Statute Section 181.59 and of any applicable local ordinance relating to civil rights and discrimination and the Affirmative Action Policy statement of Hennepin County shall be considered a part of this Agreement as though fully set forth herein. 16. Counterparts/Electronic Signatures. This Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy of this Agreement and all of which, when taken together, will be deemed to constitute one and the same agreement. The facsimile, email or other electronically delivered signatures of the Parties shall be deemed to constitute original signatures, and facsimile or electronic copies hereof shall be deemed to constitute duplicate originals. 13 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 17. Minnesota Laws Govern. The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity and construction of this Agreement and the legal relations between the Parties and their performance. The appropriate venue and jurisdiction for any litigation will be those courts located within the County of Hennepin, State of Minnesota. Litigation, however, in the federal courts involving the Parties will be in the appropriate federal court within the State of Minnesota. (This space left intentionally blank) 14 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 IN TESTIMONY WHEREOF, the Parties hereto have caused this Agreement to be executed by their respective duly authorized officers and agree to be bound by the provisions herein set forth. CITY OF CRYSTAL By:_______________________________ Mayor Date:______________________________ And:______________________________ City Manager Date:______________________________ COUNTY OF HENNEPIN ATTEST: By: By:__________________________________ Deputy/Clerk of the County Board Chair of its County Board Date: Date: ________________________________ And: ________________________________ County Administrator Date: ________________________________ REVIEWED BY THE COUNTY ATTORNEY’S OFFICE: And:_________________________________ Assistant County Administrator, Public Works By: Date:________________________________ Assistant County Attorney Date: RECOMMENDED FOR APPROVAL REVIEWED: By:_________________________________ By: County Highway Engineer County Administrative Clerk Date:________________________________ Date: RECOMMENDED FOR APPROVAL By:_________________________________ Department Director, Transportation Operations Date:________________________________ 15Pending E-Signatures4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 EXHIBIT A Engineer’s Estimate and Division of Cost Summary 16 4.10 dKd> &ĞĚĞƌĂů,^/W&ƵŶĚŝŶŐ ,ĞŶŶĞƉŝŶŽƵŶƚLJ ^ƚĂƚĞŝĚ&ůĞdždžĐĞƐƐŝƚLJŽĨƌLJƐƚĂů KEdZdKE^dZhd/KE tŝƚŚŽƵƚ&ĞĚĞƌĂů&ƵŶĚŝŶŐ ZŽĂĚǁĂLJ Ϯ͕ϱϮϴ͕Ϭϯϲ͘ϵϱΨͲΨ Ϯ͕Ϭϳϱ͕Ϯϳϲ͘ϵϱΨϰϱϮ͕ϳϲϬ͘ϬϬΨ ^ƚŽƌŵ^ĞǁĞƌ Ϯϯϱ͕ϵϱϱ͘ϬϬΨͲΨϭϭϳ͕ϵϳϴ͘ϬϬΨΨϭϭϳ͕ϵϳϳ͘ϬϬ EŽŶͲWĂƌƚŝĐŝƉĂƚŝŶŐ ͲΨͲΨͲΨͲΨ ^hdKd>;ϭͿ Ϯ͕ϳϲϯ͕ϵϵϭ͘ϵϱΨͲΨϮ͕ϭϵϯ͕Ϯϱϰ͘ϵϱΨϱϳϬ͕ϳϯϳ͘ϬϬΨ tŝƚŚ&ĞĚĞƌĂů&ƵŶĚŝŶŐ &ĞĚĞƌĂůŝƐďƵƌƐĞŵĞŶƚ;ϭͿ ϭ͕ϱϴϳ͕Ϭϭϵ͘ϳϴΨϰϭϮ͕ϵϴϬ͘ϮϮΨ ZŽĂĚǁĂLJ Ϯ͕ϱϮϴ͕Ϭϯϲ͘ϵϱΨϭ͕ϳϲϰ͕Ϭϰϱ͘ϬϬΨ ϲϬϲ͕Ϯϯϱ͘ϭϳΨϭϱϳ͕ϳϱϲ͘ϳϴΨ ^ƚŽƌŵ^ĞǁĞƌ Ϯϯϱ͕ϵϱϱ͘ϬϬΨΨϮϯϱ͕ϵϱϱ͘ϬϬ ͲΨͲΨ EŽŶͲWĂƌƚŝĐŝƉĂƚŝŶŐ ͲΨͲΨͲΨͲΨ ^hdKd> Ϯ͕ϳϲϯ͕ϵϵϭ͘ϵϱΨϮ͕ϬϬϬ͕ϬϬϬ͘ϬϬΨϲϬϲ͕Ϯϯϱ͘ϭϳΨϭϱϳ͕ϳϱϲ͘ϳϴΨ Z/',dK&tz;ϮͿ ϭϮϰ͕ϬϬϬ͘ϬϬΨͲΨϲϮ͕ϬϬϬ͘ϬϬΨϲϮ͕ϬϬϬ͘ϬϬΨ KhEdz^hWW>/Yh/WDEd;ϲͿ ϲϬ͕ϬϬϬ͘ϬϬΨϰϱ͕ϬϬϬ͘ϬϬΨϭϱ͕ϬϬϬ͘ϬϬΨ ^/'EE'/EZ/E';ϯͿ ϲϴ͕ϰϴϴ͘ϰϰΨͲΨͲΨϲϴ͕ϰϴϴ͘ϰϰΨ KE^dZhd/KEE'/EZ/E';ϰͿ ϱϳ͕Ϭϳϯ͘ϳϬΨͲΨͲΨϱϳ͕Ϭϳϯ͘ϳϬΨ KEd/E'Ez;ϱͿ Ϯϳϲ͕ϯϵϵ͘ϮϬΨͲΨϮϭϵ͕ϯϮϱ͘ϱϬΨϱϳ͕Ϭϳϯ͘ϳϬΨ WZK:ddKd>ϯ͕ϯϰϵ͕ϵϱϯ͘ϮϵΨϮ͕ϬϬϬ͕ϬϬϬ͘ϬϬΨϵϯϮ͕ϱϲϬ͘ϲϲΨϰϭϳ͕ϯϵϮ͘ϲϮΨ EKd^͗ ;ϭͿϳϵ͘ϯϱйŽƵŶƚLJͬϮϬ͘ϲϱйŝƚLJ&ĞĚĞƌĂů^Ɖůŝƚ ;ϮͿĂƐĞĚŽŶĂƉƉƌĂŝƐĂůĞƐƚŝŵĂƚĞƐ ;ϯͿϭϮйŽĨĞƐƚŝŵĂƚĞĚĐŽŶƐƚƌƵĐƚŝŽŶĐŽƐƚ ;ϰͿϭϬйŽĨĞƐƚŝŵĂƚĞĚĐŽŶƐƚƌƵĐƚŝŽŶĐŽƐƚ ;ϱͿŽŶƚŝŶŐĞŶĐLJƐĞƚĂƚϭϬйŽĨĞƐƚŝŵĂƚĞĚĐŽŶƐƚƌƵĐƚŝŽŶĐŽƐƚ KE^dZhd/KEK^d^hDDZz^KEϵϬйE'/EZΖ^^d/Dd ^,ϭϬϮ͗,EEW/EKhEdzWZK:͘EK͘ϮϮϭϭϯϬϬͲKh'>^Z^&dz/DWZKsDEd^ ^͘W͘ϬϮϳͲϳϬϮͲϬϮϯ y,//dΗΗ^hDDZzͮ&Z>&hE/E'/^dZ/hd/KE ;ϲͿŽƵŶƚLJƐƵƉƉůŝĞĚĞƋƵŝƉŵĞŶƚŝŶĐůƵĚĞƐ;ϮͿƚƌĂĨĨŝĐƐŝŐŶĂůĐĂďŝŶĞƚƐĂƚΨϯϬ͕ϬϬϬĞĂĐŚĨŽƌƐŝŐŶĂůƐLJƐƚĞŵƐĂƚϯϲƚŚ^ƚĂŶĚϰϮŶĚ^ƚ;^,ϵͿ͘dŚĞ ŝƚLJŽĨƌLJƐƚĂůƉĂLJƐϱϬйŽĨƚŚĞĐŽƐƚĨŽƌƚŚĞϯϲƚŚ^ƚĐĂďŝŶĞƚ͘ 4.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 EXHIBIT B Project Plan Title Sheet 18 4.10 194.10 Agreement No. PW 02-09-26 CSAH No. 102; C.P. 2211300 EXHIBIT C Drainage Ownership and Maintenance Responsibilities 20 4.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND214.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND224.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND234.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND244.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND254.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND264.10 EXHIBIT CCITY OF CRYSTALHENNEPIN COUNTYDRAINAGE OWNERSHIP/MAINTENANCE LEGEND274.10 Lakes 102 9 102 CRYSTAL 9 156 156 ROBBINSDALE NEW HOPE GOLDEN VALLEY ROBBINSDALEROBBINSDALE8 81 T118N R21W 18 17 19 20 Rail SystemSystemNEW HOPE 100 100 part of Railway BNSF RailwayBROOKLYN CENTER AND DOCUMENTING EXISTING UTILITIES" "STANDARD GUIDELINES FOR INVESTIGATING GUIDELINES OF CI/ASCE 38-22 ENTITLED DETERMINED ACCORDING TO THE THIS UTILITY QUALITY LEVEL WAS IN THIS PLAN IS UTILITY QUALITY LEVEL D. THE SUBSURFACE UTILITY INFORMATION NET LENGTH EXCEPTION LENGTH BRIDGE LENGTH GROSS LENGTH MILES MILES MILES MILES ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL IF ANY WERE PREPARED BY ME OR UNDER MY DIRECT I HEREBY CERTIFY THAT THE FINAL FIELD REVISIONS, DATE: _________ SIGNATURE: ___________________ PRINT NAME: _________ LICENSE: #________ MINNESOTA DEPARTMENT OF TRANSPORTATION MINN. PROJ. NO.HSIP 2726(208) TRAFFIC CONTROL ZONE LAYOUTS." UNIFORM TRAFFIC CONTROL DEVICES" INCLUDING "FIELD MANUAL FOR TEMPORARY CONFORM TO THE MOST RECENT EDITION OF THE "MINNESOTA MANUAL ON SPECIFICATIONS FOR CONSTRUCTION” SHALL GOVERN. ALL TRAFFIC DEVICES SHALL THE 2025 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION “STANDARD HENNEPIN COUNTY TRANSPORTATION DEPARTMENT INDEX SHEET NO.DESCRIPTION THIS PLAN CONTAINS 148 SHEETS APPROVED FOR APPROVAL RECOMMENDED APPROVED N/A 8,020 10 TONS A-MINOR EXPANDER 2 0 _,___,___ FEET FEET FEET FEETN/A N/A N/A N/A N/A N/A N/A N/A MnDOT METRO DISTRICT HENNEPIN COUNTY PROJECT LOCATION N/A 35 MPH STOPPING 3.5' / 2.0' HENNEPIN COUNTY: COUNTY HIGHWAY ENGINEER HENNEPIN COUNTY: DESIGN DIVISION ENGINEER CITY OF CRYSTAL: CITY ENGINEER WITH STATE AID AND/OR FEDERAL AID RULES/POLICY DISTRICT STATE AID ENGINEER: REVIEWED FOR COMPLIANCE STATE AID ENGINEER APPROVED FOR STATE AID AND/OR FEDERAL AID FUNDING: S.P. XXX-XXX-XXX, S.P. 027-702-003 TITLE SHEET SHEET 2211300/ HENNEPIN COUNTY PROJECT 102CSAH SCALES VERT. 1" = 50" HORIZ. 1" = 100" 1" = 100' 1" = 16,000' N/A 1" = 50' TYPICALS GENERAL LAYOUT INDEX MAP INTERSECTION PLAN PLAN 8,940 1 138 DATE DATE DATE DATE ) & FAIRVIEW AVE. N.102(CSAH S.P. XXX-XXX-XXX S.P. 027-702-003 2211300 CP NO 102CSAH PATH & FILENAME:c:\bentley\pw_working_hc\dms11622\1022211300_100 tsh.dgnPLOTTED/REVISED:PLOT NAME:Title Sheet11/13/2025) & 42nd AVE. N.102(CSAH S.P. XXX-XXX-XXX S.P. 027-702-003 2211300 CP NO 102CSAH ) & 36th AVE. N.102(CSAH S.P. XXX-XXX-XXX S.P. 027-702-003 2211300 CP NO 102CSAH ) & 32nd AVE. N.102(CSAH S.P. XXX-XXX-XXX S.P. 027-702-003 2211300 CP NO 102CSAH DOUGLASDR.36th AVE. 42nd AVE. ROCKFORD RD. 99 102102 32nd AVE.N. 100100 FAIR AVE.HAMPSHIREAVE.N.37th 39 th 40thAVE. 41stAVE. 44th AVE. 45th AVE. 46th AVE. 47 th 34th AVE. 48 th VIEW DATE 90% PLAN 8,9,16,17,25,21 T 118 N, R 21 W SECTIONS: SECTIONS: THE FOLLOWING LAND PROJECT IS LOCATED WITHIN Design Speed not achieved at: Height of eye / Height of Object Based on Sight Distance Design Speed ESALS (20) NO. OF PARKING LANES NO. OF TRAFFIC LANES FUNCTIONAL CLASSIFICATION PAVEMENT DESIGN ADT (Future Year) 2045 ADT (Current Year) 2025 R-VALUE 102 CSAH FOR: DESIGN DESIGNATION ARE BASED ON L102 ALIGNMENT THE PROJECT LENGTH AND DESCRIPTION GOVERNING SPECIFICATIONS CITY OF CRYSTAL GRADING, BITUMINOUS SURFACING, ADA IMPROVEMENTS AND SIGNAL SYSTEM REVISIONS CONSTRUCTION PLAN FOR 102COUNTY STATE AID HIGHWAY NO. CROSS SECTIONS RRFB PLANS SIGNAL PLANS SIGNING AND STRIPING PLANS TURF EST PLANS EROSION CONTROL PLANS SWPPP DRAINAGE PROFILES AND TABULATIONS DRAINAGE PLANS INTERSECTION DETAILS PROFILES CONSTRUCTION PLANS REMOVAL PLANS ALIGNMENT PLAN AND TABULATIONS STANDARD PLANS AND DETAILS TYPICAL SECTIONS EXISTING UTILITY PLANS TABULATIONS SOIL AND CONSTRUCTION NOTES EARTHWORK TABULATIONS AND SUMMARY STANDARD PLATES ESTIMATE QUANTITIES GENERAL LAYOUT TITLE SHEET R 21 W T 118 N XS-1-XS-10 99-131 84-98 77-83 70-76 67-68 60-66 52-59 50-51 43-49 36-42 30-35 1 2-3 4-5 6 7 9-10 11-25 26-27 8 132-138 28-29 69 DESIGN TEAM HENNEPIN COUNTY TRANSPORTATION DEPT. A. CHALUPSKY R. ALLERS B. SPECHT T. PETERSEN C. PARDRIDGE T. BRUERS 4.10 39TH AVE N32ND AVE N34TH AVE N36TH AVE N37TH AVE N38TH AVE N40TH AVE N41ST AVE N42ND AVE N (CSAH 9)43RD AVE N44TH AVE N45TH AVE N46TH AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_105 gel.dgnPLOTTED/REVISED:PLOT NAME:1022211300_105 gel.dgn3/11/2026SHEETGENERAL LAYOUT 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 2 S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL SYSTEM B SIGNAL SYSTEM A DOUGLAS DR (CSAH 102) 90% PLAN DOUGLAS DR (CSAH 102) EXISTING UTILITY PLAN REMOVAL PLAN CONSTRUCTION PLAN XX XX XX PLAN SHEET LAYOUT DRAINAGE PLAN XX XX XX XX EROSION CONTROL PLAN TURF ESTABLISHMENT PLAN SIGNING AND STRIPING PLAN 0' SCALE 300'150' 20 40 47 64 74 22 41 48 65 75 18 39 46 63 73163845627212364360707784143744617178857986 80 87 81 88 82 89 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 4.10 47TH AVE N48TH AVE NFAIRVIEW AVE N50TH AVE NCORVALLIS AVE N51ST PL NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_105 gel.dgnPLOTTED/REVISED:PLOT NAME:1022211300_105 gel.dgn3/11/2026SHEETGENERAL LAYOUT 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 3 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN DOUGLAS DR (CSAH 102) 24 42 49 66 76 83 90 EXISTING UTILITY PLAN REMOVAL PLAN CONSTRUCTION PLAN XX XX XX PLAN SHEET LAYOUT DRAINAGE PLAN XX XX XX XX EROSION CONTROL PLAN TURF ESTABLISHMENT PLAN SIGNING AND STRIPING PLAN 0' SCALE 300'150' 100 105 110 115 118+25.00 4.10 NOTES TAB SHEET NO.ITEM NO.ITEM DESCRIPTION UNIT TOTAL PROJECT FEDERAL PARTICIPATING HENNEPIN CITY OF STORM SEWER COUNTY CRYSTAL SP 027-702-023 SAP 000-000-000 SP 027-702-023 50/50 QUANTITY QUANTITY QUANTITY QUANTITY (1)2011.601 AS BUILT LUMP SUM 1 1 (3)2021.501 MOBILIZATION LUMP SUM 1 0.75 0.15 0.10 84 2102.503 PAVEMENT MARKING REMOVAL LIN FT 7600 7600 84 2102.518 PAVEMENT MARKING REMOVAL SQ FT 2800 2800 11 2104.502 REMOVE CASTING EACH 2 2 11 2104.502 REMOVE HYDRANT EACH 2 2 11 2104.502 REMOVE DRAINAGE STRUCTURE EACH 12 12 A 2104.502 REMOVE FOUNDATION EACH 3 3 84 2104.502 REMOVE SIGN EACH 5 5 84 2104.502 REMOVE SIGN PANEL EACH 5 5 84 2104.502 SALVAGE SIGN EACH 31 31 84 2104.502 SALVAGE SIGN PANEL EACH 2 2 A 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT 17 17 A 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 5726 5726 11 2104.503 REMOVE WATER MAIN LIN FT 10 10 11 2104.503 REMOVE SEWER PIPE (STORM)LIN FT 601 601 A 2104.503 REMOVE CURB AND GUTTER LIN FT 3734 3734 A 2104.503 REMOVE FENCE LIN FT 27 27 A 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT (P)SQ YD 681 681 A 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT (P)SQ YD 194 194 A 2104.504 REMOVE BITUMINOUS PAVEMENT (P)SQ YD 2026 2026 A 2104.518 REMOVE BITUMINOUS WALK SQ FT 6021 6021 A 2104.518 REMOVE CONCRETE WALK SQ FT 15358 15358 (1)84 2104.602 SALVAGE SIGN SPECIAL EACH 3 3 C 2106.507 SELECT GRANULAR EMBANKMENT (CV)(P)CU YD 271 271 (1)2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 25 25 2130.523 WATER M GALLON 5 5 2131.506 CALCIUM CHLORIDE SOLUTION GALLON 500 500 C 2211.507 AGGREGATE BASE (CV) CLASS 6 (P)CU YD 420 420 2231.509 BITUMINOUS PATCHING MIXTURE TON 605 605 WM 2503.503 6" DUCTILE IRON PIPE SEWER CL 52 LIN FT 10 10 68 2503.503 58" SPAN RC PIPE-ARCH SEWER CLASS IIIA LIN FT 68 68 68 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 468 468 68 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 42 42 (1)WM 2503.608 DUCTILE IRON FITTINGS POUND 72 72 (1)WM 2504.602 HYDRANT EACH 2 2 (1)11 2504.602 ADJUST GATE VALVE AND BOX EACH 5 5 (1)WM 2504.602 6" SLEEVE EACH 1 1 (1)WM 2504.602 6" GATE VALVE AND BOX EACH 1 1 (1)11 2504.602 ADJUST CURB STOP EACH 8 8 (1) (2)2504.603 INSPECTION HOLE LIN FT 50 50 68 2506.502 CASTING ASSEMBLY EACH 31 31 11 2506.502 ADJUST FRAME AND RING CASTING EACH 5 5 68 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN N LIN FT 56.0 56.0 68 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 57.3 57.3 68 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84-4020 LIN FT 9.6 9.6 (1)68 2506.602 CONNECT INTO EXISTING STORM SEWER EACH 4 4 B 2521.518 4" CONCRETE WALK SQ FT 17363 17363 B 2521.518 6" CONCRETE WALK SQ FT 876 876 (1)B 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED)EACH 368 368 (1)B 2521.618 CONCRETE CURB RAMP WALK SQ FT 5034 5034 B 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 LIN FT 869 435 434 B 2531.503 CONCRETE CURB AND GUTTER DESIGN B612 LIN FT 1526 1526 B 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 LIN FT 1788 894 894 B 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SQ YD 433 217 216 B 2531.504 8" CONCRETE DRIVEWAY PAVEMENT SQ YD 277 139 138 (1)B 2531.603 CONCRETE SILL LIN FT 1782 1782 (1)B 2531.603 CONCRETE CURB AND GUTTER LIN FT 495 495 (1)B 2531.603 CONCRETE CURB DESIGN V LIN FT 229 229 (1)B 2531.618 TRUNCATED DOMES SQ FT 421 421PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_110 est.dgnPLOTTED/REVISED:PLOT NAME:1022211300_110 est.dgn3/12/2026SHEETSTATEMENT OF ESTIMATED QUANTITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 4 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 ESTIMATED QUANTITY NOTES (P)DENOTES PLAN QUANTITY (1)SEE SPECIAL PROVISIONS (2)FOR USE BY THE ENGINEER (3)PRO RATA FUNDING ITEM NOTES TAB SHEET NO.ITEM NO.ITEM DESCRIPTION UNIT TOTAL PROJECT FEDERAL PARTICIPATING HENNEPIN CITY OF STORM SEWER COUNTY CRYSTAL SP 027-702-023 SAP 000-000-000 SP 027-702-023 50/50 QUANTITY QUANTITY QUANTITY QUANTITY (1)11 2550.602 ADJUST FIBER OPTIC VAULT EACH 1 1 (1)2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM 1 1 (1) (3)2563.601 TRAFFIC CONTROL LUMP SUM 1 0.75 0.15 0.10 (1)2563.601 ALTERNATE PEDESTRIAN ROUTE LUMP SUM 1 1 (1) (2)2563.602 PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2 (1) (2)2563.618 CONSTRUCTION SIGN-SPECIAL SQ FT 100 100 84 2564.502 INSTALL SIGN PANEL EACH 2 2 (1)84 2564.602 INSTALL SIGN EACH 31 31 (1)84 2564.602 INSTALL SIGN SPECIAL EACH 3 3 (1)84 2564.618 SIGN SQ FT 184 184 (1)84 2564.618 SIGN PANEL SQ FT 2 2 84 2565.516 TRAFFIC CONTROL SIGNAL SYSTEM A SYSTEM 1 1 84 2565.516 TRAFFIC CONTROL SIGNAL SYSTEM B SYSTEM 1 0.5 0.5 (1)84 2565.616 PEDESTRIAN CROSSWALK FLASHER SYSTEM SYSTEM 1 0.5 0.5 (1)84 2565.616 TEMPORARY SIGNAL SYSTEM A SYSTEM 1 1 (1)84 2565.616 TEMPORARY SIGNAL SYSTEM B SYSTEM 1 0.5 0.5 (1)D 2571.602 TREE PROTECTION EACH 2 2 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1 1 D 2573.502 STORM DRAIN INLET PROTECTION EACH 25 25 D 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT 2080 2080 E 2574.505 SUBSOILING ACRE 0.23 0.23 E 2574.505 SOIL BED PREPARATION ACRE 0.66 0.66 E 2574.508 FERTILIZER TYPE 1 POUND 149 149 E 2575.505 SEEDING ACRE 0.43 0.43 E 2575.505 WEED SPRAYING ACRE 0.23 0.23 D 2575.505 RAPID STABILIZATION METHOD 2 ACRE 0.43 0.43 E 2575.506 WEED SPRAY MIXTURE GALLON 0.05 0.05 E 2575.508 HYDRAULIC STABILIZED FIBER MATRIX POUND 1285 1285 (1)2575.601 PERMANENT VEGETATION MAINTENANCE LUMP SUM 1 1 (1)E 2575.608 SEED SOUTHERN BOULEVARD POUND 50 50 (1)E 2575.608 SEED TURFGRASS POUND 24 24 84 2582.503 MOBILE RETROREFLECTOMETER MEASUREMENTS LIN FT 6946 6946 84 2582.503 4" SOLID LINE MULTI-COMPONENT GROUND IN LIN FT 800 800 84 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN LIN FT 4750 4750 84 2582.503 4" BROKEN LINE MULTI-COMPONENT GROUND IN LIN FT 180 180 84 2582.503 6" DOTTED LINE MULTI-COMPONENT GROUND IN LIN FT 76 76 84 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN LIN FT 570 570 84 2582.503 24" SOLID LINE PREFORM THERMO GROUND IN LIN FT 282 282 84 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN ENHANCED SKID RESISTANCE SQ FT 185 185 84 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND IN ENHANCED SKID RESISTANCE SQ FT 1632 1632 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_110 est.dgnPLOTTED/REVISED:PLOT NAME:1022211300_110 est.dgn3/12/2026SHEETSTATEMENT OF ESTIMATED QUANTITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 5 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 12-25 12-25 12-25 67-68 68 84 BASIS OF ESTIMATED QUANTITIES WEARING AND NON-WEARING BITUMINOUS MIXTURE 113 LBS. PER SQ. YD. PER 1" THICKNESS WATER 50 (M) GALLONS PER DIRECTIONAL MILE FERTILIZER TYPE 1 (20-10-20)350 LBS. PER ACRE DUCTILE IRON FITTINGS (6" MEGALUG)12 LBS. PER EACH PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_115 spt.dgnPLOTTED/REVISED:PLOT NAME:1022211300_115 spt.dgn3/11/2026SHEETSTANDARD PLATES & TAB INDEX 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 6 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 EARTHWORK QUANTITIES STATION 36 MED-S EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+31.75 0+50.00 4.1 1.5 1+00.00 11.5 6.1 1+50.00 11.7 6.1 2+00.00 11.5 6.1 2+50.00 11.6 6.1 3+00.00 11.9 6.1 SUBTOTALS 62.3 32 EARTHWORK QUANTITIES STATION 36-NE EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+15.67 0+50.00 3.5 0.5 1+00.00 12.2 6.9 SUBTOTALS 21.6 11.9 EARTHWORK QUANTITIES STATION 36-NW EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+11.25 0+50.00 4.4 1.4 1+00.00 6.6 11.1 1+50.00 6.5 11 2+00.00 5 13.4 2+50.00 4.6 22.6 3+00.00 4.8 21.3 3+50.00 4.9 21.4 4+00.00 6 23.7 4+50.00 7.2 23.5 5+00.00 6.8 20.7 5+50.00 5.5 19.7 6+00.00 5.9 16.6 6+11.94 1.9 4.2 SUBTOTALS 70.1 210.6 EARTHWORK QUANTITIES STATION 36-SE EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+36.01 0+50.00 3.4 0.7 1+00.00 11.7 4.1 1+50.00 8.7 8 2+00.00 7.7 8.7 2+50.00 10.8 9.9 3+00.00 14.6 11.3 3+50.00 15.9 13.5 4+00.00 14.8 15.8 4+50.00 12.4 16.3 5+00.00 10.7 15.3 5+50.00 10.4 15 6+00.00 12.4 15.1 6+50.00 12.3 7.5 7+00.00 10.8 7.8 7+50.00 10 16 7+75.99 3.7 8.9 SUBTOTALS 170.3 173.9 EARTHWORK QUANTITIES STATION 42 MED-S EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+18.68 0+50.00 5.8 2.5 1+00.00 10.1 6.1 1+05.26 1 0.4 SUBTOTALS 16.9 9 EARTHWORK QUANTITIES STATION 42-NE EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+05.05 0+50.00 13.4 5.1 0+89.93 8.1 2.1 SUBTOTALS 21.5 7.2 EARTHWORK QUANTITIES STATION 42-NW EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+08.20 0+50.00 6 4.4 1+00.00 5.4 5 1+50.00 5.1 9.9 2+00.00 4.9 9 2+50.00 6.3 9.5 3+00.00 10 13 3+50.00 13.3 4.8 3+80.41 7.7 1.7 SUBTOTALS 58.7 57.3 EARTHWORK QUANTITIES STATION 42-SE EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+05.10 0+50.00 10.2 6.9 1+00.00 8 5.3 1+50.00 8.6 7.4 2+00.00 10 13.9 2+50.00 6.9 17.4 3+00.00 5.5 11.4 3+50.00 5.5 11.5 3+77.34 3 11.3 SUBTOTALS 57.7 85.1 EARTHWORK QUANTITIES STATION 42-SW EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+07.73 0+50.00 16 2.2 0+90.50 19.1 4.5 SUBTOTALS 35.1 6.7 EARTHWORK QUANTITIES STATION 36 MED-N EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+04.93 0+50.00 5 1+00.00 11.2 1+32.38 3.7 SUBTOTALS 19.9 EARTHWORK QUANTITIES STATION 36-SW EXCAVATION TOTALS EMBANKMENT TOTALS COMMON SUBGRADE COMMON (CV) GRANULAR (CV) CU YD CU YD CU YD CU YD 0+03.75 0+50.00 8.5 3.1 1+00.00 7.5 1.8 1+48.10 1.9 1.8 SUBTOTALS 17.9 6.7 EW EARTHWORK SUMMARY LOCATION EXCAVATION EMBANKMENT COMMON COMMON (1)(2) (CV) CU YD CU YD 36 MED-N 20 36 MED-S 62 32 36-NE 22 12 36-NW 70 211 36-SE 170 174 36-SW 18 7 42 MED-N 20 11 43 MED-S 17 9 42-NE 22 7 42-NW 59 57 42-SE 58 85 42-SW 35 7 MED 3508 TOTALS 572 611 (1)INCLUDES STRIPPED EXISTING TOPSOIL (2)INCLUDES PROPOSED SLOPE DRESSING/TOPSOIL PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_120 ews.dgnPLOTTED/REVISED:PLOT NAME:1022211300_120 ews.dgn3/11/2026SHEETEARTHWORK SUMMARY 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 7 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_125 scn.dgnPLOTTED/REVISED:PLOT NAME:1022211300_125 scn.dgn3/11/2026SHEETSOIL AND CONSTRUCTION NOTES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 8 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 A MISCELLANEOUS REMOVAL TABULATION 2104 2104 2104 2104 2104 2104 2104 2104 2104 2104 STATION TO STATION SAWING CONC PAVEMENT (FULL DEPTH) SAWING BIT PAVEMENT (FULL DEPTH) REMOVE BITUMINOUS PAVEMENT REMOVE CURB & GUTTER REMOVE CONCRETE WALK REMOVE BITUMINOUS WALK REMOVE CONCRETE DRIVEWAY PAVEMENT REMOVE BITUMINOUS DRIVEWAY PAVEMENT REMOVE FENCE REMOVE CONCRETE FOUNDATION LF LF SY LF SF SF SY SY LF EA CL 102 10+00 CL 102 12+70 192 77 56 241 40 CL 102 25+50 CL 102 33+00 655 600 335 1540 852 57 32 CL 102 33+00 CL 102 40+50 2023 1625 5180 3370 226 106 CL 102 40+50 CL 102 48+00 683 409 447 2125 792 117 11 CL 102 69+75 CL 102 77+24 829 416 586 3078 224 139 21 CL 102 77+24 CL 102 84+75 17 993 397 473 2462 622 128 24 2 CL 102 115+42 CL 102 118+00 351 127 212 732 121 14 27 1 PROJECT TOTAL 17 5726 2026 3734 15358 6021 681 194 27 3 B CONCRETE TABULATION 2521 2521 2521 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 STATION TO STATION 4" CONCRETE WALK 6" CONCRETE WALK CONCRETE CURB RAMP WALK 6" CONCRETE DRIVEWAY PAVEMENT 8" CONCRETE DRIVEWAY PAVEMENT CONCRETE SILL CONCRETE CURB & GUTTER (ADA) CONCRETE CURB & GUTTER DESIGN B612 CONCRETE CURB & GUTTER DESIGN B624 CONCRETE CURB & GUTTER DESIGN B424 CONCRETE CURB DESIGN V TRUNCATED DOMES RECTANGULAR TRUNCATED DOMES RADIAL DRILL & GROUT REINFORCEMENT BARS SF SF SF SY SY LF LF L F L F LF L F SF SF EACH CL 102 100+00 CL 102 106+75 235 110 152 40 26 40 47 22 12 CL 102 106+75 CL 102 114+00 1938 185 17 38 221 256 351 12 CL 102 114+00 CL 102 120+75 7764 160 1417 122 162 762 104 762 406 518 44 98 98 CL 102 120+75 CL 102 128+00 1703 120 1147 134 78 139 34 391 40 53 78 CL 102 128+00 CL 102 134+75 2685 111 493 124 37 210 52 169 468 55 56 CL 102 134+75 CL 102 142+00 2580 80 877 36 40 381 48 205 409 163 51 56 CL 102 142+00 CL 102 149+00 458 110 948 90 126 60 67 22 31 71 56 PROJECT TOTAL 17363 876 5034 433 277 1782 495 1526 1788 869 229 93 328 368 C SURFACING MATERIAL TABULATION 2106 2211 2360 STATION TO STATION STORM SEWER IMPACTS BITUMINOUS PATCHING MIXTURE AGGREGATE BASE CLASS 6 (CV) SELECT GRANULAR EMBANKMENT (CV) TYPE SP 12.5 NON-WEARING COURSE MIX (3,B) TYPE SP 9.5 WEARING COURSE MIX (3,C) CY CY TON TON CL 102 10+00 CL 102 12+70 8 11 4 CL 102 25+50 CL 102 33+00 44 42 25 CL 102 33+00 CL 102 40+50 155 90 144 81 CL 102 40+50 CL 102 48+00 46 8 42 18 CL 102 69+75 CL 102 77+24 71 71 68 33 CL 102 77+24 CL 102 84+75 77 102 68 41 CL 102 115+42 CL 102 118+00 19 20 8 PROJECT TOTAL 420 271 395 210 D EROSION CONTROL TABULATION 2575 2573 2573 2572 STATION TO STATION RAPID STABILIZATI ON METHOD 2 STORM DRAIN INLET PROTECTION SEDIMENT CONTROL LOG TYPE WOOD FIBER TREE PROTECTION ZONE ACRES EACH LF EACH CL 102 10+00 CL 102 12+70 0.01 1 69 CL 102 25+50 CL 102 33+00 0.11 1 356 CL 102 33+00 CL 102 40+50 0.16 11 404 CL 102 40+50 CL 102 48+00 0.06 4 455 CL 102 69+75 CL 102 77+24 0.06 3 494 1 CL 102 77+24 CL 102 84+75 0.03 3 136 CL 102 115+42 CL 102 118+00 2 166 1 PROJECT TOTAL 0.43 25 2080 2PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_130 tab.dgnPLOTTED/REVISED:PLOT NAME:1022211300_130 tab.dgn3/11/2026SHEETTABULATIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 9 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 WM WATERMAIN STATION LOCATION 2504.602 2503.608 DUCTILE IRON FITTINGS 6" DIP CL 52 HYDRANT 6" GATE VALVE & BOX 6" SLEEVE 6" MEGALUG L F EACH EACH EACH EACH (A) CL102 37+94 37'RT 1 1 3 ALIGNMENT OF CURRENT HYD. LEAD SHOULD BE EXTENDED TO NEW HYD. LOCATION. CL102 77+82 44'RT 10 1 1 3 ALIGNMENT OF CURRENT HYD. LEAD SHOULD BE EXTENDED TO NEW HYD. LOCATION. PROJECT TOTAL 10 2 1 1 6 NOTES: (A) PAID AS DUCTILE IRON FITTINGS (POUND) E TURF ESTABLISHMENT TABULATION STATION TO STATION 2575 2574 2574 2575 2575 2575 2575 2574 2575 SEEDING (A) SOIL BED PREPARATION (B) SUBSOILING (6" DEPTH) (C) WEED SPRAYING (C) WEED SPRAY MIXTURE SEED MIXTURE SOUTHERN BLVD (D) SEED MIXTURE RES. TURF (E) FERTILIZER TYPE 1 (20-10-20) (F) HYDRAULIC STABILIZED FIBER MATRIX (G) ACRE ACRE ACRE ACRE GALLON POUND POUND POUND POUND CL 82 100+00 CL 82 106+75 0.01 0.02 0.01 0.01 1 3 22 CL 82 106+75 CL 82 114+00 0.11 0.17 0.06 0.06 0.01 13 7 39 336 CL 82 114+00 CL 82 120+75 0.16 0.24 0.08 0.08 0.02 24 3 56 483 CL 82 120+75 CL 82 128+00 0.06 0.09 0.03 0.03 0.01 6 4 21 180 CL 82 128+00 CL 82 134+75 0.06 0.09 0.03 0.03 0.01 4 7 20 175 CL 82 134+75 CL 82 142+00 0.03 0.05 0.02 0.02 2 2 9 80 CL 82 142+00 CL 82 149+00 1 1 9 PROJECT TOTAL 0.43 0.66 0.23 0.23 0.05 50 24 149 1285 NOTES:(A) INCLUDES MAINTENANCE (E) SEEDING MIX RESIDENTIAL TURF GRASS APPLIED AT 200 POUNDS PER ACRE (B) 1.5 ACRE SOIL BED PREP FOR 1 ACRE OF SOIL DISTURBANCE (F) FERTILIZER TYPE 1 OR 3 APPLIED AT 350 POUNDS PER ACRE (C) 0.5 ACRE SUBSOILING/WEED SPRAYING FOR 1 ACRE OF SOIL DISTURBANCE(G) HYRAULIC STABILIZED FIBER MATRIX APPLIED AT 3000 POUNDS PER ACRE (D) SEEDING MIX SOUTHERN BLVD APPLIED AT 160 POUNDS PER ACRE PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_130 tab.dgnPLOTTED/REVISED:PLOT NAME:1022211300_130 tab.dgn3/11/2026SHEETTABULATIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 10 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 -SEE SPECIAL PROVISIONS FOR UTILITY CONTACT INFO UTILITIES AS INDICATED. - THE CONTRACTOR SHALL COORDINATE CONSTRUCTION OPERATIONS TO ALLOW FOR THE ADJUSTMENT OF THE WILL BE MADE IN THE FIELD DURING CONSTRUCTION. AND MAY NOT REFLECT THE ACTUAL EFFECTS ON THE UTILITIES BY CONSTRUCTION. ACTUAL DETERMINATIONS -THE "LEAVE AS IS", "ADJUST", AND "RELOCATE" COLUMNS ARE BASED UPON THE BEST INFORMATION AVAILABLE FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA". LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF Cl/ASCE 38-02, ENTITLED "STANDARD GUIDELINES - THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY NOTICE SYSTEM REQUIRED BY MINNESOTA STATUTE , CHAPTER 216D FOR ALL UNDERGROUND UTILITY LOCATIONS. - IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO UTILIZE THE GOPHER STATE ONE CALL EXCAVATION - ALL RELOCATES AND ADJUSTMENTS SUBJECT TO HC RIGHT OF WAY. - ALL UTILITY WORK SHOWN ON THESE SHEETS SHALL BE DONE BY OTHERS UNLESS NOTED. GENERAL NOTES www.gopherstateonecall.org 800-252-1166 651-454-0002 GOPHER STATE ONE CALL M M M M U M U M PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING UTILITY INFORMATION 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 11 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN UTILITY CONTACTS COMPANY ABBREVIATION CLASSIFICATION UTILITIES CONTACT EMAIL PHONE ARVIG ARV.PRIVATE COMMUNICATION BRIAN WOCHNICK Metroosp@arvig.com 218-298-4951 CENTER POINT ENERGY C.P.E.PRIVATE GAS JOSHUA HAUKOM joshua.haukom@centerpointenergy.com 612-321-4449 LUMEN (CENTURY LINK) LUM.PRIVATE COMMUNICATION RANDALL OLSON Randall.Olson@Lumen.com OFFICE: 612-861-8702 LUMEN (CENTURY LINK)LUM.PRIVATE COMMUNICATION MARCIE DEMAIO Marcie.Demaio@Lumen.com OFFICE: 612-431-3517 CITY OF CRYSTAL C.O.C.PUBLIC SANITARY, STORM, WATER JOSE GALEANO Jose.Galeano@crystalmn.gov 763-531-1163 COMCAST COM.PRIVATE COMMUNICATION MCCLAY LYFORD Mcclay_lyford@comcast.com 651-925-6372 HENNEPIN COUNTY FIBER HCF.PUBLIC COMMUNICATION JASON DOUVIER Jason.Douvier@hennepin.us OFFICE: 612-596-7482 MCI/ VERIZON MCI.PRIVATE COMMUNICATION GREG ALLEN greg.allen@verizon.com 612-619-9602 XCEL ENERGY XCEL PRIVATE ELECTRIC RYAN KAZECK Ryan.M.Kazeck@xcelenergy.com OFFICE: CELL: ZAYO BANDWIDTH ZAYO PRIVATE COMMUNICATION JASON OVERKAMP jason.overkamp@zayo.com 651-788-5890 PROJECT TOTALS 2104 2104 2104 2104 2104 2504 2504 2506 2506 REMOVE SEWER PIPE (STORM) REMOVE DRAINAGE STRUCTURE REMOVE CASTING REMOVE HYDRANT REMOVE WATERMAIN ADJUST GATE VALVE & BOX ADJUST CURB STOP ADJUST FRAME & RING CASTING ADJUST FIBER VAULT LF EA EA EA LF EA EA EA EA 601 12 2 2 10 5 8 5 1 ICB XXX IWMH XXX IMH XXX CMH XXX IPMH XXX IPP XXX INAP XXX SLIT XXX IHYD XXX PBOX XXX CVLT XXX RISER XXX IGTV XXX ICSB XXX PMTR XXX CCAB XXX CPP XXX IGSV XXX GMTR XXX ISMH XXX STOP XXX CAB XXX IHH XXX 90% PLAN INPLACE UTILITY LEGEND SANITARY SEWER OVERHEAD POWER GAS MAIN GAS LINE (OUT OF SERVICE) STORM SEWER WATER MAIN FIBER OPTIC OVERHEAD FIBER OPTIC BURIED COMMUNICATION BURIED WATER MANHOLE WATER CURB STOP POWER MANHOLE STORM MANHOLE SANITARY MANHOLE SIGNAL BASE ELECTRIC POLE WITH LIGHT SIGNAL HANDHOLE COMM MANHOLE COMM POLE COM VAULT/HANDHOLE GAS MANHOLE POLE-MOUNTED WIFI/SHOT-SPOTTERS SIGNAL POWER/CONDUIT BURIED POWER ELECTRIC POLE GAS VALVE COM CABINET/RISER STREET LIGHT POWER CAB/BOX POWER METER GAS METER SIGNAL CABINET STORM CATCH BASIN WATER GATE VALVE HYDRANT COMMUNICATON OVERHEAD PROPOSED STORM PROPOSED DRAINAGE STRUCTURE PROPOSED SIGNAL PUSH BUTTON PROPOSED SIGNAL CABINET PROPOSED SIGNAL BASE STRUCTURE NUMBER INPLACE CATCH BASIN STRUCTURE INVENTORY ID KEY STRUCTURE NUMBER INPLACE STORM MANHOLE STRUCTURE NUMBER INPLACE STORM APRON STRUCTURE NUMBER INPLACE SANITARY MANHOLE STRUCTURE NUMBER INPLACE GAS VALVE STRUCTURE NUMBER INPLACE GAS METER STRUCTURE NUMBER INPLACE SIGNAL HANDHOLE STRUCTURE NUMBER INPLACE SIGNAL CABINET STRUCTURE NUMBER INPLACE SIGNAL BASE STRUCTURE NUMBER INPLACE POWER METER STRUCTURE NUMBER INPLACE STREET LIGHT STRUCTURE NUMBER INPLACE POWER BOX STRUCTURE NUMBER INPLACE POWER POLE STRUCTURE NUMBER INPLACE POWER MANHOLE STRUCTURE NUMBER INPLACE WATER MANHOLE STRUCTURE NUMBER INPLACE HYDRANT STRUCTURE NUMBER INPLACE GATE VALVE STRUCTURE NUMBER INPLACE CURB STOP STRUCTURE NUMBER INPLACE COMMUNICATION RISER STRUCTURE NUMBER INPLACE COMMUNICATION VAULT STRUCTURE NUMBER INPLACE COMMUNICATION MANHOLE STRUCTURE NUMBER INPLACE COMMUNICATION CABINET STRUCTURE NUMBER INPLACE COMMUNICATION POLE CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT 3RD PARTY COMMUNICATION BURIED 3RD PARTY COMMUNICATON OVERHEAD PROPOSED R.R.F.B. 4.10 3157 6215 3200 AUTO SALES EL CHINO 3201 VAULTCOMMVAULTCOMMCPE 3" TR CPE 2" P.V.C.CPE3" TRCPE.5" SERVICE UTILITY INFO..SIZECOMBURIED F/0XCELN/A AERIALCOMAERIAL F/0LUMAERIAL F/0COM BURIED F/0 COM AERIAL F/0 XCEL AERIAL N/A PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 12 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN32ND AVE NCSAH 102 (DOUGLAS DR) IPP 420 IPP 421 IPP 419 CVLT 319 CVLT 318 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 10 0' SCALE 20'10' 4.10 3157 6215 3200 AUTO SALES EL CHINO 3201 MMMMM36" R.C.P. 8" P.V.C. 24" R.C.P. 21" R.C.P. 18" R.C.P. 24" R.C.P. 8" P.V.C.8" P.V.C.24" R.C.P.24" R.C.P.18" R.C.P.8" P.V.C.SERV N/ASERV -SERV -SERV -SERV -SERV -6" P.V.C.24" R.C.P.36" R.C.P. 24" R.C.P. HCF BURIED F/0HENN CO3" R.S.C.PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 13 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN32ND AVE NCSAH 102 (DOUGLAS DR) IGTV 529 IGTV 527 IGTV 531 IHYD 530 ICB 135 ICB 138 ICB 140 ICB 141 ICB 142 ICB 143 ICB 144 PMTR 419A IMH 139 ISMH 809 ICB 136 IMH 137 IWMH 525 IWMH 526 ICB 138A RRFB 419B RRFB 419C 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 10 0' SCALE 20'10' 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3429 3431 3443 3501 3442 3448 3517 3405 3407 341334113409 3508 STEEL 8" CPE TR 4" CPE TR 4" CPE TR 2"CPES E R VI C E 2" C P E SERVICE 2" CPESERVICE .5"CPESERVICE .5"CPEF/0 AERIAL LUM F/0 AERIAL COM AERIAL - XCELF/0 BURIEDLUMAERIAL - XCEL F/0 AERIAL LUM F/0 AERIAL COM COPPER BURIED LUM MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 14 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 102 (DOUGLAS DR) IPP 423 IPP 424 TELR 320 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 30 0' SCALE 50'25' 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3429 3431 3443 3442 3448 3517 3405 3407 341334113409 3508MMR.C.P. 24" R.C.P. 12"R.C.P. 15" R.C.P. 24" P.V.C. 8" P.V.C. 8" P.V.C. 8"P.V.C. 6"- SERVP.V.C. 6"- SERV- SERV- SERV- SERV- SERV- SERV- SERV- SERV- SERVR.C.P. 12"R.C.P. 12"- SERVN/A SERV- SERV- SERV- SERV- SERV- SERV- SERVF/0 BURIED HCF MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 15 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 102 (DOUGLAS DR) IHYD 550 IGTV 551 ISMH 817 ICB 156 ICB 157 ICB 153 ICB 155 ICSB 544 ISMH 816 ICSB 553 ICSB 549 ICSB 548 ICSB 547 ICSB 545 IGTV 552 ICSB 546 ICB 154 ICSB 553A 3 2 1 4 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED TO BE REMOVED WITH PROJECT NOTE: ALL SIGNAL HARDWARE AND CONDUIT 30 0' SCALE 50'25' 4.10 MHMH MHMH MH MH3537 3528 3601 3600 3609 3617 3616 3624 3550 6213 TR 2" CPE STEEL 8" CPE STEEL 8" CPE SERVICE 2"CPESTEEL 8"CPESERVICE .5" CPE SERVICE .5" CPE STEEL 8" CPE F/0 BURIED LUM COPPER BURIED LUM AERIAL N/A XCEL F/0 AERIAL LUM F/0 AERIAL COM AERIAL - XCELF/0 BURIEDCOMF/0 BURIED LUM F/0 BURIED LUM COPPER BURIED LUM F/0 AERIAL LUM AERIAL - XCELF/0 AERIAL COM STEEL 8"CPEF/0 BURIED LUM F/0 BURIED COMMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 16 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NIPP 425 IPP 426 IPP 429 IPP 431 IPP 434 LITE 427 LITE 430 IPP 432 IPP 433 TELR 321 TELR 323 8 7 32 4 55 6 1 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 35 40 0' SCALE 50'25' 4.10 MHMH MHMH MH MH3528 3601 3600 3609 3617 3616 3624 3550 6213 CVLT 332UUUUU UUUVAULTCOMMUUUMMMMMP.V.C. 8" P.V.C. 8" R.C.P. 15"P.V.C. 8"PLASTIC 24"P.V.C. 8"P.V.C. 24"- SERV- SERV- SERVP.V.C. 6"N/A SERV- SERV- SERV- SERV- SERVR.C.P. 22" ARCH R.C.P. 22" ARCH R.C.P. 12"R.C.P. 12"P.V.C. 8"R.C.P. 24" R.C.P. 18"R.C.P. 24"R.C.P. 22" ARCH R.C.P. 22" ARCH R.C.P. 12" R.C.P. 12" R.C.P. 12" R.C.P. 24"- SERV- SERV- SERV- SERVF/0 BURIED HCF F/0 BURIED HCF F/0 BURIED HCFMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 17 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NIHYD 557 IGTV 554 ISMH 818 ICB 159 ICB 162 ICB 163 ICB 164 ICB 168 ICB 165 ICB 169 ICB 170 ICB 171 ICB 173 ICB 174 ICB 172 CAB 333 IHH 322 IHH 324 IHH 325 IHH 326 IHH 327 IHH 331 IHH 330 IHH 334 IHH 329 IHH 328 IHH 335 ISMH 819 IMH 166 ISMH 820 IGTV 556 IMH 167 ICB 161 ICB 160ICB 158 ICSB 562 ICSB 560 ICSB 559 ICSB 561 ICSB 558 IGTV 554A 2 6 9 3 10 145 1 4 11 1313 12 15 16 8 7 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED TO BE REMOVED WITH PROJECT NOTE: ALL SIGNAL HARDWARE AND CONDUIT 35 40 0' SCALE 50'25' 4.10 MH3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 6219 6201 6218 3801 3808 6309 6310 6200MSTEEL 8" CPETR 2"CPESTEEL 8" CPE TR 2"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5" CPE SERVICE .5" CPE SERVICE .5" CPE COPPER BURIED LUM F/0 BURIED LUM F/0 AERIALCOMCOPPER BURIEDLUMF/0 BURIEDCOMF/0 AERIAL COM AERIAL - XCEL AERIAL - XCEL F/0 AERIAL COM F/0 BURIED COMMATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 18 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN37TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR) IPP 435 IPP 436 IPP 437 IMH 3361 2 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 45 0' SCALE 50'25' 4.10 MH3625 3633 3641 3632 3640 3648 3656 3703 3715 3704 6219 6201 6218 3801 3808 6309 6310 6200MMMMMMMM P.V.C. 8" P.V.C. 8" P.V.C. 8" R.C.P. 18" P.V.C. 24" P.V.C. 24" P.V.C. 24" P.V.C. 24"- SERVP.V.C. 6"P.V.C. 24"- SERV- SERVP.V.C. 8"- SERVP.V.C. 8"- SERV- SERVR.C.P. 18"R.C.P. 18" R.C.P. 18" R.C.P. 18"R.C.P. 15"R.C.P. 15"R.C.P. 18"R.C.P. 18"- SERV- SERVR.C.P. 21" F/0 BURIED HCF F/0 BURIED HCF F/0 BURIED HCFMATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 19 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN37TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR) IHYD 573 IGTV 570 IGTV 575 IGTV 574 ISMH 824 IMH 179 ICB 175 ICB 178 ICB 180 ICB 181 ICB 183 ICB 184 ICB 187 ICB 185 ISMH 825 ISMH 823 IMH 177 ICB 182 IMH 186 ICB 176 ISMH 822 ICSB 577 ICSB 572 ICSB 571 ICSB 569 IGTV 567 ICSB 566ICSB 565 ICSB 563 ICSB 576 IWMH 568 ICSB 564 21 3 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED TO BE REMOVED WITH PROJECT NOTE: ALL SIGNAL HARDWARE AND CONDUIT 45 0' SCALE 50'25' 4.10 MH4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 4156VAULTCOMM VAULTCOMMVAULTCOMMVAULTCOMMVAULTCOMMMMMSTEEL 8" CPE STEEL 8" CPE SERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVI CE .5"CPETR 3"CPESERVICE .5" CPE AERIAL - XCEL F/0 AERIAL COM F/0 AERIAL LUM F/0 AERIAL COM COPPER BURIED LUM COPPER BURIED LUM COPPER BURIED LUM COPPER BURIED LUM AERIAL - XCEL F/0 AERIAL COM F/0 AERIAL LUM BURIED 3RD PARTY LUM BURIED 3RD PARTY LUM F/0 BURIED COM F/0 AERIAL COM AERIAL - XCEL F/0 BURIED LUM F/0 BURIED LUM F/0 BURIED LUM F/0 BURIED LUM F/0 BURIED LUM AERIAL 3RD PARTY LUM AERIAL 3RD PARTY LUM AERIAL 3RD PARTY LUM AERIAL 3RD PARTY LUM MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 20 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE NIPP 445 IPP 446 IPP 447 IPP 448 IPP 449 TELR 351 CVLT 353 CVLT 354 CVLT 350 CVLT 349 CVLT 348 IMH 361 IPP 444 IPP 443 CVLT 347 TMH 346 1 8 3 6 2 4 5 7 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 70 75 0' SCALE 50'25' 4.10 MH4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 4156 VAULTCOMMUUUUUMMMMMMMMMP.V.C. 24" P.V.C. 24" P.V.C. 24"P.V.C. 6"P.V.C. 6"R.C.P. 21"R.C.P. 1 2 "R.C.P. 12"P.V.C. 8" P.V.C. 8" P.V.C. 24" P.V.C. 8"R.C.P. 15"- SERV- SERV- SERV- SERVR.C.P. 21"P.V.C. 6" P.V.C. 10"P.V.C. 10"R.C.P. 12"R.C.P. 21"- SERV- SERVP.V.C. 30"F/0 BURIED HCF F/0 BURIED HCF MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 21 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE NICB 212 ICB 211 ICB 220 CVLT 352 IHH 355 IHH 362 IHH 359 IHH 357 IHH 356 IMH 219 IMH 221 ISMH 835 IMH 214 IMH 213 IMH 210 IMH 209 ISMH 834ISMH 833 IGTV 631 IGTV 632 ICSB 629 ICSB 628 IGTV 630 IGTV 627 ICSB 626 IGTV 625 IHYD 627A 6 7 3 1 2 4 5 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED TO BE REMOVED WITH PROJECT NOTE: ALL SIGNAL HARDWARE AND CONDUIT 70 75 0' SCALE 50'25' 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 4410 4333 MSERVICE .5"CPETR 6" CPE TR 6" CPE SERVICE .5"CPESERVICE .5"CPESERVICE .5"CPESERVICE .5"CPEPLASTIC 8"CPESER V IC E .5"C PEPLASTIC 8"CPEF/0 AERIALLUM F/0 AERIAL COM AERIAL - XCEL F/0 AERIAL COM F/0 AERIAL COM STEEL 8"CPEBURIED 3RD PARTY LUM F/0 BURIED LUM F/0 BURIED LUM AERIAL 3RD PARTY LUM MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 22 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENCSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)43RD AVE NIPP 453 IPP 456 LITE 452 LITE 455 LITE 454 LITE 451 LITE 450 TELR 366 TMH 358 IPP 457 IPP 458 1 2 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 80 0' SCALE 50'25' 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 4410 4333 UUVAULTCOMMUUMMMMMMP.V.C. 24" P.V.C. 24" P.V.C. 24" P.V.C. 24"- SERVP.V.C. 6"- SERV- SERV- SERVP.V.C. 8" P.V.C. 8" P.V.C. 8" P.V.C. 8"P.V.C. 8"R.C.P. 12" R.C.P. 12"P.V.C. 8"P.V.C. 16"- SERV- SERV- SERVR.C.P. 12" R.C.P. 12"R.C.P. 12"- SERV- SERV- SERV- SERV- SERVP.V.C. 30"F/0 BURIED HCF F/0 BURIED HCF F/0 BURIED HCF R.C.P. 18"MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 23 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENCSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)43RD AVE NIHYD 636 IGTV 635 IGTV 637 ICB 224 ICB 225 ICB 226CVLT 364 IHH 363 IHH 365 IHH 360 IWMH 633 ICB 229 ICB 228 IMH 227 ISMH 836 ISMH 838 ISMH 837 ICSB 645 ICSB 642 IGTV 644 IGTV 641 ICSB 640 ICSB 639 ICSB 638 IHYD 643 IWMH 634 ICSB 637A ICSB 640A 4 8 2 7 1 55 9 10 6 3 4 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED TO BE REMOVED WITH PROJECT NOTE: ALL SIGNAL HARDWARE AND CONDUIT 80 0' SCALE 50'25' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 CPE.5" SERVICECPE 6" STEEL CPE.5" SERVICECPE.5" SERVICEXCEL - AERIAL LUM AERIAL F/0 COM AERIAL F/0 LUM BURIED COPPER LUM BURIED F/0 CPE 6" STEEL LUM AERIAL F/0COM AERIAL F/0 XCEL AERIAL N/A XCEL - AERIAL COM AERIAL F/0 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PRIVATE UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 24 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENFAIRVIEW AVE NIPP 467 IPP 469 PBOX 468 2 1 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 118+25.00 0' SCALE 20'10' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 MM12" R.C.P.10" P.V.C.24" P.V.C. 24" P.V.C. 24" P.V.C. 24" R.C.P. 24" R.C.P.21" R.C.P.8" P.V.C. 8" P.V.C. 24" R.C.P.6" P.V.C.6" P.V.C.SERV -SERV -SERV -SERV -SERV -BURIED F/0 HCF BURIED F/0 HCF BURIED F/0 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_135 ute.dgnPLOTTED/REVISED:PLOT NAME:1022211300_135 ute.dgn3/11/2026SHEETEXISTING PUBLIC UTILITIES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 25 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENFAIRVIEW AVE NIHYD 690 IGTV 689 IGTV 691 ICB 261 ISMH 849 IWMH 688 ICB 262 ICB 259 ICB 260 IGTV 687 ICSB 692 ICSB 686 3 2 1 90% PLAN CONFLICT/ACTION AREA RECONSTRUCTED 118+25.00 0' SCALE 20'10' 4.10 MEDIAN LT. TURN 12.0'11.0' RT. TURN THRU CSAH 102 6.0' THRU 12.0' EXIST BLVD 0.67'-12.0' WALK 6.0' 1.5% 2.0' (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) LC 36SE 69.0' 1.5% (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) BLVD 0.67'-9.5 WALK 6.0'2.0' VAR EXIST GRADE PROFILE EXIST CSAH 102 STA: 36SE 5+16 TO 7+76 TYPICAL SECTION BEX. R/W B624DETAIL 1 DETAIL 2 INSET B DETAIL 3 VAR. SHLD 6.0' SHLD B424 B612 EX. R/W 18.9' 1:4 1:4 CSAH 102 BLVD 0.67'-12.0' WALK 6.0' 1.5% 2.0' (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) LC 36SE EXIST CSAH 102 STA: 36SE 0+00 TO 5+16 TYPICAL SECTION A INSET B DETAIL 3 B424 EX. R/W 18.9' 1:4 1:4 MEDIANLT. TURN 12.0'11.0' RT. TURN THRU CSAH 102 6.0' THRU 12.0' EXIST BLVD 10.5' WALK 6.0'2.0' LC 36NW 70.8' 1.5% (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) BLVD 0.67'-8.5 WALK 6.0'2.0' VAR EXIST GRADE PROFILE EXIST CSAH 102 STA: 36NW 0+91 TO 1+99 TYPICAL SECTION C EX. R/W B424INSET B VAR. SHLD 6.0' SHLD B624 B612 EX. R/W 17.1' CSAH 102 CSAH 102 STA: 36NW 1+99 TO 6+12 TYPICAL SECTION D VAR1.5% (OR FLATTER) (OR FLATTER) BLVD 5.9''-10.5' WALK 6.0'2.0' LC 36NW EXIST INSET B B624 EX. R/W 17.1' VAR1.5% (OR FLATTER) (OR FLATTER) (VAR (1:4) (VAR (1:4) (VAR (1:4) (VAR (1:4) MEDIAN LT. TURN 12.0'11.0' RT. TURN THRU CSAH 102 6.0' THRU 12.0' EXIST BLVD 6.0' WALK 6.0'2.0' LC 42SE 66.4'-120.0' 1.5% (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) WALK 6.67'2.0' EXISTEXIST CSAH 102 STA: 42SE 3+09 TO 3+77 TYPICAL SECTION F EX. R/W B624 INSET B VAR. SHLD 6.0' SHLD B624 B612 EX. R/W 15.6' CSAH 102 CSAH 102 STA: 42SE 0+00 TO 3+09 TYPICAL SECTION E VAR 1.5% (OR FLATTER) (OR FLATTER) BLVD 0.67'-6.0' WALK 5.0'2.0' LC 42SE EXIST INSET B B624 EX. R/W 8.5'-15.6' VAR 1.5% (OR FLATTER) (OR FLATTER) (VAR (1:4) (VAR (1:4) (VAR (1:4) (VAR (1:4)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_145 typ.dgnPLOTTED/REVISED:PLOT NAME:1022211300_145 typ.dgn3/11/2026SHEETTYPICAL SECTIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 26 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 4.10 NOT TO SCALE (MEDIANS 10' OR LESS F/C TO F/C) DETAIL 2 4" CLASS 6 AGGREGATE 4" CONC. WALK GRADING MATERIAL BACKFILL WITH SELECT B612 B612 2' BIT. SAWCUT 2' VAR 1:0.51:1 1' 2' MATERIAL SELECT GRADING BACKFILL WITH 1/4" TYP B624 2' BIT. SAWCUT 4" CONCRETE WALK (INCIDENTAL) 4" AGGREGATE BASE - CLASS 6 (SIDEWALK) NSET BI TACK COATS (INCIDENTAL) (4,C) (SPWEB440C) 2" TYPE SP 12.5 WEARING COURSE MIXTURE (4,B) (SPNWB340B) 3" TYPE SP 12.5 NON-WEARING COURSE MIXTURE 8" AGGREGATE BASE - CLASS 6 (CSAH 102) INSET A (4,C) (SPWEB440C) 2" TYPE SP 12.5 WEARING COURSE MIXTURE INSET A INSET A 1:0.51:1 1' 2' SELECT GRADING MATERIAL BACKFILL WITH 1/4" TYP B424 2' BIT. SAWCUT INSET A 0.5' 0.5' 0.83' 4.5'5' (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) WALK 6.0' 1.5% 0.5' NOT TO SCALE (STA: 36SE 1+65 TO 7+76) DETAIL 3 8" CONCRETE WALK (INCIDENTAL) 4" AGGREGATE BASE - CLASS 6 (COMMERCIAL DRIVEWAY) INSET D SIDEWALK SHALL BE INCIDENTAL) (SUBGRADE PREP FOR COMPACTED SUBGRADE 6" CONCRETE (INCIDENTAL) 4" AGGREGATE BASE - CLASS 6 (RESIDENTIAL DRIVEWAY) INSET C SIDEWALK SHALL BE INCIDENTAL) (SUBGRADE PREP FOR COMPACTED SUBGRADE SIDEWALK SHALL BE INCIDENTAL) (SUBGRADE PREP FOR COMPACTED SUBGRADE (NOT TO SCALE) DETAIL 1 1:41:41.25'MEDIANLT. TURN 12.0'11.0' RT. TURN THRU CSAH 102 6.0' THRU 12.0' EXIST BLVD 0.67'-10.5' WALK 6.0'2.0' LC 42NW 68.5' 1.5% (VAR (1:4) (OR FLATTER) (VAR (1:4) (OR FLATTER) WALK 6.67'2.0' EXIST EXIST CSAH 102 STA: 42NW 1+26 TO 2+19 TYPICAL SECTION G EX. R/W B624INSET B 9.0' SHLD 6.0' SHLD B624 B612 EX. R/W 13.2'-13.5' CSAH 102 CSAH 102 STA: 42NW 2+19 TO 3+81 TYPICAL SECTION H VAR1.5% (OR FLATTER) (OR FLATTER) BLVD 0.67'-6.0' WALK 6.0'2.0' LC 42NW EXIST INSET B B624 EX. R/W 8.2'-13.0' VAR1.5% (OR FLATTER) (OR FLATTER) (VAR (1:4) (VAR (1:4) (VAR (1:4) (VAR (1:4) NOT TO SCALE (MEDIANS 10' OR GREATER F/C TO F/C) DETAIL 2A 6" TOPSOIL 2" DEPRESSION GRADING MATERIAL BACKFILL WITH SELECT B612 B612 2' BIT. SAWCUT 2' INSET A PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_145 typ.dgnPLOTTED/REVISED:PLOT NAME:1022211300_145 typ.dgn3/11/2026SHEETTYPICAL SECTIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 27 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN (SEE TURF EST PLANS) TOPSOIL AND SEED BOULEVARDS TOPSOIL THICKNESS IS 6" TYPICAL SECTIONS FOR VARIATIONS SEE CONSTRUCTION PLANS AND CROSS GENERAL BOULEVARD WIDTH AND SLOPE WALK AND DRIVEWAY EDGES EXTEND AGGREGATE BASE 6" BEYOND FOR CROSS SLOPES SEE CONSTRUCTION PLAN AND CROSS SECTIONS WALK AND DRIVEWAY CROSS SLOPES VARY. SHALL BE SAWCUT CONCRETE WALKWAY & DRIVEWAY JOINTS TYPICAL WALK CROSS SLOPE (0.15 FT/FT MAX) ALL SLOPES ARE FT. PER FT. 1.5' OBSTACLE CLEAR ZONE FROM FACE OR CURB GENERAL NOTES: 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_155 spn.dgnPLOTTED/REVISED:PLOT NAME:1022211300_155 spn.dgn3/11/2026SHEET 102CSAH 2211300HENNEPIN COUNTY PROJECT 138 28 S.P. XXX-XXX-XXX, S.P. 027-702-003 STANDARD PLANS & DETAILS THE FOLLOWING STANDARD PLANS, APPROVED BY THE FEDERAL HIGHWAY ADMINISTRATION, SHALL APPLY ON THIS PROJECT STANDARD PLANS INDEX NO.SUBJECT APPROVED REVISED 5-297.250 (1 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.250 (2 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.250 (3 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.250 (4 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.250 (5 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.250 (6 of 6)PEDESTRIAN CURB RAMP DETAILS 11-04-2021 5-297.254 (1 of 4)DRIVEWAY AND SIDEWALK DETAILS 11-04-2021 5-297.254 (2 of 4)DRIVEWAY AND SIDEWALK DETAILS 11-04-2021 5-297.254 (3 of 4)DRIVEWAY AND SIDEWALK DETAILS 11-04-2021 12-23-2021 5-297.254 (4 of 4)DRIVEWAY AND SIDEWALK DETAILS 11-04-2021 5-297.302 PROTECTION AND RESTORATION OF VEGETATION 12-11-2015 5-297.404 (1 of 3)PERMANENT EROSION CONTROL - ALONG ROADWAYS, DITCHES, AND FLUMES 02-28-2017 5-297.404 (2 of 3)PERMANENT EROSION CONTROL - TURF ESTABLISHMENT DETAIL AT CULVERT ENDS 01-08-2020 5-297.404 (3 of 3)PERMANENT EROSION CONTROL - REPP (BLANKET) STAPLE PATTERN FOR SLOPES 01-08-2020 5-297.405 (1 of 8)TEMPORARY SEDIMENT CONTROL - SILT CURTAIN OR SILT FENCE TYPE TB 02-28-2017 5-297.405 (2 of 8)TEMPORARY SEDIMENT CONTROL - FILTER BERMS, SEDIMENT CONTROL LOGS, AND BALE BARRIERS 01-08-2020 5-297.405 (3 of 8)TEMPORARY SEDIMENT CONTROL - DITCH CHECK 01-08-2020 5-297.405 (4 of 8)TEMPORARY SEDIMENT CONTROL - STORM DRAIN INLET PROTECTION 02-28-2017 5-297.405 (5 of 8)TEMPORARY SEDIMENT CONTROL - CONSTRUCTION EXITS 02-28-2017 5-297.405 (6 of 8)TEMPORARY SEDIMENT CONTROL - SILT FENCE 02-28-2017 5-297.405 (7 of 8)TEMPORARY SEDIMENT CONTROL - SUPER DUTY SILT FENCE 02-28-2017 5-297.405 (8 of 8)TEMPORARY SEDIMENT CONTROL - CULVERT END CONTROLS 02-28-2017 5-297.442 STANDARD STORM SEWER BEDDING FOR RIGID AND FLEXIBLE PIPE 11-15-2024 5-297.811 (1 of 2)ALTERNATE PEDESTRIAN ROUTE (APR) LAYOUTS 03-18-2021 5-297.811 (2 of 2)ALTERNATE PEDESTRIAN ROUTE (APR) LAYOUTS 03-18-2021 5-297.813 (1 of 2)TEMPORARY PEDESTRIAN ACCESS ROUTE (TPAR) DEVICES - CHANNELIZERS, SIDEWALK BARRICADES, AND PORTABLE STANDS 03-18-2021 5-297.813 (2 of 2)TEMPORARY PEDESTRIAN ACCESS ROUTE (TPAR) DEVICES - TEMPORARY CURB RAMPS AND WALKWAY SURFACES 03-18-2021 90% PLAN 4.10 NOT TO SCALE TREE PROTECTION SIDEWALK CURB & GUTTER REMOVAL FENCE LOCATION AFTER & GUTTER EXISTING CURB BELOW GRADE EXTEND 2' POSTS SHALL 8.WORK AND MATERIALS DESCRIBED IN THIS DETAIL SHALL BE PAID FOR AS "TREE PROTECTION". REMOVAL WITHIN 50' OF TREES IDENTIFIED FOR PROTECTION IN THE PLANS OR BY THE ENGINEER. 7.A HENNEPIN COUNTY FORESTRY SERVICE REPRESENTATIVE SHALL BE ON-SITE DURING CURB OR SIDEWALK PREVIOUSLY PLACED MULCH AND RETURN AREA TO TURF. ESTABLISH TURF.CONTRACTOR TO REMOVE ALL MATERIALS USED FOR TREE PROTECTION INCLUDING 6.TREE PROTECTION SHALL REMAIN IN PLACE UNTIL CONTRACTOR IS READY TO SHAPE SLOPES AND ADJACENT TO THE REMOVED CURB AS FREQUENTLY AS NECESSARY TO PREVENT DESICCATION. LOCATION.IMMEDIATELY BACKFILL THE 2' ZONE WITH MULCHING AND WATER. WATER EXPOSED ROOT AREA SHARPENED PRUNING IMPLEMENTS. RELOCATE PROTECTIVE FENCING 2 FEET BEYOND THE PREVIOUS CURB 5.FOLLOWING CURB REMOVAL, PRUNE DAMAGED OR TORN ROOTS USING A 90-DEGREE CUT WITH CLEAN, THREE TIMES PER WEEK. MEDIUM, MINIMIZING RUNOFF FROM THE BOULEVARD.MAINTAIN A WATERING SCHEDULE OF NO LESS THAN THE UNDERLYING SOIL REACHES ADEQUATE MOISTURE LEVELS. THE MULCH WILL SERVE AS A RETENTION 4.APPLY 3" OF SHREDDED HARDWOOD MULCH UNIFORMLY WITHIN THE FENCED-IN AREA. WATER UNTIL DO NOT ALTER OR MOVE THIS BARRIER FENCING NO DISTURBANCE OF ANY KIND NO CHANGE IN GRADE OR EXCAVATION NO STORAGE OR DISPOSAL MATERIALS NO EQUIPMENT OR FOOT TRAFFIC TREE PROTECTION ZONE 3.PLACE A SIGN ON EACH TREE FENCE THAT READS: GRADE. USE AS MANY POSTS AS NEEDED TO EXTEND THE FENCE TO THE DRIPLINES OR PAVEMENT EDGES. OR AGAINST PAVEMENT EDGES. POSTS SHOULD BE NO MORE THAN 6' O.C. MAXIMUM AND EXTEND 2' BELOW 2.INSTALL 4' HIGH ORANGE COMMERCIAL CONSTRUCTION FENCING AT THE DRIP LINE OF THE TREE TREES WITHIN THE CONSTRUCTION LIMITS THAT ARE TO REMAIN. 1.TREE PROTECTION FENCING MUST BE INSTALLED PRIOR TO ANY LAND DISTURBANCE AROUND ANY NOTES FOR TREE PROTECTION: CURB & GUTTER REMOVAL FENCE LOCATION PRIOR 4' 2'PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_155 spn.dgnPLOTTED/REVISED:PLOT NAME:1022211300_155 spn.dgn3/11/2026SHEET 102CSAH 2211300HENNEPIN COUNTY PROJECT 138 29 , S.P. XXX-XXX-XXXS.P. 027-702-003 STANDARD PLANS & DETAILS90% PLAN 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 30 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 0' SCALE 100'50' 0' SCALE 100'50' 0 0+65.00 00+65.0000+65.00 10 15 20 32-NW 32-NE 32 MED-S CSAH-102 0 51234 6 7 8 8+69.980 1 1+58.6701 2 3 011+33.25 0 1 1+45.00 0 1 2 3 3+25.00 0 1 1+40.002530 35 40 CSAH-102 36 MED-S 36-SE 36-SW 36-NE 36 MED-N 36-NW MED 3508 SOUTHERN ZONE, NAD83 1986 (NON-HARN VALUES) GROUND FEET, BASED ON THE MINNESOTA COORDINATE SYSTEM, HORIZONTAL CONTROL COORDINATES ARE HENNEPIN COUNTY 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 31 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 0' SCALE 100'50' 0' SCALE 100'50' 60 65 70 CSAH-102 0 0+95.00 00+90.0000+70.00011+15.0054 6 6+87.140 0+75.0045 50 55 36-NW CSAH-102 38 MED-S 38-SE 38-SW 38-NW 38-NE 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 32 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 0' SCALE 100'50' 0' SCALE 100'50' 90 95 100 CSAH-10201+00.0001 2 3 3+90.00 0 1 2 3 4 4+51.750 1+00.000 1 1+25.00 0 1 1+30.0075 80 85 42-SE 42 MED-S 42-SW 42-NW 42 MED-N 42-NE CSAH-102 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 33 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 0' SCALE 100'50' 0 0+80.000 0+70.0000+71.0000+80.00 105 110 115 0 CSAH-102 FAIRVIEW-SW FAIRVIEW-NW FAIRVIEW-NE FAIRVIEW MED-N FAIRWIEW-SE 118+25.000+65.00 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 34 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN ALIGNMENT: CSAH-102 ALIGNMENT: 38-SW ALIGNMENT: 36-NW ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHDELTADEGREERADIUSTANGENTLENGTHDELTADEGREERADIUSTANGENTLENGTHDELTADEGREERADIUSTANGENTLENGTH TANGENT START START 10+00.00 506027.691 181387.495 TANGENT START START 0+00.00 505990.796 184958.659 TANGENT START START 0+00.00 505919.201 184157.195 TANGENT HPI HPI 11+05.92 506028.784 181493.412 0.5913�°TANGENT HPI HPI 0+29.69 505991.223 184988.344 0.8241�°TANGENT PC PC 0+36.16 505955.359 184157.094 90.1596�° TANGENT HPI HPI 11+05.92 506028.784 181493.412 TANGENT HPI HPI 0+29.69 505991.223 184988.344 ARC PC PC 0+36.16 505955.359 184157.094 90.1596�° TANGENT HPI HPI 37+45.54 506017.468 184133.009 359.7544�°TANGENT PC PC 0+62.61 505991.119 185021.266 359.8191�°ARC HPI HPI 0+71.35 90�°19'14.60" LT 163�°42'08.02"35 35.2 55.17 505990.555 184156.996 PI TANGENT HPI HPI 37+45.54 506017.468 184133.009 ARC PC PC 0+62.61 505991.119 185021.266 359.8191�°ARC CC CC 505955.457 184192.094 TANGENT HPI HPI 63+97.74 506010.01 186785.19 359.8389�°ARC HPI HPI 0+86.48 89�°41'09.35" LT 238�°43'56.69"24 23.87 37.57 505991.044 185045.135 PI ARC PT PT 0+91.33 505990.456 184192.192 359.8389�° TANGENT HPI HPI 63+97.74 506010.01 186785.19 ARC CC CC 505967.119 185021.19 TANGENT PT PT 0+91.33 505990.456 184192.192 TANGENT HPI HPI 90+50.18 506005.605 189437.635 359.9049�°ARC PT PT 1+00.18 505967.175 185045.19 270.1332�°TANGENT PC PC 6+11.94 505988.993 184712.803 359.8389�° TANGENT HPI HPI 90+50.18 506005.605 189437.635 TANGENT PT PT 1+00.18 505967.175 185045.19 ARC PC PC 6+11.94 505988.993 184712.803 359.8389�° TANGENT HPI HPI 117+05.93 505984.119 192093.295 359.5364�°TANGENT END END 1+15.00 505952.352 185045.224 270.1332�°ARC HPI HPI 6+36.91 89�°54'48.89" LT 229�°10'59.22"25 24.96 39.23 505988.922 184737.765 PI TANGENT HPI HPI 117+05.93 505984.119 192093.295 ARC CC CC 505963.993 184712.733 TANGENT END END 118+25.00 505983.173 192212.359 359.5446�°ALIGNMENT: 38-NW ARC PT PT 6+51.18 505963.96 184737.733 269.9253�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PT PT 6+51.18 505963.96 184737.733 ALIGNMENT: 32 MED-S DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 6+87.14 505927.998 184737.686 269.9253�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT START START 0+00.00 505955.317 185077.343 DELTA DEGREE RADIUS TANGENT LENGTH TANGENT PC PC 0+10.16 505965.479 185077.141 91.1398�°ALIGNMENT: 36-SE TANGENT START START 0+00.00 506032.736 181416.621 ARC PC PC 0+10.16 505965.479 185077.141 91.1398�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHTANGENTENDEND0+65.00 506033.408 181481.617 0.5924�°ARC HPI HPI 0+35.82 91�°29'14.35" LT 229�°10'59.22"25 25.66 39.92 505991.132 185076.63 PI DELTA DEGREE RADIUS TANGENT LENGTH ARC CC CC 505965.977 185102.136 TANGENT START START 0+00.00 506045.072 183300.322 ALIGNMENT: 32-NW ARC PT PT 0+50.08 505990.976 185102.288 359.6525�°TANGENT HPI HPI 0+35.97 506045.944 183336.277 1.3886�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PT PT 0+50.08 505990.976 185102.288 TANGENT HPI HPI 0+35.97 506045.944 183336.277 DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 0+70.00 505990.855 185122.204 359.6525�°TANGENT PC PC 7+75.99 506042.777 184076.293 359.7549�° TANGENT START START 0+00.00 505966.85 181508.987 ARC PC PC 7+75.99 506042.777 184076.293 359.7549�° TANGENT PC PC 0+15.00 505981.849 181509.1 89.5675�°ALIGNMENT: 38-NE ARC HPI HPI 7+99.87 77�°03'18.66" RT 190�°59'09.35"30 23.89 40.35 506042.675 184100.179 PI ARC PC PC 0+15.00 505981.849 181509.1 89.5675�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ARC CC CC 506072.777 184076.421 ARC HPI HPI 0+37.75 89�°22'00.09" LT 249�°06'43.51"23 22.75 35.87 506004.596 181509.272 PI DELTA DEGREE RADIUS TANGENT LENGTH ARC PCC PCC 8+16.33 506065.932 184105.63 76.8100�° ARC CC CC 505981.676 181532.099 TANGENT START START 0+00.00 506073.228 185035.149 ARC PCC PCC 8+16.33 506065.932 184105.63 76.8100�° ARC PT PT 0+50.87 506004.675 181532.019 0.2008�°TANGENT PC PC 0+10.02 506063.208 185035.354 271.1721�°ARC HPI HPI 8+23.66 13�°54'54.55" RT 95�°29'34.68"60 7.32 14.57 506073.06 184107.301 PI TANGENT PT PT 0+50.87 506004.675 181532.019 ARC PC PC 0+10.02 506063.208 185035.354 271.1721�°ARC CC CC 506079.622 184047.213 TANGENT END END 0+65.00 506004.725 181546.149 0.2008�°ARC HPI HPI 0+34.43 88�°37'02.87" RT 229�°10'59.22"25 24.4 38.67 506038.809 185035.853 PI ARC PT PT 8+30.91 506080.382 184107.208 90.7252�° ARC CC CC 506063.72 185060.349 TANGENT PT PT 8+30.91 506080.382 184107.208 ALIGNMENT: 32-NE ARC PT PT 0+48.69 506038.72 185060.257 359.7895�°TANGENT END END 8+69.98 506119.45 184106.713 90.7252�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PT PT 0+48.69 506038.72 185060.257 DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 0+90.00 506038.568 185101.571 359.7895�°ALIGNMENT: 36 MED-N TANGENT START START 0+00.00 506090.953 181507.101 ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PC PC 0+15.00 506075.958 181507.509 271.5575�°ALIGNMENT: 38-SE DELTA DEGREE RADIUS TANGENT LENGTH ARC PC PC 0+15.00 506075.958 181507.509 271.5575�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT START START 0+00.00 506025.527 184167.266 ARC HPI HPI 0+38.52 88�°49'49.34" RT 238�°43'56.69"24 23.52 37.21 506052.452 181508.148 PI DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 1+45.00 506025.119 184312.27 359.8389�° ARC CC CC 506076.611 181531.5 TANGENT START START 0+00.00 506040.511 184954.996 ARC PT PT 0+52.21 506052.611 181531.662 0.3878�°TANGENT PC PC 0+25.58 506039.923 184980.571 358.6819�°ALIGNMENT: 36-NE TANGENT PT PT 0+52.21 506052.611 181531.662 ARC PC PC 0+25.58 506039.923 184980.571 358.6819�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHTANGENTENDEND0+65.00 506052.698 181544.452 0.3878�°ARC HPI HPI 0+47.63 90�°07'43.13" RT 260�°26'07.30"22 22.05 34.61 506039.415 185002.615 PI DELTA DEGREE RADIUS TANGENT LENGTH ARC CC CC 506061.917 184981.077 TANGENT START START 0+00.00 506103.347 184154.783 ALIGNMENT: MED 3508 ARC PT PT 0+60.19 506061.46 185003.072 88.8106�°TANGENT PC PC 0+30.33 506073.023 184155.53 271.4116�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PT PT 0+60.19 506061.46 185003.072 ARC PC PC 0+30.33 506073.023 184155.53 271.4116�° DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 0+75.00 506076.266 185003.38 88.8106�°ARC HPI HPI 0+36.63 42�°58'18.60" RT 358�°05'55.04"16 6.3 12 506066.727 184155.685 PI TANGENT START START 0+00.00 506027.175 183515.778 ARC CC CC 506073.417 184171.525 TANGENT END END 1+40.00 506026.575 183655.78 359.7544�°ALIGNMENT: 38 MED-S ARC PCC PCC 0+42.33 506062.226 184160.09 314.3834�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ARC PCC PCC 0+42.33 506062.226 184160.09 314.3834�° ALIGNMENT: 36 MED-S DELTA DEGREE RADIUS TANGENT LENGTH ARC HPI HPI 0+64.40 45�°12'26.65" RT 108�°06'18.88"53 22.07 41.82 506046.456 184175.524 PI ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT START START 0+00.00 506020.659 184922.536 ARC CC CC 506099.297 184197.968 DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 0+95.00 506020.392 185017.535 359.8389�°ARC PT PT 0+84.15 506046.298 184197.59 359.5908�° TANGENT START START 0+00.00 506015.026 183784.495 TANGENT PT PT 0+84.15 506046.298 184197.59 TANGENT END END 3+25.00 506013.635 184109.492 359.7549�°TANGENT HPI HPI 0+89.05 506046.263 184202.487 359.5908�° TANGENT HPI HPI 0+89.05 506046.263 184202.487 TANGENT HPI HPI 1+08.25 506052.286 184220.724 18.2738�° TANGENT HPI HPI 1+08.25 506052.286 184220.724 TANGENT END END 1+33.25 506052.107 184245.724 359.5908�° 90% PLAN 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_170 ali.dgnPLOTTED/REVISED:PLOT NAME:1022211300_170 ali.dgn3/11/2026SHEETALIGNMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 35 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN ALIGNMENT: 36-SW ALIGNMENT: 42-NW ALIGNMENT: FAIRVIEW-NE ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHDELTADEGREERADIUSTANGENTLENGTHDELTADEGREERADIUSTANGENTLENGTHDELTADEGREERADIUSTANGENTLENGTH TANGENT START START 0+00.00 505982.916 183989.976 TANGENT START START 0+00.00 505872.12 188142.465 TANGENT START START 0+00.00 506045.297 192089.704 TANGENT HPI HPI 0+22.20 505982.995 184012.18 0.2020�°TANGENT PC PC 0+66.57 505938.672 188140.924 91.3265�°TANGENT PC PC 0+13.06 506032.246 192090.069 271.6013�° TANGENT HPI HPI 0+22.20 505982.995 184012.18 ARC PC PC 0+66.57 505938.672 188140.924 91.3265�°ARC PC PC 0+13.06 506032.246 192090.069 271.6013�° TANGENT HPI HPI 0+44.52 505989.96 184033.38 18.1898�°ARC HPI HPI 0+81.25 32�°43'03.39" LT 114�°35'29.61"50 14.68 28.55 505953.345 188140.584 PI ARC HPI HPI 0+37.12 87�°48'54.95" RT 229�°10'59.22"25 24.06 38.32 506008.19 192090.742 PI TANGENT HPI HPI 0+44.52 505989.96 184033.38 ARC CC CC 505939.83 188190.911 ARC CC CC 506032.944 192115.059 TANGENT PC PC 0+65.63 505989.87 184054.494 359.7549�°ARC PCC PCC 0+95.12 505965.873 188148.229 58.6089�°ARC PT PT 0+51.37 506007.945 192114.805 359.4166�° ARC PC PC 0+65.63 505989.87 184054.494 359.7549�°ARC PCC PCC 0+95.12 505965.873 188148.229 58.6089�°TANGENT PT PT 0+51.37 506007.945 192114.805 ARC HPI HPI 0+91.17 37�°36'17.09" LT 76�°23'39.74"75 25.54 49.22 505989.761 184080.029 PI ARC HPI HPI 1+11.96 58�°36'50.86" LT 190�°59'09.35"30 16.84 30.69 505980.249 188157.001 PI TANGENT END END 0+71.00 506007.746 192134.428 359.4166�° ARC CC CC 505914.871 184054.173 ARC CC CC 505950.247 188173.838 ARC PCC PCC 1+14.86 505974.092 184100.193 322.1501�°ARC PT PT 1+25.81 505980.247 188173.841 359.9948�°ALIGNMENT: FAIRWIEW-SE ARC PCC PCC 1+14.86 505974.092 184100.193 322.1501�°TANGENT PT PT 1+25.81 505980.247 188173.841 ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHARCHPIHPI1+25.47 51�°29'51.25" LT 260�°26'07.30"22 10.61 19.77 505967.581 184108.571 PI TANGENT HPI HPI 3+37.76 505980.228 188385.792 359.9948�°DELTA DEGREE RADIUS TANGENT LENGTH ARC CC CC 505956.721 184086.694 TANGENT HPI HPI 3+37.76 505980.228 188385.792 TANGENT START START 0+00.00 506008.883 192017.893 ARC PT PT 1+34.63 505956.971 184108.692 270.6525�°TANGENT END END 3+90.00 505982.187 188437.992 2.1494�°TANGENT PC PC 0+17.75 506008.644 192035.64 359.2276�° TANGENT PT PT 1+34.63 505956.971 184108.692 ARC PC PC 0+17.75 506008.644 192035.64 359.2276�° TANGENT END END 1+58.67 505932.938 184108.966 270.6525�°ALIGNMENT: 42 MED-S ARC HPI HPI 0+42.06 88�°23'26.06" RT 229�°10'59.22"25 24.31 38.57 506008.316 192059.945 PI ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ARC CC CC 506033.642 192035.977 ALIGNMENT: 42-SW DELTA DEGREE RADIUS TANGENT LENGTH ARC PCC PCC 0+56.32 506032.603 192060.955 87.6181�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT START START 0+00.00 506004.478 187948.943 ARC PCC PCC 0+56.32 506032.603 192060.955 87.6181�° DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 1+25.00 506004.27 188073.943 359.9049�°ARC HPI HPI 0+68.20 12�°08'15.17" RT 51�°14'19.69"111.82 11.89 23.69 506044.481 192061.449 PI TANGENT START START 0+00.00 505974.446 188006.478 ARC CC CC 506037.25 191949.231 TANGENT PC PC 0+23.28 505974.626 188029.754 0.4413�°ALIGNMENT: 42-NE ARC PT PT 0+80.00 506056.198 192059.435 99.7557�° ARC PC PC 0+23.28 505974.626 188029.754 0.4413�°ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH ARC HPI HPI 0+44.31 45�°38'18.58" LT 114�°35'29.61"50 21.04 39.83 505974.788 188050.791 PI DELTA DEGREE RADIUS TANGENT LENGTH ALIGNMENT: FAIRVIEW-SW ARC CC CC 505924.627 188030.139 TANGENT START START 0+00.00 506090.349 188135.247 ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHARCPCCPCC0+63.10 505959.861 188065.616 314.8028�°TANGENT PC PC 0+18.62 506071.776 188136.623 274.2397�°DELTA DEGREE RADIUS TANGENT LENGTH ARC PCC PCC 0+63.10 505959.861 188065.616 314.8028�°ARC PC PC 0+18.62 506071.776 188136.623 274.2397�°TANGENT START START 0+00.00 505960.649 192030.003 ARC HPI HPI 0+74.90 42�°56'32.47" LT 190�°59'09.35"30 11.8 22.48 505951.488 188073.931 PI ARC HPI HPI 0+33.26 52�°01'14.69" RT 190�°59'09.35"30 14.64 27.24 506057.177 188137.706 PI TANGENT PC PC 0+20.68 505960.516 192050.681 359.6300�° ARC CC CC 505938.721 188044.329 ARC CC CC 506073.994 188166.541 ARC PC PC 0+20.68 505960.516 192050.681 359.6300�° ARC PT PT 0+85.59 505939.695 188074.314 271.8605�°ARC PCC PCC 0+45.86 506049.047 188149.879 326.2604�°ARC HPI HPI 0+45.07 88�°35'55.48" LT 229�°10'59.22"25 24.4 38.66 505960.358 192075.077 PI TANGENT PT PT 0+85.59 505939.695 188074.314 ARC PCC PCC 0+45.86 506049.047 188149.879 326.2604�°ARC CC CC 505935.516 192050.52 TANGENT END END 1+00.00 505925.292 188074.782 271.8605�°ARC HPI HPI 0+60.89 33�°28'00.30" RT 114�°35'29.61"50 15.03 29.21 506040.697 188162.379 PI ARC PT PT 0+59.34 505935.966 192075.516 271.0312�° ARC CC CC 506090.625 188177.65 TANGENT PT PT 0+59.34 505935.966 192075.516 ALIGNMENT: 42-SE ARC PT PT 0+75.07 506040.626 188177.412 359.7272�°TANGENT END END 0+70.00 505925.309 192075.708 271.0312�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTH TANGENT PT PT 0+75.07 506040.626 188177.412 DELTA DEGREE RADIUS TANGENT LENGTH TANGENT END END 1+00.00 506040.507 188202.341 359.7272�° TANGENT START START 0+00.00 506032.621 187659.166 TANGENT HPI HPI 0+49.43 506032.459 187708.593 359.8125�°ALIGNMENT: FAIRVIEW-NW TANGENT HPI HPI 0+49.43 506032.459 187708.593 ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHTANGENTHPIHPI0+91.98 506033.806 187751.129 1.8140�°DELTA DEGREE RADIUS TANGENT LENGTH TANGENT HPI HPI 0+91.98 506033.806 187751.129 TANGENT START START 0+00.00 505920.182 192107.738 TANGENT PC PC 3+77.34 506033.332 188036.485 359.9049�°TANGENT PC PC 0+14.46 505934.645 192107.68 90.2268�° ARC PC PC 3+77.34 506033.332 188036.485 359.9049�°ARC PC PC 0+14.46 505934.645 192107.68 90.2268�° ARC HPI HPI 3+94.19 58�°38'37.25" RT 190�°59'09.35"30 16.85 30.71 506033.304 188053.335 PI ARC HPI HPI 0+39.45 89�°57'45.22" LT 229�°10'59.22"25 24.98 39.25 505959.629 192107.581 PI ARC CC CC 506063.332 188036.535 ARC CC CC 505934.744 192132.68 ARC PCC PCC 4+08.05 506047.679 188062.128 58.5485�°ARC PT PT 0+53.72 505959.744 192132.565 0.2643�° ARC PCC PCC 4+08.05 506047.679 188062.128 58.5485�°TANGENT PT PT 0+53.72 505959.744 192132.565 ARC HPI HPI 4+24.11 35�°37'42.47" RT 114�°35'29.61"50 16.07 31.09 506061.385 188070.511 PI TANGENT END END 0+80.00 505959.865 192158.845 0.2643�° ARC CC CC 506073.768 188019.473 ARC PT PT 4+39.14 506077.41 188069.341 94.1770�°ALIGNMENT: FAIRVIEW MED-N TANGENT PT PT 4+39.14 506077.41 188069.341 ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHTANGENTENDEND4+51.75 506089.986 188068.422 94.1770�°DELTA DEGREE RADIUS TANGENT LENGTH TANGENT START START 0+00.00 505988.688 192115.549 ALIGNMENT: 42 MED-N TANGENT END END 0+65.00 505988.162 192180.549 359.5364�° ELEMENT POINT NUMBER POINT TYPE STATION CIRCULAR CURVE DATA EASTING (X)NORTHING (Y) DIRECTION AZIMUTHDELTADEGREERADIUSTANGENTLENGTH TANGENT START START 0+00.00 506015.25 188142.751 TANGENT END END 1+30.00 506015.238 188272.747 359.9948�° 90% PLAN 4.10 P 3157 6215 3200 AUTO SALES EL CHINO 3201 32ND AVE NCSAH 102 (DOUGLAS DR)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 36 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENVAULTCOMMVAULTCOMM 90% PLAN 0 0+65.00 00+65.0000+65.00 10 0' SCALE 20'10' REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3443 3442 3448 3517 CSAH 102 (DOUGLAS DR) 3405 3407 341334113409 3508 MATCHLINE 33+00.00P PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 37 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 0 1 2 3 0 1 1+40.00 30 0' SCALE 50'25' REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 3537 3528 3601 3600 3609 3617 3616 3624 3550 6213 CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NMATCHLINE 33+00.00MATCHLINE 40+50.00P PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 38 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN VAULTCOMM90% PLAN 54 6 7 8 8+69.980 1 1+58.6701 2 3 011+33.25 0 1 1+45.00 0 1 2 3 3+25.00 35 40 0' SCALE 50'25' PROTECT WALL PROTECT WALL PROTECT WALL 1 1 REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 6219 6201 6218 3801 3808 6310 620037TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR)MATCHLINE 40+50.00P PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 39 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN M90% PLAN 0 0+95.00 00+90.000 0+70.00011+15.0054 6 6+87.140 0+75.0045 0' SCALE 50'25' REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE N4156 MATCHLINE 77+25.00P PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 40 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENVAULTCOMMVAULTCOMM VAULTCOMMVAULTCOMMVAULTCOMMVAULTCOMMMMMP 90% PLAN 0 1 2 3 4 4+51.750 1+00.000 1 1+25.00 70 75 0' SCALE 50'25' POST LIGHT PROTECT PROTECT FENCE 1 1 REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR) 4410 4333 43RD AVE NMATCHLINE 77+25.00P PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 41 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSENVAULTCOMMM 90% PLAN01+00.0001 2 3 3+90.00 0 1 1+30.00 80 0' SCALE 50'25' FOUNDATION REMOVE 1 REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NP PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_180 rem.dgnPLOTTED/REVISED:PLOT NAME:1022211300_180 rem.dgn3/11/2026SHEETREMOVAL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 42 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN P 90% PLAN 0 0+80.000 0+70.0000+71.000 0+80.00 118+25.00 0 0+65.00 0' SCALE 20'10' FOUNDATION REMOVE FENCE REMOVE V-CURB REMOVE REMOVAL LEGEND WALK REMOVE CONCRETE PAVEMENT REMOVE BITUMINOUS DRIVEWAY REMOVE CONCRETE WALK REMOVE BITUMINOUS CONSTRUCTION LIMITS INPLACE RIGHT OF WAY EASEMENT PERMANENT HIGHWAY TEMPORARY EASEMENT REMOVE CURB & GUTTER SAW BIT PAVEMENT REMOVE TREE PROTECT TREEDRIVEWAY REMOVE GRAVEL DRIVEWAY REMOVE BITUMINOUS SYSTEM "A" OR "B" PART OF TRAFFIC CONTROL SIGNAL 1 SIGNAL HANDHOLE REMOVAL PAID AS NOTES: 4.10 3157 6215 3200 AUTO SALES EL CHINO 3201 32ND AVE NCSAH 102 (DOUGLAS DR)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 43 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN 11 BUS PAD 4" CONCRETE 9'90% PLAN CONSTRUCTION LEGEND +21+260 0+65.00 00+65.0000+65.00 10 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+23+43+51+15 +52+15 0' SCALE 20'10' 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3443 3442 3448 3517 CSAH 102 (DOUGLAS DR) 3405 3407 341334113409 3508 MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 44 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN C&G B424 19' 12' CNST LIMITSCNST LIMITS 11 17'16'17'MEDIAN SOIL/TURF 90% PLAN CONSTRUCTION LEGEND +12+23+490 1 2 3 0 1 1+40.00 30 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+36+49+630' SCALE 50'25' 4.10 3537 3528 3601 3600 3609 3617 3616 3624 3550 6213 CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 45 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN C&G B4241:31:3C&G B424 C&G B424 1 1 1 1 19.5'16'31'25.5' 30.5' 29'12'6'10.5'6'6'6'BUS PAD 4" CONCRETE REMOVAL SIGNAL HH REPLACED AFTER 4" CONCRETE WALK REMOVAL SIGNAL HH REPLACED AFTER 4" CONCRETE WALK 90% PLAN CONSTRUCTION LEGEND +69+7454 6 7 8 8+69.980 1 1+58.6701 2 3 011+33.25 0 1 1+45.00 0 1 2 3 3+25.00 35 40 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+37+00+10+27+11 +25+15+37 +48 +04+21+46+09+89+61+67+39+09+820' SCALE 50'25' 4.10 3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 6219 6201 6218 3801 3808 6310 620037TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR)MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 46 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN 11 17'16.5'22'10'90% PLAN CONSTRUCTION LEGEND 0 0+95.00 00+90.000 0+70.00011+15.0054 6 6+87.140 0+75.0045 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+67+90+42+56 +26+ 1 8 +09 +48+82+27+26+63+41+580' SCALE 50'25' 4.10 4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE N4156 MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 47 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN 1 16'34.2'28' 14' 11'6'6'6.6'REMOVAL SIGNAL HH REPLACED AFTER 4" CONCRETE WALK 90% PLAN CONSTRUCTION LEGEND 0 1 2 3 4 4+51.750 1+00.000 1 1+25.00 70 75 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+28+04+25+89+94+49+05+42+22+000' SCALE 50'25' 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR) 4410 4333 43RD AVE NMATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 48 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN 1 16'30.5'13.5' 12' V-CURB END V-CURB END 6'6'6'REMOVAL SIGNAL HH REPLACED AFTER 4" CONCRETE WALK 90% PLAN CONSTRUCTION LEGEND 01+00.0001 2 3 3+90.00 0 1 1+30.00 80 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+12+60+05+08 +07 +90+17+20+18+340' SCALE 50'25' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_185 cpp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_185 cpp.dgn3/11/2026SHEETCONSTRUCTION PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 49 S.P. XXX-XXX-XXX, S.P. 027-702-00302/13/2026 T. BRUERS T. PETERSEN T. PETERSEN 11 IRW 9'90% PLAN CONSTRUCTION LEGEND +15+450 0+80.000 0+70.0000+71.000 0+80.00 118+25.00 0 0+65.00 ADA WALK PATCH BITUMINOUS PAVEMENT 4" CONCRETE WALK 6" CONCRETE WALK/DRIVEWAY 8" CONCRETE DRIVEWAY COMMERCIAL CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT MEDIAN CURB IS B612 UNLESS OTHERWISE NOTED CURB AND GUTTER IS B624 UNLESS OTHERWISE NOTED PAID AS 6" CONCRETE 1 CONSTRUCT MEDIAN NOSE PER MNDOT STD PLATE 7113 NOTES:+18+71+56+12+59 +11 +74+28 0' SCALE 20'10' 4.10 SHEETPATH & FILENAME:c:\bentley\pw_working_hc\dms11622\1022211300_190 pro.dgnPLOTTED/REVISED:PLOT NAME:SHEET 01 [Sheet]3/5/2026102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 50 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN PROFILES 90% PLAN 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 875 875 880 880 885 885 890 890 895 895 900 900 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 865 865 870 870 875 875 880 880 885 885 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 865 865 870 870 875 875 880 880 SCALE V SCALE H 50'0'25' 10'0'5' 36-NWVPI 0+00.00EL 876.05VPI 0+08.26EL 875.45VPI 0+28.47EL 874.31VPI 0+50.13EL 873.52VPI 0+79.87EL 873.61VPI 1+15.89EL 874.73VPI 1+42.29EL 875.53VPI 1+82.14EL 876.86VPI 2+02.25EL 877.59VPI 2+21.48EL 878.32VPI 2+32.29EL 878.78VPI 2+46.78EL 879.33VPI 3+34.92EL 882.65VPI 3+59.02EL 883.44VPI 4+54.14EL 886.71VPI 4+89.62EL 887.94VPI 5+98.42EL 891.13VPI 6+20.66EL 891.83VPI 6+36.54EL 892.07VPI 6+55.02EL 892.38VPI 6+83.41EL 892.43-7.33%-5.64%-3 .62%+0.30%+3.11%+3.01%+3.34%+3.62%+3.81%+4.21%+3.83% +3.76% +3.28% +3.44% +3.48% +2.93% +3.13%+1.49%+1.67%+0.18% 36-SEVPI -0+00.00EL 874.66VPI 0+38.46EL 873.13VPI 1+09.49EL 871.54VPI 1+54.53EL 870.81VPI 1+65.99EL 870.78VPI 2+18.15EL 870.59VPI 2+74.44EL 870.31VPI 3+29.31EL 869.76VPI 3+84.21EL 869.39VPI 4+07.22EL 869.35VPI 4+38.63EL 868.96-3 .98% -2.24% -1.61%-0.25%-0.37%-0.49%-1.02%-0.67%-0.20%-1.21%-0.65% 36-SEVPI 4+54.39EL 868.86VPI 4+86.84EL 868.97VPI 5+16.39EL 868.81VPI 5+66.03EL 868.94VPI 6+77.41EL 869.59VPI 7+37.82EL 869.71VPI 7+73.62EL 870.13VPI 8+14.36EL 870.23VPI 8+36.07EL 870.37VPI 8+40.86EL 870.44VPI 8+69.68EL 871.59-0.65%+0.34%-0.54%+0.26%+0.58%+0.19%+1.17%+0.26%+0.64%+1.55%+3.97% ELEVATION: 892.479 E: 506043.222 N: 188169.326 TNH NEQ CSAH 102 & 42ND BM HYD 42 ELEVATION: 875.539 E: 506063.335 N: 184181.521 TNH SWQ CSAH 102 & 36TH AVE BM HYD 36 4.10 SHEETPATH & FILENAME:c:\bentley\pw_working_hc\dms11622\1022211300_190 pro.dgnPLOTTED/REVISED:PLOT NAME:SHEET 02 [Sheet]3/11/2026102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 51 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN PROFILES 90% PLAN 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 885 885 890 890 895 895 900 900 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 885 885 890 890 895 895 900 900 905 905 SCALE V SCALE H 50'0'25' 10'0'5' 42-NWVPI 0+00.00EL 890.23VPI 0+27.17EL 890.17VPI 2+11.99EL 890.96VPI 2+44.33EL 891.76VPI 2+58.05EL 892.19VPI 3+09.48EL 893.40VPI 3+41.08EL 894.43VPI 3+62.08EL 894.83VPI 3+90.04EL 895.56VLP 1+14.36EL 889.46L=50.17'VPC 0+97.94EL 889.54VPT 1+48.11EL 889.78-0.19%-0.90%+1.85%VPI 1+23.02EL 889.3142-SEVPI 0+00.00EL 896.67VPI 0+41.29EL 896.61VPI 0+62.94EL 896.46VPI 0+92.44EL 896.37VPI 1+37.02EL 895.94VPI 1+49.33EL 895.68VPI 1+76.75EL 895.22VPI 1+92.54EL 894.96VPI 2+63.77EL 893.25VPI 4+52.37EL 888.92L=80.00'VPC 3+42.58EL 890.79VPT 4+22.58EL 889.18-0.14%-0.69%-0.32%-0.96%-2.13%-1.68%-1.66% -2.40% -3 .12% -0.89%VPI 3+82.58EL 889.544.10 0+00 0+50 860 860 865 865 5V FEET 20H FEET BUS PAD 4" CONCRETE 32ND AVE NCSAH 102 (DOUGLAS DR) 32-NW864.05EL 0+00.00 VPI863.73EL 0+23.85 VPI863.58EL 0+34.12 VPI863.22EL 0+45.56 VPI863.12EL 0+65.00 VPI-1.34%-1.50% -3.12%-0.51%PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/12/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 52 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 9'001 002 F F F 6" 6" 0" F0" 6" 6" 90% PLAN Pt. No.Alignment Northing 001 32-NW 0+27.92 0.00 181512.73 505994.08 863.67 002 32-NE 0+29.89 0.00 181512.36 506062.13 862.85 0+00 0+50 860 860 865 865 B624 0+15.000+21.370+26.36B624 0+15.01 0+50.91B6120+22.520+42.530+52.210 0+65.00 00+65.0000+65.00 32-NE862.24EL 0+00.00 VPI862.77EL 0+24.32 VPI862.92EL 0+34.54 VPI863.10EL 0+53.98 VPI863.10EL 0+65.00 VPI+2.17%+1.50%+0.91%+0.06% 4.10 BUS PAD 4" CONCRETE 3550 36TH AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 53 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN PROFILE SCALES 5V FEET 20H FEET SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 6'003 001 S F S F F F 6" 0" 4" 0" 4" 0" 6" 6" CSAH 102 (DOUGLAS DR) 90% PLAN Pt. No.Alignment Northing 001 36-SW 1+05.89 0.00 184092.80 505979.16 872.13 MA 2B 36-SW 1+06.35 -11.50 184087.21 505969.09 872.80 PBS 2B 36-SW 1+17.86 -6.00 184098.16 505967.92 872.86 003 36-SE 8+12.11 0.00 184104.38 506061.90 870.23 MA 1B 36-SE 8+13.02 11.22 184094.12 506066.50 870.48 PBS 1B 36-SE 7+98.13 6.80 184091.95 506055.56 870.35 0+00 0+50 1+00 1+50 870 870 875 875 8+00 8+50 870 870 875 875 7+68.997+73.98B6123+00.400+44.520+03.78B462 1+48.10 0+24.30B424 8+36.58 B624 0+11.26 7 8 8+69.980 1 1+58.673 3+25.00 PBS-2B MA-2B MA-1B PBS-1B 36-SW870.02EL -0+00.00 VPI870.38EL 0+26.35 VPI870.67EL 0+43.76 VPI870.81EL 0+51.88 VPI870.96EL 0+65.92 VPI871.34EL 0+88.04 VPI871.81EL 0+98.46 VPI872.15EL 1+06.18 VPI872.38EL 1+17.84 VPI873.38EL 1+36.76 VPI873.84EL 1+43.40 VPI874.17EL 1+45.86 VPI875.05EL 1+61.09 VPI+1.35%+1.71%+1.70%+1.05%+1.71%+4.53%+4.36%+2.00% +5.28%+6.95%+13.41%+5.75% 36-SE870.13EL 7+73.62 VPI870.23EL 8+14.36 VPI870.37EL 8+36.07 VPI870.44EL 8+40.86 VPI871.59EL 8+69.68 VPI+1.17%+0.26%+0.64%+1.55% +3.97% 4.10 5V FEET 20H FEET 3601 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 54 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN CSAH 102 (DOUGLAS DR)36TH AVE NSIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 6'S 002 004 S F SS S 4% 1.5% 1.5%.5%6" 4" 0" 0" 6" 6" 90% PLAN Pt. No.Alignment Northing 002 36-NW 0+70.25 0.00 184172.35 505984.36 873.58 MA 3B 36-NW 0+52.81 -8.00 184168.07 505967.75 874.04 PBS 3B 36-NW 0+69.81 -7.70 184176.45 505977.76 874.02 004 36-NE 0+57.56 0.00 184172.15 506053.01 871.80 MA 4B 36-NE 0+58.53 8.00 184176.77 506059.61 872.31 PBS 4B 36-NE 0+44.88 8.30 184167.53 506066.50 872.03 0+00 0+50 1+00 870 870 875 875 880 880 0+00 0+50 1+00 870 870 875 875 B424 0+15.67 0+89.111+08.251+24.64B624 0+11.26 0+09.941+27.3901 2 011+33.25 0 1 1+45.00 MA-3B PBS-3B MA-4B PBS-4B 36-NW876.05EL 0+00.00 VPI875.45EL 0+08.26 VPI874.31EL 0+28.47 VPI873.52EL 0+50.13 VPI873.61EL 0+79.87 VPI-7.33%-5 .64 % -3 .62% +0.30% +3.11% 36-NE870.86EL 0+00.00 VPI870.57EL 0+12.78 VPI870.60EL 0+22.51 VPI871.54EL 0+44.44 VPI871.80EL 0+57.48 VPI872.28EL 0+66.13 VPI872.68EL 0+75.22 VPI873.27EL 0+89.21 VPI873.69EL 1+04.50 VPI874.92EL 1+33.28 VPI-2.24%+0.30% +4.26% +2.00%+5.64%+4.34%+4.21%+2.73% +4.28% 4.10 5V FEET 20H FEET37TH AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 55 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 001 F 6" 0" 6" 90% PLAN Pt. No.Alignment Northing 001 36-NW 6+28.93 0.00 184728.49 505983.40 891.95 6+00 6+50 7+00 890 890 895 895 B624 6+56.17 0 6 6+87.14891.13EL 5+98.42 VPI891.83EL 6+20.66 VPI892.07EL 6+36.54 VPI892.38EL 6+55.02 VPI892.43EL 6+83.41 VPI+2.93% +3.13%+1.49%+1.67%+0.18% 37-SW 4.10 5V FEET 20H FEET 3715 3801 38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 56 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 10'002 004 001 F S F S F S F S S 0"0"6"4"4" 6" 0" 0" 0" 4" 003 6" 006 005 6"6"0" 0" 6" 6" 4" F SS 0" 6" 90% PLAN Pt. No.Alignment Northing 001 38-SW 0+32.56 0.00 184991.21 505991.21 900.29 002 38-SW 0+71.07 0.00 185029.55 505989.62 901.23 003 38-NW 0+26.36 0.00 185081.90 505980.66 901.93 004 38-SE 0+46.23 0.00 184998.52 506048.51 900.96 005 38-NE 0+41.4 0.00 185053.13 506039.78 901.78 006 38-NE 0+71.92 0.00 185083.48 506038.64 902.44 0+00 0+50 900 900 905 905 0+50 1+00 900 900 905 905 0+00 0+50 900 900 905 905B6240+25.580+62.62B6120+40.920+57.750+24.57B 6 2 4 0 + 9 4 . 6 7 B62 4 0 + 23.99 0+87.85B624 0+08.88 0+47.750 0+95.00 00+90.000 0+70.00011+15.000 0+75.0038-NE901.90EL 0+00.00 VPI901.57EL 0+08.78 VPI901.64EL 0+31.67 VPI901.87EL 0+47.43 VPI902.30EL 0+64.28 VPI902.69EL 0+86.21 VPI-3 .79%+0.30%+1.47%+2.57%+1.76% 38-SW899.89EL 0+16.96 VPI900.17EL 0+26.92 VPI900.42EL 0+39.35 VPI900.85EL 1+12.49 VPI901.28EL 0+81.05 VHP50.00'L=901.58EL 0+74.26 VPI900.75EL 0+49.26 VPC901.10EL 0+99.26 VPT+2.89%+2.00%+3.31% -1.90% 38-SE899.32EL 0+00.00 VPI900.11EL 0+25.30 VPI900.77EL 0+37.55 VPI900.93EL 0+45.78 VPI901.60EL 0+57.76 VPI901.97EL 0+72.99 VPI+3.12% +5.36%+2.00%+5.56%+2.40% 4.10 5V FEET 20H FEET SIGNAL HH REMOVED REPLACED AFTER 4" CONCRETE WALK HH REMOVED AFTER SIGNAL WALK REPLACED 4" CONCRETE CSAH 9 (42ND AVE N)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 57 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 6'001 003 F F F F S S 6" 6" 0" 6" 6" 0" 0" 0" 90% PLAN Pt. No.Alignment Northing 001 42-SW 0+46.17 0.00 188051.90 505969.65 889.91 MA-2A 42-SW 0+50.99 -10.83 188050.50 505958.10 PBS-2A 42-SW 60.10 -4.61 188060.37 505958.49 003 42-SE 4+15.23 0.00 188065.42 506054.05 889.26 MA-1A 42-SE 4+15.23 10.52 188055.75 506058.20 889.66 PBS-1A 42-SE 3+98.86 10.67 188049.22 506048.74 889.90 0+00 0+50 890 890 895 895 4+00 4+50 890 8901+00.26B624 4+42.35B6240+07.740+90.50 B624 0+05.05 4 4+51.750 1+00.001 1+25.00 MA-2A PBS-2A MA-1A PBS-1A 890.39EL 0+09.99 VPI890.00EL 0+30.79 VPI889.70EL 0+82.03 VPI889.97EL 0+90.22 VPI889.93EL 0+91.34 VPI-1.90% -0.59%+2.48%-3 .86% 42-SE 888.92EL 4+52.37 VPI80.00'L=889.18EL 4+22.58 VPT-0.89%889.54EL 3+82.58 VPI4.10 5V FEET 20H FEET CSAH 102 (DOUGLAS DR)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 58 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 6'002 004 F F F F S S 0" 6" 6" 0" 0" 6" 6" 0" 90% PLAN Pt. No.Alignment Northing 002 42-NW 0+91.10 0.00 188146.27 505962.36 889.59 MA-3A 42-NW 0+87.98 -11.29 188155.34 505955.08 889.91 PBS-3A 42-NW 1+04.82 -6.83 188158.92 505967.98 889.64 004 42-NE 0+37.15 0.00 188143.43 506054.86 889.11 MA-4A 42-NE 0+53.36 11.33 188161.22 506055.62 889.54 PBS-4A 42-NE 0+36.68 6.81 188148.45 506059.49 889.40 0+00 0+50 1+00 890 890 0+00 0+50 1+00 890 890 B624 0+05.05 0+89.93B6120+16.7101+00.00 1 2 3 0 1 1+30.00 MA-3A PBS-3A MA-4A PBS-4A 42-NWVPI 0+00.00EL 890.23VPI 0+27.17EL 890.17VLP 1+14.36EL 889.46L=50.00VPC 0+97.94EL 889.54-0.19% -0.90% VPI 1+23.02 EL 889.31 42-NEVPI -0+00.00EL 888.89VPI 0+05.05EL 888.93VPI 0+58.76EL 889.24VPI 0+83.87EL 889.49VPI 1+00.00EL 889.76+0.77%+0.58%+1.02%+1.68% 4.10 5V FEET 20H FEET CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NV-CURB PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_210 ada.dgnPLOTTED/REVISED:PLOT NAME:1022211300_210 ada.dgn3/11/2026SHEETINTERSECTION DETAILS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 59 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN SIGNAL LEGEND PROPOSED PUSH BUTTON STATION PROPOSED SIGNAL MAST ARM POLE INTERSECTION LEGEND X" ABC REFERENCE POINTS AT FLOW LINE 27 PRIOR TO ORDERING AND INSTALLING DOMES. ARC LENGTHSNEEDED AT RADIAL DOME CORNERS CONTRACTOR SHALL VERIFY RADIUS AND SEE SHEET FOR CONCRETE WALK TYP. SECTION. ALL SAWCUTS SHALL BE INCIDENTAL. SAWCUT AT REMOVAL LIMIT OR NEAREST JOINT. ACCESSIBILITY GUIDELINES (PROWAG). (ADA) AND PUBLIC RIGHTS-OF-WAY AS PER AMERICANS WITH DISABILITIES ACT THIS PROJECT SHALL BE CONSTRUCTED GENERAL NOTES: TRUNCATED DOMES (SEE STANDARD PLATE 7038) CONSTRUCT CONCRETE CURB & GUTTER CURB HEIGHT AND MAX. 2.0% SLOPE IN ALL DIRECTIONS LANDING AREA - 4' X 4' MIN. DIMENSIONS CROSS SLOPE SHALL NOT EXCEED 2.0% EXCEED 8.3% IN THE DIRECTION SHOWN AND INDICATES PEDESTRAN RAMP - SLOPE SHALL NOT SHALL NOT EXCEED 2.0% IN THE DIRECTION SHOWN AND CROSS SLOPE BE GREATER THAN 2.0% AND LESS THAN 5.0% INDICATES PEDESTRAN RAMP - SLOPE SHALL DRAINAGE FLOW DIRECTION F S PROPOSED R.R.F.B. GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC 9'001 002 005 004 003 FF S F F S F S F F S F F F PAN GUTTER 2% 6" 6" 0" 0" 0" 4"0"6"0" 0" 4" 6" 4" 0" 6" S 0" 0" 0" 3"3"0" 0" 3" 3" 90% PLAN Pt. No.Alignment Northing 001 FAIRVIEW-SW 0+43.95 0.00 192070.67 505950.31 875.31 002 FAIRVIEW-NW 0+31.24 0.00 192113.04 505950.21 875.47 003 FAIRVIEW-SE 0+38.4 0.00 192054.17 506016.49 875.43 004 FAIRVIEW-NE 0+36.73 0.00 192101.03 506012.25 875.65 005 FAIRVIEW-NE 0+62.03 0.00 192125.46 506007.84 875.55 0+50 875 875 880 880 0+00 0+50 875 875 880 880 0+00 0+50 875 875 880 880 0+50 875 880B6240+17.740+56.32 B62 40+27.99 0+71.000+15.000+44.990+74.27B624 0+10.98 B6240+09.830+59.34 0 0+80.000 0+70.0000+71.000 0+80.00 0 0+65.00 RRFB-1 RRFB-2 FAIRVIEW-SWVPI 0+11.48EL 875.08VPI 0+56.48EL 875.39VPI 0+69.94EL 875.35+0.71%-0.30% FAIRVIEW-NWVPI 0+01.66EL 875.24VPI 0+10.00EL 875.28VPI 0+34.52EL 875.50VPI 0+53.98EL 875.40VPI 0+59.66EL 875.54VPI 0+79.90EL 875.60+0.50%+0.88%-0.50%+2.48%+0.30% FAIRVIEW-NEVPI -0+00.01EL 876.33VPI 0+08.86EL 876.25VPI 0+21.98EL 875.89VPI 0+35.23EL 875.65VPI 0+62.28EL 875.55VPI 0+71.00EL 875.28-0.82%-2.77% -1.80%-0.37%-3.12% FAIRWIEW-SEVPI 0+08.78EL 874.91VPI 0+39.42EL 875.45VPI 0+47.66EL 875.93VPI 0+57.97EL 876.34+1.75%+5.83%+4.04% 4.10 MM3157 6215 AUTO SALES EL CHINO 3201 32ND AVE NCSAH 102 (DOUGLAS DR) ICB 135 ICB 138 ICB 140 ICB 141 ICB 142 ICB 143 ICB 144 IMH 139 ICB 136 IMH 137 10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 60 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 20'10' 4.10 1 3415 3408 3414 3422 3430 3421 3423 3425 3427 3429 3431 3443 3501 3442 3448 3517 CSAH 102 (DOUGLAS DR) 3405 3407 341334113409 ICB 157 ICB 153 ICB 155 ICB 154 CB-5101 30 MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102C.S.A.H. 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 61 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 50'25' 4.10 1 1 1 1 1 1 1 1 1 2 11 MMMHMH MH MH MHMH3537 3528 6319 6310 3601 3600 3609 3617 3616 3624 3550 6213 CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NICB 164 ICB 168 ICB 165 ICB 169 ICB 170 IMH 166 IMH 167 ICB 161 ICB 160ICB 158 CB-5102 CB-5103 CB-5104 MH-5153 CB-5105 CB-5107 CB-5158 CB-5159 ICB-174 CB-5112 MH-5162 CB-5109 CB-5111 MH-5157 CB-5106 MH-5152 35 40 MATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102C.S.A.H. 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 62 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 MH-5155 CB-5156 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 50'25' 4.10 2 1 1 MMMMH3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 3801 3808 6309 6310 37TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR) IMH 179 ICB 178 ICB 180 ICB 181 ICB 183 ICB 184 ICB 187 ICB 185 IMH 177 ICB 182 IMH 186 ICB 176 CB-5113 ICB-175 45 MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102C.S.A.H. 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 63 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 50'25' 4.10 1 1 1 1 1 1 1 1 MMMMMMMH4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE N4156 IMH 219 IMH 221 IMH 214 IMH 213 IMH 210 IMH 209 MH-5253 CB-5204 CB-5203CB-5201 CB-5202 70 75 MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102C.S.A.H. 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 64 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 50'25' 4.10 1 1 1 M4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4301 63196316 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR) 4333 43RD AVE NICB 229 ICB 228 IMH 227 CB-5205 CB-5208 CB-5206 CB-5207 80 MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102C.S.A.H. 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 65 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 CB-5255 CB-5256 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 50'25' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NICB 261 ICB 262 259 ICB 260 118+25.00 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_300 drp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_300 drp.dgn3/12/2026SHEETDRAINAGE PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 66 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT 90% PLAN CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PROPOSED RIGHT OF WAY WALL EASEMENT TEMPORARY EASEMENT RR RIGHT OF WAY INPLACE STORM SEWER PIPE PROPOSED STORM SEWER PIPE EASEMENT(?) DRAINAGE/UTILITY SUBSURFACE INFILTRATION BASIN SUPERELEVATION TRANSITION INPLACE STRUCTURE NUMBER PROPOSED STRUCTURE NUMBER INPLACE DRAINAGE STRUCTURES PROPOSED DRAINAGE STRUCTURES DRAINAGE FLOW DIRECTION XXXX DRAINAGE LEGEND 1 2 XXX XXX CONSTRUCTION NOTES: CONNECT INTO EXISTING STORM SEWER INSTALL CASTING ASSEMBLY 0' SCALE 20'10' 4.10 11 850 850 860 860 870 870 24" RCP 32.8' 0.0% MH-5152 850 850 860 860 870 870 MH-5157 T.C. 870.22 F.L. 864.74' MH-5155 T.C. 868.60 F.L. 864.54' MH-5153 T.C. 867.79 F.L. 863.88' MH-5152 T.C. 867.88 F.L. 863.96' 44" SPAN RCP 70.0' 0.2% 24" RCP 35.8' 0.1% 58" SPAN RCP 82.1' 0.2% 44" SPAN RCP 177.0' 0.2% 850 850 860 860 870 870 CB-5102 T.C. 868.81 F.L. 864.39' MH-5152 15" RCP 7.9' 1.3% 850 850 860 860 870 870 15" RCP 10.0' 0.4% CB-5104 T.C. 868.74 F.L. 864.31' CB-5103 T.C. 868.71 F.L. 864.27' 15" RCP 7.2' 1.3% MH-5153 850 850 860 860 870 870 CB-5105 T.C. 869.52 F.L. 865.09'ICB-164 MH-5155 15" RCP 9.6' 5.8% 1 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_305 dpt.dgnPLOTTED/REVISED:PLOT NAME:1022211300_305 dpt.dgn3/12/2026SHEETDRAINAGE PROFILES AND TABULATIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 67 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT ALL 48" OR LARGER DRAINAGE STRUCTURES SHALL USE OFFSET MANHOLE TOP SLAB. SEE APPLICABLE MNDOT STANDARD PLATES FOR DETAILS OF CASTING ASSEMBLIES. SEE APPLICABLE MNDOT STANDARD PLATES FOR DETAILS OF DRAINAGE STRUCTURE DESIGN. ALL CIRCULAR CONCRETE PIPE SHALL BE SEWER DESIGN 3006 GASKET JOINT PIPE. BUILD HEIGHTS ARE CALCULATED PER MNDOT 2506. IN TOP OF CASTING ELEVATIONS. CASTING SUMP = 0.10 FT FOR DRAINAGE STRUCTURE CASTINGS. SUMP HAS BEEN INCLUDED PIPE LENGTHS ARE TO CENTER OF STRUCTURE. INSIDE EDGE OF THE FLOWS FROM STRUCTURE. THE OUTLET ELEVATION ON THE TABULATION IS THE INVERT ELEVATION OF THE PIPE AT THE INVERT ELEVATIONS ON THE PROFILES (F.L.) ARE AT CENTER OF STRUCTURE. INSIDE EDGE OF THE FLOWS TO STRUCTURE. THE INLET ELEVATION ON THE TABULATION IS THE INVERT ELEVATION OF THE PIPE AT THE STA. AND OFFSET IS AT CENTER OF CASTING UNLESS OTHERWISE NOTED. GENERAL NOTES: ELEVATION. VERIFY EXISTING INVERT STORM SEWER. FIELD CONNECT TO EXISTING PROFILE REMARKS: 90% PLAN 850 850 860 860 870 870 15" RCP 18.2' 1.6%15" RCP 7.9' 1.9% CB-5106 T.C. 870.08 F.L. 865.19' CB-5156 T.C. 870.03 F.L. 864.89' MH-5157 850 850 860 860 870 870 CB-5107 T.C. 870.15 F.L. 865.19' MH-5157 15" RCP 34.5' 1.3% 4.10 1 1 860 860 870 870 880 880 CB-5108 T.C. 873.93 F.L. 869.50'CB-5159 T.C. 873.63 F.L. 869.19' CB-5109 T.C. 873.88 F.L. 868.34' 15" RCP 12.0' 2.6% 18" RCP 42.3' 2.0% 860 860 870 870 880 880 CB-5111 T.C. 873.80 F.L. 868.46' 15" RCP 28.4' 3.8% 1 860 860 870 870 880 880 CB-5112 T.C. 878.70 F.L. 874.28' MH-5162 T.C. 879.35 F.L. 872.73' 15" RCP 8.5' 1.0% 1 880 880 890 890 900 900 CB-5201 T.C. 892.96 F.L. 888.46'CB-5203 T.C. 889.78 F.L. 886.29' 15" RCP 107.0' 2.0% 1 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_305 dpt.dgnPLOTTED/REVISED:PLOT NAME:1022211300_305 dpt.dgn3/12/2026SHEETDRAINAGE PROFILES AND TABULATIONS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: 138 68 S.P. XXX-XXX-XXX, S.P. 027-702-003 A. MCGOVERN B. SPECHT B. SPECHT ALL 48" OR LARGER DRAINAGE STRUCTURES SHALL USE OFFSET MANHOLE TOP SLAB. SEE APPLICABLE MNDOT STANDARD PLATES FOR DETAILS OF CASTING ASSEMBLIES. SEE APPLICABLE MNDOT STANDARD PLATES FOR DETAILS OF DRAINAGE STRUCTURE DESIGN. ALL CIRCULAR CONCRETE PIPE SHALL BE SEWER DESIGN 3006 GASKET JOINT PIPE. BUILD HEIGHTS ARE CALCULATED PER MNDOT 2506. IN TOP OF CASTING ELEVATIONS. CASTING SUMP = 0.10 FT FOR DRAINAGE STRUCTURE CASTINGS. SUMP HAS BEEN INCLUDED PIPE LENGTHS ARE TO CENTER OF STRUCTURE. INSIDE EDGE OF THE FLOWS FROM STRUCTURE. THE OUTLET ELEVATION ON THE TABULATION IS THE INVERT ELEVATION OF THE PIPE AT THE INVERT ELEVATIONS ON THE PROFILES (F.L.) ARE AT CENTER OF STRUCTURE. INSIDE EDGE OF THE FLOWS TO STRUCTURE. THE INLET ELEVATION ON THE TABULATION IS THE INVERT ELEVATION OF THE PIPE AT THE STA. AND OFFSET IS AT CENTER OF CASTING UNLESS OTHERWISE NOTED. GENERAL NOTES: 1 ELEVATION. VERIFY EXISTING INVERT STORM SEWER. FIELD CONNECT TO EXISTING PROFILE REMARKS: 90% PLAN 880 880 890 890 900 900 CB-5208 T.C. 892.70 F.L. 888.26'CB-5206 T.C. 889.39 F.L. 886.04' CB-5207 T.C. 889.26 F.L. 885.39' 15" RCP 59.9' 1.1% 15" RCP 155.5' 1.4% 4.10 PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_320 swp.dgnPLOTTED/REVISED:PLOT NAME:1022211300_320 swp.dgn3/11/2026SHEETWATER RESOURCES NOTES 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 69 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX B. SPECHT T. PETERSEN B. SPECHT 90% PLAN 4.10 3157 6215 3200 AUTO SALES EL CHINO 3201 32ND AVE NCSAH 102 (DOUGLAS DR)MMPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 70 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 10 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 20'10' 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3443 3442 3448 3517 CSAH 102 (DOUGLAS DR) 3405 3407 341334113409 3508 MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 71 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 30 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 50'25' 4.10 3537 3528 3601 3600 3609 3617 3616 3624 3550 6213 CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NMMMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 72 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 35 40 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 50'25' 4.10 3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 6219 6201 6218 3801 3808 6310 620037TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR)MMMMATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 73 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 45 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 50'25' 4.10 4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE N4156 MMMMMMMATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 74 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 70 75 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 50'25' 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR) 4410 4333 43RD AVE NMMATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 75 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 80 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 50'25' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_325 erc.dgnPLOTTED/REVISED:PLOT NAME:1022211300_325 erc.dgn3/11/2026SHEETEROSION CONTROL PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 76 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN EROSION CONTROL LEGEND TYPE COMPOST SEDIMENT CONTROL LOG SILT FENCE: MACHINE SLICED RAPID STABILIZATION METHOD 2 STORM DRAIN INLET PROTECTION DRAINAGE FLOW DIRECTION 118+25.00 CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT - PLACE INLET PROTECTION ON EXISTING CATCH BASINS UNTIL REMOVAL. - SILT FENCE SHALL BE AS CLOSE AS POSSIBLE TO A SINGLE CONTOUR. - SEE STANDARD PLANS FOR EROSION CONTROL BLANKET STAPLING PATTERN DETAILS. WITH THE TURF ESTABLISHMENT AND EROSION CONTROL PLAN. - FURNISH AND INSTALL EROSION CONTROL MEASURES AS STAGING DICTATES IN ACCORDANCE GENERAL NOTES: 0' SCALE 20'10' 4.10 3157 6215 3200 AUTO SALES EL CHINO 3201 32ND AVE NCSAH 102 (DOUGLAS DR)PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 77 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 10 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 20'10' 4.10 3415 3408 3414 3422 3430 3421 3423 3425 3427 3443 3442 3448 3517 CSAH 102 (DOUGLAS DR) 3405 3407 341334113409 3508 MATCHLINE 33+00.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 78 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 30 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 50'25' 4.10 3537 3528 3601 3600 3609 3617 3616 3624 3550 6213 CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 79 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 35 40 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 50'25' 4.10 3625 3633 3641 3632 3640 3648 3656 3703 3715 6309 3704 6219 6201 6218 3801 3808 6310 620037TH AVE N38TH AVE N38TH AVE NCSAH 102 (DOUGLAS DR)MATCHLINE 40+50.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 80 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 45 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 50'25' 4.10 4141 CITY OF CRYSTAL CITY HALL POLICE DEPARTMENT 4150 4156 4162 4168 4174 6225 ACCESS VETERINARY CARE 4101 WEST METRO FIRE - RESCUE STATION 2 4087 4134 4142 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)41ST AVE N4156 MATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 81 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 70 75 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 50'25' 4.10 4210 ALMSTED'S FRESH MARKET 6304 B&R TRANSMISSION AND SERVICE CENTER 4213 4300 4231 4237 4243 4308 4320 4328 4301 4336 CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR) 4410 4333 43RD AVE NMATCHLINE 77+25.00PATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 82 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 80 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 50'25' 4.10 4901 GROGAN PARK COMMUNITY CENTER CITY OF CRYSTAL 4800 CEMETERY WASHBURN-MCREAVY 5100 4909 FAIRVIEW AVE NPATH & FILENAME:pw://hennepin-pw.bentley.com:hennepin-pw-01/Documents/Projects/102_2211300/Design/CADD/Plans/1022211300_330 trf.dgnPLOTTED/REVISED:PLOT NAME:1022211300_330 trf.dgn3/11/2026SHEETTURF ESTABLISHMENT PLAN 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 83 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN TURF ESTABLISHMENT LEGEND 118+25.00 (3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (200 LBS PER ACRE) RESIDENTIAL TURF GRASS MIX CONSTRUCTION LIMITS INPLACE RIGHT OF WAY PERMANENT HIGHWAY EASEMENT TEMPORARY EASEMENT(3000 LBS PER ACRE) HYDRAULIC STABILIZED FIBER MATRIX (350 LBS PER ACRE) FERTILIZER TYPE 1,20-10-20 (160 LBS PER ACRE) SOUTHERN BLVD MIX GENERAL NOTES: TWO OR MORE WEEKS AFTER MOWING BUT BEFORE FLOWERING. - SPOT-SPRAY PERENNIAL NOXIOUS WEEDS IN AREAS OF PERMANENT SEEDING STAGING AREAS BEFORE FLOWERING. - SPRAY PERENNIAL NOXIOUS WEEDS GROWING IN STOCKPILES AND - SUBSOIL PER MNDOT 2574 TO A MINIMUM DEPTH OF 6" PRIOR TO INSTALLING TOPSOIL. 0' SCALE 20'10' 4.10 S-1 TRIANGLE-PAINT CIRCLE-MULTI COMP C=CONTRAST W=WET REFLECTIVE E=ENHANCED SKID RESISTANCE G=GROUND IN EXAMPLE: 4SW GCW GROUND IN, CONTRAST, WET REFLECTIVE 4" SOLID LINE WHITE PREF THERMO = OCTAGON-PREF THERMO B - BLACK Y - YELLOW W - WHITE COLOR 3RD DIGIT BOX-PREF TAPE ___ ___ S - SOLID B - BROKEN PATTERN 2ND DIGIT D - DOUBLE SOLID T - DOTTED WIDTH 1ST DIGIT 4", 8", ETC. ___ ___ STRIPING KEY ___ ___ SYMBOLS & MATERIALS LEGEND PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 84 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN SIGN ENHANCED SKID RESISTANCE PREFORM THERMOPLASTIC GROUND IN LEFT ARROW WHITE-PAVEMENT MESSAGE GROUND IN ENHANCED SKID RESISTANCE CROSSWALK WHITE PREFORM THERMOPLASTIC BROKEN LINE-40' CYCLE (10' LINE, 30' GAP) UNLESS SHOWN OTHER WISE IN THE PLAN DOTTED LINE-8' CYCLE (2' LINE, 6' GAP),SIGN BACK TO BACK 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 85 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN GENERAL NOTES SIGNING STRIPING AND PAVEMENT MARKINGS BACKGROUND WITH YELLOW BORDER. COUNTY ROUTE MARKERS (M1-6M) SHALL HAVE "HENNEPIN" AND "COUNTY" YELLOW COLORED TEXT AND YELLOW ROUTE NUMBERS ON BLUE IN THE PLANS AND AS DIRECTED BY THE ENGINEER. ALL REMOVED SIGNS SHALL BECOME THE PROPERTY OF THE CONTRACTOR. ALL INPLACE SIGNS WITHIN THE CONSTRUCTION LIMITS SHALL BE PROTECTED INPLACE, REMOVED OR SALVAGED AND REINSTALLED AS SHOWN YELLOW-GREEN BACKGROUND COLOR. ALL SIGNS SHOWN IN THE MN MUTCD WITH OPTIONAL FLUORESCENT YELLOW-GREEN BACKGROUND COLOR SHALL USE THE FLUORESCENT MOUNTED BACK TO BACK WITH THE KEEP RIGHT AND AN OBJECT MARKER (OM1-1) MOUNTED BELOW THE KEEP RIGHT SIGN. ALL KEEP RIGHT SIGNS (R4-7) SHALL HAVE REAR DELINEATION AS SHOWN IN THE REAR DELINEATION DETAIL UNLESS ANOTHER SIGN IS OBJECT MARKER (OM1-1) IF MOUNTED BELOW A KEEP RIGHT (R4-7) 4.0 FEET OBJECT MARKERS AND SNOW PLOW MARKERS (X3-5) 5.0 FEET MOUNTING HEIGHT TO THE BOTTOM EDGE OF THE LOWEST SIGN SHALL BE 7.0 FEET EXCEPT AS FOLLOWS: ALL SIGNS SHALL HAVE HOLES PUNCHED ONLY FOR THE NUMBER OF POSTS REQUIRED. ALL SIGNING SHALL BE FHA TYPE XI. ALL THERMOPLASTIC AND TAPE MATERIAL SHALL HAVE BEADS EMBEDDED IN THE FACTORY. AND BE PLACED IN FRONT OF MEDIAN NOSES. CROSSWALK MARKINGS SHALL CONNECT PEDESTRIAN CURB RAMPS WITH A STRAIGHT LINE,WHERE POSSIBLE AT 90 DEGREES TO THE ROADWAY NO STRIPING OR MARKINGS SHALL BE PLACED WITHIN ANY MARKED CROSSWALK. BY THE ENGINEER. SPECIFICATIONS AFTER THE GROUND IN PROCESS (GROOVED) AND BEFORE ANY THERMOPLASTIC OR TAPE MATERIAL IS APPLIED, AS DIRECTED THERMOPLASTIC OR TAPE MATERIAL SHALL HAVE A SEALER APPLIED THAT IS IN ACCORDANCE WITH ALL OF THE MANUFACTURER'S APPLICATIONS. SESSION THAT ADDRESSES SURFACE PREPARATIONS AND ALL APPLICATION REQUIREMENTS AND TECHNIQUES NECESSARY FOR SUCCESSFUL THE INSTALLERS OF ALL THERMOPLASTIC OR TAPE MATERIALS MUST CARRY A CARD CERTIFYING THAT THEY HAVE ATTENDED A TRAINING PERMANENT PAVEMENT MARKINGS, STRIPING AND MESSAGES SHALL NOT BE PLACED ONTO A CONCRETE GUTTER. 20 FOOT PERPENDICULAR GAP. CROSSHATCHING (HASH MARKS) SHALL BE 24 INCHES WIDE THERMOPLASTIC GROUND IN (GROOVED) ESR LINE. INSTALLED AT 45 DEGREE WITH LENGTH AND 6 FOOT GAP. A TURN LANE EXTENSION DOTTED LINE SHALL BE A 6 INCH WIDE MULTI COMPONENT GROUND IN (GROOVED) LINE AND SHALL HAVE A 2 FOOT GROUND IN (GROOVED). BOTH SHALL HAVE A 10 FOOT LENGTH AND 30 FOOT GAP. A BROKEN WHITE LINE SHALL BE 6 INCH WIDE AND A BROKEN YELLOW LINE SHALL BE 4 INCH WIDE. BOTH SHALL BE MULTI COMPONENT BE 4 INCH WIDE MULTI COMPONENT GROUND IN (GROOVED) EXCEPT YELLOW EDGE LINES WHICH SHALL BE 6 INCH, UNLESS NOTED. ALL WHITE LONGITUDINAL LINES SHALL BE 6 INCH WIDE MULTI COMPONENT GROUND IN (GROOVED). ALL YELLOW LONGITUDINAL LINES SHALL ALL PAVEMENT MARKING SYMBOLS AND SIGNS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS. ANY NECESSARY REARRANGEMENT SHALL BE AS DIRECTED BY THE ENGINEER. MAY BE REQUIRED TO ACHIEVE A GROOVE AT THE RECOMMENDED DEPTH WHEN WORKING NEAR OBSTACLES SUCH AS CURBS OR MEDIANS. INTERSECTION MARKINGS, LEGENDS, AND SYMBOLS MAY REQUIRE USE OF WIDER CUTTING HEADS TO REDUCE THE NUMBER OF RIDGES FORMED BY MULTIPLE PASSES WITH THE CUTTING HEAD. THE HEIGHT OF THE RIDGES SHOULD BE LESS THAN 20% OF THE GROOVE DEPTH. SMALLER EQUIPMENT PERFORM THE SPOTTING, THE CONTRACTOR MUST PROVIDE TEMPORARY TRAFFIC CONTROL. NECESSARY STARTING AND CUTOFF POINTS. LONGITUDINAL JOINTS, PAVEMENT EDGES AND EXISTING MARKINGS MAY SERVE AS HORIZONTAL CONTROL WHEN SO DIRECTED. THE CONTRACTOR IS ALSO RESPONSIBLE TO PROVIDE TRAFFIC CONTROL FOR SPOTTING. IF THE ENGINEER ELECTS TO THE ENGINEER'S INVOLVEMENT IN THE APPLICATION OF THE MATERIAL SHALL BE LIMITED TO FIELD CONSULTATION AND INSPECTION. THE CONTRACTOR WILL PLACE NECESSARY "SPOTTING" AT APPROPRIATE POINTS TO PROVIDE HORIZONTAL CONTROL FOR STRIPING AND TO DETERMINE ALL TRAFFIC CONTROL DEVICES SHALL CONFORM AND BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE MNDOT "TRAFFIC ENGINEERING MANUAL" AND THE "MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MN MUTCD) AND THE FOLLOWING DETAILS. 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 86 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 87 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 88 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN RADIUS 12"x 30"15"x 36"18"x 48" (NO SCALE) A B 1.50"1.88"2.25" 6.00"6.00"5.00" 2.50"3.00"3.00" DIMENSIONS SIZE MOUNT ON 24"x 30"30"x 36"36"x 48" REAR DELINEATION FOR R4-7 COLOR: YELLOW & BLACK FHA TYPE XI SIGN SHEETING ONLY. B 45° B A A REAR DELINEATION FOR R4-7 4.10 50'MAJOR CROSS STREETMINOR CROSS STREETA 8'-16' 50' MINIMUM 50' MINIMUM 100' A TWO-WAY LEFT-TURN LANE MODIFIED: HC 02/11/2026 AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'AREA = 15 SQ' REM = 48 SQ ' PERIMETER = 30 'AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'AREA = 15 SQ' REM = 48 SQ ' PERIMETER = 30 'PUBLISHED BY OTE: 26 SEPT 2024 4" LINE YELLOW BROKEN 4" LINE YELLOW SOLID SOLID4" LINE YELLOW DOUBLE 6" LINE WHITE SOLID LANE WIDTH 4"4" TWO WAY LEFT TURN LANE SECTION A-A 4" LINE YELLOW SOLID4" LINE YELLOW SOLID 4" LINE YELLOW BROKEN NOT TO SCALE 6" DOTTED LINE WHITE AND DOTTED LINE EXTENSION TURN LANE WITH ARROW MESSAGE WHITE LINE DOTTED 6" 2" +/- 1" 2" +/- 1" THRU LANE 2" +/- 1" 2" +/- 1" TURN LANE THRU LANE TURN LANE LEFT TURN LANE RIGHT TURN LANE MODIFIED: HC 02/11/2026 2" +/- 1"2" +/- 1" PUBLISHED BY OTE: 16 NOV 2021 50' 20' 30' - 80' 12' 50' RADIUS BEGINNING OF MARKINGS AT END PAVEMENT NOTE: / CROSSWALK OR AT STOP BAR 50' OR LESS 200'"L" "L" 1/2 50' 30' - 80' OVER 200' 20' LINE WHITE 6" DOTTED OR " DOTTED6 LINE WHITE SOLID 6" LINE WHITE DOTTED NOT TO SCALE OR DOTTED LINE WHITE SOLID 6" LINE WHITE 6" SOLID LINE WHITE 6" SOLID LINE WHITE 6" SOLID PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 89 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 4.10 LEFT TURN ISLANDS TYPICAL MARKINGS FOR20' LINE YELLOW 24" SOLID END PAVEMENT MARKINGS AT BEGINNING OF RADIUS OR AT STOP BAR / CROSSWALK LEFT TURN LANE ISLAND MODIFIED: HC 02/11/2026 NOTE: YELLOW SOLID 500' MINIMUM PUBLISHED BY OTE: 16 NOV 2021 SOLID 4" YELLOW LINE DOUBLE 45 0 NOT TO SCALE (L) WIDTH OF INSIDE LANE 10' 11' 12' (W) WIDTH OF PAINTED AREA 2.0' 2.0' 2.0' (S) WIDTH OF SPACE 2.5' 3.0' 3.0' 3.0' 3.5' 3.5' ALTERNATE H (SEE NOTE 7) 2. 1.5' MINIMUM W S (S) WIDTH OF SPACE (SEE NOTE 2) L L H 1.5' MINIMUM 7) (SEE NOTE (SEE NOTE 2) MODIFIED: HC 02/27/2026PUBLISHED BY OTE: 16 NOV 2021 PEDESTRIAN CROSSWALK MARKINGS NOTES: THE ALTERNATE (S) MAY BE USED WHEN BLOCKS LONGER THAN 6' (H) ARE USED.8. AS LONG AS THE APPROACHING SIDEWALK OR SHARED USE PATH. TRUNCATED DOMES, FOR FANNED TRUNCATED DOMES THE BLOCKS SHALL BE AT LEAST THE BLOCKS SHALL BE A MINIMUM OF 6' LONG AND AT LEAST AS LONG AS THE7. PATH OF THE VEHICLES. THE BLOCKS SHALL BE PLACED SO THAT THEY ARE NOT LOCATED IN THE WHEEL6. AS SHOWN. AT SKEWED CROSSWALKS, THE BLOCKS ARE TO REMAIN PARALLEL TO THE LANE LINES5. ACROSS THE TRAVELED PORTION OF THE ROADWAY. IN THE MEDIAN SO THAT THE BLOCKS ARE MAINTAINED IN THEIR PROPER LOCATION FOR DIVIDED ROADWAYS, ADJUSTMENTS IN SPACING OF THE BLOCKS SHOULD BE MADE4. ON TWO LANE TWO WAY STREETS, USE SPACING SHOWN FOR AN 11 FT. INSIDE LANE.3. IF LAST PAINTED AREA FALLS INTO THIS DISTANCE IT MUST BE OMITTED. A MINIMUM OF 1.5 FT. CLEAR DISTANCE SHALL BE LEFT ADJACENT TO THE CURB FACE. PAINTED AREAS TO BE CENTERED ON CENTERLINE AND LANE LINES.1. W S NOT TO SCALE PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 90 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 4.10 FOR 2 INCH SQUARE TUBE RISER POST ON CONCRETE SHEAR BOLT BASE DETAIL SIGNING 1 OF 1 SHEAR BOLT BASE WITH POST COUPLER SQUARE TUBE FIN BASE DETAIL FIN BASE ASSEMBLY FROM CONCRETE SURFACE FLUSH WITH CONCRETE MOUNT TOP OF SQUARE TUBE TO MATCH EXISTING THICKNESS FILL WITH CONCRETE (MIX NO 3F52) OR PREFORMED OPENING 15" DIAMETER CONCRETE CORE SHEAR BOLT BASE CORED THROUGH CONCRETE (MIN 4" THICKNESS) CONCRETE SURFACE SCREW ANCHOR BOLT TO CONCRETE SURFACE SHEAR BOLT BASE MOUNTED 7 FEET MINIMUM NOTES: 1. 2. 3. 4. 5. 6. SQUARE TUBE SIGN POSTS PER MnDOT SPEC. 3402.7. FOR SIGN PANEL MOUNTING DETAILS SEE SQUARE TUBE SIGN MOUNTING DETAILS. USE ANTI SEIZE ON THE SHEAR BOLT CONNECTIONS. TO MEET CRASHWORTHY REQUIREMENTS THE DISTANCE BETWEEN THE BOTTOM OF THE SIGN PANEL AND THE GROUND SURFACE INSTALLATION OF SHEAR BOLT BASE MUST BE NO EARLIER THAN 3 DAYS AFTER CONCRETE IS PLACED. FOR SHEAR BOLT BASE USE APPROVED PRODUCT FROM MnDOT APPROVED PRODUCTS LIST, PRODUCT MUST BE MODIFIED AS SHOWN. THE CRASH RESPONSE TYPE FOR THIS STRUCTURE IS BREAKAWAY. SIGN PANEL OF 2270 PSI. ALLOWABLE TENSION LOAD THAT MUST MEET A MINIMUM 5" LONG CARBON STEEL INSERTED INTO SHEAR BOLT BASE WITH A GALVANIZED STEEL SQUARE TUBE RISER 2" x 2" 12 GAUGE PREPUNCHED INSERTED INTO SHEAR BOLT BASE WITH A GALVANIZED STEEL SQUARE TUBE RISER 2" x 2" 12 GAUGE PREPUNCHED SHEAR BOLT BASE INSERT LOCK NUT WITH ZINC COATED STEEL NYLON �" STAINLESS STEEL BOLT SCREW ANCHOR BOLT. DRILL ½" HOLE FOR NYLON INSERT LOCK NUT WITH ZINC COATED STEEL �" STAINLESS STEEL BOLT BELOW ANY PORTION OF THE PRIMARY SIGN PANEL MUST BE A MINIMUM OF 7 FEET. SEE TABULATIONS FOR MOUNTING HEIGHT. TUBE INTERNAL SLEEVE FOR STIFFENING. PREPUNCHED GALVANIZED STEEL SQUARE 1 ¾" x 1 ¾" x 36" 12 GAUGE TUBE INTERNAL SLEEVE FOR STIFFENING. PREPUNCHED GALVANIZED STEEL SQUARE 1 ¾" x 1 ¾" x 36" 12 GAUGE PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 91 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 4.10 BACK TO BACK BACK TO BACK14 DOUGLAS DR N AVE NND32LIONS VALLEY PLACELIONS VALLEY PLACEDOUGLAS DR N AVE NND32STOPCITY OF CRYSTAL PALACE VALLEY 14SPEEDLIMIT35STOP STOP BACK TO BACK BACK TO BACK CSAH 102 (DOUGLAS DR)32ND AVE N6'13.3'PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 92 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE6.3'13.2'90% PLAN S-1 S-3 S-2 NOTE 4,5,7-11 NOT USED ON SHEET 6 INSTALL 3 SALVAGE 2 INPLACE 1 F & I NOTES: 1 1 2 2 2 2 2 2 2 2 2 3 6 10 0' SCALE 20'10' 4.10 6SW G 6SW G 4SY G 4BY G 4SY G 4BY GADOPT-A-HIGHWAYTHANKS TOMarkgraf-ZachariasLaylaHhennepin.usCSAH 102 (DOUGLAS DR) BACK TO BACK BACK TO BACK 4SY G 4BY G MATCHLINE 33+00.00PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 93 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 12.8'11'19'11'6'90% PLAN S-4 S-5 S-6 NOTE 4,5,7-11 NOT USED ON SHEET 6 INSTALL 3 SALVAGE 2 INPLACE 1 F & I NOTES: 2 3 6 1 1 30 0' SCALE 50'25' 4.10 6SW G 6SW G 6SW G 6SW G 4DY G 24SW G 24SY G 6TW G 6TW GPARKINGADDITIONAL FLORALTO CARDELLSTREET NEXTACROSS THESPEEDLIMIT35REQUIRED PARKING VEHICLE ID UP TO $200 FINE FOR VIOLATION REQUIRED PARKING VEHICLE ID UP TO $200 FINE FOR VIOLATION VAN ACCESSIBLE 14COUNTY102HENNEPINPARKINGADDITIONAL FLORALTO CARDELLSTREET NEXTACROSS THESTOPSERVICE THIS CURRENTLY NO BUSES COUNTY102HENNEPINONLY4SY G 4BY G 4BY G 4SY G 4BY G 1 :5 TAPER 1 :5 TAPER 4DY G BACK TO BACK BACK TO BACK BACK TO BACK BACK TO BACK CSAH 102 (DOUGLAS DR)36TH AVE N36TH AVE NWAYONEWAYONE MUSTLEFT LANETURN LEFTEXPENSEAT OWNERSTOWED AWAYWILL BEVEHICLESUNAUTHORIZEDCUSTOMERPARKINGEXPENSEAT OWNERSTOWED AWAYWILL BEVEHICLESUNAUTHORIZEDCUSTOMERPARKING14.8'11'8'11'11'6'24SW G 6TW G 6TW G 4SY GMATCHLINE 33+00.00MATCHLINE 40+50.00PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 94 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 12'11'6'13'12'12.7'11'19'11'6'6'12'6'11'12'8.8'12'90% PLAN S-8 S-17 S-19 S-7 S-18S-14 S-15 S-9 S-22 S-20 S-21 S-23 S-16 NOTE 4,5,7,8,10,11 NOT USED ON SHEET 9 INSTALL SIGN PANEL 6 INSTALL 3 SALVAGE 2 INPLACE 1 F & I NOTES: S-9 S-11 S-12 S-13S-10 REMOVE EXISTING CROSSWALK BLOCKS AND STOP BARS AT INTERSECTION NOTES: 2 2 1 3 6 3 6 1 3 6 3 6 3 6 3 6 3 6 3 6 3 6 3 6 2 3 6 3 6 1 1 9 3 6 3 35 40 0' SCALE 50'25' 4.10 4SY G 4BY G 6SW G ONLYONLYONLY35SPEEDLIMITSTOPSERVICE THIS CURRENTLY NO BUSES DOUGLAS DR N AVE NTH38 AVE NTH38DOUGLAS DR NDOUGLAS DR N AVE NTH37 AVE NTH37DOUGLAS DR N STOPSERVICE THIS CURRENTLY NO BUSES STOPSTOPSTOP STOPSERVICE THIS CURRENTLY NO BUSES CENTERLANEONLYDOUGLAS DR N AVE NTH38 AVE NTH38DOUGLAS DR N STOPSERVICE THIS CURRENTLY NO BUSES ADOPT-A-HIGHWAYIn honor ofKathy LindmannHhennepin.usWife, softbal/hockey mom4SY G 4BY G 6SW G BACK TO BACK BACK TO BACK 1:35 TAPER CSAH 102 (DOUGLAS DR)38TH AVE N38TH AVE N37TH AVE N14.6'11'19'11'6'5.9'13.7'BACK TO BACK BACK TO BACK MATCHLINE 40+50.00PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 95 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 6'13.5'90% PLAN S-31 S-26 S-27 S-25 S-24 S-29 S-30 S-32 NOTE 7,9 NOT USED ON SHEET 11 INSTALL SIGN SPECIAL 10 SALVAGE SIGN SPECIAL 8 SALVAGE SIGN PANEL 6 INSTALL 5 REMOVE SIGN PANEL 4 REMOVE 3 SALVAGE 2 INPLACE 1 F & I NOTES: S-28 REMOVE EXISTING CROSSWALK BLOCKS AND STOP BARS AT INTERSECTION NOTES: 2 2 2 2 2 2 2 2 2 2 1 1 1 4 8 4 3 6 5 5 10 11 10 11 1 45 0' SCALE 50'25' 4.10 6SW G 6SW G 6TW G 24SW G 24SY G COUNTY9HENNEPINLIBRARYJCTONLYCOUNTY9HENNEPINSTOPSERVICE THIS CURRENTLY NO BUSES YIELDSTOPSERVICE THIS CURRENTLY NO BUSES SPEEDLIMIT35COUNTY102HENNEPINBACK TO BACK BACK TO BACK BACK TO BACK4SY G 4BY G41ST AVE NCSAH 102 (DOUGLAS DR)CSAH 9 (42ND AVE N)COUNTY102HENNEPINPRIVATENO THRUSTREETDRIVEBACK TO BACKPRIVATE NO THRU STREET DRIVE MATCHLINE 77+25.00PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 96 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 6'11'12'8'12'12'90% PLAN S-33 S-35 S-34 S-36 S-38 S-37 S-39 S-40 S-41 NOTE 4,5,7,8,10,11 NOT USED ON SHEET 9 INSTALL SIGN PANEL 6 INSTALL 3 SALVAGE 2 INPLACE 1 F & I NOTES: REMOVE EXISTING CROSSWALK BLOCKS AND STOP BARS AT INTERSECTION NOTES: 3 6 2 2 3 6 93 1 3 6 3 6 1 3 6 3 6 3 6 70 75 0' SCALE 50'25' 4.10 1:35 TAPER 1:35 TAPER 6SW G 6SW G 6TW G 4SY G 4BY G 4DY G 24SW G 24SY G COUNTY 102 HENNEPIN 717716 764 COUNTY102HENNEPIN35SPEEDLIMITWAYONEWAYONECOUNTY9HENNEPINONLYONLYONLYLIBRARYONLYCOUNTY9HENNEPINJCT1:5 TAPER BACK TO BACKBACK TO BACKBACK TO BACK CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)43RD AVE NMATCHLINE 77+25.00PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 97 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE12'11'6'16.2'11'8'13'12'90% PLAN S-42 S-43 S-44 S-45 S-48 S-47 S-46 S-49 S-50 S-51 NOTE 8-11 NOT USED ON SHEET 7 F & I SIGN PANEL 6 INSTALL 5 REMOVE SIGN PANEL 4 REMOVE 3 SALVAGE 2 INPLACE 1 F & I NOTES: REMOVE EXISTING CROSSWALK BLOCKS AND STOP BARS AT INTERSECTION NOTES: 2 2 2 2 4 3 6 3 6 3 6 3 6 3 6 5 736 1 1 4 80 0' SCALE 50'25' 4.10 CENTERLANEONLYSTOP716STOP CENTERLANEONLYSTOPFORPEDESTRIANINCROSSWALK716CRYSTAL POOLFairview Ave NCRYSTAL POOLFairview Ave NDouglas Dr NDouglas Dr N BACK TO BACK BACK TO BACKFAIRVIEW AVE NCSAH 102 (DOUGLAS DR)NOPARKINGOVERNIGHTPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_433 pss.dgn3/11/2026SHEETPERMANENT SIGNING AND STRIPING PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 98 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 5.9'13.3'5.8'14'90% PLAN S-57 S-54 S-56 S-55 S-53 NOTE 7,9 NOT USED ON SHEET 11 INSTALL SIGN SPECIAL 10 SALVAGE SIGN SPECIAL 8 SALVAGE SIGN PANEL 6 INSTALL 5 REMOVE SIGN PANEL 4 REMOVE 3 SALVAGE 2 INPLACE 1 F & I NOTES: REMOVE EXISTING CROSSWALK BLOCKS AND STOP BARS AT INTERSECTION NOTES: S-52 2 2 2 2 2 1 1 8 4 2 10 11 6 3 6 5 5 118+25.00 0' SCALE 20'10' 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 99 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN PLATE NO.PLATE DESCRIPTION TRAFFIC SIGNAL BRACKETING (POLE MOUNTED)8110E 8123G 8111E 8122F PEDESTAL & PEDESTAL BASE (1) (2) POLE AND MAST ARM, (2 SHEETS) (FOR TRAFFIC CONTROL SIGNALS SUPPORT), (2 SHEETS) TRAFFIC SIGNAL BRACKETING (PEDESTAL MOUNTED), (3 SHEETS) STANDARD PLATES HIGHWAY ADMINISTRATION, SHALL APPLY ON THIS PROJECT. THE FOLLOWING STANDARD PLATES, APPROVED BY THE FEDERAL METALLIC CONDUIT (NMC) ONLY. WIRE OUTSIDE OF THE CONDUIT. FOR USE WITH NON (3) TO BE USED AS A TRACER AND LOCATOR WIRE. PLACE (2) SIGNAL MOUNTING PLATE (END OF MAST ARM) APPLIES. (1) SEE SPECIAL PROVISIONS. TYPE 3/C #14 48SM FIBER OPTIC 1/C #12 2/C #14 (SHLD) 3/C #20 (SHLD) 1/C # 3 USAGE EVP INDICATOR LIGHT AND LUMINAIRES PEDESTRIAN PUSH BUTTONS EVP DETECTOR INCOMING POWER SIGNAL INTERCONNECT LOCATE AND TRACER NOTES (3) TRAFFIC SIGNAL CABLES 7/C #14 VEHICULAR INDICATIONS EQUIPMENT GROUND 1/C # 6 GRN 144SM FIBER OPTIC SIGNAL INTERCONNECT TRAFFIC MANAGEMENT CAMERAS AND COMMUNICATION CONTROL AND BATTERY BACK-UP SERVICE CABINET 4/C #14 VEHICULAR AND PEDESTRIAN INDICATIONS CAT-6 3/C #18 1/C #10 TRAFFIC MANAGEMENT CAMERA GROUND 1/C # 8 INCOMING POWER CAT-5 BATTERY BACK-UP SYSTEM AND REMOTE BATTERY MANAGEMENT SYSTEM 360° VIDEO DETECTION CAMERAS DIRECTIONAL VIDEO DETECTION CAMERAS COLOR CODING OF CONDUCTORS ORANGE BLUE WHITE RED WITH BLACK TRACER ORANGE WITH BLACK TRACER BLUE WITH BLACK TRACER WHITE WITH BLACK TRACER BLACK BLACK WITH WHITE TRACER R O BL WH R/BLK O/BLK BL/BLK WH/BLK BLK BLK/WH GREEN WITH BLACK TRACER GREEN YELLOW G/BLK G Y BLK/R BLACK WITH RED TRACER WH/R WHITE WITH RED TRACER RED Y/BLK YELLOW WITH BLACK TRACER BROWNBRN WIRING DIAGRAM LEGEND ABBREVIATIONS SOP HH CAC HH MA SOP SA 2-1 CAC MA PBS SV SC SA SC SIGNAL PLAN LAYOUT LEGEND V ITEM DESCRIPTION UNIT TOTAL SYSTEM NOTES TRAFFIC CONTROL SIGNAL SYSTEM A 1 TABULATION OF ESTIMATED QUANTITIES SYSTEM TRAFFIC CONTROL SIGNAL SYSTEM B 1 EQUIPMENT GROUND CONNECTION PUSH BUTTON INDICATOR PEDESTRIAN INDICATION LUMINAIRE SOURCE OF POWER HANDHOLE DETECTOR LOOP (_ DENOTES PHASE) MAST ARM PB IND EVP LUM SOP HH D_ MA SA RED RIGHT TURN ARROW YELLOW RIGHT TURN ARROW GREEN RIGHT TURN ARROW RRTA YRTA GRTA 2-1 RED YEL GRN RLTA YLTA GLTA DW W NEU SPARE EQG EQUIPMENT GROUND SPARE CONDUCTOR NEUTRAL WALK DON'T WALK GREEN LEFT TURN ARROW YELLOW LEFT TURN ARROW RED LEFT TURN ARROW GREEN YELLOW RED SIGNAL PHASE AND FACE NUMBER PHASE FYLTA FLASHING YELLOW LEFT TURN ARROW FYRTA FLASHING YELLOW RIGHT TURN ARROW FYEL FLASHING YELLOW CAC SC CONTROLLER AND CABINET EMERGENCY VEHICLE PREEMPTION SERVICE CABINET SIGNAL ASSEMBLY PEDESTAL MOUNT APS ACCESSIBLE PEDESTRIAN SIGNAL PTZ PAN TILT ZOOM CAMERA PED OR P Ø INPLACE STRUCTURE NEUTRAL CONDUCTOR INPLACE CONDUCTOR OR CONDUIT INPLACE CONTROLLER CABINET INPLACE HANDHOLE PEDESTRIAN INDICATION SIGNAL PHASE AND FACE NUMBER SIGNAL FACE WITH BACKGROUND SHIELD CONTROLLER CABINET AND SERVICE MAST ARM SIGNAL POLE WITH OPTIONAL LUMINAIRE SHAFT EXTENSION AS NOTED MAST ARM SIGNAL POLE UPRIGHT ONLY LUMINAIRE SHAFT EXTENSION AS NOTED (NO MAST ARM) WITH OPTIONAL DISCONNECT ON ONE CONCRETE PAD SOURCE OF POWER PAD MOUNTED POLE MOUNTED SIGNAL INTERCONNECT SPLICE VAULT INPLACE SOURCE OF POWER PAD MOUNTED POLE MOUNTED METER AND DISCONNECT EMERGENCY VEHICLE PREEMPTION (EVP) ONE-WAY LUMINAIRE APS PUSH BUTTON STATION SIGNAL ASSEMBLY PEDESTAL MOUNT INPLACE SERVICE CABINET WITH PVC HANDHOLE WITH METAL COVER INPLACE SIGNAL ASSEMBLY PEDESTAL MOUNT INPLACE MAST ARM SIGNAL POLE OR NON-METALLIC CONDUIT (NMC) HIGH DENSITY POLYETHYLENE (HDPE) INPLACE CONDUIT SIGNAL SYSTEM RIGID STEEL CONDUIT (RSC) PAN TILT ZOOM CAMERA VIDEO DETECTION CAMERA AND CABINET WITH METER AND 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 100 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE V V V 90% PLAN PHASE 8 = D PHASE 6 = C PHASE 4 = B PHASE 2 = A APS ADDRESS LABELING: - SOFT RECALL: PHASES 2 AND 6. - DUAL ENTRY: PHASES 4 AND 8. MAY BE USED ON ALL APPROACHES. - PROTECTED ONLY MODE DURING CONFLICTING PEDESTRIAN PHASE - LEADING PEDESTRIAN INTERVAL MAY BE USED ON ALL APPROACHES. - ALL LEFT TURN PHASES MAY BE LEADING OR LAGGING. PROTECTED/PERMISSIVE OR PROTECTED ONLY PHASING MODES. - ALL LEFT TURNS MAY OPERATE IN PERMISSIVE ONLY, - SIGNAL SYSTEM FLASH MODE SHALL BE ALL RED. SIGNAL SYSTEM OPERATION 3- 1/C #3 2" RSC SOP-1A TO HH-8A 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 2- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 3- 7/C #14 4" RSC HH-5A TO HH-3A 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 2- 3/C #14 9- 4/C #14 6- 7/C #14 4" RSC HH-1A TO CAC-1A 3- 1/C #3 2" RSC HH-8A TO SC-1A 2- CAT-5 1- 3/C #18 2" RSC 1- 1/C #6 GRN 2- 1/C #8 2" RSC SC-1A TO CAC-1A 2- 3/C #14 2" RSC HH-1A TO SC-1A 1- CAT-6 (PTZ) 1- 1 1/4" RSC HH-4A TO CAC-1A INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-1A TO THE SOUTH 1- 1/C #12 EMPTY 1 1/4" NMC (BLUE HDPE) 1- 48 SM FIBER OPTIC CABLE 1 1/4" NMC (ORANGE HDPE) SV-1A TO CAC-1A EMPTY 4" RSC HH-5A TO HH-7A Ø2 WALK Ø6 WALK 8 WALKØØ84 WALKØP6-1 MA-4A P8-2PB6-1 (NO SCALE) CONTROLLER PHASING LAYOUT Ø4(DOUGLAS DR)CSAH 102Ø6 Ø2 CSAH 9 (42ND AVE N)P4-1MA-3AP6-2 PB4-1P8-1MA-1AP2-2PB8-1P2-1 MA-2A P4-2PB2-1 PB6-2 PBS-3A PBS-2APB4-2PBS-4APB8-2PBS-1A PB2-2 MA 3A MA 4A MA 1A MA 2A Ø5 + Ø6 Ø7 + Ø8Ø1 + Ø2 Ø3 + Ø4(B1)(C2) (C1)(D2)(D1)(A2) (A1)(B2)HENNEPIN COUNTY SIGNAL ID: 8000300 1-1 1-2 2-1 2-2 2-33-13-24-14-25-1 5-2 6-1 6-2 6-3 7-17-28-18-2 V-1A V-2A PTZ-1A Ø3 & Ø8 EVPØ2 & Ø5 EVP Ø1 & Ø6 EVP Ø4 & Ø7 EVP 1A CAC 1A SC 2A HH 1A MA 1A PBS 1A SV(35 MPH)CSAH 102 (DOUGLAS DR) 1A SOP 8A HH 2A SV 1A HH 2A PBS 3A PBS 4A PBS 2A MA 3A MA 4A MA 3A HH 4A HH 5A HH 7A HH 6A HH CSAH 9 (42ND AVE N) (35 MPH)(DOUGLAS DR)CSAH 102CSAH 9 (42ND AVE N) 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 3- 7/C #14 3" RSC MA-1A TO HH-1A 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 3" RSC MA-2A TO HH-3A 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 3- 7/C #14 3" RSC MA-3A TO HH-5A 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 3" RSC MA-4A TO HH-7A 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 4- 3/C #14 9- 4/C #14 6- 7/C #14 4" RSC HH-3A TO HH-2A 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 2- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 4" RSC HH-7A TO HH-1A 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 2- 3/C #14 9- 4/C #14 6- 7/C #14 4" RSC HH-2A TO CAC-1A 2- 3/C #14 2" RSC HH-2A TO SC-1A 1- CAT-6 (PTZ) 1- 1 1/4" RSC MA-3A TO HH-6A 1- CAT-6 (PTZ) 1- 1 1/4" RSC HH-6A TO HH-4A INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-2A TO THE NORTH INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-2A TO SV-1A INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-2A TO THE EAST INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-2A TO THE WEST PHASING ASSIGNMENTS TO BE DETERMINED IN THE FIELD. CAMERA NO. V-1A LOCATION TYPE 360° MOUNT LOCATION VIDEO ARMMA-1A POLE VIDEO DETECTION PHASE - V-2A 360°VIDEO ARMMA-3A - 0' SCALE 40'20' 1- 2/C #14 (SHLD) 1" RSC PBS-4A TO HH-7A 1- 2/C #14 (SHLD) 1" RSC PBS-3A TO HH-5A 1- 2/C #14 (SHLD) 1" RSC PBS-2A TO HH-3A 1- 2/C #14 (SHLD) 1" RSC PBS-1A TO HH-1A 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 101 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN A (SYSTEM). ENGINEER AND ALL COSTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR TRAFFIC CONTROL SIGNAL SYSTEM 15. ALL WORK AS DETAILED IN NOTES 1 - 14 SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE 14. SIGNAL INTERCONNECT ITEMS ARE PAID FOR AS PART OF THE TRAFFIC CONTROL SIGNAL SYSTEM PAY ITEM. EXISTING SURFACES. ALLOWED ON EXISTING PAVEMENT. SIGNAL CONDUIT SHALL BE BURIED 24 INCHES TO 36 INCHES UNDER 13. ALL CONDUIT RUNS ACROSS EXISTING ROADWAYS SHALL BE DIRECTIONAL BORED. NO OPEN CUTTING IS 12. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. INFORMATION. SHALL WORK WITH THE CITY AND THE POWER COMPANY TO ESTABLISH METER ADDRESS AND BILLING COSTS DIRECTLY TO THE POWER COMPANY. HENNEPIN COUNTY SHALL NOT BE BILLED. THE CONTRACTOR 11. THE CITY SHALL BE BILLED FOR ALL TRAFFIC SIGNAL SYSTEM POWER COSTS AND THE CITY SHALL PAY THOSE EQUIPMENT TO SUPPLY POWER TO THE TRAFFIC SIGNAL SYSTEM. PROVISIONS FOR MORE INFORMATION. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY WITH THE SERVICE CONNECTION AND MONTHLY ELECTRICAL SERVICE. REFER TO THE SIGNAL SPECIAL SYSTEM WITH THE ELECTRICAL UTILITY COMPANY. CITY OF CRYSTAL IS RESPONSIBLE FOR COSTS ASSOCIATED 10. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE SERVICE CONNECTION FOR THE TRAFFIC SIGNAL VISIBILITY DUE TO ROADWAY GEOMETRICS. 9. THE CONTRACTOR SHALL ADJUST THE SIGNAL HEAD ANGLE ON THE MAST ARM TO OPTIMIZE SIGNAL 8. THE CONTRACTOR SHALL IF REQUIRED RELOCATE THE VIDEO OR EVP DETECTORS. BITUMINOUS WALK, ETC. TO IT'S ORIGINAL CONDITION OR BETTER. 7. THE CONTRACTOR SHALL PLACE COMMON BACK FILL AND RESTORE ALL DISTURBED TURF, CONCRETE OR MA-2A, MA-3A AND MA-4A MOUNTED TO SIGN BRACKET "B". 6. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE R10-X12 SIGN (36" X 42") ON THE MAST ARM OF MA-1A, MAST ARM OF MA-1A, MA-2A, MA-3A AND MA-4A, WITH PHASING AS SHOWN IN THE PLANS. 5. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE EVP DETECTOR AND CONFIRMATION LIGHT ON THE CAMERA ON THE DAVIT ARM OF MA-3A. CAMERA ARM OF MA-1A AND MA-3A. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE PAN TILT ZOOM 4. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE 360 DEGREE VIDEO DETECTION CAMERA ON THE OF MA-1A, MA-2A, MA-3A AND MA-4A. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE LED LUMINAIRE ON THE LUMINAIRE SHAFT EXTENSION MOUNTED PUSH BUTTONS SHALL INCLUDE A POLE MOUNT ADAPTOR. 2A,PBS-3A, PBS-4A, MA-1A, MA-2A, MA-3A AND MA-4A, FOR OPERATION AS SHOWN IN THE PLANS. POLE 2. ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN R10-3E (9" X 15") SHALL BE INSTALLED ON PBS-1A, PBS- 1. SEE DIVISION "SS" OF SPECIAL PROVISIONS FOR MATERIALS PROVIDED BY HENNEPIN COUNTY. NOTES: G Y Y R G Y Y R G Y Y R G Y Y R 1-1 AND 1-2 SIGNAL FACE 3-1 AND 3-2 SIGNAL FACE 5-1 AND 5-2 SIGNAL FACE 7-1 AND 7-2 SIGNAL FACE Ø1 FYA Ø2 Ø1 Ø3 Ø3 Ø5 Ø5 Ø7 Ø7 4-SECTION SIGNAL HEAD PHASING WITH FLASHING YELLOW ARROW FYA Ø4 FYA Ø6 FYA Ø8 SIG. POLE NO. FACE NO. SIG. Ø RED YEL GRN PED SIGNAL FACE MOUNT 5,6 2 2 2 7,8 7,8 4 4 1,2 1,2 6 6 3,4 1-1 1-2 2-2 2-3 3-2 4-2 5-1 6-2 6-3 7-1 7-2 LED INDICATIONS 12" INDICATIONS FYEL MAST ARM (END) MAST ARM (MID) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT MAST ARM (END) MAST ARM (MID) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT 6 MA-1A MA-2A MA-3A MA-4A PLUMBIZER MOUNTING 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER ANGLE. SEE DETAIL 4 2 8 SIGNAL INDICATIONS AND MOUNTING *** INTERNATIONAL SYMBOLS IN A DUAL FACE SINGLE HOUSING WITH PEDESTRIAN COUNTDOWN TIMER. *** *** *** ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER POLE MOUNT P4-1 6-1 4-1 POLE MOUNT P2-1 POLE MOUNT P8-1 2-1 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER P6-2 POLE MOUNT 6 ***180° ANGLE MOUNT PLUMBIZER P4-2 POLE MOUNT 4 ***180° ANGLE MOUNT PLUMBIZER P2-2 POLE MOUNT 2 ***180° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT 3,4 8 8 5,6 3-1 5-2 8-2 180° ANGLE MOUNT PLUMBIZER 6 *** 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER POLE MOUNT P6-1 8-1 P8-2 POLE MOUNT 8 ***180° ANGLE MOUNT PLUMBIZER 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 102 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN MA 1A 14 15 16 17 18 19 20 21 22 23 24 BLK WH PB8-2 25 26 27 28 29 30 R BLK/R BLK WH 31 Ø2-PED R BLK/R BLK WH 32 Ø8-PED 33 BLK WH PB8-1 BLK WH G 34 Ø2 & Ø5 EVP IND LIGHT Y BL O 35 Ø2 & Ø5 EVP (-) (+) 6 11 G INS. GR. 9,11,14-24 6,11,25-36 37 BLK WH PB2-2 6,9 (TO SC-1A) 11,14-37 INTERCONNECT (48 SM FIBER OPTIC) CONTROLLER CABINET 1A 14 15 16 17 18 19 R BLK/R BLK WH 20 R BLK/R BLK WH 21 BLK WH 22 BLK WH G 9023 Y BL O 36 24 BLK WH PB8-2 90 25 26 27 28 29 30 P2-2 Ø2-DW Ø2-W SPARE NEU R BLK/R BLK WH 31 P8-1 Ø8-DW Ø8-W SPARE NEU R BLK/R BLK WH 32 PB8-1 BLK WH 33 34 BLK WH G Ø2 & Ø5 EVP IND NEU SPARE SYS EVP Ø2 & Ø5 (-) (+) Y BL O 35 BLK WHPB2-2 37 11 EQG (1/C #6 GRN) EMPTY (TO HH-5A) HH 7A 4A PBS HH 1A 1A PBS CAT-6 VIDEO DETECTION CAMERA 1A R BL WH BRN O Y/BLK BLK R BLK/R BLK WH R BLK/R BLK WH R BL WH BRN O Y/BLK BLK R BL WH BRN O Y/BLK BLK R BL BRN 5-1 Y/BLK O WH BLK R BLK/R BLK WH 2-3 R BLK/R BLK WH 2-2 R BLK/R BLK WH 2-1 R BL BRN 7-2 Y/BLK O WH BLK SPARE R BL BRN Y/BLK O WH BLK 5-1 Ø5-RLTA Ø5-YLTA Ø5-GLTA NEU Ø6-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R NEU R BLK/R BLK WH 2-3 Ø2-RED Ø2-YEL Ø2-GRN NEU R BLK/R BLK WH 2-2 Ø2-RED Ø2-YEL Ø2-GRN NEU R BLK/R BLK WH 2-1 Ø2-RED Ø2-YEL Ø2-GRN 7-2 Ø7-RLTA Ø7-YLTA Ø7-GLTA NEU Ø8-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE NEU BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE SPARE SPARE SPARE BLK WH G LUM 1A MA 4A 9,11,14-2336 Ø8-DW Ø8-W SPARE NEU P8-2 Ø6-DW Ø6-W SPARE NEU P6-1 PB6-1 Ø3 & Ø8 EVP IND NEU SPARE Ø3 & Ø8 (-) (+) SYS EVP CAT-6 Ø3-RLTA Ø3-YLTA Ø3-GLTA Ø4-FYLTA NEU 3-1 SPARE SPARE NEU Ø8-RED Ø8-YEL Ø8-GRN 8-2 NEU Ø8-RED Ø8-YEL Ø8-GRN 8-1 Ø5-RLTA Ø5-YLTA Ø5-GLTA Ø6-FYLTA NEU 5-2 SPARE SPARE NEU SPARE SPARE SPARE SPARE SPARE SPARE SPARE 1A SV INTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE SOUTHINTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC 2A SV INTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE WEST INTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE EASTINTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE NORTHR BL BRN Y/BLK O WH BLK INS. GR. 9 11 BLK WH G G Y BL O BLK WH R BLK/R BLK WH R BLK/R BLK WH BLK/R BLK WH R BLK/R BLK WH R R BL BRN Y/BLK O WH BLK R BL BRN Y/BLK O WH BLK BLK WH G LUM 4A (-) (+) IND LIGHT PB6-1 Ø8-PED Ø6-PED Ø3 & Ø8 EVP Ø3 & Ø8 EVP 3-1 8-2 8-1 5-2 SPARE VIDEO DETECTOR 1A 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 103 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN R BL BRN 7-1 Y/BLK O WH BLK MA 2A R BLK/R BLK WH Ø4-PED R BLK/R BLK WH Ø2-PED BLK WH PB2-1 BLK WH G Ø4 & Ø7 EVP IND LIGHT Y BLBL OO Ø4 & Ø7 EVP (-) (+) 50 BLK 7 WH G LUM 2A 12 G INS. GR. G INS. GR.(#10 BETWEEN CAMERA AND POLE BASE) PTZ 1A 13 Ø4-DW Ø4-W SPARE NEU P4-2 Ø2-DW Ø2-W SPARE NEU P2-1 PB2-1 Ø4 & Ø7 EVP IND NEU SPARE Ø4 & Ø7 (-) (+) SYS EVP 13 PTZ 1A R BLK/R BLK WH BLK/R BLK WH 4-2 R BLK/R BLK WH 4-1 R R BL BRN 1-2 Y/BLK O WH BLK SPARE R BL BRN Y/BLK O WH BLK VIDEO DETECTOR 2A Ø7-RLTA Ø7-YLTA Ø7-GLTA Ø8-FYLTA NEU 7-1 SPARE SPARE NEU Ø4-RED Ø4-YEL Ø4-GRN 4-2 NEU Ø4-RED Ø4-YEL Ø4-GRN 4-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA Ø2-FYLTA NEU 1-2 SPARE SPARE NEU SPARE SPARE SPARE SPARE SPARE SPARE SPARE CAT-6 WH BLK R HHHH 3A 5A SERVICE CABINET 1A HH 2A LUM 1A LUM 2A LUM 3A LUM 4A 2A PBS WH BLK PB4-2 3A PBS WH BLK PB6-2 MA 3A SOP BLKWHR1A HH 8A GR. ROD8,12,39-51 NEU SPARE (-) (+) EVP SYS PB4-1 PB6-2 SPARE Ø6-DW Ø6-W NEU Ø4-DW Ø4-W P4-1 SPARE NEU P6-2 EQG (1/C #6 GRN) Ø1 & Ø6 EVP IND Ø1 & Ø6 12,10 6 7 8 9 51 49 48 47 42 41 12 7,86,9 (TO HH-1A)18,12,39-5012,39-62 7,8,12,39-62BLK WH G BLK WH G BLK WH G BLK WH G 43 44 45 46 10 EQG (1/C #6 GRN) SIGNAL SERVICE (1/C #8) NEU (1/C #8) EQUIPMENT GROUND 10 2 R BLK/R BLK WH R BLK/R BLK WH BLK WH BLK WH G Y BL O BLK WH BLK WH CONTROLLER CABINET 1A 52 53 54 55 56 57 R BLK/R BLK WH 58 R BLK/R BLK WH 59 BLK WH 60 BLK WH G 61 Y BL O 50 62 BLK WH PB4-2 39 40 EMPTY (TO HH-7A) 1 5162 2 1-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA NEU Ø2-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 6-3 Ø6-RED Ø6-YEL Ø6-GRN NEU R BLK/R BLK WH 6-2 Ø6-RED Ø6-YEL Ø6-GRN NEU R BLK/R BLK WH 6-1 Ø6-RED Ø6-YEL Ø6-GRN 3-2 Ø3-RLTA Ø3-YLTA Ø3-GLTA NEU Ø4-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE NEU BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE SPARE SPARE SPARE R BL WH BRN O Y/BLK BLK R BLK/R BLK WH R BLK/R BLK WH R BL WH BRN O Y/BLK BLK R BL WH BRN O Y/BLK BLK CAT-6 VIDEO DETECTION CAMERA 2A REMOTE BATTERY MANAGEMENT SYSTEM BATTERY BACKUP SYSTEM 5 4 3 BATTERY BACKUP BLK WH G 3-5 REMOTE BATTERY MANAGEMENT SYSTEM (CAT-5) BATTERY BACKUP SYSTEM (CAT-5) 5 4 3 BATTERY BACKUP (3/C #18) BLK WH G 7,12,52-611-1 (-) (+) IND LIGHT PB4-1 Ø6-PED Ø4-PED INS. GR. Ø1 & Ø6 EVP 8 12 44 39 41 43 40 42 45 46 47 48 49 6-3 6-2 6-1 3-2 SPARE LUM 3A R BL BRN Y/BLK O WH BLK BLK WH G G Y BL O BLK WH R BLK/R BLK WH R BLK/R BLK WH BLK/R BLK WH R BLK/R BLK WH R R BL BRN Y/BLK O WH BLK R BL BRN Y/BLK O WH BLK BLK WH G 52 53 55 54 56 57 58 59 60 61 Ø1 & Ø6 EVP CAT-6 13 HH 6A HH 4A 1313 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 104 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN FOR INFORMATION ONLY4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 105 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN FOR INFORMATION ONLY4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 106 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN FOR INFORMATION ONLY4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 107 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGEVVV 90% PLAN PHASE 8 = D PHASE 6 = C PHASE 4 = B PHASE 2 = A APS ADDRESS LABELING: - SOFT RECALL: PHASES 2 AND 6. - DUAL ENTRY: PHASES 4 AND 8. MAY BE USED ON ALL APPROACHES. - PROTECTED ONLY MODE DURING CONFLICTING PEDESTRIAN PHASE - LEADING PEDESTRIAN INTERVAL MAY BE USED ON ALL APPROACHES. - ALL LEFT TURN PHASES MAY BE LEADING OR LAGGING. PROTECTED/PERMISSIVE OR PROTECTED ONLY PHASING MODES. - ALL LEFT TURNS MAY OPERATE IN PERMISSIVE ONLY, - SIGNAL SYSTEM FLASH MODE SHALL BE ALL RED. SIGNAL SYSTEM OPERATION Ø4 WALK Ø8 WALK WALKØ2Ø2 WALKØ6P8-1 MA-4B P2-2PB8-1 (NO SCALE) CONTROLLER PHASING LAYOUT Ø6(DOUGLAS DR)CSAH 102Ø8 36TH AVE N Ø4P6-1MA-3BP8-2 PB6-1P2-1MA-1BP4-2PB2-1P4-1 MA-2B P6-2PB4-1 PB8-2 PBS-3B PBS-2BPB6-2PBS-4BPB2-2PBS-1B PB4-2 MA 3B MA 4B MA 1B MA 2B Ø5 + Ø6Ø3 + Ø8Ø1 + Ø2(B2) (B1)(C2)(C1)(D2) (D1)(A2)(A1)HENNEPIN COUNTY SIGNAL ID: 80086001-11-22-12-24-1 4-2 4-35-15-26-16-28-1 8-2 8-3 V-1B V-2B PTZ-1B Ø3 & Ø8 EVP Ø2 & Ø5 EVPØ1 & Ø6 EVPØ4 EVP 1B CAC 1B SC 1B SOP 2B HH 1B MA 1B PBS 1B SV 2B MA 3B MA 4B MA 2B PBS 3B PBS 4B PBS 1B HH 7B HH 4B HH 3B HH 5B HH 6B HH 4-4 8-4 36TH AVE N (30 MPH)(35 MPH)CSAH 102 (DOUGLAS DR)36TH AVE N Ø4 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 2- 7/C #14 3" RSC MA-1B TO HH-1B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 3" RSC MA-2B TO HH-3B 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 3" RSC MA-3B TO HH-5B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 1- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 2- 7/C #14 3" RSC MA-4B TO HH-6B 3- 1/C #3 2" RSC SOP-1B TO HH-7B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 2- 3/C #14 10- 4/C #14 4- 7/C #14 4" RSC HH-1B TO CAC-1B 3- 1/C #3 2" RSC HH-7B TO SC-1B 2- 3/C #14 2" RSC HH-1B TO SC-1B 1- CAT-6 (PTZ) 1- 1 1/4" RSC HH-4B TO CAC-1B EMPTY 4" RSC HH-5B TO HH-6B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 1- 3/C #20 (SHLD) 2- 2/C #14 (SHLD) 2- 3/C #14 5- 4/C #14 2- 7/C #14 4" RSC HH-6B TO HH-1B EMPTY 2" RSC 1- 1/C #6 GRN 2- 1/C #8 2" RSC SC-1B TO CAC-1B INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-1B TO THE NORTH INPLACE 1- 1/C #12 (TRACER WIRE) EMPTY INPLACE 1 1/4" NMC (BLUE HDPE) INPLACE 1- 144 SM FIBER OPTIC CABLE INPLACE 1 1/4" NMC (ORANGE HDPE) SV-1B TO THE SOUTH 1- 1/C #12 EMPTY 1 1/4" NMC (BLUE HDPE) 1- 48 SM FIBER OPTIC CABLE 1 1/4" NMC (ORANGE HDPE) SV-1A TO CAC-1A 1- 1/C #6 GRN 1- 3/C #20 (SHLD) 2- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 3- 7/C #14 4" RSC HH-5B TO HH-3B 1- CAT-6 (PTZ) 1- 1 1/4" RSC MA-2B TO HH-4B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 4- 3/C #14 8- 4/C #14 6- 7/C #14 4" RSC HH-3B TO HH-2B 1- 1/C #6 GRN 1- CAT-6 (VIDEO) 2- 3/C #20 (SHLD) 4- 2/C #14 (SHLD) 2- 3/C #14 8- 4/C #14 6- 7/C #14 4" RSC HH-2B TO CAC-1B 2- 3/C #14 2" RSC HH-2B TO SC-1B(DOUGLAS DR)CSAH 102PHASING ASSIGNMENTS TO BE DETERMINED IN THE FIELD. CAMERA NO. V-1B LOCATION TYPE 360° MOUNT LOCATION VIDEO ARMMA-2B POLE VIDEO DETECTION PHASE - V-2B 360°VIDEO ARMMA-4B - 0' SCALE 40'20' 1- 2/C #14 (SHLD) 1" RSC PBS-4B TO HH-6B 1- 2/C #14 (SHLD) 1" RSC PBS-3B TO HH-5B 1- 2/C #14 (SHLD) 1" RSC PBS-2B TO HH-3B 1- 2/C #14 (SHLD) 1" RSC PBS-1B TO HH-1B 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 108 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN B (SYSTEM). ENGINEER AND ALL COSTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR TRAFFIC CONTROL SIGNAL SYSTEM 15. ALL WORK AS DETAILED IN NOTES 1 - 14 SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE 14. SIGNAL INTERCONNECT ITEMS ARE PAID FOR AS PART OF THE TRAFFIC CONTROL SIGNAL SYSTEM PAY ITEM. EXISTING SURFACES. ALLOWED ON EXISTING PAVEMENT. SIGNAL CONDUIT SHALL BE BURIED 24 INCHES TO 36 INCHES UNDER 13. ALL CONDUIT RUNS ACROSS EXISTING ROADWAYS SHALL BE DIRECTIONAL BORED. NO OPEN CUTTING IS 12. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. INFORMATION. SHALL WORK WITH THE CITY AND THE POWER COMPANY TO ESTABLISH METER ADDRESS AND BILLING COSTS DIRECTLY TO THE POWER COMPANY. HENNEPIN COUNTY SHALL NOT BE BILLED. THE CONTRACTOR 11. THE CITY SHALL BE BILLED FOR ALL TRAFFIC SIGNAL SYSTEM POWER COSTS AND THE CITY SHALL PAY THOSE EQUIPMENT TO SUPPLY POWER TO THE TRAFFIC SIGNAL SYSTEM. PROVISIONS FOR MORE INFORMATION. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY WITH THE SERVICE CONNECTION AND MONTHLY ELECTRICAL SERVICE. REFER TO THE SIGNAL SPECIAL SYSTEM WITH THE ELECTRICAL UTILITY COMPANY. CITY OF CRYSTAL IS RESPONSIBLE FOR COSTS ASSOCIATED 10. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE SERVICE CONNECTION FOR THE TRAFFIC SIGNAL VISIBILITY DUE TO ROADWAY GEOMETRICS. 9. THE CONTRACTOR SHALL ADJUST THE SIGNAL HEAD ANGLE ON THE MAST ARM TO OPTIMIZE SIGNAL 8. THE CONTRACTOR SHALL IF REQUIRED RELOCATE THE VIDEO OR EVP DETECTORS. BITUMINOUS WALK, ETC. TO IT'S ORIGINAL CONDITION OR BETTER. 7. THE CONTRACTOR SHALL PLACE COMMON BACK FILL AND RESTORE ALL DISTURBED TURF, CONCRETE OR "B". AND MA-4B AND ONE R10-12 SIGN (30" X 36") ON THE MAST ARM OF MA-3B MOUNTED TO SIGN BRACKET 6. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE R10-X12 SIGN (36" X 42") ON THE MAST ARM OF MA-2B MAST ARM OF MA-1A, MA-2A, MA-3A AND MA-4A, WITH PHASING AS SHOWN IN THE PLANS. 5. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE EVP DETECTOR AND CONFIRMATION LIGHT ON THE CAMERA ON THE DAVIT ARM OF MA-2B. CAMERA ARM OF MA-2B AND MA-4B. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE PAN TILT ZOOM 4. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE 360 DEGREE VIDEO DETECTION CAMERA ON THE OF MA-1B, MA-2B, MA-3B AND MA-4B. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE LED LUMINAIRE ON THE LUMINAIRE SHAFT EXTENSION MOUNTED PUSH BUTTONS SHALL INCLUDE A POLE MOUNT ADAPTOR. 2B,PBS-3B, PBS-4B, MA-1B, MA-2B, MA-3B AND MA-4B, FOR OPERATION AS SHOWN IN THE PLANS. POLE 2. ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN R10-3E (9" X 15") SHALL BE INSTALLED ON PBS-1B, PBS- 1. SEE DIVISION "SS" OF SPECIAL PROVISIONS FOR MATERIALS PROVIDED BY HENNEPIN COUNTY. NOTES: SIG. POLE NO. FACE NO. SIG. Ø RED YEL GRN PED SIGNAL FACE MOUNT MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT 8 8 8 5,6 5,6 2 2 2-2 5-1 5-2 4-4 8-2 8-3 180° ANGLE MOUNT PLUMBIZER LED INDICATIONS 12" INDICATIONS FYEL MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT MA-1B MA-2B MA-3B MA-4B PLUMBIZER MOUNTING 90° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER ANGLE. SEE DETAIL 8 6 SIGNAL INDICATIONS AND MOUNTING *** INTERNATIONAL SYMBOLS IN A DUAL FACE SINGLE HOUSING WITH PEDESTRIAN COUNTDOWN TIMER. *** *** 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER POLE MOUNT P8-1 2-1 POLE MOUNT P6-1 8-1 90° ANGLE MOUNT PLUMBIZER P2-2 POLE MOUNT 2 ***180° ANGLE MOUNT PLUMBIZER P8-2 POLE MOUNT 8 ***180° ANGLE MOUNT PLUMBIZER 4 4 1,2 1,2 6 6 8 1-1 1-2 8-4 4-2 4-3 6-2 MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT MAST ARM (END) MAST ARM (INSIDE) POLE MOUNT POLE MOUNT 4 90° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER 180° ANGLE MOUNT PLUMBIZER 4 2 *** *** ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER ANGLE MOUNT PLUMBIZER STRAIGHT MOUNT PLUMBIZER POLE MOUNT P4-1 6-1 4-1 POLE MOUNT P2-1 90° ANGLE MOUNT PLUMBIZER P6-2 POLE MOUNT 6 ***180° ANGLE MOUNT PLUMBIZER P4-2 POLE MOUNT 4 ***180° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER 90° ANGLE MOUNT PLUMBIZER 3 3 4 G Y Y R G Y Y R G Y Y R 1-1 AND 1-2 SIGNAL FACE 8-3 AND 8-4 SIGNAL FACE 5-1 AND 5-2 SIGNAL FACE Ø1 FYA Ø2 Ø1 Ø8 Ø3 Ø5 Ø5 AND 5-SECTION SIGNAL HEAD PHASING 4-SECTION SIGNAL HEAD PHASING WITH FLASHING YELLOW ARROW FYA Ø6 G 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 109 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN MA 1B Ø4-PED Ø2-PED PB2-1 Ø4 EVP IND LIGHT Ø4 EVP (-) (+) 6 LUM 1B 11 INS. GR. 25 BLK WH PB2-2 14 15 16 17 18 R BLK/R BLK WH 19 Ø2-PED R BLK/R BLK WH 20 Ø8-PED 21 BLK WH PB8-1 BLK WH G 22 Ø2 & Ø5 EVP IND LIGHT Y BL O 23 Ø2 & Ø5 EVP (-) (+) 9 11 G INS. GR. 9,11,14-25 6,11,26-35 36 BLK WH PB4-2 6,9 (TO SC-1B) 11,14-36 INTERCONNECT (48 SM FIBER OPTIC) CONTROLLER CABINET 1B Ø4-DW Ø4-W SPARE NEU P4-2 Ø2-DW Ø2-W SPARE NEU P2-1 PB2-1 Ø4 EVP IND NEU SPARE Ø4 (-) (+) SYS EVP 24 90 14 15 16 17 18 P2-2 Ø2-DW Ø2-W SPARE NEU R BLK/R BLK WH 19 P8-1 Ø8-DW Ø8-W SPARE NEU R BLK/R BLK WH 20 PB8-1 BLK WH 21 22 BLK WH G Ø2 & Ø5 EVP IND NEU SPARE SYS EVP Ø2 & Ø5 (-) (+) Y BL O 23 BLK WH PB2-2 25 11 EQG (1/C #6 GRN) EMPTY (TO HH-5B) HH 6B 4B PBS HH 1B 1B PBS 4-2 4-1 1-2 SPARE CAT-6 VIDEO DETECTION CAMERA 2B NEU Ø4-RED Ø4-YEL Ø4-GRN 4-2 NEU Ø4-RED Ø4-YEL Ø4-GRN 4-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA Ø2-FYLTA NEU 1-2 SPARE SPARE NEU SPARE SPARE SPARE SPARE SPARE SPARE SPARE R BL BRN 5-1 Y/BLK O WH BLK R BLK/R BLK WH 2-2 R BLK/R BLK WH 2-1 SPARE R BL BRN Y/BLK O WH BLK 5-1 Ø5-RLTA Ø5-YLTA Ø5-GLTA NEU Ø6-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R NEU R BLK/R BLK WH 2-2 Ø2-RED Ø2-YEL Ø2-GRN NEU R BLK/R BLK WH 2-1 Ø2-RED Ø2-YEL Ø2-GRN SPARE NEU BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE SPARE SPARE SPARE BLK WH G LUM 4B MA 4B 9,11,14-2424 27 28 29 30 31 R BLK/R BLK WH 32 R BLK/R BLK WH 33BLK WH 34 BLK WH G 35 Y BL O 36BLK WHPB4-2 CAT-6 R BLK/R BLK WH R BLK/R BLK WH R BL WH BRN O Y/BLK BLK R BL WH BRN O Y/BLK BLK BLK WH G G Y BL O BLK WH R BLK/R BLK WH R BLK/R BLK WH BLK/R BLK WH R BLK/R BLK WH R R BL BRN Y/BLK O WH BLK R BL BRN Y/BLK O WH BLK BLK WH G 27 29 28 30 31 32 33 34 35 VIDEO DETECTOR 2B 1B SV INTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE SOUTHINTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE NORTH4-3 BLK/R BLK WH R 26 NEU Ø4-RED Ø4-YEL Ø4-GRN 4-3 26 R BLK/R BLK WH 4-4 BLK/R BLK WH R NEU Ø4-RED Ø4-YEL Ø4-GRN 4-4 R BLK/R BLK WH 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 110 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN R BL BRN Y/BLK O WH BLK MA 2B 37 38 39 40 41 42 R BLK/R BLK WH 43 R BLK/R BLK WH 44 BLK WH 45 BLK WH G 46 Y BLBL OO 58 BLK WH G G G INS. GR.(#10 BETWEEN CAMERA AND POLE BASE) PTZ 1B 13 13 PTZ 1B BLK/R BLK WH R BLK/R BLK WH R R BL BRN Y/BLK O WH BLK R BL BRN Y/BLK O WH BLK VIDEO DETECTOR 1B CAT-6 WH BLK R HHHH 3B 5B SERVICE CABINET 1B HH 2B LUM 1B LUM 2B LUM 3B LUM 4B 2B PBS WH BLK PB6-2 3B PBS WH BLK PB8-2 MA 3B SOP BLKWHR1B HH 7B GR. ROD8,12,37-47 NEU SPARE (-) (+) EVP SYS PB4-1 PB6-2 SPARE Ø6-DW Ø6-W NEU Ø4-DW Ø4-W P4-1 SPARE NEU P6-2 EQG (1/C #6 GRN) Ø1 & Ø6 EVP IND Ø1 & Ø6 12,10 6 7 8 9 59 57 56 55 50 49 12 7,86,9 (TO HH-1B)18,12,37-4612,37-59 7,8,12,37-59BLK WH G BLK WH G BLK WH G BLK WH G 51 52 53 54 10 EQG (1/C #6 GRN) SIGNAL SERVICE (1/C #8) NEU (1/C #8) EQUIPMENT GROUND 10 2 R BLK/R BLK WH R BLK/R BLK WH BLK WH BLK WH G Y BL O BLK WH BLK WH CONTROLLER CABINET 1B 58 48 EMPTY (TO HH-6B) 1 4759 2 1-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA NEU Ø2-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 6-2 Ø6-RED Ø6-YEL Ø6-GRN NEU R BLK/R BLK WH 6-1 Ø6-RED Ø6-YEL Ø6-GRN BL WH BRN Y/BLK O BLK R SPARE NEU BL WH BRN Y/BLK O BLK SPARE SPARE R SPARE SPARE SPARE SPARE CAT-6 VIDEO DETECTION CAMERA 1B 7,12,48-58R BL BRN Y/BLK O WH BLK INS. GR. 8 12 BLK WH G G Y BL O BLK WH R BLK/R BLK WH R BLK/R BLK WH BLK/R BLK WH R BLK/R BLK WH R R BL BRN Y/BLK O WH BLK R BL BRN Y/BLK O WH BLK BLK WH G LUM 3B 1-1 (-) (+) IND LIGHT PB4-1 Ø6-PED Ø4-PED INS. GR. Ø1 & Ø6 EVP 7 12 52 48 49 51 50 53 54 55 56 57 6-2 6-1 8-4 SPARE LUM 2B (-) (+) IND LIGHT PB6-1 Ø8-PED Ø6-PED Ø3 & Ø8 EVP Ø3 & Ø8 EVP 8-3 8-2 8-1 5-2 SPARE Ø1 & Ø6 EVP CAT-6 37 38 39 40 41 42 R BLK/R BLK WH 43 R BLK/R BLK WH 44BLK WH 45 BLK WH G 46 Y BL O 47BLK WHPB8-2 R BL WH BRN O Y/BLK BLK R BLK/R BLK WH R BLK/R BLK WH R BL WH BRN O Y/BLK BLK R BL WH BRN O Y/BLK BLK Ø8-DW Ø8-W SPARE NEU P8-2 Ø6-DW Ø6-W SPARE NEU P6-1 PB6-1 Ø3 & Ø8 EVP IND NEU SPARE Ø3 & Ø8 (-) (+) SYS EVP SPARE NEU 8-3 NEU Ø8-RED Ø8-YEL Ø8-GRN 8-2 NEU Ø8-RED Ø8-YEL Ø8-GRN 8-1 Ø5-RLTA Ø5-YLTA Ø5-GLTA Ø6-FYLTA NEU 5-2 SPARE SPARE NEU SPARE SPARE SPARE SPARE SPARE SPARE SPARE Ø8-RED Ø8-YEL Ø8-GRN Ø3-GLTA Ø3-YLTA HH 4B 1313 SPARE NEU 8-4 Ø8-RED Ø8-YEL Ø8-GRN Ø3-GLTA Ø3-YLTA 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 111 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN FOR INFORMATION ONLY4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 112 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN FOR INFORMATION ONLY4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 113 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 5.08.03.9 49.3 8.0 12.9 3.9 5.018.078.0 3.0" Radius, 1.0" Border, W hite on G reen; "Douglas Dr", E M od 2K; 3.9 12.1 20.0 27.8 36.2 40.3 47.9 61.2 70.1 Doug las D r 5.08.05.2 31.4 8.0 22.2 5.2 5.018.072.0 3.0" Radius, 1.0" Border, W hite on G reen; "42nd Ave", E M od 2K; 5.2 14.6 23.6 31.4 44.6 53.8 61.5 4 2 nd A ve 5.08.03.9 28.1 8.0 22.1 3.9 5.018.066.0 3.0" Radius, 1.0" Border, W hite on G reen; "36th Ave", E M od 2K; 3.9 12.0 20.0 26.7 40.0 49.1 56.8 36th A ve OF MAST ARM SIGNAL POLES. 2.) SEE SPECIAL PROVISIONS FOR PAINTING AND GALVANIZING REQUIREMENTS 1.) POLE SHAFT SHALL BE BACK RAKED TO SET PLUMB UNDER NORMAL LOAD. NOTES: (NO SCALE, SEE SPECIAL PROVISIONS) ROTATABLE LUMINAIRE SHAFT EXTENSION CLASSIC HEAVY MAST ARM SIGNAL POLE AND 2 3/8" O.D. SLIPFITTER THE PLAN LOCATION IF SHOWN IN CAMERA MOUNTING TRAFFIC PAN TILT ZOOM SHAFT OR POLE CAP CAMERA EXTENSION ARM WITH VIDEO CENTERLINE OF MAST CLOCKWISE FROM AT 350° MEASURED EXTENSION MOUNTED LUMINAIRE SHAFT DAVIT TYPE ROTATABLE CAP EXTENSION OR POLE LUMINAIRE SHAFT CONNECTION FOR ROTATABLE TYPE RADIUS DAVIT ARM LENGTH AS TABULATED 2 3/8" O.D. SLIPFITTER SIGN BRACKET 3/4" DIA. HALF COULPING (EVP HUB) FOR VIDEO APPLICATIONS PLASTIC THREADED PIPE COVER 3/4" DIA. HALF COUPLING WITH FROM CENTERLINE OF MAST ARM TO CENTER OF HUBS AT 0° , 90° , 180° AND 270° AS MEASURED CLOCKWISE 8 - DN 1 1/2" IPS SEMI-BLIND HUBS MOUNTED ON POLE LUMINAIRE MOUNTING HEIGHT (SEE TABULATION)21' 0""B" "C" "D" "E" "F" "G" "H" "I" "J" "A" ROTATABLE H-BASE AT END OF MAST ARM BY ADJUSTING FOR ROADWAY GRADE SET CONCRETE FOUNDATION ELEVATION TO MAINTAIN CLEARANCE 3' 6"9' 6"12' 8"18' 0"SIGN BRACKET SIGN BRACKET WITH 3" X 5" HANDHOLE 2 3/8" O.D. SLIPFITTER CONCRETE FOUNDATION SIGN PANEL FOR MA-2A AND MA-4A SIGN PANEL FOR MA-1A, MA-3A, MA-1B AND MA-3B SIGN PANEL FOR MA-2B AND MA-4B MA-1A MA-2A MA-3A MA-1B MA-2B MA-3B POLE LUMINAIRE MOUNTING HEIGHT DAVIT ARM LENGTH MAST ARM POLE MOUNTING DETAILS MAST ARM DIMENSIONS "A""B""C""F""E""D""G""H" MAST ARM "I" MA-4A MA-4B 23.5' 25.0' ----- ----- SIG. HEAD "J" 45.0' 40.0' 40.0' 40.0' 9.0' 9.0' 9.0' ----- ----- ----- ---------- 19.5' ----- 25.5'30.5' 24.5' 33.5' 27.5' ----- ----- 40.0' 20.5' 23.0' ----- ----- 30.0' 40.0' 25.0' 35.0' 11.5' 9.5' 9.0' 9.0' ----- ----- ----- ---------- ----- 16.5' 14.0' 19.5' 17.0' ----- ----- 40.0' 35.0' 40.0' 40.0' 18.0' 20.5' 13.0' 20.5' 22.0' SIG. HEAD SIGN ----- ----- 8.0' VIDEO SHAFT MOUNTING HEIGHT ----- ----- 8.0' 8.0' 8.0' 8.0' 8.0' 8.0' 8.0' 35.0' 40.0' 40.0' VIDEO HUBHUB EVPSIGN 2.0' 2.0' 2.0' 2.0' 2.0' 2.0' 2.0' 2.0' BRACKET ----- ----- ----- ----- ----- ----- ----- ----- 4.0' 4.0' 6.0' 4.0' 4.0' 4.0' 6.0' 4.0' BRACKET SIGN BRACKET SIGN BRACKET SIGN BRACKET ----- ----- 40.0' 40.0' ----- ----- 4.) ALL DIMENSIONS SHOWN ARE IN INCHES. PRICE BID FOR THE PAY ITEM TRAFFIC CONTROL SIGNAL SYSTEM (SYSTEM). 3.) ALL COSTS TO PROVIDE AND INSTALL MAST ARM MOUNTED SIGN PANELS SHALL BE INCLUDED IN THE UNIT 2.) COLOR - WHITE LEGEND AND BORDER ON GREEN BACKGROUND. ALL SIGNING SHALL USE DG3 SIGN SHEETING. 1.) SEE SIGNAL MAST ARM DETAIL SHEET FOR SIGN MOUNTING PLATE LOCATIONS. NOTES: 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 114 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN AA 27" DIA. 17" DIA. BOLT CIRCLE (NO SCALE) MAST ARM SIGNAL POLE FOUNDATION SEC. A-A CONCRETE SHALL BE MIX 3G52 OR EQUAL COMPLETE WITH LEVELING NUTS. PER ASTM F1554, GRADE 105, EACH 4 - 2" X 96" MINIMUM ANCHOR BOLTS: 3' DIA. 1/2" RADIUS GROUND LINE EXISTING OR PROPOSED SHOWN IN THE PLANS. BE OF THE SIZE AND NUMBER RIGID STEEL CONDUIT SHALL LAPPED 5" OR BUTT WELDED 9 - 1/2" � X 27" DIA. CIRCLES OPPOSITE 2 - 1/2" � X 11' DIAMETRICALLY 14 - 1/2" � X 9' 3" FASTENED OR WELDED TOGETHER. REINFORCEMENT SHALL BE SECURELY DEFORMED BARS. THE STEEL REINFORCEMENT SHALL BE NOTE: 3" MIN., 5" MAX 10' MIN.3" PROJECTION OF RSC 10" PROJECTION OF BOLTS 6" MIN. 3" GRADE 5 7/16" X 2" LOCKING BOLTS JAM NUT BY POLE MFG"R. 1/2" DIMPLE (2) NIPPLE CLOSE O RING FLANGE 4-3/4" NOM. 1-1/2" PIPE NIPPLE STAINLESS STEEL SCHEDULE 80 1-1/2" HEAVY HOLES THREADED (4) 15/32" TUBE PVC 5-1/2" POLE MFG'R. POLE HUB BY C 5-3/4" 4-3/4" BOLTS 1/2" LOCKING WASHER 1/2" LOCK (BY POLE MFG'R.) 1/2" DIMPLE (2) NOM. 1-1/2" PIPE STAINLESS STEEL SCHEDULE 80 1-1/2" HEAVY MFG'R.) (BY POLE POLE HUB MFG'R.) (BY POLE POLE HOLES THREADED (4) 1/2" SIGNAL MOUNT) HOLES (FOR 1" SLOTTED (4) 7/16" X FLANGE PIPE 3 1/2" THREADED HUB AND FLANGE POLE ADAPTER EXTENDED THREADED POLE ADAPTER MAST ARM 13'-2"10'-0"PLUMBIZER MOUNT ANGLE MOUNT CAP ANGLE & STRAIGHT TYPICAL SIGNAL POLE MOUNTING ADAPTER FLANGE POLE THREADED HUB &SECTION HEADSWITH 4USE SPACERS3'-6"ABOVE LANDINGUNIT W/SIGN PUSHBUTTON PEDESTRIAN ACCESSIBLE PUSHBUTTON PEDESTRIAN INSTRUCTIONS) MOUNTING (MANUFACTURERS MOUNT ADAPTOR BUTTON POLE APS PUSH WIRE HOLE FOR DRILL 1/2" ADAPTERS THREADED POLE USE EXTENDED HEAD ASSEMBLIES SECTION CLUSTER WHEN MOUNTING 5 SEE STANDARD PLATE NUMBER 8124A FOR ADDITIONAL SIGNAL POLE DETAILS. NOTES: OPENING ACCESS 1/2" NUT 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 115 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 360 CAMERA WIRING AND MOUNTING DETAIL OF THE ENGINEER. INSTRUCTIONS. ADJUST AND LEVEL CAMERAS TO THE SATISFACTION INSTALL CAMERAS IN ACCORDANCE WITH THE MANUFACTURER'S 17'19'9" 8' 360 CAMERA NOTES: TRAFFIC SIGNAL POLE UPRIGHT TRAFFIC SIGNAL TRANSFORMER BASE TRAFFIC SIGNAL MAST ARM 18'0" 360 DEGREE CAMERA MOUNTING 5' GALVANIZED STEEL SCHED. 80 PIPE CAMERA MOUNTING BELL NPS THREADS FOR NPT THREADS COUPLINGS 1 1/2" WELDED HALF 5'15'AND REMOVABLE COVER 3"X5" ACCESS OPENING 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 116 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN SAMPLE TABLE SECTION A-APLAN VIEW V-CURB 6" WIDE LANDING 4' MIN. A A 9" 11 8 D 9 6 7 10 5 8 7 12 11 9" 12 B A CCROSSWALKCROSSWALK WALKWALK BLVD CROSSWALK CROSSWALKWALK BLVD C&G DEPRESSED CORNERTWIN PERPENDICULARS NOTES: D - C - B - A - WALKSURFACE WALKABLE NON- PB2-1 PB4-2 LANDING WALK CONCRETE WHEN PUSHBUTTONS ARE AT THE TOP OF A RAMP THIS TYPICAL DETAIL APPLIES TO DESIGNS C&GC&GV-CURB 6" WIDE C&G APS PEDESTRIAN PUSHBUTTON LOCATIONAPS PUSHBUTTON STATION WHEN PUSHBUTTONS ARE AT THE BOTTOM OF A RAMP THIS TYPICAL DETAIL APPLIES TO DESIGNS (SADDLE ADAPTORS) MOUNTING SPACERS APS PUSHBUTTON STATION PUSHBUTTON SIGNAL CONTROL POINTS LANDING (FT) FRONT OF DISTANCE TO LANDING (FT) BACK OF DISTANCE TO B DC A Y - -- - XSIGNAL NO. PB2-1 PB4-2 LANDING MEASURED IN THE OPPOSITE DIRECTION OF TRAVEL CLEAR DISTANCE FROM THE PUSHBUTTON TO THE BACK OF EDGE OF DOMES IN THE DIRECTION OF TRAVEL DISTANCE MEASURED FROM THE PUSHBUTTON TO THE OUTSIDE BACK OF LANDING/EDGE OF WALK CLEAR DISTANCE MEASURED FROM THE PUSHBUTTON TO THE OF LANDING/TOP OF RAMP DISTANCE MEASURED FROM THE PUSHBUTTON TO THE FRONT BASE BREAKAWAY CIRCLE 6" BOLT RODS ANCHOR MINIMUM 4" THICK COMPACTED AGGREGATE BEDDING RIGID STEEL CONDUIT SWEEP PROJECTIONS FOLLOW MANUFACTURER'S INSTRUCTIONS FOR ANCHOR ROD SYSTEM FOUND ON THE MnDOT APL FOR SIGNALS INSERT FOUR ANCHOR RODS USING ADHESIVE ANCHORING BOLT CABLE TETHER � 18" DIAMETERABOVE SIDEWALK LANDING AREA4 3 2 1 3F52 OR EQUAL CONCRETE MIX15"AREA LANDING SIDEWALK PUSHBUTTON SILICONE BEAD 1 SIGN UNIT WITH PUSHBUTTON PEDESTRIAN ACCESSIBLE SPUN FINISHED (SCHEDULE 40 ALUMINUM - 48" LENGTH) 4" TRADE SIZE DIAMETER ALUMINUM SHAFT FOR WIRES " HOLE43DRILL 3' 6" 1" RIGID STEEL CONDUIT 1V:2H SLOPE BELL (2"±½" PROJECTION) 1" RIGID STEEL CONDUIT WITH END 3 2 1 ALUMINUM DOME CAP 4 4 7"± PLACEMENT ANCHOR ROD THREADED INSERT HOLES FOR BLIND "6425DRILL " RADIUS21 (ROUNDED) EDGE ON BOTH ENDS SPEC. 3385.2B AND CHAMFERED STEEL ROD IN ACCORDANCE WITH " GALVANIZED41"±21⅝" UNC X 7 1:11:112" 12" 12" 9"3" 18" INTEGRAL PUSHBUTTON STATION WITH V-CURB 6" WIDE V-CURB MATCH HEIGHT OF ADJACENT 18" WIDE CONCRETE; 12" 42" WALK TOP OF CONCRETE SURFACE. EDGE OF THE CROSSWALK SO USERS DEPARTING FROM THE PUSHBUTTON WILL TRAVERSE A CONSTRUCT AN 8%-10% WALKABLE CONCRETE FLARE WHEN THE PUSHBUTTON IS OFFSET FROM THE POSITION PUSHBUTTON 2' MINIMUM FROM CURB RAMP GRADE BREAK AND BACK OF SIDEWALK. FOUNDATIONS, SIGNAL CABINETS, OR ANOTHER PUSHBUTTON. BETWEEN A PUSHBUTTON AND ANY OBSTRUCTIONS, INCLUDING BUILDINGS, V-CURB, ELECTRICAL A MAR REQUIRES A 6' MINIMUM CLEAR DISTANCE FOR SIDEWALKS (10' FOR SHARED-USE PATHS) PROVIDE A MAINTENANCE ACCESS ROUTE (MAR) WHEREVER POSSIBLE FOR SNOW REMOVAL PURPOSES. POSITION PUSHBUTTONS AT LEAST 10' APART (PUSHBUTTON FACE TO PUSHBUTTON FACE). MINIMUM FROM THE BACK OF CURB TO AVOID KNOCKDOWNS. MEASURED IN THE DIRECTION OF TRAVEL. STANDALONE PUSHBUTTON STATIONS SHOULD BE 4' POSITION PUSHBUTTONS BETWEEN 1.5' AND 10' FROM THE BACK OF CURB OR EDGE OF ROADWAY, MEASURED PERPENDICULARLY FROM EXTENSION OF CROSSWALK. POSITION PUSHBUTTONS WITHIN 5' OF THE OUTSIDE EDGE OF THE CROSSWALK. DISTANCE IS MAXIMUM SLOPE IN ALL DIRECTIONS. CONSTRUCT A MINIMUM 4'x4' LANDING AREA ADJACENT TO EACH PUSHBUTTON, WITH A 2% POSITION THE FACE OF THE PUSHBUTTON PARALLEL WITH THE OUTSIDE EDGE OF THE CROSSWALK. PIPE THREAD (NPT) AS REQUIRED AT END OF PIPE NOMINAL 4" AMERICAN NATIONAL STANDARD TAPER AND MOUNTING HARDWARE APL UNDER SIGNALS/PEDESTRIAN PUSHBUTTONS APS PUSHBUTTON BASE LISTED ON THE MnDOT "414 6" MIN.12" MIN. PUSHBUTTON STATION FOUNDATION FORMING NOTES: 9 8 7 6 5 10 11 12 MATERIALS THAT MATCHES THE COLOR OF THE NEAREST EDGE LINE. FURNISH AND INSTALL 3" WIDE TUBULAR DELINEATOR/MARKER SHEETING FROM MnDOT'S APL FOR SIGNING/SHEETING INSTALLATION INSTRUCTIONS. FURNISH AND INSTALL THE MANUFACTURER-PROVIDED CABLE TETHER ASSEMBLY IN ACCORDANCE WITH THE MANUFACTURER'S PUSHBUTTON FOUNDATION. ENSURE CONCRETE CONTROL JOINTS AND EDGE OF CONCRETE WALK ARE A MINIMUM OF 9" FROM THE CENTER OF THE FOUNDATION IS NOT LOCATED NEAR EDGE OF SIDEWALK AND IS SURROUNDED BY CONCRETE WALK. PROVIDE 1V:2H SLOPE GRADING 360 DEGREES FOR THE TRANSITION FROM THE SIDEWALK TO THE FOUNDATION WHEN THE COMPACTED AGGREGATE BEDDING AND THICKNESS USED FOR THE SIDEWALK THROUGHOUT THE SLOPE AND FOUNDATION GRADING. GRADE WHERE THE 6" MINIMUM SIDEWALK DEPTH TRANSITIONS TO THE 12" MINIMUM FOUNDATION DEPTH. MAINTAIN THE THE PUSHBUTTON STATION FOUNDATION IS MONOLITHIC (POURED AT ONE TIME) WITH THE SIDEWALK. PROVIDE A 1V:2H SLOPE APPLY A BEAD OF 100% SILICONE SEALANT ALONG THE TOP OF THE PUSHBUTTON UNIT WHERE IT CONTACTS THE 4" SHAFT. "-20 STAINLESS STEEL MOUNTING BOLTS. APPLY BRUSH-ON ANTI-SEIZE COMPOUND TO BOLTS BEFORE ASSEMBLY.41USE APS FURNISH AND INSTALL BLIND THREADED INSERTS USING MANUFACTURER'S SPECIFIC INSERTION TOOL. PLUMB AND LEVEL APS PUSHBUTTON STATIONS, AND TIGHTEN ANCHOR RODS IN ACCORDANCE WITH CONTRACT DOCUMENTS. ORIENT THE BASE ACCESS OPENING DIRECTLY BELOW THE APS BUTTON. POSITION BEFORE MOUNTING ACCESSIBLE PEDESTRIAN PUSHBUTTON UNIT TO THE SHAFT. MOUNT THE BUTTON SO THAT THE FACE IS PARALLEL WITH THE ASSOCIATED CROSSWALK. SCREW IN SHAFT TO A TIGHTENED 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 117 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN C FRONT ELEVATION CAPPED AND VENTED ROOF HINGE (TYPICAL) CIRCUIT BREAKERS CUTOUT PROVISIONS FOR DEAD FRONT LATCH HINGED DEAD FRONT DOOR LUMINAIRE TEST SWITCH LARGE - 5" W X 6 3/4" H SMALL - 4" W X 5 3/4" H BACKUP BYPASS SWITCH PROVISIONS FOR BATTERY TWO (2) CUTOUT SWING DOWN PLATE POLICE LOCK WITH PADLOCKING PROVISIONS 3PT LATCH WITH HINGED FRONT DOOR STEEL SCREEN BACKING PERFORATED STAINLESS 4" LOUVERED VENTS WITH ALUMINUM BASE FRAME 23"16"54 1/2"4"60"27" TYPICAL SERVICE CABINET DETAILS FULL BATTERY BACKUP (DOOR REMOVED) FRONT ELEVATION ENCLOSED PHOTOELECTRIC CELL LOAD CENTER CIRCUIT BREAKERS 2PT TERMINAL BLOCK GROUND BUS 4P CONTACTOR LUMINAIRE TEST SWITCH NEUTRAL BUS 3PT TERMINAL BLOCK BATTERY BACKUP BYPASS SWITCH ADJUSTABLE REMOVABLE SHELF 3" WIDE LOAD POWER WIRE WAY LINE AND LOAD POWER ALUMINUM BARRIER BETWEEN ADJUSTABLE REMOVABLE SHELF RACK STANDARD ADJUSTABLE REMOVABLE SHELF21"5"39 1/4"56 3/4" WINDOW CONTROL VIEWING PHOTOELECTRIC METER SOCKET (BY OTHERS) HINGE (TYPICAL) HINGED BACK DOOR LINE AND LOAD POWER ALUMINUM BARRIER BETWEEN WIRE WAY WITH COVER 3" WIDE LINE POWER SWING DOWN PLATE POLICE LOCK WITH PADLOCKING PROVISIONS 3PT LATCH WITH BACK ELEVATION 13"10"4"32"34 1/2"RIGHT SIDE ELEVATION VIEWING WINDOW PHOTOELECTRIC CONTROL METER (BY OTHERS) UNISTRUT RAILS 17" 15" 19" WITH OPEN BOTTOM ALUMINUM BASE FRAME FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2 1/2" 3 1/2" 16" 19" 23"1 1/2"12"14"17"SERVICE CABINET BASE DETAILS SERVICE CABINET SHELF DETAILS GROMMETS FOR WIRING THREE (3) 2" DIA. HOLES WITH SLIDING RACK BRACE 17" X 2" ADJUSTABLE 17 1/4"1"13 1/4"2"PHOTOCELL TOGGLE SWITCH TEST BY-PASS CONTROL POWER LUMINAIRE AUTO TEST 2 1 34 NEUTRAL BUS CABINET TO SIGNAL ROD GROUND NEUTRAL BUSMAIN SERVICE, 120/240V, SINGLE PHASE, 3 WIRE FEED POINT WIRING DIAGRAM L1 N L2 C STREET LIGHTS METERED POWER SIGNAL CONTROLLER CABINET SIGNAL SERVICE METERED POWER TO 3/C #18 TO SIGNAL CONTROLLER CABINET CAT-5 TO SIGNAL CONTROLLER CABINET CAT-5 TO SIGNAL CONTROLLER CABINET 30A/4P CONTACTOR CONTROL 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P 60A/1P CIRCUIT BREAKER TB2 (60 AMP)GROUND BUSBATTERIES UPS SYSTEM BATTERY BACK-UP AC OUT NEU GND AC IN 3/C #18 CAT-5 CAT-5 100A/2P MAIN CONTROL CELL. 9. PROVIDE CLEARANCE TO INSTALL OR REMOVE THE PHOTOELECTRIC WITHIN THE CABINET. 8. PROVIDE A PHOTOELECTRIC CONTROL CELL AND LUMINAIRE TEST SWITCH 7. SHORT CIRCUIT RATING - 10,000 AIC SYMMETRICAL. AGE. MARKED IN A MANNER THAT WILL NOT DETERIORATE WITH MOISTURE OR WITH NUMBER" OR "FUTURE"). ALL CIRCUIT BREAKERS SHALL BE CLEARLY WITH THE LOAD WHICH IT IS CARRYING (E.G. "SIGNALS", "LUMINAIRE CLEARLY MARKED WITH THE "ON" AND "OFF" POSITIONS AND IDENTIFIED 6. THE CIRCUIT BREAKERS SHALL BE 120/240 VOLT AC, 60 HZ, AND SHALL BE SOURCES AND SHALL NORMALLY FACE NORTH OR EAST. CABINET, ORIENTED TO ELIMINATE INTERFERENCE BY MANMADE LIGHT TOP SECTION OF THE CABINET AND ON THE LEFT OR RIGHT SIDE OF THE PLASTIC PHOTOELECTRIC CONTROL VIEWING WINDOW. LOCATED IN THE 5. PROVIDE A 2" DIA. WEATHERPROOF AND VANDAL RESISTANT CLEAR TO FORM A COMPLETE SEAL WITH THE ENCLOSURE. 4. BOTH DOOR OPENINGS SHALL BE PROVIDED WITH A NEOPRENE GASKET SWING DOWN PLATE. PROVIDE ONE (1) KEY. WITH A STANDARD POLICE LOCK COMPLETE WITH A NUMBER 2 KEY AND WITH NON-CORRODING TAMPERPROOF CARRIAGE BOLTS AND SECURED 3. THE SERVICE CABINET DOORS SHALL BE ATTACHED TO THE ENCLOSURE CONSTRUCTION. 2. ALL HINGES, HINGE PINS AND LOCKS SHALL BE OF NON-CORRODING EXTERNAL THIRTY (30) MINUTE CLEAR ANODIZED FINISH. CABINET, BOTH INSIDE AND OUTSIDE, SHALL BE PROTECTED WITH AN OUTDOOR WEATHERPROOF SERVICE. AFTER FABRICATION, THE SERVICE 1. EACH SERVICE CABINET SHALL BE FABRICATED FROM 1/8" ALUMINUM FOR BACK-UP EQUIPMENT. 19. THE SERVICE CABINET SHALL BE SUPPLIED AND INSTALLED WITH BATTERY SEE THE EQUIPMENT PAD DETAIL SHEETS FOR ADDITIONAL DETAILS. 18. ONE (1) SERVICE CABINET SHALL BE INSTALLED ON EACH EQUIPMENT PAD, DETAILS. 17. SEE THE EQUIPMENT PAD DETAIL SHEET FOR TYPICAL ANCHOR ROD TIA/EIA 3100 STANDARDS. 16. THE 19" RACK IN THE BASE OF THE CABINET SHALL BE CONSTRUCTED TO TO THE SIDES OF THE SERVICE CABINET. FOR THREE (3) ADJUSTABLE AND REMOVABLE SHELVES SHALL BE MOUNTED 15. UNISTRUT RAILS (#A400EA OR EQUIVALENT) USED FOR SHELF SUPPORTS 1/2" GAP FOR DRAINAGE. CORNER HOLE/SLOTS TO ACCOMMODATE THE ANCHOR RODS. PROVIDE A SHALL CONSIST OF FOUR (4) STRIPS, SIZED TO FIT THE BASE INCLUDING THE CONCRETE FOUNDATION AND THE SERVICE CABINET. THE GASKET 14. A 1/2" THICK SOLID BUTYL RUBBER GASKET SHALL BE PROVIDED BETWEEN LUMINAIRES AT EACH INTERSECTION. 13. SEE THE INTERSECTION LAYOUT FOR THE REQUIRED NUMBER OF WITH U.L. STANDARDS. 12. EACH SERVICE CABINET SHALL BE WELDED TO THE BASE IN ACCORDANCE OUTDOOR USE. FOR USE AS SERVICE ENTRANCE EQUIPMENT" AND APPROVED FOR 11. EACH SERVICE CABINET SHALL BE U.L. LISTED AND LABELED AS "SUITABLE APPROVED DUCT SEAL. 10. ALL CONDUIT ENTERING THE FOUNDATION SHALL BE SEALED WITH AN CONSTRUCTION NOTES MECHANICAL BYPASS RINGLESS SOCKET WITH 5 TERMINAL 200 AMP METER SOCKET SIGNAL SYSTEM A 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 118 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN C FRONT ELEVATION CAPPED AND VENTED ROOF HINGE (TYPICAL) CIRCUIT BREAKERS CUTOUT PROVISIONS FOR DEAD FRONT LATCH HINGED DEAD FRONT DOOR LUMINAIRE TEST SWITCH LARGE - 5" W X 6 3/4" H SMALL - 4" W X 5 3/4" H BACKUP BYPASS SWITCH PROVISIONS FOR BATTERY TWO (2) CUTOUT SWING DOWN PLATE POLICE LOCK WITH PADLOCKING PROVISIONS 3PT LATCH WITH HINGED FRONT DOOR STEEL SCREEN BACKING PERFORATED STAINLESS 4" LOUVERED VENTS WITH ALUMINUM BASE FRAME 23"16"54 1/2"4"60"27" TYPICAL SERVICE CABINET DETAILS FULL BATTERY BACKUP READY (DOOR REMOVED) FRONT ELEVATION ENCLOSED PHOTOELECTRIC CELL LOAD CENTER CIRCUIT BREAKERS 2PT TERMINAL BLOCK GROUND BUS 4P CONTACTOR LUMINAIRE TEST SWITCH NEUTRAL BUS 3PT TERMINAL BLOCK BATTERY BACKUP BYPASS SWITCH ADJUSTABLE REMOVABLE SHELF 3" WIDE LOAD POWER WIRE WAY LINE AND LOAD POWER ALUMINUM BARRIER BETWEEN ADJUSTABLE REMOVABLE SHELF RACK STANDARD ADJUSTABLE REMOVABLE SHELF21"5"39 1/4"56 3/4" WINDOW CONTROL VIEWING PHOTOELECTRIC METER SOCKET (BY OTHERS) HINGE (TYPICAL) HINGED BACK DOOR LINE AND LOAD POWER ALUMINUM BARRIER BETWEEN WIRE WAY WITH COVER 3" WIDE LINE POWER SWING DOWN PLATE POLICE LOCK WITH PADLOCKING PROVISIONS 3PT LATCH WITH BACK ELEVATION 13"10"4"32"34 1/2"RIGHT SIDE ELEVATION VIEWING WINDOW PHOTOELECTRIC CONTROL METER (BY OTHERS) 17" 15" 19" WITH OPEN BOTTOM ALUMINUM BASE FRAME FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2 1/2" 3 1/2" 16" 19" 23"1 1/2"12"14"17"SERVICE CABINET BASE DETAILS SERVICE CABINET SHELF DETAILS GROMMETS FOR WIRING THREE (3) 2" DIA. HOLES WITH SLIDING RACK BRACE 17" X 2" ADJUSTABLE 17 1/4"1"13 1/4"2"PHOTOCELL TOGGLE SWITCH TEST BY-PASS CONTROL POWER LUMINAIRE AUTO TEST 2 1 34 NEUTRAL BUS CABINET TO SIGNAL ROD GROUND NEUTRAL BUSMAIN SERVICE, 120/240V, SINGLE PHASE, 3 WIRE FEED POINT WIRING DIAGRAM L1 N L2 C STREET LIGHTS METERED POWER SIGNAL CONTROLLER CABINET SIGNAL SERVICE METERED POWER TO 30A/4P CONTACTOR CONTROL 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P LUMINAIRE 15A/1P 60A/1P CIRCUIT BREAKER TB2 (60 AMP)GROUND BUSUPS SYSTEM BATTERY BACK-UP AC OUT NEU GND AC IN 100A/2P MAIN CONTROL CELL. 9. PROVIDE CLEARANCE TO INSTALL OR REMOVE THE PHOTOELECTRIC WITHIN THE CABINET. 8. PROVIDE A PHOTOELECTRIC CONTROL CELL AND LUMINAIRE TEST SWITCH 7. SHORT CIRCUIT RATING - 10,000 AIC SYMMETRICAL. AGE. MARKED IN A MANNER THAT WILL NOT DETERIORATE WITH MOISTURE OR WITH NUMBER" OR "FUTURE"). ALL CIRCUIT BREAKERS SHALL BE CLEARLY WITH THE LOAD WHICH IT IS CARRYING (E.G. "SIGNALS", "LUMINAIRE CLEARLY MARKED WITH THE "ON" AND "OFF" POSITIONS AND IDENTIFIED 6. THE CIRCUIT BREAKERS SHALL BE 120/240 VOLT AC, 60 HZ, AND SHALL BE SOURCES AND SHALL NORMALLY FACE NORTH OR EAST. CABINET, ORIENTED TO ELIMINATE INTERFERENCE BY MANMADE LIGHT TOP SECTION OF THE CABINET AND ON THE LEFT OR RIGHT SIDE OF THE PLASTIC PHOTOELECTRIC CONTROL VIEWING WINDOW. LOCATED IN THE 5. PROVIDE A 2" DIA. WEATHERPROOF AND VANDAL RESISTANT CLEAR TO FORM A COMPLETE SEAL WITH THE ENCLOSURE. 4. BOTH DOOR OPENINGS SHALL BE PROVIDED WITH A NEOPRENE GASKET SWING DOWN PLATE. PROVIDE ONE (1) KEY. WITH A STANDARD POLICE LOCK COMPLETE WITH A NUMBER 2 KEY AND WITH NON-CORRODING TAMPERPROOF CARRIAGE BOLTS AND SECURED 3. THE SERVICE CABINET DOORS SHALL BE ATTACHED TO THE ENCLOSURE CONSTRUCTION. 2. ALL HINGES, HINGE PINS AND LOCKS SHALL BE OF NON-CORRODING EXTERNAL THIRTY (30) MINUTE CLEAR ANODIZED FINISH. CABINET, BOTH INSIDE AND OUTSIDE, SHALL BE PROTECTED WITH AN OUTDOOR WEATHERPROOF SERVICE. AFTER FABRICATION, THE SERVICE 1. EACH SERVICE CABINET SHALL BE FABRICATED FROM 1/8" ALUMINUM FOR UPS/RBMS. ALL ITEMS EXCEPT FOR THE UPS, RBMS, BATTERIES AND CABLING FOR THE 19. THE SERVICE CABINET SHALL BE BATTERY BACK-UP READY WHICH INCLUDES SEE THE EQUIPMENT PAD DETAIL SHEETS FOR ADDITIONAL DETAILS. 18. ONE (1) SERVICE CABINET SHALL BE INSTALLED ON EACH EQUIPMENT PAD, DETAILS. 17. SEE THE EQUIPMENT PAD DETAIL SHEET FOR TYPICAL ANCHOR ROD TIA/EIA 3100 STANDARDS. 16. THE 19" RACK IN THE BASE OF THE CABINET SHALL BE CONSTRUCTED TO TO THE SIDES OF THE SERVICE CABINET. FOR THREE (3) ADJUSTABLE AND REMOVABLE SHELVES SHALL BE MOUNTED 15. UNISTRUT RAILS (#A400EA OR EQUIVALENT) USED FOR SHELF SUPPORTS 1/2" GAP FOR DRAINAGE. CORNER HOLE/SLOTS TO ACCOMMODATE THE ANCHOR RODS. PROVIDE A SHALL CONSIST OF FOUR (4) STRIPS, SIZED TO FIT THE BASE INCLUDING THE CONCRETE FOUNDATION AND THE SERVICE CABINET. THE GASKET 14. A 1/2" THICK SOLID BUTYL RUBBER GASKET SHALL BE PROVIDED BETWEEN LUMINAIRES AT EACH INTERSECTION. 13. SEE THE INTERSECTION LAYOUT FOR THE REQUIRED NUMBER OF WITH U.L. STANDARDS. 12. EACH SERVICE CABINET SHALL BE WELDED TO THE BASE IN ACCORDANCE OUTDOOR USE. FOR USE AS SERVICE ENTRANCE EQUIPMENT" AND APPROVED FOR 11. EACH SERVICE CABINET SHALL BE U.L. LISTED AND LABELED AS "SUITABLE APPROVED DUCT SEAL. 10. ALL CONDUIT ENTERING THE FOUNDATION SHALL BE SEALED WITH AN CONSTRUCTION NOTES MECHANICAL BYPASS RINGLESS SOCKET WITH 5 TERMINAL 200 AMP METER SOCKET (FUTURE) UNISTRUT RAILS SIGNAL SYSTEM B 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 119 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN PLAN VIEW SEE SIGNAL PLAN LAYOUT FOR ADDITIONAL INFORMATION NOT TO SCALE FOR ILLUSTRATION ONLY TYPICAL PAD WITH CONTROLLER CABINET AND SERVICE CABINET (NO SCALE) SERVICE CABINET AND CONTROLLER CABINET TYPICAL ANCHOR ROD LOCATION CABINET SERVICE CONTROLLER CABINET CONCRETE PAD FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2 1/2" FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2" 11" 14" 11" 6" 41"15"16" 6" 8 3/4" 18 1/2" 8 3/4" (NO SCALE) SERVICE CABINET AND CONTROLLER CABINET TYPICAL ANCHOR ROD 3" 18" 3" 13 UNC-2A 3/4" DIA. BOLT AND FLAT WASHER HEAVY HEX NUT 563 ASSEMBLED AFTER ROD PLATING. HEAVY HEX NUT AND FLAT WASHER, ASTM, A- 3. RODS TO BE SUPPLIED WITH GALVANIZED RUN FREE AFTER PLATING. 2. HOT DIP GALVANIZE FULL LENGTH. NUTS SHALL DIA. X 21" LONG BEFORE BENDING. 1. MATERIAL STEEL SHALL BE ASTM, A-36. 3/4" NOTES:SIDE VIEW 3'3' CABINET CONTROLLER GROUND LINE PROPOSED EXISTING OR CONCRETE PAD30" 4" MIN. CONCRETE WALK 12" THE GREEN INSULATED 6 AWG CONDUCTOR TO THAT GROUND ROD. POLE HANDHOLE GROUND ROD IS LOCATED WITHIN THE SPECIFIED DISTANCE MENTIONED, BOND CONDUCTOR IN THE CONDUIT GOING TO THAT HAND HOLE. IF THE REQUIRED TRAFFIC SIGNAL THE HAND HOLE INSTEAD OF A 10' GROUND ROD AND PULL A GREEN INSULATED 6 AWG SUPPLEMENTAL GROUND ROD MAY BE PLACED IN THAT HANDHOLE. USE A 12' GROUND ROD IN AND NO MORE THAN 10' APART FROM THE GROUND ROD LOCATED IN THE EQUIPMENT PAD, THE CONNECTIONS. IF A COUNTY TRAFFIC SIGNAL SYSTEM HAND HOLE IS LOCATED AT LEAST 6' APART ROD ELECTRODES, 6 AWG GREEN INSULATED COPPER CONDUCTOR, AND EXOTHERMIC WELDED SYSTEM DETAIL ON STANDARD PLATE 8106 SHEET 3 EXCEPT FURNISH AND INSTALL 10' GROUND 11. PLACE A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH THE GROUNDING ELECTRODE THEIR BACK TO THE INTERSECTION WHEN WORKING IN THE CABINET. CABINET. THE CONTROLLER CABINET SHALL NOT BE ORIENTATED SUCH THAT A PERSON HAS WORKING IN THE CABINET HAS A CLEAR LINE OF SITE TO SEE THE INTERSECTION AND SEE IN THE 10. ORIENT THE CONTROLLER CABINET SUCH THAT WHEN THE CABINET DOOR IS OPENED A PERSON SURFACE, AS DIRECTED BY THE ENGINEER. TECHNICIAN WILL STAND WITH THE CABINET OPEN OR ANY FORM OF PAVEMENT OR HARD THE RSC STUBS. NO RSC STUB SHALL BE TERMINATED UNDER THE CONCRETE WALK WHERE THE CABINET SHALL BE PERMANENTLY MARKED WITH AN ARROW TO INDICATE THE DIRECTION OF 9. THREAD AND CAP BOTH ENDS OF ALL RSC STUBS. THE CAPS LOCATED WITHIN THE CONTROLLER SHOWN. CONFLICT WITH THE CONTROLLER CABINET OR THE CONTROLLER CABINET DOOR OPEN AS 8. THE SERVICE CABINET DOORS SHALL FACE AWAY FROM THE CONTROLLER CABINET TO AVOID EXISTING OR PROPOSED GROUND LINE, AS DIRECTED BY THE ENGINEER. 7. THE CONCRETE PAD ELEVATION SHALL BE ADJUSTED TO MAINTAIN THE 12" CLEARANCE ABOVE THE DIRECTED BY THE ENGINEER. 6. THE CONCRETE PAD AND THE CONCRETE WALK SHALL BE CONCRETE MIX 3G52 OR EQUAL, AS BY THE ENGINEER. 5. A CONCRETE SIDEWALK SHALL BE ON THE DOOR SIDE OF THE CONTROLLER CABINET, AS DIRECTED CONCRETE PAD. 4. CONDUITS WITH BOTH ENDS TERMINATING WITHIN THE PAD SHALL BE INSTALLED WITHIN THE ETC.). FINAL CONDUIT LOCATIONS, AS DIRECTED BY THE ENGINEER. INTERFERE WITH THE CABINET FUNCTIONS (CONTROL EQUIPMENT, SUPPORTING MEMBERS, THE CONDUITS SHALL PROJECT 2" TO 3" ABOVE THE CONCRETE. THE CONDUITS SHALL NOT CONDUIT FROM THE INSIDE LIP OF THE MOUNTING FLANGE ON THE DOOR SIDE OF THE CABINET. 3. THE LOCATION OF CONDUITS WITHIN THE CONCRETE PAD SHALL BE 6" TO THE CENTER OF THE AFTER CABLES ARE INSTALLED. 2. THE TOP OF THE CONDUITS SHALL BE THREADED AND CAPPED AFTER INSTALLATION AND SEALED AS DIRECTED BY THE ENGINEER. 1. THE UPPER PART OF THE CONCRETE PAD SHALL BE BEVELED OR CHAMFERED IN A NEAT MANNER, NOTES: 7" SERVICE CABINET CONTROLLER CABINET 2" TO 3" GROUND LINE PROPOSED EXISTING OR PROJECT 2" - 3" ABOVE CONCRETE GROUND ROD (5/8" DIA X 15') FRONT VIEW SIGNAL SYSTEM A BASE FRAME ANGLE IRON FRONT DOOR GROUND ROD SERVICE CABINET 2-2" RSC CONTROLLER CABINET DOOR INSIDE LIP OF MOUNTING FLANGE PREFORMED JOINT FILLER 6" TYPICAL BACK DOOR 8" MIN. CONCRETE WALK CONTROLLER CABINET 2" RSC TO HH-1A 2" RSC TO HH-2A 2" RSC TO HH-8A TO SOP-1A 4" RSC TO HH-2A 4" RSC STUB 2" RSC STUB 1" RSC STUB 1 1/4" RSC TO HH-4A (PTZ) 4" RSC TO HH-1A 2-1 1/4" HDPE TO SV-1A GROUNDING CONDUCTOR INSULATED STRANDED 6 AWG GREEN 1" RSC 11 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500sgp.dgn3/11/2026SHEETTRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 120 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN SIGNAL SYSTEM B (NO SCALE) SERVICE CABINET AND CONTROLLER CABINET TYPICAL ANCHOR ROD LOCATION CABINET SERVICE CONTROLLER CABINET CONCRETE PAD FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2 1/2" FOR ANCHOR RODS SLOTTED MTG. HOLE FOUR (4) 1" X 2" 11" 14" 11" 6" 41"15"16" 6" 8 3/4" 18 1/2" 8 3/4" (NO SCALE) SERVICE CABINET AND CONTROLLER CABINET TYPICAL ANCHOR ROD 3" 18" 3" 13 UNC-2A 3/4" DIA. BOLT AND FLAT WASHER HEAVY HEX NUT 563 ASSEMBLED AFTER ROD PLATING. HEAVY HEX NUT AND FLAT WASHER, ASTM, A- 3. RODS TO BE SUPPLIED WITH GALVANIZED RUN FREE AFTER PLATING. 2. HOT DIP GALVANIZE FULL LENGTH. NUTS SHALL DIA. X 21" LONG BEFORE BENDING. 1. MATERIAL STEEL SHALL BE ASTM, A-36. 3/4" NOTES:SIDE VIEW 3'3' CABINET CONTROLLER GROUND LINE PROPOSED EXISTING OR CONCRETE PAD30" 4" MIN. CONCRETE WALK 12" THE GREEN INSULATED 6 AWG CONDUCTOR TO THAT GROUND ROD. POLE HANDHOLE GROUND ROD IS LOCATED WITHIN THE SPECIFIED DISTANCE MENTIONED, BOND CONDUCTOR IN THE CONDUIT GOING TO THAT HAND HOLE. IF THE REQUIRED TRAFFIC SIGNAL THE HAND HOLE INSTEAD OF A 10' GROUND ROD AND PULL A GREEN INSULATED 6 AWG SUPPLEMENTAL GROUND ROD MAY BE PLACED IN THAT HANDHOLE. USE A 12' GROUND ROD IN AND NO MORE THAN 10' APART FROM THE GROUND ROD LOCATED IN THE EQUIPMENT PAD, THE CONNECTIONS. IF A COUNTY TRAFFIC SIGNAL SYSTEM HAND HOLE IS LOCATED AT LEAST 6' APART ROD ELECTRODES, 6 AWG GREEN INSULATED COPPER CONDUCTOR, AND EXOTHERMIC WELDED SYSTEM DETAIL ON STANDARD PLATE 8106 SHEET 3 EXCEPT FURNISH AND INSTALL 10' GROUND 11. PLACE A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH THE GROUNDING ELECTRODE THEIR BACK TO THE INTERSECTION WHEN WORKING IN THE CABINET. CABINET. THE CONTROLLER CABINET SHALL NOT BE ORIENTATED SUCH THAT A PERSON HAS WORKING IN THE CABINET HAS A CLEAR LINE OF SITE TO SEE THE INTERSECTION AND SEE IN THE 10. ORIENT THE CONTROLLER CABINET SUCH THAT WHEN THE CABINET DOOR IS OPENED A PERSON SURFACE, AS DIRECTED BY THE ENGINEER. TECHNICIAN WILL STAND WITH THE CABINET OPEN OR ANY FORM OF PAVEMENT OR HARD THE RSC STUBS. NO RSC STUB SHALL BE TERMINATED UNDER THE CONCRETE WALK WHERE THE CABINET SHALL BE PERMANENTLY MARKED WITH AN ARROW TO INDICATE THE DIRECTION OF 9. THREAD AND CAP BOTH ENDS OF ALL RSC STUBS. THE CAPS LOCATED WITHIN THE CONTROLLER SHOWN. CONFLICT WITH THE CONTROLLER CABINET OR THE CONTROLLER CABINET DOOR OPEN AS 8. THE SERVICE CABINET DOORS SHALL FACE AWAY FROM THE CONTROLLER CABINET TO AVOID EXISTING OR PROPOSED GROUND LINE, AS DIRECTED BY THE ENGINEER. 7. THE CONCRETE PAD ELEVATION SHALL BE ADJUSTED TO MAINTAIN THE 12" CLEARANCE ABOVE THE DIRECTED BY THE ENGINEER. 6. THE CONCRETE PAD AND THE CONCRETE WALK SHALL BE CONCRETE MIX 3G52 OR EQUAL, AS BY THE ENGINEER. 5. A CONCRETE SIDEWALK SHALL BE ON THE DOOR SIDE OF THE CONTROLLER CABINET, AS DIRECTED CONCRETE PAD. 4. CONDUITS WITH BOTH ENDS TERMINATING WITHIN THE PAD SHALL BE INSTALLED WITHIN THE ETC.). FINAL CONDUIT LOCATIONS, AS DIRECTED BY THE ENGINEER. INTERFERE WITH THE CABINET FUNCTIONS (CONTROL EQUIPMENT, SUPPORTING MEMBERS, THE CONDUITS SHALL PROJECT 2" TO 3" ABOVE THE CONCRETE. THE CONDUITS SHALL NOT CONDUIT FROM THE INSIDE LIP OF THE MOUNTING FLANGE ON THE DOOR SIDE OF THE CABINET. 3. THE LOCATION OF CONDUITS WITHIN THE CONCRETE PAD SHALL BE 6" TO THE CENTER OF THE AFTER CABLES ARE INSTALLED. 2. THE TOP OF THE CONDUITS SHALL BE THREADED AND CAPPED AFTER INSTALLATION AND SEALED AS DIRECTED BY THE ENGINEER. 1. THE UPPER PART OF THE CONCRETE PAD SHALL BE BEVELED OR CHAMFERED IN A NEAT MANNER, NOTES: 7" SERVICE CABINET CONTROLLER CABINET 2" TO 3" GROUND LINE PROPOSED EXISTING OR PROJECT 2" - 3" ABOVE CONCRETE GROUND ROD (5/8" DIA X 15') FRONT VIEW PLAN VIEW SEE SIGNAL PLAN LAYOUT FOR ADDITIONAL INFORMATION NOT TO SCALE FOR ILLUSTRATION ONLY TYPICAL PAD WITH CONTROLLER CABINET AND SERVICE CABINET BASE FRAME ANGLE IRON FRONT DOOR GROUND ROD SERVICE CABINET 2-2" RSC CONTROLLER CABINET DOOR INSIDE LIP OF MOUNTING FLANGE PREFORMED JOINT FILLER 6" TYPICAL BACK DOOR 8" MIN. CONCRETE WALK CONTROLLER CABINET 2" RSC TO HH-1B 2" RSC TO HH-2B 2" RSC TO HH-7B TO SOP-1B 4" RSC TO HH-2B 4" RSC STUB 2" RSC STUB 1" RSC STUB 1 1/4" RSC TO HH-4B (PTZ) 4" RSC TO HH-1B 2-1 1/4" HDPE TO SV-1B GROUNDING CONDUCTOR INSULATED STRANDED 6 AWG GREEN 1" RSC 11 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 121 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY TEMPORARY SIGNAL PLAN LAYOUT LEGEND (1) ITEM DESCRIPTION UNIT TOTAL SYSTEM NOTES TEMPORARY SIGNAL SYSTEM A 1 TABULATION OF ESTIMATED QUANTITIES (1) SEE SPECIAL PROVISIONS. (1)SYSTEM TEMPORARY SIGNAL SYSTEM B 1 INPLACE CONTROLLER CABINET INPLACE HANDHOLE PEDESTRIAN INDICATION SIGNAL PHASE AND FACE NUMBER SIGNAL FACE WITH BACKGROUND SHIELD CONTROLLER CABINET AND SERVICE 40' WOOD SERVICE POLE WITH OPTIONAL LUMINAIRE SHAFT EXTENSION AS NOTED DISCONNECT ON ONE CONCRETE PAD SOURCE OF POWER PAD MOUNTED POLE MOUNTED SIGNAL INTERCONNECT SPLICE VAULT INPLACE SOURCE OF POWER PAD MOUNTED POLE MOUNTED METER AND DISCONNECT EMERGENCY VEHICLE PREEMPTION (EVP) ONE-WAY LUMINAIRE APS PUSH BUTTON STATION PORTABLE SIGNAL ASSEMBLY WITH PUSH BUTTONS INPLACE SERVICE CABINET WITH PVC HANDHOLE WITH METAL COVER TRAFFIC MANAGEMENT CAMERA VIDEO DETECTION CAMERA AND CABINET WITH METER AND SOP HH CAC HH SOP 2-1 CAC PBS SV SC PSA SC V WSP DOWN GUY WITH EXPANDING ANCHOR OVERHEAD SPAN WIRE NON-METALLIC CONDUIT (NMC) HIGH DENSITY POLYETHYLENE (HDPE) INPLACE CONDUIT SIGNAL SYSTEM RIGID STEEL CONDUIT (RSC) 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 122 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKYPLOT NAME:SGP Temp 02 [Sheet]G Y R TYPICAL WOOD SIGNAL POLE DETAIL (NO SCALE) LUMINAIRE AS REQUIRED IN PLAN ON POLE WITH A J-BRACKET VIDEO DETECTION CAMERA MOUNTED POLE HEIGHT AS REQUIRED IN PLAN GROUND WIRE AND CLAMPS ALTERNATE GUY DESIGN IF REQUIRED DOWN GUY DOWN GUY GUARD GROUND LINE EXPANDING ANCHOR HANDHOLE AS REQUIRED IN PLAN RSC AS REQUIRED IN PLAN BACKFILL AS DIRECTED BY ENGINEER METAL COVER RSC AS REQUIRED IN PLAN 3/8" SPAN WIRE PLAN REQUIRED IN SIGNAL HEADS AS STAINLESS STEEL TIES 18" HANGER SPACING WITH 3/8" HIGH STRENGTH SPAN WIRE HEAD TYPICAL WEATHERPROOF ENTRANCE 8' MAST ARM 18'NOMINAL 35' MOUNTING HEIGHT AND LIGHT EVP DETECTOR WIRE ENTRANCE WOOD POLE MOUNTING R Y G ARROW YELLOW ON FLASHING YIELD LEFT TURN 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 123 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY (NOT TO SCALE) OVERHEAD SIGNAL BRACE DETAIL (NOT TO SCALE) E.V.P. OR TRAFFIC DETECTOR WOOD POLE MOUNT (NOT TO SCALE) PORTABLE SIGNAL ASSEMBLY FOUNDATIONPORTABLE SIGNAL ASSEMBLY (PSA) (NO SCALE) 4" POST COLLAR 3' DIA. X 1' THICK CONCRETE PAINTED YELLOW POLE AND BASE TO BE PEDESTRIAN PUSH BUTTON 4 IN. PIPE ALLOY CHAIN GRADE 80 STRAIGHT LINK 3/8" WELDED, REBAR REINFORCING 3' 6" 10' BAND-IT POLE PLATE E.V.P. DETECTOR (ABOVE ROADWAY) 20' MOUNTING HEIGHT CONNECTION WATERPROOF STRAPS STAINLESS STEEL (AS REQUIRED) WEATHERHEAD NMC RISER AND WOOD POLE 4" POST COLLAR #3 REBAR STIRRUPS GRADE 80 ALLOY CHAIN 3/8" WELDED, STRAIGHT LINK FOR LIFTING 20" LOOP (BOTH SIDES) GRADE 80 ALLOY CHAIN 3/8" WELDED, STRAIGHT LINK 3" WIDTH ACCESS GROOVE RETENTION BOLT CHAIN LINKS THREADED THROUGH ON 12" SPACING (1) #3 REBAR STIRRUPS 4" POST COLLAR 1'-0" 3'-0" AND A WIRE ENTRANCE FITTING. CLAMP, A BALANCE ADJUSTER, CONSIST OF A CABLE SUSPENSION MOUNTING ASSEMBLY SHALL THE ONE-WAY SPAN WIRE WIRE ENTRANCE FITTING MN/DOT APPROVED. NOTE: TETHER CLAMP SHALL BE TETHER CLAMP ALUMINUM ANGLE IRON (SUPPORT) 3/8" SPAN WIRE SIGNAL CABLES (AS SHOWN IN PLAN) SIGNAL HEAD (AS SHOWN IN PLAN) BACKGROUND SHIELD S-HOOK 3/8" MIN. (BREAKAWAY) TURNBUCKLE (5/16" MIN. EYE BOLTS) CLAMP (STABILIZER) 3/8" SPAN WIRE WITH SIGNAL TETHER CLAMP ATTACHED TO SIGNAL HEAD (1 1/2" X 1 1/2" X 1/4" X 1/4") ALUMINUM ANGLE IRON 90% PLAN 4.10 M M M M M M M M PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 124 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY CSAH 9 (42ND AVE N)CSAH 102 (DOUGLAS DR)- SOFT RECALL: PHASES 2 AND 6. - DUAL ENTRY: PHASES 4 AND 8. PEDESTRIAN PHASE MAY BE USED ON ALL APPROACHES. - PROTECTED ONLY MODE DURING CONFLICTING APPROACHES. - LEADING PEDESTRIAN INTERVAL MAY BE USED ON ALL - ALL LEFT TURN PHASES MAY BE LEADING OR LAGGING. MODES. PROTECTED/PERMISSIVE OR PROTECTED ONLY PHASING - ALL LEFT TURNS MAY OPERATE IN PERMISSIVE ONLY, - SIGNAL SYSTEM FLASH MODE SHALL BE ALL RED. SIGNAL SYSTEM OPERATION P2-1 Ø2 WALK Ø6 WALK 8 WALKØØ84 WALKØP6-1 P8-2(NO SCALE) CONTROLLER PHASING LAYOUT Ø4(DOUGLAS DR)CSAH 102Ø6 Ø2 CSAH 9 (42ND AVE)P4-1PSA-4AP6-2 PB4-1P8-1PSA-2AP2-2PB8-1PSA-3A P4-2PB2-1 PB6-2 PSA-4A PSA-3APB4-2PSA-2A PB2-2 (DOUGLAS DR)CSAH 102CSAH 9 (42ND AVE) PSA-1A PB6-1 PSA-1APB8-2Ø7 + Ø8Ø1 + Ø2 Ø3 + Ø4Ø5 + Ø6 WSP 4A WSP 1A WSP 2A WSP 3A V-1AV-2A V-4A V-3ALUM-1A LUM-2A LUM-3A LUM-4A Ø1 & Ø6 EVP Ø3 & Ø8 EVPØ4 & Ø7 EVPØ2 & Ø5 EVP TMC-1A5-2 5-1 2-2 2-1 7-27-14-24-11-1 6-2 1-23-26-1 3-18-28-1AND USE FOR TEMPORARY SIGNAL. - REMOVE EXISTING TMC CAMERA FROM INPLACE SIGNAL SIGNAL AND USE FOR TEMPORARY SIGNAL. - REMOVE EXISTING VIDEO DETECTION FROM INPLACE CONTROLLER CABINET FOR TEMPORARY SIGNAL. - USE EXISTING SOURCE OF POWER, SERVICE CABINET AND 2- 3/8" SPAN WIRE WSP-3A TO 1-1 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 2- 7/C #14 2- 3/8" SPAN WIRE WSP-4A TO 3-1 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 3-1 TO 8-2 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE WSP-3A TO 4-2 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-3A TO WSP-3A 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-4A TO WSP-4A 1- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE 6-2 TO WSP-4A 1- 7/C #14 2- 3/8" SPAN WIRE 1-1 TO 6-2 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1- 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE 4-2 TO 7-1 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1- 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 2- 7/C #14 2- 3/8" SPAN WIRE 7-1 TO WSP-2A 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-2A TO WSP-2A 8-2 TO WSP-1A 2- 3/8" SPAN WIRE 3- 7/C #14 3- 4/C #14 2- 4/C #14 (PED) 1- 3/C #14 2- 2/C #14 (SHLD) 1- 3/C #14 (LUM) 1- 3/C #18 (VIDEO) 1- 3/C #20 (SHLD) 4- 3/C #14 (LUM) 2" RSC HH-1A TO SC-1A 2- 3/C #20 (SHLD) 2- 3/C #18 (VIDEO) 2- 3/C #14 (LUM) 4- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 (PED) 3- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 2-2 TO WSP-2A 2- 3/C #20 (SHLD) 2- 3/C #18 (VIDEO) 2- 3/C #14 (LUM) 4- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 (PED) 4- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 2-2 TO 5-1 2- 3/C #20 (SHLD) 2- 3/C #18 (VIDEO) 2- 3/C #14 (LUM) 4- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 (PED) 4- 4/C #14 4- 7/C #14 2- 3/8" SPAN WIRE 5-1 TO WSP-1A 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-1A TO WSP-1A 4- 3/C #20 (SHLD) 4- 3/C #18 (VIDEO) 4- 3/C #14 (LUM) 8- 2/C #14 (SHLD) 4- 3/C #14 8- 4/C #14 (PED) 8- 4/C #14 8- 7/C #14 ENTRANCE HEAD AND WEATHERPROOF 2-3" RSC WITH RISER WSP-1A TO HH-1A 4- 3/C #20 (SHLD) 4- 3/C #18 (VIDEO) 8- 2/C #14 (SHLD) 4- 3/C #14 8- 4/C #14 (PED) 8- 4/C #14 8- 7/C #14 2-3" RSC HH-1A TO CAC-1A TEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM A 0' SCALE 40'20' CAC 1A HH 1A WSP 1A WSP 2A 3A WSP WSP 4A PSA 1A PSA 2A PSA 3A 4A PSA VVV VVSC 1A 1- 1/C #10 1- CAT-6 (TMC) 1- 2" RSC TMC-1A TO WSP-1A TO CAC-1A 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 125 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY BE INCLUDED IN THE UNIT PRICE BID FOR TEMPORARY SIGNAL SYSTEM A (SYSTEM). 21.) ALL WORK AS DETAILED IN NOTES 1 - 20 SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE ENGINEER AND ALL COSTS SHALL OF TEMPORARY SIGNAL SYSTEM. 20.) THE EXISTING CAC, SC AND SOP SHALL BE USED FOR THE TEMPORARY SIGNAL SYSTEM AND SHALL REMAIN INPLACE UNTIL THE REMOVAL 19.) THE CONTRACTOR SHALL TERMINATE FIBER AND MAKE ALL FIBER CONNECTIONS TO THE TEMPORARY SIGNAL SYSTEM. 18.) THE CONTRACTOR SHALL REMOVE THE COMPLETE TEMPORARY SIGNAL SYSTEM, UNLESS NOTED. TRAFFIC CONTROL SIGNAL SYSTEM. 17.) THE CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE ANY DAMAGED TRAFFIC SIGNAL COMPONENT THAT IS TO BE RELOCATED TO 16.) ANY ELECTRICAL CABLE SPLICES SHALL BE INTERNAL AND ONLY ALLOWED IN THE TEMPORARY SIGNAL. DIRECTION THAT THE PEDESTRIAN MOVEMENT IS RESTRICTED. WHEN THE PEDESTRIAN MOVEMENT IS RESTRICTED. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE R9-3 SIGN FOR EACH TIMES. THE CONTRACTOR SHALL REMOVE OR DISABLE AND COVER ANY PEDESTRIAN PUSH BUTTONS AND PEDESTRIAN INDICATIONS 15.) THE CONTRACTOR SHALL MAINTAIN SAFE AND FULL PEDESTRIAN ACCESS TO ALL NONRESTRICTED PEDESTRIAN PUSH BUTTONS AT ALL INCIDENTAL TO THE TEMPORARY SIGNAL SYSTEM. PORTABLE SIGNAL ASSEMBLIES. RELOCATION MAY BE REQUIRED MULTIPLE TIMES DURING CONSTRUCTION. ALL RELOCATIONS ARE 14.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FREQUENT AND NECESSARY RELOCATION OF ALL OVERHEAD SIGNAL HEADS AND THE RELOCATIONS OF ALL OVERHEAD SIGNAL HEADS AND PORTABLE SIGNAL ASSEMBLIES. SHALL CONFORM TO EACH TRAFFIC CONTROL AREA AS REQUIRED. ELECTRICAL CABLES SHALL BE OF SUFFICIENT LENGTH TO FACILITATE 13.) ALL OVERHEAD SIGNAL HEADS AND PORTABLE SIGNAL ASSEMBLES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS, ACTUAL LOCATIONS ACTUAL LOCATIONS SHALL BE DETERMINED IN THE FIELD AT THE TIME OF CONSTRUCTION. EACH WITH TWO DOWN GUYS COMPLETE WITH GUARD AND EXPANDING ANCHOR. THE LOCATIONS SHOWN ARE APPROXIMATE. 12.) THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WOOD SERVICE POLES, WHICH SHALL BE A MINIMUM OF 40' CLASS II WOOD POLES 11.) THE CONTRACTOR SHALL BE FULLY COMPLIANT WITH THE MOST CURRENT MN MUTCD AND NEC AT ALL TIMES. PHASING AS SHOWN IN THE PLANS. 10.) THE CONTRACTOR SHALL INSTALL ONE EVP DETECTOR WITH CONFIRMATION LIGHT ON WSP-1A, WSP-2A, WSP-3A AND WSP-4A, WITH 9.) THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. COMPANY TO ESTABLISH METER ADDRESS AND BILLING INFORMATION. TO THE POWER COMPANY. HENNEPIN COUNTY SHALL NOT BE BILLED. THE CONTRACTOR SHALL WORK WITH THE CITY AND THE POWER 8.) THE CITY SHALL BE BILLED FOR ALL TEMPORARY TRAFFIC SIGNAL SYSTEM POWER COSTS AND THE CITY SHALL PAY THOSE COSTS DIRECTLY THE POWER COMPANY. 7.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE CONNECTION OF THE POWER FOR THE TRAFFIC SIGNAL SYSTEM WITH 6.) THE CONTRACTOR SHALL IF REQUIRED RELOCATE THE VIDEO OR EVP DETECTORS. ORIGINAL CONDITION OR BETTER. 5.) THE CONTRACTOR SHALL PLACE COMMON BACK FILL AND RESTORE ALL DISTURBED TURF, CONCRETE OR BITUMINOUS WALK, ETC. TO IT'S 4.) THE CONTRACTOR SHALL INSTALL ONE VIDEO DETECTION CAMERA ON WSP-1A, WSP-2A, WSP-3A AND WSP-4A. 3.) ONE LED LUMINAIRE SHALL BE FURNISH AND INSTALLED ON WSP-1A, WSP-2A, WSP-3A AND WSP-4A LUMINAIRE SHAFT EXTENSION. FOR OPERATION AS SHOWN IN THE PLANS. 2.) TWO STANDARD PEDESTRIAN PUSH BUTTONS WITH SIGN R10-3E (9" X 15") SHALL BE INSTALLED ON PSA-1A, PSA-2A, PSA-3A, AND PSA-4A, 1.) SEE DIVISION "SS" OF SPECIAL PROVISIONS FOR MATERIALS PROVIDED BY HENNEPIN COUNTY. TEMPORARY SIGNAL 1A NOTES: SIG. POLE NO. FACE NO. SIG. Ø RED YEL GRN PED SIGNAL FACE MOUNT SPAN WIRE BRACE POLE MOUNT POLE MOUNT 5,6 2 8 5,6 7,8 4 2 7,8 1,2 4 1,2 3,4 6 3,4 3-1 1-2 4-2 5-1 3-2 6-2 7-1 5-2 8-2 1-1 7-2 2-2 PLATE 8111E TYPE 2C LED INDICATIONS 12" INDICATIONS FYEL POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT 6 8 WSP-1A BRACKET MOUNTING LOCATION, TYPE, AND 4 2 8 6 TEMPORARY SIGNAL 1A SIGNAL INDICATIONS AND MOUNTING *** *** *** *** OVERHEAD ON SPAN WIRE POLE MOUNT P4-1 6-1 4-1 POLE MOUNT P2-1 POLE MOUNT P8-1 2-1 POLE MOUNT P6-1 8-1 P6-2 POLE MOUNT 6 *** P4-2 POLE MOUNT 4 *** P2-2 POLE MOUNT 2 *** P8-2 POLE MOUNT 8 *** G Y Y R G Y Y R G Y Y R G Y Y R 1-1 AND 1-2 SIGNAL FACE 3-1 AND 3-2 SIGNAL FACE 5-1 AND 5-2 SIGNAL FACE 7-1 AND 7-2 SIGNAL FACE Ø1 FYA Ø2 Ø1 Ø3 Ø3 Ø5 Ø5 Ø7 Ø7 4-SECTION SIGNAL HEAD PHASING WITH FLASHING YELLOW ARROW FYA Ø4 FYA Ø6 FYA Ø8 PSA-1A WSP-2A PSA-2A WSP-3A PSA-3A WSP-4A PSA-4A *** INTERNATIONAL SYMBOLS IN A DUAL FACE SINGLE HOUSING WITH PEDESTRIAN COUNTDOWN TIMER. STANDARD PLATE NO. SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 126 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY INTERCONNECT (48 SM FIBER OPTIC) CONTROLLER CABINET 1A 14 15 17 16 18 R BLK/R BLK WH Ø8-DW Ø8-W SPARE NEU P8-1 19 R BLK/R BLK WH Ø2-DW Ø2-W SPARE NEU P2-2 20 BLK WH PB8-1 22 BLK WH G Ø2 & Ø5 EVP IND NEU SPARE 9023 Y BL O Ø2 & Ø5 (-) (+) SYS EVP 90 25 27 28 Ø8-DW Ø8-W SPARE NEU R BLK/R BLK WH 29 P8-1 33 BLK WH G Ø3 & Ø8 EVP IND NEU SPARE SYS EVP Ø3 & Ø8 (-) (+) Y BL O 34 11 EQG (1/C #6 GRN) R BL WH BRN Ø5-RLTA Ø5-YLTA Ø5-GLTA Ø6-FYLTA NEU 5-1 O Y/BLK BLK SPARE SPARE R BLK/R BLK WH NEU Ø2-RED Ø2-YEL Ø2-GRN 2-2 R BLK/R BLK WH NEU Ø2-RED Ø2-YEL Ø2-GRN 2-1 R BL WH BRN Ø7-RLTA Ø7-YLTA Ø7-GLTA Ø8-FYLTA NEU 7-2 O Y/BLK BLK SPARE SPARE 5-2 Ø5-RLTA Ø5-YLTA Ø5-GLTA NEU Ø6-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R NEU R BLK/R BLK WH 8-2 Ø8-RED Ø8-YEL Ø8-GRN NEU R BLK/R BLK WH 8-1 Ø8-RED Ø8-YEL Ø8-GRN EQG (1/C #6 GRN) 49 12 REMOTE BATTERY MANAGEMENT SYSTEM (CAT-5) BATTERY BACKUP SYSTEM (CAT-5) 5 4 10 3 EQG (1/C #6 GRN) SIGNAL SERVICE (1/C #8) NEU (1/C #8) BATTERY BACKUP (3/C #18) 2 BLK WH G BLK WH 36 38 40 R BLK/R BLK WH Ø4-DW Ø4-W SPARE NEU P4-2 41 R BLK/R BLK WH Ø2-DW Ø2-W SPARE NEU P2-1 47 1-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA NEU Ø2-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 6-2 Ø6-RED Ø6-YEL Ø6-GRN R BL WH BRN Ø7-RLTA Ø7-YLTA Ø7-GLTA Ø8-FYLTA NEU 7-1 O Y/BLK BLK SPARE SPARE R BLK/R BLK WH NEU Ø4-RED Ø4-YEL Ø4-GRN 4-1 11,13-35 2,10 3-5 13 (TO WSP 1A) 6,7,8,9 (TO SC-1A) INTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE WEST INTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE SOUTHINTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE EASTINTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE NORTHHH 1A WH BLK R SERVICE CABINET 1A LUM 1A LUM 2A LUM 3A LUM 4ABLKWHR1A GR. ROD16 7 8 9 6,7,8,9 (TO HH-1A)1BLK WH G BLK WH G BLK WH G BLK WH G EQUIPMENT GROUND 10 12 REMOTE BATTERY MANAGEMENT SYSTEM BATTERY BACKUP SYSTEM 5 4 3 BATTERY BACKUP BLK WH G 6-9,11-57 (TO WSP 1A) 21 BLK WH PB2-2 24 BLK WH G VIDEO DETECTOR 2A 26 3-1 Ø3-RLTA Ø3-YLTA Ø3-GLTA NEU Ø4-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R Ø6-DW Ø6-W SPARE NEU R BLK/R BLK WH 30 P6-1 BLK WHPB8-2 31 BLK WHPB6-1 32 VIDEO DETECTOR 1A 35 BLK WH G 13 CAT-6 TMC CAMERA 1A 48 3-2 Ø3-RLTA Ø3-YLTA Ø3-GLTA NEU Ø4-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 50 Ø6-RED Ø6-YEL Ø6-GRN 6-1 Ø6-DW Ø6-W SPARE NEU BLK/R BLK WH 51 P6-2 R Ø4-DW Ø4-W SPARE NEU BLK/R BLK WH 52 P4-1 R BLK WHPB6-2 53 BLK WHPB4-1 54 55 BLK WH G Ø1 & Ø6 EVP IND NEU SPARE SYS EVP Ø1 & Ø6 (-) (+) Y BL O 56 VIDEO DETECTOR 4A 57 BLK WH G 37 R BL WH BRN Ø1-RLTA Ø1-YLTA Ø1-GLTA Ø2-FYLTA NEU 1-2 O Y/BLK BLK SPARE SPARE 39 R BLK/R BLK WH NEU Ø6-RED Ø6-YEL Ø6-GRN 6-1 42 BLK WH PB4-2 43 BLK WH PB2-1 44 BLK WH G Ø4 & Ø7 EVP IND NEU SPARE 45 Y BL O Ø4 & Ø7 (-) (+) SYS EVP 46 BLK WH G VIDEO DETECTOR 3A 12,36-57 HH 2A SOP SV 1A 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 127 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY R BL BRN 3-1 Y/BLK O WH BLK BLK/R BLK WH 8-2 R 27 26 R BL BRN 7-1 Y/BLK O WH BLK BLK/R BLK WH 4-2 R 38 36 BL WH BRN Y/BLK O BLK R 5-1 14 BLK/R BLK WH R 2-2 16 R BL BRN 1-1 Y/BLK O WH BLK 47 R BLK/R BLK WH 6-2 49 R BL BRN 1-2 Y/BLK O WH BLK 37 BLK/R BLK WH 4-1 39 R R BL BRN 3-2 Y/BLK O WH BLK BLK/R BLK WH 6-1 R 50 48 BLK WH G Ø1 & Ø6 EVP IND LIGHT Y BL O Ø1 & Ø6 EVP (-) (+) 55 56 BLK WH G LUM 4A Ø6-PED Ø4-PED R BLK/R BLK WH R BLK/R BLK WH 51 52 BLK WH PB6-2 BLK WH PB4-1 53 54 BL WH BRN Y/BLK O BLK R 5-2 25 BLK/R BLK WH R 8-1 28 BL WH BRN Y/BLK O BLK R 7-2 15 BLK/R BLK WH R 2-1 17 Ø4-PED Ø2-PED R BLK/R BLK WH R BLK/R BLK WH 40 41 BLK WH PB4-2 BLK WH PB2-1 42 43 BLK WH G Ø4 & Ø7 EVP IND LIGHT Y BL O Ø4 & Ø7 EVP (-) (+) 44 45 BLK WH G LUM 3A BLK/R BLK WH R 29 Ø8-PED BLK/R BLK WH R 30 Ø6-PED PB8-2 BLK WH 31 PB6-1 BLK WH 32 Ø3 & Ø8 EVP IND LIGHT WH G BLK 33 Ø3 & Ø8 EVP BL O Y 34 (-) (+) BLK/R BLK WH R 18 Ø8-PED BLK/R BLK WH R 19 Ø2-PED PB8-1 BLK WH 20 PB2-2 BLK WH 21 Ø2 & Ø5 EVP IND LIGHT WH G BLK 22 Ø2 & Ø5 EVP BL O Y 23 (-) (+) LUM 2A 7 BLK WH G BLK WH G VIDEO DETECTOR 4A 57 BLK WH G VIDEO DETECTOR 3A 46 VIDEO DETECTOR 2A WH G BLK 24 LUM 1A 6 BLK WH G VIDEO DETECTOR 1A WH G BLK 35 WSP 2A WSP 1A WSP 4A WSP 3A PSA 2A PSA 1A PSA 4A PSA 3A CAT-6 CAT-6 TMC 1A 8 9 9,26,27,47-57 25,28-32 6,33-357,8,15,17-24,36-4615 ,17 -21 7, 2 2 - 2 4 13 48 ,50 -54 9, 5 5 - 5 7 47,498,44-4637,39-43 8,37,39-46 6-9,11-57 (TO HH-1A) 13 (TO CONTROLLER CABINET 1A) #6 INS. GR. 1112#6 INS. GR.9,47-57 8,36-46 7,8,14-24,36-4690% PLAN 4.10 M M M PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 128 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKYCSAH 102 (DOUGLAS DR)36TH AVE N - SOFT RECALL: PHASES 2 AND 6. - DUAL ENTRY: PHASES 4 AND 8. PEDESTRIAN PHASE MAY BE USED ON ALL APPROACHES. - PROTECTED ONLY MODE DURING CONFLICTING APPROACHES. - LEADING PEDESTRIAN INTERVAL MAY BE USED ON ALL - ALL LEFT TURN PHASES MAY BE LEADING OR LAGGING. MODES. PROTECTED/PERMISSIVE OR PROTECTED ONLY PHASING - ALL LEFT TURNS MAY OPERATE IN PERMISSIVE ONLY, - SIGNAL SYSTEM FLASH MODE SHALL BE ALL RED. SIGNAL SYSTEM OPERATION Ø4 WALK Ø8 WALK WALKØ2Ø6 WALKØ6(NO SCALE) CONTROLLER PHASING LAYOUT Ø2(DOUGLAS DR)CSAH 102Ø4 Ø7 + Ø8 36TH AVEØ8 36TH AVE (DOUGLAS DR)CSAH 102Ø5 + Ø6Ø1 + Ø2P6-1P8-2 PB8-2 PSA-4B WSP 4B PB6-1PSA-4BP8-1 P8-2WSP 1B PB2-2PSA-1BPSA-1B PB8-1 P4-1 PSA-3B P6-2PB4-1 WSP 3B PB6-2PSA-3BP2-1P4-2 PB4-2 WSP 2B PSA-2B PB2-1PSA-2BV-4B V-1BV-2BV-3BLUM-4B LUM-1B LUM-3B LUM-2B Ø8 EVPØ2 & Ø5 EVPØ4 & Ø7 EVP Ø1 & Ø6 EVPTMC-1B6-28-3 8-2 8-16-11-15-25-12-27-22-27-1 4-2 4-1 1-2AND USE FOR TEMPORARY SIGNAL. - REMOVE EXISTING TMC CAMERA FROM INPLACE SIGNAL SIGNAL AND USE FOR TEMPORARY SIGNAL. - REMOVE EXISTING VIDEO DETECTION FROM INPLACE CONTROLLER CABINET FOR TEMPORARY SIGNAL. - USE EXISTING SOURCE OF POWER, SERVICE CABINET AND 4- 3/C #14 (LUM) 2" RSC HH-1B TO SC-1B 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-3B TO WSP-3B 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-2B TO WSP-2B 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-4B TO WSP-4B 2- 2/C #14 (SHLD) 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 PSA-1B TO WSP-1B 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 1-1 TO 6-2 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 2- 7/C #14 2- 3/8" SPAN WIRE WSP-4B TO 1-1 1- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE 4-2 TO WSP-4B 1- 7/C #14 2- 3/8" SPAN WIRE 7-1 TO 4-2 2- 3/8" SPAN WIRE WSP-3B TO 7-1 2- 3/C #20 (SHLD) 2- 3/C #18 (VIDEO) 2- 3/C #14 (LUM) 4- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 (PED) 4- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 8-1 TO WSP-1B 2- 3/C #20 (SHLD) 2- 3/C #18 (VIDEO) 2- 3/C #14 (LUM) 4- 2/C #14 (SHLD) 2- 3/C #14 4- 4/C #14 (PED) 3- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE WSP-2B TO 8-1 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1- 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 2- 7/C #14 2- 3/8" SPAN WIRE 5-1 TO WSP-2B 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1- 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 2- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE 2-2 TO 5-1 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1 - 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 1- 4/C #14 1- 7/C #14 2- 3/8" SPAN WIRE WSP-3B TO 2-2 4- 3/C #20 (SHLD) 4- 3/C #18 (VIDEO) 8- 2/C #14 (SHLD) 4- 3/C #14 8- 4/C #14 (PED) 8- 4/C #14 7- 7/C #14 2-3" RSC HH-1B TO CAC-1B 1- 3/C #20 (SHLD) 1- 3/C #18 (VIDEO) 1- 3/C #14 (LUM) 2- 2/C #14 (SHLD) 1- 3/C #14 2- 4/C #14 (PED) 3- 4/C #14 3- 7/C #14 2- 3/8" SPAN WIRE 6-2 TO WSP-1B 4- 3/C #20 (SHLD) 4- 3/C #18 (VIDEO) 4- 3/C #14 (LUM) 8- 2/C #14 (SHLD) 4- 3/C #14 8- 4/C #14 (PED) 8- 4/C #14 7- 7/C #14 ENTRANCE HEAD AND WEATHERPROOF 2-3" RSC WITH RISER WSP-1B TO HH-1B TEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM B 0' SCALE 40'20' CAC 1B HH 1B WSP 1B WSP 2B 3B WSP WSP 4B PSA 4B 1B PSA PSA 2B PSA 3B V VVVVSC 1B 1- 1/C #10 1- CAT-6 (TMC) 1- 2" RSC TMC-1B TO WSP-1B TO CAC-1B 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 129 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY SIG. POLE NO. FACE NO. SIG. Ø RED YEL GRN PED SIGNAL FACE MOUNT SPAN WIRE BRACE POLE MOUNT POLE MOUNT 8 8 6 5,6 2 8 5,6 7,8 2 7,8 1,2 4 1,2 1-1 7-2 2-2 8-1 1-2 4-2 5-1 6-1 6-2 7-1 5-2 PLATE 8111E TYPE 2C LED INDICATIONS 12" INDICATIONS FYEL POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT POLE MOUNT 4 6 WSP-1B BRACKET MOUNTING LOCATION, TYPE, AND 8 6 4 2 TEMPORARY SIGNAL 1B SIGNAL INDICATIONS AND MOUNTING *** *** *** *** OVERHEAD ON SPAN WIRE POLE MOUNT P8-2 4-1 2-2 POLE MOUNT P6-2 POLE MOUNT P4-2 8-2 POLE MOUNT P2-2 8-3 P6-1 POLE MOUNT 6 *** P4-1 POLE MOUNT 4 *** P2-1 POLE MOUNT 2 *** P8-1 POLE MOUNT 8 *** G Y Y R G Y Y R G Y Y R G Y Y R 1-1 AND 1-2 SIGNAL FACE 3-1 AND 3-2 SIGNAL FACE 5-1 AND 5-2 SIGNAL FACE 7-1 AND 7-2 SIGNAL FACE Ø1 FYA Ø2 Ø1 Ø3 Ø3 Ø5 Ø5 Ø7 Ø7 4-SECTION SIGNAL HEAD PHASING WITH FLASHING YELLOW ARROW FYA Ø4 FYA Ø6 FYA Ø8 PSA-1B WSP-2B PSA-2B WSP-3B PSA-3B WSP-4B PSA-4B *** INTERNATIONAL SYMBOLS IN A DUAL FACE SINGLE HOUSING WITH PEDESTRIAN COUNTDOWN TIMER. STANDARD PLATE NO. SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE SPAN WIRE BRACE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C OVERHEAD ON SPAN WIRE OVERHEAD ON SPAN WIRE PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C PLATE 8111E TYPE 2C BE INCLUDED IN THE UNIT PRICE BID FOR TEMPORARY SIGNAL SYSTEM B (SYSTEM). 21.) ALL WORK AS DETAILED IN NOTES 1 - 20 SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE ENGINEER AND ALL COSTS SHALL OF TEMPORARY SIGNAL SYSTEM. 20.) THE EXISTING CAC, SC AND SOP SHALL BE USED FOR THE TEMPORARY SIGNAL SYSTEM AND SHALL REMAIN INPLACE UNTIL THE REMOVAL 19.) THE CONTRACTOR SHALL TERMINATE FIBER AND MAKE ALL FIBER CONNECTIONS TO THE TEMPORARY SIGNAL SYSTEM. 18.) THE CONTRACTOR SHALL REMOVE THE COMPLETE TEMPORARY SIGNAL SYSTEM, UNLESS NOTED. TRAFFIC CONTROL SIGNAL SYSTEM. 17.) THE CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE ANY DAMAGED TRAFFIC SIGNAL COMPONENT THAT IS TO BE RELOCATED TO 16.) ANY ELECTRICAL CABLE SPLICES SHALL BE INTERNAL AND ONLY ALLOWED IN THE TEMPORARY SIGNAL. DIRECTION THAT THE PEDESTRIAN MOVEMENT IS RESTRICTED. WHEN THE PEDESTRIAN MOVEMENT IS RESTRICTED. THE CONTRACTOR SHALL FURNISH AND INSTALL ONE R9-3 SIGN FOR EACH TIMES. THE CONTRACTOR SHALL REMOVE OR DISABLE AND COVER ANY PEDESTRIAN PUSH BUTTONS AND PEDESTRIAN INDICATIONS 15.) THE CONTRACTOR SHALL MAINTAIN SAFE AND FULL PEDESTRIAN ACCESS TO ALL NONRESTRICTED PEDESTRIAN PUSH BUTTONS AT ALL INCIDENTAL TO THE TEMPORARY SIGNAL SYSTEM. PORTABLE SIGNAL ASSEMBLIES. RELOCATION MAY BE REQUIRED MULTIPLE TIMES DURING CONSTRUCTION. ALL RELOCATIONS ARE 14.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FREQUENT AND NECESSARY RELOCATION OF ALL OVERHEAD SIGNAL HEADS AND THE RELOCATIONS OF ALL OVERHEAD SIGNAL HEADS AND PORTABLE SIGNAL ASSEMBLIES. SHALL CONFORM TO EACH TRAFFIC CONTROL AREA AS REQUIRED. ELECTRICAL CABLES SHALL BE OF SUFFICIENT LENGTH TO FACILITATE 13.) ALL OVERHEAD SIGNAL HEADS AND PORTABLE SIGNAL ASSEMBLES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS, ACTUAL LOCATIONS ACTUAL LOCATIONS SHALL BE DETERMINED IN THE FIELD AT THE TIME OF CONSTRUCTION. EACH WITH TWO DOWN GUYS COMPLETE WITH GUARD AND EXPANDING ANCHOR. THE LOCATIONS SHOWN ARE APPROXIMATE. 12.) THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WOOD SERVICE POLES, WHICH SHALL BE A MINIMUM OF 40' CLASS II WOOD POLES 11.) THE CONTRACTOR SHALL BE FULLY COMPLIANT WITH THE MOST CURRENT MN MUTCD AND NEC AT ALL TIMES. PHASING AS SHOWN IN THE PLANS. 10.) THE CONTRACTOR SHALL INSTALL ONE EVP DETECTOR WITH CONFIRMATION LIGHT ON WSP-1A, WSP-2A, WSP-3A AND WSP-4A, WITH 9.) THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. COMPANY TO ESTABLISH METER ADDRESS AND BILLING INFORMATION. TO THE POWER COMPANY. HENNEPIN COUNTY SHALL NOT BE BILLED. THE CONTRACTOR SHALL WORK WITH THE CITY AND THE POWER 8.) THE CITY SHALL BE BILLED FOR ALL TEMPORARY TRAFFIC SIGNAL SYSTEM POWER COSTS AND THE CITY SHALL PAY THOSE COSTS DIRECTLY THE POWER COMPANY. 7.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE CONNECTION OF THE POWER FOR THE TRAFFIC SIGNAL SYSTEM WITH 6.) THE CONTRACTOR SHALL IF REQUIRED RELOCATE THE VIDEO OR EVP DETECTORS. ORIGINAL CONDITION OR BETTER. 5.) THE CONTRACTOR SHALL PLACE COMMON BACK FILL AND RESTORE ALL DISTURBED TURF, CONCRETE OR BITUMINOUS WALK, ETC. TO IT'S 4.) THE CONTRACTOR SHALL INSTALL ONE VIDEO DETECTION CAMERA ON WSP-1B, WSP-2B, WSP-3B AND WSP-4B. 3.) ONE LED LUMINAIRE SHALL BE FURNISH AND INSTALLED ON WSP-1B, WSP-2B, WSP-3B AND WSP-4B LUMINAIRE SHAFT EXTENSION. FOR OPERATION AS SHOWN IN THE PLANS. 2.) TWO STANDARD PEDESTRIAN PUSH BUTTONS WITH SIGN R10-3E (9" X 15") SHALL BE INSTALLED ON PSA-1B, PSA-2B, PSA-3B, AND PSA-4B, 1.) SEE DIVISION "SS" OF SPECIAL PROVISIONS FOR MATERIALS PROVIDED BY HENNEPIN COUNTY. TEMPORARY SIGNAL 1B NOTES: 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 130 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY INTERCONNECT (48 SM FIBER OPTIC) CONTROLLER CABINET 1B 15 16 17 R BLK/R BLK WH Ø4-DW Ø4-W SPARE NEU P4-2 18 R BLK/R BLK WH Ø2-DW Ø2-W SPARE NEU P2-1 19 BLK WH PB4-2 21 BLK WH G Ø8 EVP IND NEU SPARE 9022 Y BL O Ø8 (-) (+) SYS EVP 90 26 27 Ø8-DW Ø8-W SPARE NEU R BLK/R BLK WH 28 P8-1 32 BLK WH G Ø1 & Ø6 EVP IND NEU SPARE SYS EVP Ø1 & Ø6 (-) (+) Y BL O 33 11 EQG (1/C #6 GRN) R BLK/R BLK WH NEU Ø8-RED Ø8-YEL Ø8-GRN 8-2 R BL WH BRN Ø5-RLTA Ø5-YLTA Ø5-GLTA Ø6-FYLTA NEU 5-2 O Y/BLK BLK SPARE SPARE NEU R BLK/R BLK WH 6-2 Ø6-RED Ø6-YEL Ø6-GRN NEU R BLK/R BLK WH 6-1 Ø6-RED Ø6-YEL Ø6-GRN EQG (1/C #6 GRN) 48 12 REMOTE BATTERY MANAGEMENT SYSTEM (CAT-5) BATTERY BACKUP SYSTEM (CAT-5) 5 4 10 3 EQG (1/C #6 GRN) SIGNAL SERVICE (1/C #8) NEU (1/C #8) BATTERY BACKUP (3/C #18) 2 BLK WH G BLK WH 35 37 39 R BLK/R BLK WH Ø6-DW Ø6-W SPARE NEU P6-2 40 R BLK/R BLK WH Ø4-DW Ø4-W SPARE NEU P4-1 46 7-1 Ø7-RLTA Ø7-YLTA Ø7-GLTA NEU Ø8-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 4-2 Ø4-RED Ø4-YEL Ø4-GRN R BL WH BRN Ø5-RLTA Ø5-YLTA Ø5-GLTA Ø6-FYLTA NEU 5-1 O Y/BLK BLK SPARE SPARE R BLK/R BLK WH NEU Ø2-RED Ø2-YEL Ø2-GRN 2-2 11,13-35 2,10 3-5 13 (TO WSP 1B) 6,7,8,9 (TO SC-1B) INTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE WEST INTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE SOUTHINTERCONNECT AND 1/C #12) (144 SM FIBER OPTIC TO THE EASTINTERCONNECTAND 1/C#12)(144 SM FIBER OPTIC TO THE NORTHHH 1B WH BLK R SERVICE CABINET 1B LUM 1B LUM 2B LUM 3B LUM 4BBLKWHR1B GR. ROD16 7 8 9 6,7,8,9 (TO HH-1B)1BLK WH G BLK WH G BLK WH G BLK WH G EQUIPMENT GROUND 10 12 REMOTE BATTERY MANAGEMENT SYSTEM BATTERY BACKUP SYSTEM 5 4 3 BATTERY BACKUP BLK WH G 6-9,11-57 (TO WSP 1B) 20 BLK WH PB2-1 23 BLK WH G VIDEO DETECTOR 2B 25 1-1 Ø1-RLTA Ø1-YLTA Ø1-GLTA NEU Ø2-FYLTA BL WH BRN Y/BLK O BLK SPARE SPARE R Ø2-DW Ø2-W SPARE NEU R BLK/R BLK WH 29 P2-2 BLK WHPB8-1 30 BLK WHPB2-2 31 VIDEO DETECTOR 1B 34 BLK WH G 13 CAT-6 TMC CAMERA 1B 47 1-2 Ø1-RLTA Ø1-YLTA Ø1-GLTA NEU Ø2-FYLTA R BL WH BRN Y/BLK O BLK SPARE SPARE NEU R BLK/R BLK WH 49 Ø4-RED Ø4-YEL Ø4-GRN 4-1 Ø8-DW Ø8-W SPARE NEU BLK/R BLK WH 50 P8-2 R Ø6-DW Ø6-W SPARE NEU BLK/R BLK WH 51 P6-1 R BLK WHPB8-2 52 BLK WHPB6-1 53 54 BLK WH G Ø4 & Ø7 EVP IND NEU SPARE SYS EVP Ø4 & Ø7 (-) (+) Y BL O 55 VIDEO DETECTOR 4B 56 BLK WH G 36 R BL WH BRN Ø7-RLTA Ø7-YLTA Ø7-GLTA Ø8-FYLTA NEU 7-2 O Y/BLK BLK SPARE SPARE 38 R BLK/R BLK WH NEU Ø2-RED Ø2-YEL Ø2-GRN 2-2 41 BLK WH PB6-2 42 BLK WH PB4-1 43 BLK WH G Ø2 & Ø5 EVP IND NEU SPARE 44 Y BL O Ø2 & Ø5 (-) (+) SYS EVP 45 BLK WH G VIDEO DETECTOR 3B 12,36-57 24 NEU R BLK/R BLK WH 8-3 Ø8-RED Ø8-YEL Ø8-GRN 14 R BLK/R BLK WH NEU Ø8-RED Ø8-YEL Ø8-GRN 8-1 HH 2B SOP SV 1B 90% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:1022211300_500_temp_sgp.dgn3/11/2026SHEETTEMPORARY TRAFFIC CONTROL SIGNAL SYSTEM PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 131 S.P. XXX-XXX-XXX, S.P. 027-702-003 C. PARDRIDGE A. CHALUPSKY A. CHALUPSKY R BL BRN 1-1 Y/BLK O WH BLK BLK/R BLK WH 6-2 R 26 25 R BL BRN 5-1 Y/BLK O WH BLK BLK/R BLK WH 2-2 R 37 35 BLK/R BLK WH R 8-1 14 R BL BRN 7-1 Y/BLK O WH BLK 46 R BLK/R BLK WH 4-2 48 R BL BRN 7-2 Y/BLK O WH BLK 36 BLK/R BLK WH 2-2 38 R R BL BRN 1-2 Y/BLK O WH BLK BLK/R BLK WH 4-1 R 49 47 BLK WH G Ø4 & Ø7 EVP IND LIGHT Y BL O Ø4 & Ø7 EVP (-) (+) 54 55 BLK WH G LUM 4B Ø8-PED Ø6-PED R BLK/R BLK WH R BLK/R BLK WH 50 51 BLK WH PB8-2 BLK WH PB6-1 52 53 BL WH BRN Y/BLK O BLK R 8-3 24 BLK/R BLK WH R 6-1 27 BL WH BRN Y/BLK O BLK R 5-2 15 BLK/R BLK WH R 8-2 16 Ø6-PED Ø4-PED R BLK/R BLK WH R BLK/R BLK WH 39 40 BLK WH PB6-2 BLK WH PB4-1 41 42 BLK WH G Ø2 & Ø5 EVP IND LIGHT Y BL O Ø2 & Ø5 EVP (-) (+) 43 44 BLK WH G LUM 3B BLK/R BLK WH R 28 Ø8-PED BLK/R BLK WH R 29 Ø2-PED PB8-1 BLK WH 30 PB2-2 BLK WH 31 Ø1 & Ø6 EVP IND LIGHT WH G BLK 32 Ø1 & Ø6 EVP BL O Y 33 (-) (+) BLK/R BLK WH R 17 Ø4-PED BLK/R BLK WH R 18 Ø2-PED PB4-2 BLK WH 19 PB2-1 BLK WH 20 Ø8 EVP IND LIGHT WH G BLK 21 Ø8 EVP BL O Y 22 (-) (+) LUM 2B 7 BLK WH G BLK WH G VIDEO DETECTOR 4B 56 BLK WH G VIDEO DETECTOR 3B 45 VIDEO DETECTOR 2B WH G BLK 23 LUM 1B 6 BLK WH G VIDEO DETECTOR 1B WH G BLK 34 WSP 2B WSP 1B WSP 4B WSP 3B PSA 2B PSA 1B PSA 4B PSA 3B CAT-6 CAT-6 TMC 1B 8 9 24,27-31 6,32-347,8,15-23,35-4715 -20 7, 2 1 - 2 3 13 47 ,49 -53 9, 5 4 - 5 6 46,488,43-4536,38-42 8,36,38-45 6-9,11-57 (TO HH-1B) 13 (TO CONTROLLER CABINET 1B) #6 INS. GR. 1112#6 INS. GR.9,46-56 8,35-47 9,25,26,46-56 7,8,14-23,35-4790% PLAN 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 132 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN SYSTEM (SYSTEM). ENGINEER AND ALL COSTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR PEDESTRIAN CROSSWALK FLASHER 9.) ALL WORK AS DETAILED IN NOTES 1 - 8 SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE SURFACES. ALLOWED ON EXISTING PAVEMENT. CONDUIT SHALL BE BURIED 24 INCHES TO 36 INCHES UNDER EXISTING 8.) ALL CONDUIT RUNS ACROSS EXISTING ROADWAYS SHALL BE DIRECTIONAL BORED. NO OPEN CUTTING IS THE ENGINEER. APPROXIMATE. EXACT LOCATIONS SHALL BE COORDINATED WITH ALL UTILITIES AND VERIFIED IN THE FIELD BY 7.) THE LOCATIONS OF THE HANDHOLES, FOUNDATIONS, CONCRETE PAD, AND CONDUIT SHOWN IN THE PLAN ARE 6.) THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. INFORMATION. CONTRACTOR SHALL WORK WITH THE CITY AND THE POWER COMPANY TO ESTABLISH METER ADDRESS AND BILLING SHALL PAY THOSE COSTS DIRECTLY TO THE POWER COMPANY. HENNEPIN COUNTY SHALL NOT BE BILLED. THE 5.) THE CITY SHALL BE BILLED FOR ALL PEDESTRIAN CROSSWALK FLASHER SYSTEM POWER COSTS AND THE CITY TO SUPPLY POWER TO THE SYSTEM. PROVISIONS FOR MORE INFORMATION. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EQUIPMENT COSTS ASSOCIATED WITH THE SERVICE CONNECTION AND MONTHLY ELECTRICAL SERVICE. REFER TO THE SPECIAL CROSSWALK FLASHER SYSTEM WITH THE ELECTRICAL UTILITY COMPANY. CITY OF CRYSTAL IS RESPONSIBLE FOR 4.) THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE SERVICE CONNECTION FOR THE PEDESTRIAN FOUNDATION WORK AND SERVICE CABINET PAD. 3.) THE CONTRACTOR SHALL COORDINATE THE PEDESTRIAN RAMP WORK WITH THE CONSTRUCTION OF THE PEDESTAL BITUMINOUS WALK, ETC. TO IT'S ORIGINAL CONDITION OR BETTER. 2.) THE CONTRACTOR SHALL PLACE COMMON BACK FILL AND RESTORE ALL DISTURBED TURF, CONCRETE OR RRFB-2, FOR OPERATION AS SHOWN IN THE PLANS. PEDESTAL MOUNTED PUSH BUTTONS SHALL INCLUDE SPACERS. 1.) ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN R10-3E (9" X 15") SHALL BE INSTALLED ON RRFB-1 AND NOTES: ITEM DESCRIPTION UNIT TOTAL SYSTEM NOTES PEDESTRIAN CROSSWALK FLASHER SYSTEM 1 TABULATION OF ESTIMATED QUANTITIES (1) (1) SEE SPECIAL PROVISIONS. TYPE 3/C #14 1/C # 3 USAGE LUMINAIRES INCOMING POWER NOTES TRAFFIC SIGNAL CABLES EQUIPMENT GROUND 1/C # 6 GRN 1/C # 8 INCOMING POWER 8/C #18 RRFB PEDESTRIAN PUSH BUTTONS 2/C #14 RRFB LIGHTS COLOR CODING OF CONDUCTORS BL/BLK R/BLK BRN Y G BLK WH BL O R BLUE WITH BLACK TRACER RED WITH BLACK TRACER BROWN YELLOW GREEN BLACK WHITE BLUE ORANGE RED WIRING DIAGRAM LEGEND ABBREVIATIONS RRFB MA HH SOP SC CC LUM APS PB EQG NEU NEUTRAL CONDUCTOR RECTANGULAR RAPID FLASHING BEACON MAST ARM HANDHOLE SOURCE OF POWER SERVICE CABINET CONTROL CABINET LUMINAIRE ACCESSIBLE PEDESTRIAN SIGNAL PUSH BUTTON EQUIPMENT GROUND CONNECTION EQUIPMENT GROUND NEUTRAL INDICATED BY THE WIRING DIAGRAM CONDUCTORS WITH TAPS AS OR PARALLELING OF CABLED DENOTES TAP OF CABLED CONDUCTOR SIGNAL PLAN LAYOUT LEGEND SOP HH CC RRFB SC DISCONNECT ON ONE CONCRETE PAD SERVICE CABINET WITH METER AND AND PEDESTRIAN PUSH BUTTON AS NOTED PEDESTAL WITH MOUNTED CONTROL CABINET RECTANGULAR RAPID FLASHING BEACON (RRFB) POLE MOUNTED PAD MOUNTED SOURCE OF POWER PVC HANDHOLE WITH METAL COVER SIGNAL SYSTEM RIGID STEEL CONDUIT (RSC) 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 133 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN AA 1 3/4" 4 5/8" 1 7/16"1 7/16"1 3/4"7/8" DIA.7/8"2 5/16" RRFB SYSTEM FOUNDATION DETAILS SIGNAL ASSEMBLY PEDESTAL MOUNT FOUNDATION (NO SCALE) 22" DIA. (CONTRACTOR'S OPTION) 2' SQUARE OR 30" ROUND FOUNDATION CONCRETE SHALL BE MIX 3G52 OR EQUAL 2' SQ. 30" DIA. SEC. A-A 2 1/4" PROJECTION OF BOLTS AND RSC GROUND LINE EXISTING OR PROPOSED 4-3/8" Ø X 3'-6" OR BUTT WELDED 4-1/4" Ø X 22" DIA. CIRCLES LAP SIZE AND NUMBER SHOWN IN THE PLANS RIGID STEEL CONDUIT SHALL BE OF THE 4' MIN.OR WELDED TOGETHER. THE REINFORCEMENT SHALL BE SECURELY FASTENED STEEL REINFORCEMENT SHALL BE DEFORMED BARS. NOTE: SIGNAL ASSEMBLY PEDESTAL MOUNT FLAT WASHER TYPICAL (NO SCALE) FLAT WASHERS SHALL BE 1/4" THICK A36 GALVANIZED STEEL. NOTE: RECTANGULAR RAPID FLASHING BEACON LED (RRFB) AC POWERED PEDESTRIAN FLASHER ASSEMBLY PEDESTAL MOUNT SIDE VIEW (NO SCALE) UNIVERSAL MOUNTING BRACKET SIGN MOUNTING BRACKET SIGN MOUNTING BRACKET 16' 3"3'6"7'8' 8"9' 2"3'6"7'8' 8"9' 2"16' 3"RECTANGULAR RAPID FLASHING BEACON LED (RRFB) AC POWERED PEDESTRIAN FLASHER ASSEMBLY PEDESTAL MOUNT FRONT VIEW (NO SCALE) POLE CAP RRFB-1 FIT ALL RRFB LIGHTS INSTALL ONLY ON CONTROL CABINET ENCLOSURE SHALL SHEETING YELLOW-GREEN DG3 SIGN BLACK ON FLUORESCENT WARNING SIGN W11-2 (36" X 36") PLANS) APPROX. 4"H X 22"W BACK TO BACK AS SHOWN ON THE RRFB (LED) ONE-SIDED (MOUNTED OPERATING THE PEDESTRIAN WHEN RRFB IS TRAVEL TO PROVIDE NOTICE TO THE DIRECTION OF PEDESTRIAN END MOUNTED LED, FACING IN DG3 SIGN SHEETING BLACK ON FLUORESCENT YELLOW-GREEN WARNING SIGN W16-7P (30" X 18") 80 ALUMINUM PEDESTAL POLE 4.5" OUTSIDE DIAMETER 15' SCHEDULE ON WHITE DG3 SIGN SHEETING R10-25 SERIES SIGN (9" X 12") BLACK FLASHING". SHALL BE "YELLOW LIGHTS ARE APS PUSH BUTTON. VOICE MESSAGE THREADED ON BOTTOM END) 4" VAR. ALUMINUM PEDESTAL (PIPE PEDESTAL COLLAR PEDESTAL BASE MOUNT FOUNDATION FOR DETAILS SIGNAL ASSEMBLY PEDESTAL CONCRETE FOUNDATION, SEE THE WALK OR BITUMINOUS TRAIL TOP OF FINISHED CONCRETE BUTTON TURN WARNING LIGHTS TO ON PUSH 3" 3" MIN., 5" MAX 1/2" RADIUS 12 3/4" BOLT CIRCLE (4-3/4" X 19" ANCHOR BOLTS) 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 134 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 2" TO 3" FRONT VIEW 30" GROUND LINE EXISTING OR PROPOSED PROJECT 2" - 3" ABOVE CONCRETE GROUND ROD (5/8" DIA X 15') SIDE VIEW GROUND LINE EXISTING OR PROPOSED 12" 20"36" 30"CONCRETE PAD CABINET SERVICE 4" MIN. CONCRETE WALK CABINET SERVICE TYPICAL ANCHOR ROD RRFB SERVICE CABINET (NO SCALE) AND FLAT WASHER HEAVY HEX NUT UNC-2A 3/4" DIA. BOLT 13 A-563 ASSEMBLED AFTER ROD PLATING. HEAVY HEX NUT AND FLAT WASHER, ASTM, 3. RODS TO BE SUPPLIED WITH GALVANIZED SHALL RUN FREE AFTER PLATING. 2. HOT DIP GALVANIZE FULL LENGTH. NUTS 3/4" DIA. X 21" LONG BEFORE BENDING. 1. MATERIAL STEEL SHALL BE ASTM, A-36. NOTES: 3" 18" 3" BOND THE GREEN INSULATED 6 AWG CONDUCTOR TO THAT GROUND ROD. TRAFFIC SIGNAL POLE HANDHOLE GROUND ROD IS LOCATED WITHIN THE SPECIFIED DISTANCE MENTIONED, GREEN INSULATED 6 AWG CONDUCTOR IN THE CONDUIT GOING TO THAT HAND HOLE. IF THE REQUIRED THAT HANDHOLE. USE A 12' GROUND ROD IN THE HAND HOLE INSTEAD OF A 10' GROUND ROD AND PULL A THE GROUND ROD LOCATED IN THE EQUIPMENT PAD, THE SUPPLEMENTAL GROUND ROD MAY BE PLACED IN TRAFFIC SIGNAL SYSTEM HAND HOLE IS LOCATED AT LEAST 6' APART AND NO MORE THAN 10' APART FROM AWG GREEN INSULATED COPPER CONDUCTOR, AND EXOTHERMIC WELDED CONNECTIONS. IF A COUNTY DETAIL ON STANDARD PLATE 8106 SHEET 3 EXCEPT FURNISH AND INSTALL 10' GROUND ROD ELECTRODES, 6 9. PLACE A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH THE GROUNDING ELECTRODE SYSTEM THE CABINET. CABINET SHALL NOT BE ORIENTATED SUCH THAT A PERSON HAS THEIR BACK TO THE RRFB WHEN WORKING IN IN THE CABINET HAS A CLEAR LINE OF SITE TO SEE THE RRFB AND SEE IN THE CABINET. THE SERVICE 8. ORIENT THE SERVICE CABINET SUCH THAT WHEN THE FRONT CABINET DOOR IS OPENED A PERSON WORKING SHALL BE TERMINATED UNDER ANY FORM OF PAVEMENT OR HARD SURFACE, AS DIRECTED BY THE ENGINEER. BE PERMANENTLY MARKED WITH AN ARROW TO INDICATE THE DIRECTION OF THE RSC STUBS. NO RSC STUB 7. THREAD AND CAP BOTH ENDS OF ALL RSC STUBS. THE CAPS LOCATED WITHIN THE SERVICE CABINET SHALL OR PROPOSED GROUND LINE, AS DIRECTED BY THE ENGINEER. 6. THE CONCRETE PAD ELEVATION SHALL BE ADJUSTED TO MAINTAIN THE 12" CLEARANCE ABOVE THE EXISTING THE ENGINEER. 5. THE CONCRETE PAD AND THE CONCRETE WALK SHALL BE CONCRETE MIX 3G52 OR EQUAL, AS DIRECTED BY ENGINEER. 4. A CONCRETE SIDEWALK SHALL BE ON THE FRONT DOOR SIDE OF THE SERVICE CABINET, AS DIRECTED BY THE ENGINEER. FUNCTIONS (EQUIPMENT, SUPPORTING MEMBERS, ETC.). FINAL CONDUIT LOCATIONS, AS DIRECTED BY THE PROJECT 2" TO 3" ABOVE THE CONCRETE. THE CONDUITS SHALL NOT INTERFERE WITH THE CABINET THE INSIDE LIP OF THE MOUNTING FLANGE ON THE DOOR SIDE OF THE CABINET. THE CONDUITS SHALL 3. THE LOCATION OF CONDUITS WITHIN THE CONCRETE PAD SHALL BE 6" TO THE CENTER OF THE CONDUIT FROM INSTALLED AND THEN SEALED AFTER CABLES HAVE BEEN INSTALLED). 2. THE TOP OF THE CONDUITS SHALL BE THREADED AND CAPPED AFTER INSTALLATION (UNTIL CABLES ARE BY THE ENGINEER. 1. THE UPPER PART OF THE CONCRETE PAD SHALL BE BEVELED OR CHAMFERED IN A NEAT MANNER, AS DIRECTED NOTES: PLAN VIEW SEE RRFB PLAN LAYOUT FOR ADDITIONAL INFORMATION NOT TO SCALE FOR ILLUSTRATION ONLY TYPICAL PAD WITH RRFB SERVICE CABINET CONCRETE WALK PREFORMED JOINT FILLER 2" RSC TO HH-1 TO SOP-1 FRONT DOOR SERVICE CABINET 2" RSC STUB DOOR BACK 3" RSC TO RRFB-1 11 GROUND ROD GROUNDING CONDUCTOR INSULATED STRANDED 6 AWG GREEN 1" RSC ANGLE IRON BASE FRAME 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 135 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN C FEED POINT WIRING DIAGRAM C PHOTOCELL TOGGLE SWITCH TEST BY-PASS CONTROL POWER LUMINAIRE MAIN SERVICE, 120/240V, SINGLE PHASE, 3 WIRE MECHANICAL BYPASS RINGLESS SOCKET WITH 5 TERMINAL 200 AMP METER SOCKET MAIN 60A/2PROD GROUND NEUTRAL BUSCONTROL FUTURE LUMINAIRE FUTURE LUMINAIRE 15A/1P 15A/1P 15A/1P 30A/4P CONTACTOR FUTURE STREET LIGHTS METERED POWER TO RRFB CONTROL BOX RRFB SERVICE METERED POWER 20A/1P TB2 (60 AMP) CIRCUIT BREAKER NEUTRAL BUS CONTROL BOX TO RRFB AUTO TEST 2 1 34 L1 N L2 15. SEE THE EQUIPMENT PAD DETAIL SHEET FOR TYPICAL ANCHOR ROD DETAILS. STANDARDS. 14. THE 19" RACK IN THE BASE OF THE CABINET SHALL BE CONSTRUCTED TO TIA/EIA 3100 RODS. PROVIDE A 1/2" GAP FOR DRAINAGE. SIZED TO FIT THE BASE INCLUDING CORNER HOLE/SLOTS TO ACCOMMODATE THE ANCHOR FOUNDATION AND THE SERVICE CABINET. THE GASKET SHALL CONSIST OF FOUR (4) STRIPS, 13. A 1/2" THICK SOLID BUTYL RUBBER GASKET SHALL BE PROVIDED BETWEEN THE CONCRETE STANDARDS. 12. EACH SERVICE CABINET SHALL BE WELDED TO THE BASE IN ACCORDANCE WITH U.L. SERVICE ENTRANCE EQUIPMENT" AND APPROVED FOR OUTDOOR USE. 11. EACH SERVICE CABINET SHALL BE U.L. LISTED AND LABELED AS "SUITABLE FOR USE AS SEAL. 10. ALL CONDUIT ENTERING THE FOUNDATION SHALL BE SEALED WITH AN APPROVED DUCT 9. PROVIDE CLEARANCE TO INSTALL OR REMOVE THE PHOTOELECTRIC CONTROL CELL. CABINET. 8. PROVIDE A PHOTOELECTRIC CONTROL CELL AND LUMINAIRE TEST SWITCH WITHIN THE 7. SHORT CIRCUIT RATING - 10,000 AIC SYMMETRICAL. CLEARLY MARKED IN A MANNER THAT WILL NOT DETERIORATE WITH MOISTURE OR AGE. (E.G. "RRFB", "LUMINAIRE WITH NUMBER" OR "FUTURE"). ALL CIRCUIT BREAKERS SHALL BE WITH THE "ON" AND "OFF" POSITIONS AND IDENTIFIED WITH THE LOAD WHICH IT IS CARRYING 6. THE CIRCUIT BREAKERS SHALL BE 120/240 VOLT AC, 60 HZ, AND SHALL BE CLEARLY MARKED LIGHT SOURCES AND SHALL NORMALLY FACE NORTH OR EAST. LEFT OR RIGHT SIDE OF THE CABINET, ORIENTED TO ELIMINATE INTERFERENCE BY MANMADE CONTROL VIEWING WINDOW. LOCATED IN THE TOP SECTION OF THE CABINET AND ON THE 5. PROVIDE A 2" DIA. WEATHERPROOF AND VANDAL RESISTANT CLEAR PLASTIC PHOTOELECTRIC COMPLETE SEAL WITH THE ENCLOSURE. 4. BOTH DOOR OPENINGS SHALL BE PROVIDED WITH A NEOPRENE GASKET TO FORM A COMPLETE WITH A NUMBER 2 KEY AND SWING DOWN PLATE PROVIDE ONE (1) KEY. CORRODING TAMPERPROOF CARRIAGE BOLTS AND SECURED WITH A STANDARD POLICE LOCK 3. THE SERVICE CABINET DOORS SHALL BE ATTACHED TO THE ENCLOSURE WITH NON- 2. ALL HINGES, HINGE PINS AND LOCKS SHALL BE OF NON-CORRODING CONSTRUCTION. FINISH. OUTSIDE, SHALL BE PROTECTED WITH AN EXTERNAL THIRTY (30) MINUTE CLEAR ANODIZED WEATHERPROOF SERVICE. AFTER FABRICATION, THE SERVICE CABINET, BOTH INSIDE AND 1. EACH SERVICE CABINET SHALL BE FABRICATED FROM 1/8" ALUMINUM FOR OUTDOOR CONSTRUCTION NOTES 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 136 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN SERVICE CABINET - METERED FRONT VIEW MANUAL BYPASS SOCKET W/ 200 AMP METER MAIN BREAKER THE METER AND #2 WIRE BETWEEN TURN LATCH DEAD FRONT W/ QUARTER COMPONENTS BEHIND HINGED LOWER INTERIOR WARNING HAZARD ARC FLASH & SHOCK equipment required BASE LAYOUT ANCHOR BOLT REAR FRONT INSIDE OF DOOR STICKERS ON ETL LISTING DOOR LABEL AND BONDED NEUTRALGROUNDRIGHT SIDE VIEW REAR VIEW LEFT SIDE VIEW WARNING HAZARD ARC FLASH & SHOCK equipment required SNOW WATER & TO SHED CAPPED ROOF FRONT DOOR LABEL ON ARC FLASH SOCKET METER CENTER OF 48" TO APPROX. 58" 6" X 13" LOWER SECTION WAY IN REAR UTILITY WIRE (UPPER) METER SECTION FLANGE 1 1/2" PANEL BOARD SECTION 3/4" FLANGE MOUNTING HOLES FOR SLOTTED (4) 7/8" X 2" SECTION LOWER DIVIDER 5 3/4" 9 1/4" 16" CABINET BOTTOM OF PROVIDED FOR GASKET 1/4" BASE PHOTOCELL 1-15A/1P FLASHER CROSSWALK 1-20A/1P 2-15A/1P-LUM 1-60A/2P DISCONNECT 60A SERVICE #BR3040L200 CENTER CIRCUIT LOAD HAMMER, 30 CUTLER 22K AIC RATED REQUIREMENTS SIZED TO NEC USING 600V WIRE FACTORY WIRED SHALL BE EQUIPMENT AND CONTROL DISTRIBUTION **ALL BLACK COATED AND POWDER DIE CAST OFF HINGES STYLE LIFT SOUTHCO 2"DEAD FRONT RAILSPHOTOCELL WINDOW FOR LEXAN SECTION IN REAR 6"D x 13"W WIREWAY UTILITY 16" 16" 6 1/4" 20" DIVIDER LENGTH FULL WELDED CORNERS ALL FRONT COVER LABEL ON ARC FLASH COATED BLACK POWDER CAST AND HINGES- DIE LIFT OFF -WIRING ETL LISTED IN ACCORDANCE W/ UL508A -BOX ETL LISTED IN ACCORDANCE W/ UL50 -NEOPRENE GASKET ON DOORS (UNLESS OTHERWISE NOTED) -STAINLESS STEEL HARDWARE -ANODIZED 1 HOUR CLEAR -WELDED CONSTRUCTION -1/8" ALUMINUM 5052-H32 -NEMA3R BOX CONSTRUCTION: HANDLE STEEL PULL STAINLESS LOCKING TAB & DOOR W/ REAR ACCESS CONTACTOR FOR LIGHTING CIRCUITS. PHOTOCELL, TEST SWITCH, AND NOTE: CABINET SHALL INCLUDE PROVISIONS PADLOCKING LATCH W/ STEEL SNAP STAINLESS 5 1/2"4.10 FAIRVIEW AVE NCSAH 102 (DOUGLAS DR) FAIRVIEW AVE NCSAH 102 (DOUGLAS DR)PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 137 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 3. RRFB FLASH TIME SHOULD BE 17 SECONDS. STUB (THREAD AND CAP BOTH ENDS). 2. ALL FOUNDATIONS AND SERVICE CABINET PAD SHALL HAVE A 2" RSC WIRES FROM RRFB-1 TO CC-1. 1. CC-1 MOUNTED ON RRFB-1 PEDESTAL. SEE WIRING DIAGRAM FOR NOTES: 1- 1/C # 6 GRN 4- 2/C # 14 1- 8/C # 18 3" RSC RRFB-2 TO RRFB-1 1- 1/C # 6 GRN 3- 1/C # 8 3" RSC SC-1 TO RRFB-1 3- 1/C # 3 2" RSC HH-1 TO SC-1 3- 1/C # 3 2" RSC SOP-1 TO HH-1 BACK TO BACK BACK TO BACK RRFB 1 1 CC SOP 1 1 SC 1 HH RRFB 2 118+25.00 0' SCALE 20'10' 4.10 PATH & FILENAME:PLOTTED/REVISED:PLOT NAME:3/11/2026SHEETRRFB PLANS 102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:138 138 S.P. XXX-XXX-XXX, S.P. 027-702-003 R. ALLERS C. PARDRIDGE C. PARDRIDGE 90% PLAN 1 RRFB LIGHT INS. GR. 3 7 13 BLK WH G RRFB 3-7,13R BLK O Y BRN BL R/BLK BL/BLK RRFB LIGHT 4 BLK WH RRFB LIGHT 5 BLK WH RRFB LIGHT 6 BLK WH PB-1 2 RRFB LIGHT INS. GR. 8 12 13 BLK WH G RRFB 8-13R BLK O Y BRN BL R/BLK BL/BLK RRFB LIGHT 9 BLK WH RRFB LIGHT 10 BLK WH RRFB LIGHT 11 BLK WH PB-2 8-13 RRFB-2 FOUNDATIONRRFB-1 FOUNDATION 2,142 8-132,14EQG (1/C #6 GRN) SIGNAL SERVICE (1/C #8) NEU (1/C #8) 2 14 BLK WH RRFB LIGHT PB-1 8 7 R BLK O Y BRN BL BLK WH R/BLK BL/BLK RRFB LIGHT 9BLK WH RRFB LIGHT 10BLK WH RRFB LIGHT 11BLK WH RRFB LIGHT 6BLK WH RRFB LIGHT 5BLK WH RRFB LIGHT 4BLK WH RRFB LIGHT 3BLK WH CONTROL CABINET PB-2 12 R BLK O Y BRN BL R/BLK BL/BLK EQG (1/C #6 GRN) 13 WH BLK R SERVICE CABINET SOP BLK WH R1 HH 1 1 1 1 GR. RODEQUIPMENT GROUND 14 4.10 8"SAN 36-SE - 0+00.00 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 880 880 HENNEPIN LUMEN 24"WATR 36-SE 8"SAN 36-SE - 0+49.10 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 HENNEPIN LUMEN 24"WATR 36-SE 1.5%1.3% 8"SAN 36-SE - 0+50.00 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 HENNEPIN LUMEN 24"WATR 36-SE 1.5%1.2% 8"SAN 36-SE - 1+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN .5"GAS 24"WATR 36-SE 1.5% 8"SAN 36-SE - 1+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 1.5% 8"SAN 36-SE - 2+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 1:5.11.5% 8"SAN 36-SE - 2+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 1:4.61:4.81.5% 8"SAN 36-SE - 3+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 1:4.41:4.5 1.5% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-SE_015/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-1 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-SE - 3+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR SCALE V SCALE H 20'0'10' 10'0'5' 36-SE 1:41:4 1.5% 4.10 8"SAN 36-SE - 3+62.58 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 0.5%0.5% 8"SAN 36-SE - 4+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN 24"WATR 36-SE 1:41:4 1.5% 8"SAN 36-SE - 4+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 HENNEPIN 22" SPANEX. 24"WATR 36-SE 1:41:4 -0.7% 8"SAN 36-SE - 4+71.05 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 HENNEPIN 22" SPANEX. 24"WATR 36-SE 0.5%0.5%-5.2% 8"SAN 36-SE - 5+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 HENNEPIN 22" SPANEX. 24"WATR 36-SE 1:41:4 1.5% 8"SAN 36-SE - 5+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 22" SPANEX. 24"WATR 36 MED-S 36-SE -0.2%1:41:4 1.5% 36-SE - 6+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 22" SPANEX. 24"WATR 36 MED-S 36-SE 1:41:4 1.5% 36-SE - 6+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 22" SPANEX. 24"WATR 36 MED-S 36-SE 0.8% 1.5%1.5%4.4% X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-SE_025/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-2 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-SE - 6+61.06 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 22" SPANEX. 24"WATR SCALE V SCALE H 20'0'10' 10'0'5' 36 MED-S 36-SE 1.2% 1.5%1.5%3.7% 4.10 36-SE - 7+00.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 22" SPANEX. 24"WATR 36 MED-S 36-SE 2.4%1:41:4 1.5% 36-SE - 7+50.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 4"GAS 22" SPANEX. 24"WATR 36 MED-S 36-SE 3.2%1:41:4 1.5% X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-SE_035/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-3 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-SE - 7+75.00 40 30 20 10 0 10 20 30 40 860 860 865 865 870 870 875 875 HENNEPIN LUMEN 4"GAS 22" SPANEX. 24"WATR SCALE V SCALE H 20'0'10' 10'0'5' 36 MED-S 36-SE 3.2%1:41:4 1.5% 4.10 8"SAN 36-NW - 0+95.00 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 880 880 885 885 LUMEN 8"GAS 18"EX. 12"EX. 36 MED-N36-NW 1.5%1.5%-4.4% 8"SAN 36-NW - 1+00.00 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 880 880 885 885 LUMEN 8"GAS 36 MED-N36-NW 1.5%1.5%-4.3% 8"SAN 36-NW - 1+38.20 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 880 880 LUMEN 8"GAS 36 MED-N36-NW 4.9%1.5%6.1%-3.9% 8"SAN 36-NW - 1+50.00 40 30 20 10 0 10 20 30 40 865 865 870 870 875 875 880 880 LUMEN 8"GAS 36 MED-N36-NW -0.9%1.5%6.1%-3.4% 8"SAN 36-NW - 2+00.00 40 30 20 10 0 10 20 30 40 870 870 875 875 880 880 LUMEN 8"GAS 36-NW 1.5%1.5% 8"SAN 36-NW - 2+08.91 40 30 20 10 0 10 20 30 40 870 870 875 875 880 880 885 885 LUMEN 8"GAS 36-NW 1.5%6.1% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-NW_015/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-4 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-NW - 2+50.00 40 30 20 10 0 10 20 30 40 870 870 875 875 880 880 885 885 LUMEN 8"GAS SCALE V SCALE H 20'0'10' 10'0'5' 36-NW 1.5%1.5% 4.10 8"SAN 36-NW - 2+82.36 40 30 20 10 0 10 20 30 40 870 870 875 875 880 880 885 885 LUMEN 8"GAS 36-NW 1.5%3.0% 8"SAN 36-NW - 3+00.00 40 30 20 10 0 10 20 30 40 875 875 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 1.5%-0.7% 8"SAN 36-NW - 3+50.00 40 30 20 10 0 10 20 30 40 875 875 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 1.5%1.5% 8"SAN 36-NW - 3+69.39 40 30 20 10 0 10 20 30 40 875 875 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 13.8% 1.5%6.1% 8"SAN36-NW - 4+00.00 40 30 20 10 0 10 20 30 40 875 875 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 1.5%1.5% 8"SAN36-NW - 4+50.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 1.5%1.5% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-NW_025/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-5 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-NW - 4+89.80 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 LUMEN 8"GAS SCALE V SCALE H 20'0'10' 10'0'5' 36-NW 1.5%4.0% 4.10 8"SAN 36-NW - 5+00.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 LUMEN 8"GAS 36-NW 1.5%-1.4% 8"SAN 36-NW - 5+41.55 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 8"GAS 36-NW 4.3%1.5%8 .3% 8"SAN 36-NW - 5+50.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 8"GAS 36-NW 1.5%1.5% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:36-NW_035/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-6 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 36-NW - 6+00.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 LUMEN 8"GAS SCALE V SCALE H 20'0'10' 10'0'5' 36-NW 1.5%1.5% 4.10 8"SAN 42-SE - 0+06.00 40 30 20 10 0 10 20 30 40 890 890 895 895 900 900 HENNEPIN LUMEN 24"WATR 42-SE 1.5% 8"SAN 42-SE - 0+27.19 40 30 20 10 0 10 20 30 40 890 890 895 895 900 900 HENNEPIN LUMEN 24"WATR 42-SE 2.0%11.1% 8"SAN 42-SE - 0+50.00 40 30 20 10 0 10 20 30 40 890 890 895 895 900 900 HENNEPIN LUMEN 24"WATR 42-SE 1.5% 8"SAN 42-SE - 1+00.00 40 30 20 10 0 10 20 30 40 890 890 895 895 900 900 HENNEPIN LUMEN 24"WATR 42-SE 8.0%2.0%6.6% 8"SAN 42-SE - 1+04.44 40 30 20 10 0 10 20 30 40 890 890 895 895 900 900 HENNEPIN LUMEN 24"WATR 42-SE 8.0%2.0%6.8% 8"SAN 42-SE - 1+26.04 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 HENNEPIN LUMEN LUMEN 24"WATR 42-SE 8.0%2.0%10.8% 8"SAN 42-SE - 1+50.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 HENNEPIN LUMEN LUMEN 24"WATR 42-SE 1.5%1.5%1:4 8"SAN 42-SE - 1+88.46 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 HENNEPIN LUMEN LUMEN 42-SE 10.0%1.5%0.7% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:42-SE_015/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-7 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 42-SE - 2+00.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 HENNEPIN LUMEN LUMEN SCALE V SCALE H 20'0'10' 10'0'5' 42-SE 1.5%1.5% 4.10 8"SAN 42-SE - 2+50.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 HENNEPIN LUMEN LUMEN 30"WATR 42-SE 1.5%1.5% 8"SAN 42-SE - 2+93.90 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 HENNEPIN LUMEN LUMEN 30"WATR 42-SE 1.5%1.5%-2.3% 8"SAN 42-SE - 3+00.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 HENNEPIN LUMEN LUMEN 30"WATR 42-SE 1.5%1.5%-2.3% 8"SAN 42-SE - 3+50.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 HENNEPIN LUMEN LUMEN 30"WATR 42 MED-S 42-SE 1.5%1.5% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:42-SE_025/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-8 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 42-SE - 3+75.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 HENNEPIN LUMEN LUMEN 12"EX. 30"WATR SCALE V SCALE H 20'0'10' 10'0'5' 42 MED-S 42-SE 1.5%1.5% 4.10 8"SAN 42-NW - 1+30.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 42 MED-N42-NW 1.5%1.5% 8"SAN 42-NW - 1+50.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 42 MED-N42-NW 1:4 1.5%1.5% 8"SAN 42-NW - 2+00.00 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 42 MED-N42-NW 1.5%1.9% 8"SAN 42-NW - 2+07.47 40 30 20 10 0 10 20 30 40 880 880 885 885 890 890 895 895 LUMEN 42 MED-N42-NW 1.5%2.2% 8"SAN 42-NW - 2+50.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 LUMEN 42-NW 1.5%1.5% 8"SAN 42-NW - 2+60.55 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 LUMEN 42-NW 12. 8%1.5%8 .2% 8"SAN 42-NW - 3+00.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 LUMEN 42-NW 1.5%1.5% 8"SAN 42-NW - 3+49.65 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 LUMEN 42-NW 5.7%1.5% 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:42-NW_015/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-9 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 42-NW - 3+50.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 LUMEN SCALE V SCALE H 20'0'10' 10'0'5' 42-NW 5.6%1.5% 4.10 8"SAN X-SECTIONS STATION TO STATION SHEETPATH & FILENAME:PLOTTED/REVISED:PLOT NAME:42-NW_025/19/2025102CSAH 2211300HENNEPIN COUNTY PROJECT DESIGN BY: CAD BY: CHECKED BY: LAST REVISION:XS-10 XS-10 S.P. XXX-XXX-XXX, S.P. 027-702-003XX/XX/XXXX T. BRUERS T. PETERSEN T. PETERSEN 90% PLAN 42-NW - 3+80.00 40 30 20 10 0 10 20 30 40 885 885 890 890 895 895 900 900 LUMEN SCALE V SCALE H 20'0'10' 10'0'5' 42-NW 1.5% 4.10 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026-__ RESOLUTION RECOGNIZING JUNE AS PRIDE MONTH WHEREAS, a priority of the Crystal City Council is to make Crystal a welcoming and inclusive community; and WHEREAS, all Crystal residents have the right to feel safe, be free from discrimination, and to live without the threat of harassment; and WHEREAS, the Crystal City Council is committed to making Crystal an inclusive and welcoming community for all, which includes Crystal’s LGBTQ community; and WHEREAS, June is recognized as Pride Month to promote dignity and equal rights for the LGBTQ community and celebrate their important contributions; and WHEREAS, the Crystal City Council Rules Section 2.2.8 provides the City Council may use symbolic resolutions to make public statements on matters directly related to the business of the city; and WHEREAS, the City Council determines that making a public statement supporting Crystal’s LGBTQ community by recognizing Pride Month is directly related to the city’s efforts to be a more welcoming and inclusive community. NOW, THEREFORE, BE IT RESOLVED, by the Crystal City Council, that June 2026 is Pride Month in Crystal to recognize the contributions of our LGBTQ community. Adopted this 19th day of May 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Kimberly Therres, Assistant City Manager 4.11 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 1 OF 9 ___________________________________________________________________________________ FROM: Dan Olson, City Planner ___________________________________________________________________________________ TO: Adam R. Bell, City Manager (for May 19 Meeting) DATE: May 13, 2026 RE: Consider a resolution approving a conditional use permit request for Islamic Education and Cultural Center for a religious institution at 4801 Welcome Avenue North A.BACKGROUND The Islamic Education and Cultural Center (IECC) has applied for a conditional use permit (CUP) to allow a religious institution at 4801 Welcome Avenue North. The existing commercial building is vacant. The property is zoned Neighborhood Commercial (NC), and the proposed use is a conditional use within that district. Notice of the May 11 public hearing was published in the Sun Post on April 30, mailed to owners, renters and business tenants within 500 feet (see attachment A), and posted to all neighborhoods on Nextdoor. A sign was also posted on the property. 1.Public comment at the Planning Commission public hearing. At the May 11 Planning Commission public hearing, the Commission unanimously recommended approval of the CUP application, with five individuals from the public providing comments: ➢First resident. The resident expressed concern about increased traffic in the neighborhood due to the proposed religious institution. Staff response. The city engineer has reviewed this proposed religious facility and found that the number of vehicles per day that could be added will not produce any unusual effects. ➢Second resident. The resident expressed concern about increased traffic and on -street parking by the attendees at the religious institution. COUNCIL STAFF REPORT Conditional Use Permit for 4801 Welcome Avenue North 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 2 OF 9 Staff response. See previous response relating to traffic. The city cannot prohibit on- street parking, but the installation of no parking signs on the north side of 48th and the west side of Welcome Avenues will help alleviate traffic obstructions. ➢Third resident. The resident said that this proposed use will produce more litter in the neighborhood, bring more traffic, and not pay taxes. He is against the proposed use. Staff response. This type of use is not prone to produce unusual amounts of litter, but the applicant is adding a dumpster enclosure to the property that was not previously there. The proposed use is allowed in the NC district as a conditional use. ➢Fourth resident. The resident was concerned that children would be in close proximity from a bar and a liquor store across West Broadway. Staff response. There is no zoning requirement that a religious institution be a certain distance to bars and liquor stores. ➢Fifth resident. The resident was concerned that the proposed use would repeat the code violations in 2021 when an unlawful nightclub was located on the property. Those code violations included littering, noise, overnight parking in the neighborhood, and increased traffic from hundreds of nightclub attendees. Staff response. The proposed religious institutional use will operate very differently from the unlawful nightclub, with no overnight parking and no noise impacts. 2.Planning Commission added conditions. The Commission unanimously recommended approval of the CUP with the staff- recommended conditions, plus an additional condition requiring at least 30 minutes between the end of one worship service and the beginning of the next, and a recommendation that the City Council adopt resident parking only for the surrounding neighborhood. Because a resident parking only restriction would not be based on a known, actual problem that exists, but instead would be speculative based on assumptions about how the facility will operate, staff does not recommend exploration of such restriction at this time. If an actual on-street parking problem emerges at some point in the future, the City Council could then consider imposing such restriction. 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 3 OF 9 Attachments: A.Site location and public hearing mailing notice map B.Zoning map C.Photos of existing property D.Applicant’s project narrative E.Site plans (10 sheets) F.Resolution 2025 Aerial Photo: 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 4 OF 9 B.PROPOSED CONDITIONAL USE 1.Neighborhood open house The applicant held a neighborhood open house on April 16, 2026, which was attended by four neighborhood residents, the mayor, two planning commission members, and the city planner. The purpose of the open house was to provide information on the proposed use to property owners and tenants near the facility. Attendees asked questions about how the applicant would use the property, hours of operation, and timing of the opening of the religious institution. 2.Existing Use The existing 5,600 sq. ft. building was constructed in 1964 on the 21,185 sq. ft. (0.5 acres) property. The property has 25 parking spaces. The building has been vacant since 2022. 3.Adjacent uses The following are the existing land uses and zoning districts surrounding this property: •North.Residential treatment facility, zoned Neighborhood Commercial (NC) •East.Across West Broadway, restaurant zoned NC •West.Single-family homes zoned R-1 •South.Multi-family residential buildings zoned R-2. 4.Proposed use The applicant is proposing to repurpose the existing building for a religious institution. This would involve extensive interior remodeling, including the installation of a fire suppression system (sprinklers). The applicant is not proposing to enlarge the building or increase the size of the existing parking lot. In the NC district, principal uses cannot open before 5 a.m., or be open after 10 p.m., and the applicant is not proposing to exceed those hours. The busiest time will be Fridays from noon to 1:30 p.m., when typically 30 individuals will be congregating at the building for prayer. If needed, this prayer time could be broken into two time slots so that everyone does not attend at the same time. On Saturdays, children will be dropped off for educational purposes. The following are notable site plan elements for the proposed use: (a)Parking. There are 25 parking spaces on the property. For religious institutions the Unified Development Code (UDC) states that the number of required parking spaces is based on the design capacity of the assembly rooms. Attachment E shows the proposed floor plan including the assembly rooms for men and women that limits this capacity to 75 persons. Due to the limited number of off-street parking spaces on the property, a condition of CUP approval has been made that limits the capacity of the building to 75 people at any given time. Any event that will have more than 75 people will be held off-site. 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 5 OF 9 Currently parking is not allowed on the west side of Welcome Ave. N. south of 48 th Ave., and on the east side of Welcome Ave. north of 48th. The city engineer is recommending the installation of no parking signs on two streets (see the illustration below): ➢ Since 48th Ave. N is narrower than Welcome, on-street parking should be limited to one side of that street to allow for the passage of vehicles. ➢ Parking on the west side of Welcome north of 48th would cause a hazardous condition for vehicles traveling on Welcome. The city engineer will request that city council adopt a resolution prohibiting parking on the north side of 48th between Welcome and the alley and for the west side of Welcome from 48th to West Broadway. If City Council approves these restrictions, the applicant will be required to pay for the installation of no parking signs as part of the site improvement agreement. Based on the parking requirements in the UDC, the proposed 25 parking spaces are sufficient for the religious institution as proposed with the 75-person limit. The applicant will be resurfacing the parking lot, which has reached the end of its useful life. The resurfacing project includes the installation of surmountable curb around the parking lot perimeter. The submittal of additional technical information relating to the parking lot resurfacing has been made a condition of CUP approval. 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 6 OF 9 (b) Access and circulation. There are two existing driveways off 48th Avenue N., providing access to the parking lot. The city’s Public Works Director and the West Metro Fire Rescue District staff have reviewed the traffic circulation plan and found it adequate to accommodate vehicle movement into and within the site, including fire trucks and delivery vehicles, provided that the no parking zones on 48th and Welcome are implemented as described in Section B (4) (a) of this report. There is an existing sidewalk along 48th Ave. N. (c) Stormwater management. Since the disturbed area for this proposed use is less than one acre, a stormwater management plan is not required. However the applicant will improve storm drainage on the property by installing surmountable curb and adequate drainage slopes for the resurfacing of the parking lot (currently the parking lot has no curbing). The submittal of additional technical information relating to property drainage has been made a condition of CUP approval. (d) Landscape Plan. There is one large existing tree on the north side of the building that appears to have started as a volunteer tree. The applicant proposes to plant 10 new trees (American Linden, Blue Beech, and Swamp White Oak) together with two varieties of shrubs which will screen the east side of the parking lot. For those trees that will be planted in the right-of-way, the applicant will be asked to sign a maintenance and replacement agreement with the city. The submittal of this executed agreement for city signature is made a condition of CUP approval. (e) Screening. The site plan shows a proposed dumpster enclosure on the alley side of the building. The applicant is not proposing new rooftop or ground-mounted mechanical equipment that would need to be screened. (f) Exterior lighting. There are two existing unused light poles on the property that will be removed, and no new ones are proposed. Seven wall fixtures are proposed to be added and this lighting meets city requirements. 5. Recommended Findings The following are the relevant criteria for approval of a conditional use permit in city code section 510.19: (a) The proposed use has been approved as a conditional use in the zoning district for which it is proposed. Findings: Religious institutions are a conditional use in the NC zoning district. (b) The conditional use will be in accordance with the general objectives, or with any specific objective, of the city’s comprehensive plan and the unified development code (UDC). 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 7 OF 9 Findings: The property is guided as Commercial on the 2040 Planned Land Use Map, which includes retail, offices, restaurants and some automobile-oriented uses (on corridors designated in the UDC). The proposed religious institutional use, which is allowed as a conditional use in the UDC, is in conformance to this designation. (c) The conditional use will be designed, constructed, operated, and maintained so as to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and that such use will not change the essential character of the same area. Findings: Since the applicant will not increase the size of the building footprint or parking lot for this use, the existing character of the area will not change. Because the proposed use is allowed as a conditional use in the NC district, it is compatible with the intended character of the area, provided that the CUP conditions are met. (d) Impacts such as noise, hours of activity, and exterior lighting have been sufficiently addressed to mitigate negative impacts on nearby uses. Findings: The proposed use is not expected to generate unusual noise impacts. To ensure compliance with the noise ordinance and to ensure compatibility with adjacent residential uses, no loudspeakers or other external amplified sounds will be permitted. Hours of operation will be in compliance with the limits in the UDC. The new exterior lighting meets city requirements. (e) Parking is adequately provided for the proposed conditional use. Findings: As described in section 4(a) of this report, the proposed religious institution use will have 25 parking spaces. This CUP approval institutes a maximum limit of 75 persons that can be on the property at any given time. Any event that will have more than 75 people will be held off-site. (f) In the approval of a conditional use permit, the City Council may impose such conditions as it determines is necessary to make the use compatible with other uses allowed in the same district zone or vicinity. Findings: The proposed conditions of approval for the CUP are found in section C of this staff report. 6. Use specific standards The following is the relevant use specific standard in city code section 515.19, Subd. 7 for approval of a secondary school or public or semipublic building, followed by staff’s findings of the standard. a) The facility is served by arterial, collector, or municipal state aid streets and such pedestrian facilities as are necessary to accommodate the traffic generated by the facility. 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 8 OF 9 Findings: The property is adjacent to Welcome Ave. N., which is a minor collector street and municipal state aid street. This means that it is designed for higher traffic volumes and larger vehicles than a standard residential street. Welcome Avenue connects 4801 Welcome to West Broadway, a major collector street. There is a public sidewalk along the north side of 48th, directly adjacent to the property, which connects to a network of sidewalks on Welcome Ave. N. and West Broadway. To safely accommodate vehicular access, both for the facility and adjacent properties, additional parking restrictions on 48th and Welcome are necessary as described in Section B 4 (a) of this report. C. REQUESTED ACTION At the May 11, 2026 Planning Commission public hearing, the Commission recommended approval of the CUP by a vote of 7 to 0 (two members were absent), subject to the following conditions of approval: 1. Site Plan. The property shall be developed according to the site plan in attachment E. Prior to issuance of the building permit to renovate the building’s interior and resurface the parking lot, the applicant shall: a. Submittal deadline. The applicant shall submit the permit application for the interior building renovation by May 1, 2027 or submit a request for zoning administrator approval of a one-year extension before that permit application deadline. b. Site drawing. Provide a site plan drawing showing the following information for the parking lot resurfacing: i. Cross-section showing the thickness of class 5 and bituminous material for the project. ii. The location of slopes in the parking lot and along the curb to verify that adequate drainage is provided. c. Site improvement agreement. Sign a site improvement agreement with the city and provide an escrow to guarantee resurfacing of the parking lot and installation of the landscaping plan. As part of this agreement, the applicant will also pay $750 to install five no parking signs adjacent to the property. d. Maintenance agreement. Provide a maintenance and replacement agreement for city approval for the trees planted in public street right -of- way which will be recorded against the property. 2. Parking related limitations. a. Maximum number of people. Notwithstanding any other code or rule, due to the limited number of off-street parking stalls on the property, no more than 75 people can attend an event on the property at one time. Any event that will have more than 75 people shall be held off-site. b. Time separation. To ensure adequate separation between the departure of the previous attendees and the arrival of the subsequent attendees, there 6.1 4801 WELCOME AVENUE NORTH – CONDITIONAL USE PERMIT APPLICATION PAGE 9 OF 9 shall be at least a 30-minute gap between the end of the previous worship service and the beginning of the subsequent worship service. 3. Amplified sounds. No loudspeakers or other external amplified sounds are permitted. 4. Compliance. This conditional use permit is subject to the applicable requirements of the city code, and the applicant is required to comply with all applicable federal, state, and local laws, rules, regulations, and ordinances, and is required to obtain such other permits and permissions as may be required . 5. No Waiver. Failure by the City to take action with respect to any violation of any condition, covenant or term of this conditional use permit shall not be deemed to be a waiver of such condition, covenant, or term or any subsequent violation of the same or any other condition, covenant, or term. 6. Revocation. The violation of any terms or conditions of this conditional use permit including, but not limited to, any applicable federal, state, or local laws, rules, regulations, and ordinances, may result in revocation of the conditional use permit. The applicant shall be given written notice of any violation and reasonable time, as determined by the City, to cure the violation before a revocation of the permit will occur. 7. Binding Effect. This conditional use permit, and the conditions placed on it, are binding on the applicant, their successors and assigns, shall run with the property, and shall not in any way be affected by the subsequent sale, lease, or other change from current ownership, until the conditional use permit is terminated or revoked as provided herein. The obligations of the applicant under this conditional use permit shall also be the obligations of the current and any subsequent owners of the property. 8. Acceptance of Conditions. Utilization of the property for any of the uses allowed by this conditional use permit shall automatically be deemed acceptance of, and agreement to, the terms and conditions of this conditional use permit without qualification, reservation, or exception. The applicant anticipates renovating the building interior and making the site improvements this year. City Council motion to approve the proposed resolution (attachment F) is requested. 6.1 Site Location and Public Hearing Notice Mailing Map 4801 Welcome Ave N 4141 Douglas Dr. N. Crystal MN 55422 Attachment A 6.1 Zoning Map 4801 Welcome Ave N 4141 Douglas Dr. N. Crystal MN 55422 Attachment B 6.1 Front of building facing east (Welcome Ave. N.) Photo taken from 48th and Welcome Avenues N. Attachment C 6.1 South side facing 48th Ave. N. West side facing alley 6.1 Operational Overview, Parking Management & Neighborhood Compatibility The proposed facility will operate as an Islamic Education and Cultural Community Center (IECC), managed by members of the Gambian community, and serving a diverse population of residents in Crystal and surrounding communities. The center registered as non-profit 501(c)3 will provide a range of services including educational programs, youth development activities, cultural events, community gatherings, and daily prayer services. Daily operations are expected to be low in intensity and primarily indoors, generating minimal tra"ic. The primary peak activity occurs during Friday mid-day congregational prayer, which typically lasts approximately 45–60 minutes. The organization recognizes the importance of responsibly managing parking demand and maintaining a positive relationship with neighboring businesses and residents. Operational Measures to Minimize Parking Impact To ensure continued compliance and minimize parking impacts, the organization is committed to implementing the following operational measures: 1.Attendance Management The organization will actively monitor attendance levels to ensure that gatherings remain within the on-site parking capacity of approximately 75 people. Current Friday attendance is approximately 30 individuals, with anticipated growth to approximately 50 individuals as the facility becomes fully operational. Attendance will be managed proactively to prevent overflow beyond available parking capacity. 2.O!-Site Scheduling for Larger Events Any events expected to exceed the 75-person capacity will be scheduled at alternate locations. For example, large gatherings such as Eid prayers (twice annually) are held at the Crystal Community Center, which is better suited for higher attendance. This ensures that high-volume events do not impact surrounding properties and residences. 3.Staggered Friday Prayer Services If attendance increases over time, the organization will implement two staggered Friday prayer services (e.g., 12:30 PM and 1:30 PM). This approach distributes attendance across time periods and can reduce peak parking demand by up to 50%. This measure will be implemented proactively if attendance approaches capacity. Attachment D 6.1 4. On-Site Parking Management Volunteer parking attendants will be present during peak times (especially Friday prayers) to: • Direct vehicles e"iciently • Maximize use of available spaces • Prevent congestion or misuse of nearby properties 5. Carpooling and Ridesharing Encouragement The organization will encourage attendees to carpool and rideshare, particularly during Friday prayers. This reduces the total number of vehicles and improves parking e"iciency. 6. Signage and Parking Guidance Clear on-site signage and communication will be provided to ensure attendees: • Park only in designated areas • Do not use unauthorized or restricted spaces Instructions will also be communicated internally to reinforce compliance. 7. Weekend School Tra!ic Management Weekend educational programs will operate primarily on a drop-o! and pick-up basis. These activities are staggered and short in duration, minimizing prolonged parking demand and congestion. 8. Monitoring and Ongoing Adjustment The organization will monitor parking conditions and make operational adjustments as needed to maintain compliance. If any concerns arise, the organization will work collaboratively with City sta! to implement additional measures if required. 9. Neighborhood Coordination and Communication The organization is committed to maintaining positive relationships with neighboring businesses and residents. A neighborhood open house will be hosted prior to Planning Commission review to: • Provide transparency • Address questions • Build community understanding and support 6.1 10.Commitment to Compliance The organization will operate in full compliance with all City regulations and CUP conditions. All activities will be conducted in a manner that respects surrounding properties and minimizes impact on the neighborhood. Through these measures, the organization aims to ensure that the facility operates responsibly while contributing positively to the local community. 6.1 Attachment E 6.1 6.1 6.1 6.1 6.1 Scale: as notedFilename: 4801 Welcome.AGIDate:5/8/2026Job Name:Lighting LayoutVersion AMatt WelchThe Lighting Analysis, ezLayout, Energy Analysis and/or Visual Simulation ("Lighting Design)provided by ROUZER ("ROUZER")represents an anticipated prediction of lighting system performancebased upon design parameters and information supplied by others. These design parameters andinformation provided by others have not been field verified by ROUZER and therefore actual measured resultsmay vary from the actual field conditions. ROUZER recommends that design parameters and other information befield verified to reduce variation. ROUZER neither warranties, either implied or stated with regard to actualmeasured light levels or energy consumption levels as compared to those illustrated by the Lighting Design.ROUZER neither warranties, either implied or stated, nor represents the appropriateness, completeness or suitabilityof the Lighting Design intent as compliant with any applicable regulatory code requirements with the exception ofthose specifically stated on drawings created and submitted by ROUZER. The Lighting design is issued, in whole orin part, as advisory documents for informational purposes and is not intendedfor construction nor as being part ofa project's construction documentation package.Drawn By:Filename: C:\Users\matt\OneDrive - Rouzer Group\Desktop\MATT DT PROJECTS 2026\EPS\Lexington Crossing\4801 Welcome.AGIPrepared For: JHLNot to Scale 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 1.2 0.7 0.3 0.4 1.0 0.9 0.3 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 2.3 18.7 4.9 0.6 1.2 12.3 10.0 1.2 1.5 0.9 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.6 5.5 5.9 1.7 0.6 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.9 8.0 6.9 7.0 2.2 0.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 4.0 2.0 4.7 2.1 0.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 9.3 8.7 2.4 0.9 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 1.8 2.3 4.7 2.1 0.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.0 11.2 4.2 5.8 2.1 0.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 1.3 8.4 7.1 1.9 0.6 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.6 1.9 1.0 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.1 Filename: C:\Users\matt\OneDrive - Rouzer Group\Desktop\MATT DT PROJECTS 2026\EPS\Lexington Crossing\4801 Welcome.AGIScale: as notedFilename: 4801 Welcome.AGIDate:5/8/2026Job Name:Lighting LayoutVersion ANOTES: * The light loss factor (LLF) is a product of many variables, only lamp lumen depreciation (LLD) has been applied to the calculated results unless otherwise noted. The LLD is the result (quotient) of mean lumens / initial lumens per lamp manufacturers' specifications. * Illumination values shown (in footcandles) are the predicted results for planes of calculation either to the plane of calculation. * The calculated results of this lighting simulation represent an anticipated prediction of system performance. Actual measured results may vary from the anticipated performance and are subject to means and methods which are beyond the control of the designer. * Mounting height determination is job site specific, our lighting simulations assume a mounting height (insertion point of the luminaire symbol) to be taken at the top of the symbol for ceiling mounted luminaires and at the bottom of the symbol for all other luminaire mounting configurations. * RAB Lighting Inc. luminaire and product designs are protected under U.S. and International intellectual property laws. horizontal, vertical or inclined as designated in the calculation summary. Meter orientation is normal Patents issued or pending apply.The Lighting Analysis, ezLayout, Energy Analysis and/or Visual Simulation ("Lighting Design)provided by ROUZER ("ROUZER")represents an anticipated prediction of lighting system performancebased upon design parameters and information supplied by others. These design parameters andinformation provided by others have not been field verified by ROUZER and therefore actual measured resultsmay vary from the actual field conditions. ROUZER recommends that design parameters and other information befield verified to reduce variation. ROUZER neither warranties, either implied or stated with regard to actualmeasured light levels or energy consumption levels as compared to those illustrated by the Lighting Design.ROUZER neither warranties, either implied or stated, nor represents the appropriateness, completeness or suitabilityof the Lighting Design intent as compliant with any applicable regulatory code requirements with the exception ofthose specifically stated on drawings created and submitted by ROUZER. The Lighting design is issued, in whole orin part, as advisory documents for informational purposes and is not intendedfor construction nor as being part ofa project's construction documentation package.Drawn By:Matt WelchPrepared For: JHL***LAYOUT AND BOM ARE SUBJECT TO APPROVAL*** Luminaire Schedule Symbol Qty Tag Label Arrangement Expanded Luminaire Location Summary Lum. Lumens Arr. Lum. Lumens LLF Description LumNo Tag X Lum. Watts Arr. Watts Total Watts Y MTG HT Orient Calculation Summary Tilt Label CalcType Units 1 S 96.75 166 Avg 8.5 180 0 2 Max Min S 96.75 Avg/Min Max/Min Description 3 W 130 w34s_35w_5000k_ ntclr23060086 Single 5454 5454 1.000 W34S @ 35W _ 5000K 38.8 38.8 116.4 PtSpcLr PtSpcTb Meter Type CalcPts_1 8.5 180 0 2 3 S2 S2 slim15-34w_ ntclr23050153 Single 116 111.75 8.5 270 0 4 S2 159 111.75 8.5 270 0 Illuminance Fc 3907 3907 1.000 SLIM15 @34W 35.3 35.3 70.6 0.63 18.7 5 W 174 173 8.5 0 0 6 W 174 122 0.0 N.A.N.A. 12.7 12.7 25.4 8.5 0 0 7 W 2 S slim15-13w_ ntclr23050151 Single 1493 1493 1.000 SLIM15 @13W Readings taken @ 0'- 0" AFF 10 10 174 147 8.5 0 0 Total Quantity: 7 Horizontal 6.1 Quote # DN26-05083 - 4801 WELCOME ISLAMIC PRAYER CENTER Date: 5/8/2026 Page 1 Page 1 of 1 To: DOMINIC CHASKA ELECTRIC Job/Project Name: 4801 WELCOME ISLAMIC PRAYER CENTER Remarks: LEAD TIMES ARE ESTIMATES ONLY Qty Type Mfg Description Unit Price Extd.Price 4 WP1 RAB SLIM15 $64.00 $256.00 3 WP2 RAB W34S $97.00 $291.00 frt allowed factory stock TOTAL:$547.00 MFG Code F.O.B TERMS Lead Time Prices firm for entry by: 30 DAYS Shipment by: PER MFG Lead Time: PER MFG. This quotation/proposal is subject to the manufacturer's published terms and conditions. Quotation is void if changed. Prices are firm for 30 days from quotation date. After 30 days our quotation is subject to revision. All prices contained herein are subject to immediate revision if any product becomes subject to USTR imposed tariffs. PLEASE NOTE: DUE TO SUPPLY CHAIN SHORTAGES, LEAD TIMES ARE CONSIDERED APPROXIMATE AND CAN CHANGE WITH LITTLE NOTICE. JH LARSON WILL NOT BEAR ANY FINANCIAL BURDEN BASED ON SHIPMENT DELAYS! 1.Special order/non stock and or direct product returns are subject to the factory return policy. 2.Note: pre-shipment of anchor bolts will be plus freight 3.Tax is not included in our quotations 4.See quote for freight terms! 5.Our quotation/proposal is subject to correction of typographical errors if present. 6.Counts/items/types listed are only estimates and are not guaranteed to be complete job requirements. 7.Projects that require "shop drawing approval" will not be released by us until we have an approved and signed copy of submittal . 8.This quotaion/proposal is not to be presumed as "approved by the engineer" until after a proper approval process has been completed by the contractor/engineer/architect. 9. Change orders will require written notice to us. 11.Our quotations are not to be presumed to include all "ADDENDUMS". 12.We appreciate your business 13 OUR PRICING DOES NOT INCLUDE STAGING, STORAGE AND/OR DELIVERY OF MATERIAL TO THE JOBSITE! 14 A minimum fee of 4% of job value will apply for staging, storing and delivery to jobsite, and requires completion of a Bill and Hold Agreement. 15 TARIFFS: All quotes provided are base on current pricing & conditions at time of issuance. Prices are subject to change without prior notice due to fluctuations in tariffs, exchange rates or other market conditions. Any changes in tariffs, governmental regulations or unforseen cost increases may impact the final price of goods or services Printed: 05/08/26 13:36:29 Per: Denise Nord Email: 6.1 6.1 6.1 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026- _______ RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR ISLAMIC EDUCATION AND CULTURAL CENTER WHEREAS, Islamic Education and Cultural Center (“Applicant”) submitted an application to the City of Crystal (“City”) for a conditional use permit to allow a religious institution at 4801 Welcome Avenue North in Crystal, which is legally described in the attached Exhibit A (“Property”); and WHEREAS, the Planning Commission, after due notice having been provided, held a public hearing regarding the Applicant’s request on May 11, 2026, and voted to forward the application to the City Council with a recommendation that the requested conditional use permit be approved with certain conditions; and WHEREAS, the City Planner’s report (“Planner’s Report”) dated May 13, 2026, regarding this matter, which is attached hereto as Exhibit B, is incorporated herein and made part of this Resolution, except that the conditions set out below are controlling; and WHEREAS, the City Council finds that the requested conditional use permit, as recommended by the Planning Commission and discussed in the Planner’s Report, and as conditioned below herein, complies with the applicable rules and regulations of the Uniform Development Code within the Crystal City Code. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Crystal, based on the record of this matter and the findings and determinations contained herein and in the Planner’s Report, hereby approves and issues a conditional use permit for Islamic Education and Cultural Center on the Property, subject to compliance with the Crystal City Code and all of the following conditions: 1.Site Plan. The property shall be developed according to the site plan in attachment F. Prior to issuance of the building permit to renovate the building’s interior and resurface the parking lot, the applicant shall: a.Submittal deadline. The applicant shall submit the permit application for the interior building renovation by May 1, 2027, or submit a request for zoning administrator approval of a one-year extension before that permit application deadline. b.Site drawing. Provide a site plan drawing showing the following information for the parking lot resurfacing: i.Cross-section showing the thickness of class 5 and bituminous material for the project. Attachment F 6.1 ii. The location of slopes in the parking lot and along the curb to verify that adequate drainage is provided. c. Site improvement agreement. Sign a site improvement agreement with the city and provide an escrow to guarantee resurfacing of the parking lot and installation of the landscaping plan. As part of this agreement, the applicant will also pay $750 to install five no parking signs adjacent to the property. d. Maintenance agreement. Provide a maintenance and replacement agreement for city approval for the trees planted in public street right -of-way which will be recorded against the property. 2. Parking related limitations. a. Maximum number of people. Notwithstanding any other code or rule, due to the limited number of off-street parking stalls on the property, no more than 75 people can attend an event on the property at one time. Any event that will have more than 75 people shall be held off-site. b. Time separation. To ensure adequate separation between the departure of the previous attendees and the arrival of the subsequent attendees, there shall be at least a 30-minute gap between the end of the previous worship service and the beginning of the subsequent worship service. 3. Amplified sounds. No loudspeakers or other external amplified sounds are permitted. 4. Compliance. This conditional use permit is subject to the applicable requirements of the city code, and the applicant is required to comply with all applicable federal, state, and local laws, rules, regulations, and ordinances, and is required to obtain such other permits and permissions as may be required. 5. No Waiver. Failure by the City to take action with respect to any violation of any condition, covenant or term of this conditional use permit shall not be deemed to be a waiver of such condition, covenant, or term or any subsequent violation of the same or any other condition, covenant, or term. 6. Revocation. The violation of any terms or conditions of this conditional use permit including, but not limited to, any applicable federal, state, or local laws, rules, regulations, and ordinances, may result in revocation of the conditional use permit. The applicant shall be given written notice of any violation and reasonable time, as determined by the City, to cure the violation before a revocation of the permit will occur. 7. Binding Effect. This conditional use permit, and the conditions placed on it, are binding on the applicant, their successors and assigns, shall run with the property, and shall not in any way be affected by the subsequent sale, lease, or other change from current ownership, until the conditional use permit is terminated or revoked as provided herein. 6.1 The obligations of the applicant under this conditional use permit shall also be the obligations of the current and any subsequent owners of the property. 8. Acceptance of Conditions. Utilization of the property for any of the uses allowed by this conditional use permit shall automatically be deemed acceptance of, and agreement to, the terms and conditions of this conditional use permit without qualification, reservation, or exception. Adopted by the Crystal City Council this 19th day of May 2026. ____________________________ Julie Deshler, Mayor ATTEST: _____________________________ Chrissy Serres, City Clerk 6.1 EXHIBIT A Legal Description of the Property Lots 7 and 8, Block 1, West Lilac Terrace Fourth Unit, Hennepin County, Minnesota 6.1 EXHIBIT B Planner’s Report (attached hereto) 6.1 COUNCIL STAFF REPORT DATE: May 19, 2026 FROM: Jesse Struve, PE, Director of Public Works / City Engineer TO: Mayor and City Council City Manager Adam R. Bell CC: RE: Approve parking on portions of the west side of Welcome Ave N and portions of 48th Ave N. Background A new development is going to be occupying 4801 Welcome Ave. With the change of occupancy staff is recommending adding five no parking signs along a portion of the west side of Welcome Ave. N. and a portion of the north side of 48th Ave. N. Restricting parking in these areas (see attached map), will allow for safe sight lines for people entering and exiting 4801 Welcome Ave. N. The addition of no parking in this area will not impact the residential areas just west or south of this development from parking on the street. The no parking areas can be expanded in the future if additional issues arise from operations at the facility. No parking will be permitted at any time on the west side of Welcome Ave. N. from 48th Ave. to West Broadway and on the north side of 48th Ave. from the alley (just west of 4801) to Welcome Ave. N. (see attached map). Requested City Council Action Motion to approve the resolution prohibiting parking on the west side of Welcome Ave. N. from 48th Ave. to West Broadway and on the north side of 48th Ave. from the alley (just west of 4801) to Welcome Ave. N. (see attached map). Attachments •Resolution •Map showing restricted areas 6.2 CITY OF CRYSTAL MINNESOTA RESOLUTION NO. 2026- PROHIBITING PARKING ON PORTIONS OF THE WEST SIDE OF WELCOME AVENUE NORTH AND PORTIONS THE NORTH SIDE OF 48TH AVE N WHEREAS, the Crystal City Council is committed to providing and maintaining quality infrastructure that is essential for everyday residential, commercial, industrial, and recreational activities in the City; and WHEREAS, the City of Crystal approved a new development at 4801 Welcome Ave. N.; and WHEREAS, the City staff have concerns with the sight lines for people entering and exiting 4801 Welcome Ave. N.; and WHEREAS, the addition of no parking along portions of Welcome Ave. N. and 48th Ave. N. will improve the sight lines for people going to and from the development; NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Crystal as follows: 1. The Crystal City Council hereby prohibits the parking of any vehicles or equipment at all times on the west side of Welcome Ave. N. from 48th Ave. to West Broadway and on the north side of 48th Ave. from the alley (just west of 4801) to Welcome Ave. N. Adopted this 19th day of May 2026. ______________________________ Julie Deshler, Mayor ATTEST: _______________________________ Chrissy Serres, City Clerk 6.2 XeniaAve N 48th Ave N XeniaAve NWelcome Ave NWelcomeAve N 48th Ave N 48 th A v e N 4900 54 47004755 4801 48014800 4806 4812 4818 4754 4901 4900 54 ArcGIS Web Map City Boundary Crystal Parcels HennepinCounty_MN_Nearmap_Sp24_6in.sid Red: Band_1 Green: Band_2 Blue: Band_3 5/14/2026, 12:37:04 PM 0 0.01 0.020.01 mi 0 0.01 0.030.01 km 1:591 6.2