2021.12.21 Council Meeting Packet
4141 Douglas Drive North • Crystal, Minnesota 55422-1696
Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov
Posted: Dec. 17, 2021
City Council Meeting Schedule
Tuesday, Dec. 21, 2021
Time Meeting Location
6 p.m.
City Council work session to discuss:
1. Commission applicant interviews.
2. Blue Line Extension update.
3. City manager monthly check-in.
4. Constituent issues update.
5. New business.
6. Announcements.
Council Chambers/
Zoom
7 p.m. City Council meeting Council Chambers/
Zoom
Immediately
following the City
Council meeting
Continuation of City Council work session, if necessary Council Chambers/
Zoom
The public may monitor and participate in the meeting by connecting to it through one of the methods
identified below.
Topic: Crystal City Council work session, City Council meeting, continuation of City Council work session,
if necessary.
Time: Dec. 21, 2021, 6 p.m. Central Time (US and Canada)
Join Zoom Meeting
https://us02web.zoom.us/j/81141242905?pwd=UkVBT0lwV2ZuVW52cHRxeXFaR2FDZz09
Meeting ID: 811 4124 2905
Passcode: 414141
One tap mobile
+19292056099,,81141242905#,,,,*414141# US (New York)
+13017158592,,81141242905#,,,,*414141# US (Washington DC)
Dial by your location
+1 929 205 6099 US (New York)
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
888 475 4499 US Toll-free
877 853 5257 US Toll-free
Find your local number: https://us02web.zoom.us/u/keD9l4alBT
Auxiliary aids are available upon request to individuals with disabilities by calling the City Clerk at
(763) 531-1145 at least 96 hours in advance. TTY users may call Minnesota Relay at 711 or 1-800-627-3529.
4141 Douglas Drive North • Crystal, Minnesota 55422-1696
Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov
Posted: Dec. 17, 2021
City Council Work Session Agenda
Tuesday, Dec. 21, 2021 at 6 p.m.
Council Chambers/Zoom
Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter,
the work session of the Crystal City Council was held on Tuesday, Dec. 21, 2021 at _____ p.m. in the
Council Chambers at City Hall, 4141 Douglas Dr. N., Crystal, Minnesota. If the agenda items are not
completed in time for the regular City Council meeting at 7 p.m., the work session will be continued
and resumed immediately following the regular City Council meeting. The public may also monitor
and participate in the meetings by connecting via Zoom, through one of the methods identified on
the City Council Meeting Schedule for Tuesday, Dec. 21, 2021.
I. Attendance
Council members Staff
____ Adams ____ Norris
____ Banks ____ Therres
____ Budziszewski ____ Gilchrist
____ Cummings ____ Elholm
____ Kiser ____ Larson
____ LaRoche ____ Ray
____ Parsons ____ Revering
____ Sutter
____ Serres
II. Agenda
The purpose of the work session is to discuss the following agenda items:
1. Commission applicant interviews.
2. Blue Line Extension update.
3. City manager monthly check-in.
4. Constituent issues update.
5. New business. *
6. Announcements. *
III. Adjournment
The work session adjourned at ______ p.m.
* Denotes no supporting information included in the packet.
Auxiliary aids are available upon request to individuals with disabilities by calling the city clerk at
(763) 531-1145 at least 96 hours in advance. TTY users may call Minnesota Relay at 711 or 1-800-627-3529.
___________________________________________________________________________________
FROM: John Sutter, Community Development Director
TO: Anne Norris, City Manager (for December 21 work session)
DATE: December 16, 2021
SUBJECT: Blue Line Extension update
___________________________________________________________________________________
At the Sep. 23 City Council work session, Metro Transit and Hennepin County staff (“the
project”) presented different design concepts for the Crystal segment of the proposed Blue
Line Extension. Most prominent among these options was a grade separation of Bottineau
Blvd. over Bass Lake Road, with the station at grade in between the northbound and
southbound embankments of Bottineau Blvd. The primary purpose of the grade separation
would be to improve the traffic flow through the Bass Lake Road intersection and reduce the
number of lanes pedestrians would need to cross.
Since then:
•Due to concerns expressed by city staff about the interchange option, especially related to
public safety, the project prepared an alternative concept that would maintain 6 lanes at
grade through the Bass Lake Road intersection, similar to the configuration in place from
2011-2015 before the segment from Wilshire south to Hwy 100 was restriped to 6 lanes.
This option would include a pedestrian bridge over Bottineau Blvd with an elevator and
staircase accessing the south end of the station platform. This is called the “4-6-4 Option”.
•The project has also modified the Interchange Option in response to city staff concerns.
The most significant change is lengthening the bridges so the station platform is no longer
between two embankments. This means the pedestrian crossing and access to the south
end of the station platform would be from a path under bridges instead of a tunnel through
embankments as shown on Sep. 23.
•The project also took current traffic counts for comparison with historic and forecast counts
on Bottineau Blvd. This included two segments (Wilshire-Corvallis and Corvallis-47th) that
had not previously been counted. An updated traffic simulation comparing the 4-6-4 and
Interchange options is being prepared but will not be ready for the Dec. 21 work session.
The purpose of the Dec. 21 work session is to share these materials with the City Council and
receive feedback before they are presented at a community open house from 5-7 p.m. on Jan.
6 in the Community Room in the basement of City Hall, 4141 Douglas Dr. N.
COUNCIL STAFF REPORT
Blue Line Extension Update
Based on staff, Council and community feedback, the project will refine these concepts and
present them in person at a Council work session on Feb. 10.
In the meantime, on Dec. 13 the project released a Draft Route Modification Report for public
and agency comment. This report finds that the Bottineau Boulevard alignment appears to be
workable in a very general sense but it does not address the specific issues and challenges
with this alignment, and most significantly does not address concerns about the mobility
impacts of eliminating a lane in each direction north of Highway 100. At the Jan. 13 work
session, staff will present proposed comments on the Route Modification Report for Council
discussion, followed by Council consideration of a formal comment resolution on Jan. 18. The
project’s deadline for comment is Jan. 25.
Attachments:
1. Draft Route Modification Report (summary)
2. Slideshow for Dec. 21 work session
3. Traffic Counts and Forecasts
4. Right of way comparison (11x17) - 4-6-4 Option vs Interchange Option
5. Aerial and ground view comparisons (11x17) - 4-6-4 Option vs Interchange Option
METRO Blue Line LRT Extension
Route Link Options Update | November 2021METRO BLUE LINE EXTENSION
Draft Route Modification Report Summary • December 2021
Background
Since August 2020, the Metropolitan Council and
Hennepin County have partnered to evaluate
revised route options that do not use freight rail
property as previously planned for the METRO
Blue Line Extension.
Brooklyn Park:
The former route and stations along West
Broadway in Brooklyn Park remain the same.
Crystal and Robbinsdale:
The proposed route along Bottineau Boulevard
(County Road 81) closely parallels the original
route for most of this area.
Minneapolis:
Two route options are being evaluated ‑–one along
ry and Washington Avenues (shown iLow n purple)
and one along West Broadway Avenue (shown in
green).
Purpose of the Report
The Initial Route Evaluation Report released
in March 2021 laid out a process and general
timeline to identify a community‑supported route
for the project. Now, this Draft Route Modification
Report describes the overall process, public
input, and technical evaluation that will inform the
recommendation of a modified route. The Final
Route Modification Report will recommend a
community supported route for further evaluation
in spring 2022 that responds to the Project
Principles and project goals.
Help us select a route!
Now is the time to give comments as your feedback will shape the final recommendation. To submit your comments on the Draft
Route Modification Report and for a list of upcoming community meetings, visit BlueLineExt.org.
Schedule
AUGUST
2020
MARCH
2021
JULY
2021
NOVEMBER
2021
DECEMBER
2021
SPRING
2022
Hennepin County and
the Metropolitan Council
issued a joint statement
on advancing the project
without using 8 miles of
railroad right-of-way
Release of the Initial
Route Evaluation
Report that
identified potential
route options
ONGOING PUBLIC ENGAGEMENT
Release of
potential station
study areas and
visualizations of
light rail
We’re here
Release of
preliminary design
options on how
LRT could fit into
each community
Release of
Draft Route
Modification
Report
Release of
Final Route
Modification
Report
Olson Memorial HighwayFremont Ave N7t
h
S
t
N10th Ave NLyndale Ave N63rd Ave
METRO C LINE (BUS RAPID TRANSIT)PLANNED METRO D LINE (BUS RAPID TRANSIT) MississippiRiverMississippi RiverDouglasDrBr
ookl
y
nBlvds58th Ave
42nd Ave N
Bass Lake Rd
O
s
seo
R
d
B
o
t
t
i
n
e
a
u
B
o
u
l
e
v
a
r
d
(C
o
u
n
t
y
R
o
a
d
8
1
)
Dul uth St
WinnetkaAveN69th Ave
57th Ave
Webber
PkwyWBroadwayA
v
e
OrchardAve44th Ave N
45th Ave N
CSAH 57
Douglas Dr NHumboldt Ave¬«55
¬«252
¬«100
Brooklyn
Center
Brooklyn Park
Crystal
Fridley
Golden Valley
New
Hope
Minneapolis
Robbinsdale
[0 1½Miles
Potential Station
Study Areas
METRO Bus Rapid Transit
Stations (Existing and Planned)
§¨¦94
§¨¦394
§¨¦694
Former Locally Preferred
Alternative (LPA) Station Locations
Former Route
West Broadway Route
Lowry Route
2013 Locally Preferred Alternative (LPA)
Shared (common) Route
METRO C LINE (BUS RAPID TRANSIT)Golden Valley Rd
Olson Memorial HighwayFremont Ave NPenn Ave NWEST BROADWAY
ROUTE
§¨¦94
Golden Valley
Robbinsdale
Plymouth Ave N
LOWRY ROUTE
3rd/4th St Ramps(
C
o
u
n
t
y
R
o
a
d
8
1
)
B
o
t
t
i
n
e
a
u
B
l
v
d
Lowry Ave N
10th Ave N10th Ave N7t
h
S
t
N
7t
h
S
t
N
21st Ave N
W Broadway Ave
Lyndale Ave NTARGET FIELDSTATION
Victory Memorial
Parkway/
Grand Rounds
North
Commons
Park Hall
Park
Farview
Park
Palmer Park
Central
Park
Washington Ave NFor project questions or to invite us to an event, contact:
Brooklyn Park/Minneapolis/Robbinsdale/
Overall Project Questions:
Sophia Ginis – Sophia.Ginis@metrotransit.org
Crystal:
David Davies – David.Davies@metrotransit.org
Visit BlueLineExt.org for more information,
to sign-up for the project newsletter,
and share your comments, questions and
concerns on our interactive feedback map.
Stay Connected!
METRO Blue Line LRT Extension
Route Link Options Update | November 2021METRO BLUE LINE EXTENSION
Project Update • November 2021
Background
Since March 2021, the project team
has been evaluating two routes
in Minneapolis, one along West
Broadway (shown in green) and one
along Lowry Avenue (shown in purple)
to connect to the cities of Robbinsdale
and Crystal along County Road 81 and
then into Brooklyn Park. The project
team has updated design details that
help show how light rail could fit into
your community.
Next Steps
Following the recommendation on
a community supported route in
early 2022, design and the technical
evaluation of the recommended route
will advance and be documented in the
federal and state environmental review
documents. Through this process, the
Metropolitan Council and Hennepin
County will work closely with project
partners at all levels to effectively
address and advance defined goals and
policies set forth in adopted plans and
applicable design guidelines, such as:
•City of Minneapolis plans and policies
such as the Climate Aciton Plan, Vision
Zero, Transportation Action Plan,
Street Design Guide, and Complete
Streets policy among others.
•Metropolitan Council’s Thrive MSP 2040
•Hennepin County’s Climate Action Plan
•President’s Justice40 Initiative
Olson Memorial HighwayFremont Ave N7t
h
S
t
N10th Ave NLyndale Ave N63rd Ave
METRO C LINE (BUS RAPID TRANSIT)PLANNED METRO D LINE (BUS RAPID TRANSIT)MississippiRiverDouglasDrBr
ookl
ynBlvds58th Ave
42nd Ave N
Bass Lake Rd
O
s
seo
R
d
B
o
t
t
i
n
e
a
u
B
o
u
l
e
v
a
r
d
(
C
o
u
n
t
y
R
o
a
d
8
1
)
Duluth St
WinnetkaAveN69th Ave
57th Ave
Webber
PkwyWBroadwayA
v
e
OrchardAve44th Ave N
45th Ave N
CSAH 57
Douglas Dr NHumboldt AvePalmer Park
Central
Park
¬«55
¬«252
¬«100
Brooklyn
Center
Brooklyn Park
Crystal
Fridley
Golden Valley
New
Hope
Minneapolis
Robbinsdale
[0 1½
Miles
Potential Station
Study Areas
METRO Bus Rapid Transit
Stations (Existing and Planned)
§¨¦94
§¨¦394
§¨¦694
Former Locally Preferred
Alternative (LPA) Station Locations
Former Route
METRO C LINE (BUS RAPID TRANSIT)PLANNED METRO D LINE (BUS RAPID TRANSIT)reviRippississiMreviRippississiMGolden Valley Rd
Olson Memorial HighwayFreemont Ave NPenn Ave NWEST BROADWAY
ROUTE
§¨¦94
Golden Valley
Robbinsdale
Plymouth Ave N
LOWRY ROUTE
Victory Memorial
Parkway/
Grand Rounds
North
CommonsPark
HallPark
FairviewPark
3rd/4th St Ramps(
C
o
u
n
t
y
R
o
a
d
8
1
)
B
o
t
t
i
n
e
a
u
B
l
v
d Washington Ave NLowryAve N
10th Ave N10th Ave N7t
h
S
t
N
7t
h
S
t
N
21st Ave N
W Broadway Ave
Lyndale Ave NTARGET FIELDSTATION
[§¨¦94
£¤169
¬«610
Brooklyn Park
Brooklyn Center
Maple Grove
Osseo
OAK GROVE
STATION
93RD AVENUE STATION
85TH AVENUE
STATION
BROOKLYN
BOULEVARD STATION
85th Ave
93rd Ave
Miles
0 0.50.25
73rd Ave
69th AveZane AveNoble PkwyBr
o
o
k
l
y
n
B
l
vdBo
t
t
i
n
e
a
u
B
l
v
d
(C
ou
n
t
y
Ro
ad
8
1
)W Broadway AvePLANNED STATIONS IN
BROOKLYN PARK
ATTACHMENT 1
METRO Blue Line LRT Extension
Route Link Options Update | November 2021METRO BLUE LINE EXTENSION
Draft Route Modification Report Summary • December 2021
Community Engagement
The METRO Blue Line Extension Project relies on community voices to inform project decision‑making. Since August 2020,
the project has engaged with communities through a variety of activities, including in‑person and virtual community meetings,
door knocking, attending community events, online and paper surveys, and interactive maps. See below for the timing and
project updates shared since August 2020.
• Round 1 (August 2020 through January 2021):
Input on project goals, concerns, opportunities, and thoughts on potential new routes
• Round 2 (March 2021):
Input on new route options released as part of the Initial Route Modification Report
• Round 3 (July to August 2021):
Input on the connections that light rail would make within communities and station locations within those areas
• Round 4 (Late September to December 2021):
Input on updated design concepts and potential opportunities and impacts of light rail options
Since March 2021, project staff have contracted directly with 12 community and cultural organizations to support a robust
engagement process. These organizations are seeking feedback on the project by hosting activities prioritizing low‑income
communities, communities of color, and specific areas of the corridor. The community and cultural organizations include:
• Asian Media Access Inc
• CAPI USA
• Encouraging Leaders
• Harrison Neighborhood Association
• Juxtaposition Arts
• Lao Assistance Center of MN
• Liberian Business Association
• Northside Economic Opportunity Network
• Northside Residents Redevelopment Council
• West Broadway Business Coalition
• Jordan Area Community Council
• Hawthorne Neighborhood Council
Major themes heard from the community:
• Avoid impacts/disruption to communities and the environment
• Safety on transit and in communities served
• Easy pedestrian access to/from stations
• Anti‑displacement efforts are a priority
• Support for businesses during construction
• Access to regional destinations
• Support economic development
• Improve the transit experience
• Improve access/serve transit dependent populations
Anti-Displacement Initiative
The Metropolitan Council and Hennepin County are committed to delivering a light rail transit (LRT) investment that benefits
current corridor residents and businesses. In response to feedback received during engagement activities, project partners are
advancing efforts to address community concerns about housing affordability, business support, and displacement.
The project team is convening a diverse Anti‑Displacement Workgroup with seats for agency and community partners to
research and recommend programs and policies that will support this initiative. The Center for Urban and Regional Affairs
(CURA) will lead and facilitate the Anti‑Displacement Workgroup and provide recommendations in the next 18 months.
October 9th Bike, Walk, Bus tour of Minneapolis route options and
station study areas.
METRO Blue Line LRT Extension
Route Link Options Update | November 2021METRO BLUE LINE EXTENSION
Draft Route Modification Report Summary • December 2021
Project
Principles
ROUTE
PRINCIPLES
ENGAGEMENT
PRINCIPLES
• Meet Federal Transit
Administration (FTA) New
Starts criteria
• Maintain existing alignment
(route) as much as possible
• Mitigate negative impacts
• Meaningful engagement
of stakeholders
• Engage, inform, and consult
diverse communities to
co-create project solutions
that reduce disparities
Evaluation Process
To determine a community‑supported route, the project team is considering Project Principles and goals, community and
business feedback, and engineering requirements. Each route is evaluated against the project goals to see how it serves
community needs.
Each route has been evaluated based on its ability to meet project goals. All the routes have received an overall assessment
of “good” in their ability to serve the community. In some cases these routes achieve an excellent rating based on unique
features and the potential to deliver exemplary positive benefits. None of the routes have been assessed as “poor,” which
would mean they did not meet the project goals. The Evaluation Findings section of this report provides more detail on how
each route was evaluated against the project goals.
ASSESSMENT OF ROUTE OPTIONS TO DEFINED GOALS
PROJECT GOAL
BOTTINEAU BOULEVARD
(COUNTY ROAD 81) IN BROOKLYN
PARK, CRYSTAL, AND ROBBINSDALE
LOWRY
ROUTE
WEST
BROADWAY
ROUTE
Improve transit access and connections to
jobs and regional destinations EXCELLENT EXCELLENT EXCELLENT
Improve frequency and reliability of transit
service to communities in the corridor EXCELLENT GOOD GOOD
Provide transit improvements that
maximize transit benefits, while being cost
competitive and economically viable
GOOD GOOD GOOD
Support communities’ development goals EXCELLENT GOOD EXCELLENT
Promote healthy communities and sound
environmental practices including efforts
to address climate change
GOOD GOOD GOOD
Advance local and regional equity and
work towards reducing regional
economic disparities
GOOD GOOD EXCELLENT
METRO Blue Line LRT Extension
Route Link Options Update | November 2021METRO BLUE LINE EXTENSION
Draft Route Modification Report Summary • December 2021
Next Steps
The Draft Route Modification Report is available for public review, and comments will be accepted through January 25, 2022.
The Metropolitan Council and Hennepin County will carefully review the community input received along with the findings from
the technical analysis completed to date to recommend a community‑supported route for further evaluation in spring 2022 as part
of the Final Route Modification Report. Following that recommendation, design and technical evaluation of the recommended
route will advance and will be documented in federal and state environmental review documents. Further robust community
engagement will continue through these and future phases.
To submit your comments on the draft report and for a list of upcoming community meetings in January, visit BlueLineExt.org.
For project questions or to invite us to an event, contact:
Brooklyn Park/Minneapolis/Robbinsdale/
Overall Project Questions:
Sophia Ginis – Sophia.Ginis@metrotransit.org
Crystal:
David Davies – David.Davies@metrotransit.org
Visit BlueLineExt.org for more information,
to sign-up for the project newsletter,
and share your comments, questions and
concerns on our interactive feedback map.
Stay Connected!
Blue Line Extension Community-Supported Route:
• Best meets the Project Principles and goals
• Grounded in community feedback through collaboration with stakeholders
• Supported by project corridor communities and decision‑makers
LRT projects are complex and unforeseen challenges arise.
Schedules and timelines are subject to change.
1 YEAR 1.5 – 2 YEARS 1.5 – 2 YEARS 3 – 4 YEARS
Identify
community-
supported route
Environmental review
Document benefits
and impacts of the
project
Municipal Consent
Seek city support of
the LRT design
Engineering
Develop construction
ready design plans
Station area planning
Construction and Full
Funding Grant
Agreement
Federal funding
Goal — Line
opens in 2028
We’re here
Click to edit Master title styleBrooklyn Park | Crystal | Robbinsdale | Golden Valley | MinneapolisCR81 Options Comparison at Bass Lake RoadATTACHMENT 2
Comparison of BLRT CR81 Options at Bass Lake Road3CATEGORIES 4-6-4 INTERCHANGE KEY TAKEAWAY Design ŶExpands CR 81 Between Crystal Airport Rd and Wilshire Blvd, keeping six lanes of thru traffic for just over half of a mile (3,000 feet) ŶLight rail is at-grade in the center of the roadwayŶPark and ride access via Lakeland Ave N. from the Wilshire intersectionŶCR 81 has four thru lanes are on a grade-separated overpass at Bass Lake Road with ramps for access from Bass Lake Road; the intersection maintains full access for Bass Lake RoadŶLight rail is at-grade centered between overpass bridgesŶPark and ride access via Lakeland Ave N. from the Wilshire intersection¾The 4-6-4 option includes an additional through lane in each direction, while the interchange elevates CR81 over Bass Lake Road Right of WayŶAdding LRT to a 6-lane CR 81 requires additional right of way on the east side of the roadwayŶInterchange ramps and bridges requires additional right of way on the east side of the roadway¾There are similar right of way impacts between the road expansion for the 4-6-4 option and the Interchange option Form & Function ŶStation platform is in the middle of a six-lane road (with additional turning lanes at the intersection) ŶThe pedestrian bridge provides a crossing of CR 81 and concept provides grade-separated access to the south end of the station to the platform from the park and ride and trails (note: must accommodate the truck moving route so the overpass is higher than typical pedestrian bridge)ŶStation platform is at-grade framed by adjacent interchange bridgesŶThe south at-grade crossing provides grade-separation from CR 81 and provides access to trails on either side of CR 81 and access from park and ride to station ¾The Interchange creates more space for the station with the additional area under the bridges available as complementary community space Station ExperienceŶChallenging due to traffic on both sides of the platformŶAccess to the north end of the station requires crossing between three and five lanes of traffic on CR 81ŶPedestrian bridge access to park and ride and regional trailŶRoad noise will sound louder to riders at the platformŶSeparated from vehicle traffic with opportunities for placemakingŶAccess to the north end of the station requires crossing only the access ramps for CR 81 ŶSouth end at-grade access to platform without crossing roadwayŶLess road noise at the platform due to the separation from CR 81 ŶOffers more protection from weather elements for riders at platform and at-grade crossing users¾The Interchange offers more opportunity for placemaking, easier passenger access to the station, and less road noise on the platformTraffic Performance ŶOffers slight improvement over four-lane CR81 with LRTŶTraffic operations slightly degraded from existing conditions for peak-hour travelŶThru traffic on CR 81 is separated from the intersection (no stopping)ŶImproves Bass Lake Road operations from existing ŶBest performing traffic option compared to four or six lanes, reduces travel time for vehicles on CR 81 by ~20-25%ŶTraffic operations are better than existing conditions¾The 4-6-4 accommodates traffic almost as well as the existing intersection.¾The Interchange accommodates traffic better than the existing intersection. Pedestrian Crossing ExperienceŶAt grade crossing: similar to what pedestrians experience todayŶTrack design would provide pedestrian refuge in the center of the road with pedestrian crossing buttons ŶPedestrian bridge: added height for truck moving route increases pedestrian effort and travel time compared to the at-grade crossing, most pedestrians and bikes will likely cross at-grade to save timeŶIntersection has many more opportunities where pedestrians and vehicles could conflict, making it less safe (due to the number of lanes that pedestrians cross and the directions of traffic)ŶBass Lake Road at-grade crossing: separate from the CR 81 thru lanesŶSouth end at-grade crossing: requires no roadway crossingŶDirect connection between trails on east and west sides of CR 81ŶDirect connection from park and ride to stationŶPedestrian and bike safety features will be included at rail crossing¾The 4-6-4 would continue to include a long crosswalk but includes an elevated pedestrian bridge crossing option; while the Interchange option allows pedestrians and bikes to cross CR81 at-grade without crossing the through traffic.g
Right of Way84-6-4 OptionInterchange Option
4-6-4 Option Design44-6-4 Design
4-6-4 Design5
9Bass Lake Road: 4-6-4 OptionAerial View of Station Area Looking NorthDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
10Bass Lake Road: 4-6-4 OptionAerial View of Station Area Looking EastDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
11Bass Lake Road: 4-6-4 OptionGround View of Station Area – Pedestrian CrossingDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
Interchange Design6
Interchange Design7
Traffic Performance12Bass Lake Road: Interchange OptionGround View of Station Area Looking SouthDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
13Bass Lake Road: Interchange OptionGround View of Station Area Looking EastDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
14Bass Lake Road: Interchange OptionGround View of Station Area Looking East from Park & RideDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
15Bass Lake Road: Interchange OptionAerial View of Station Area Looking NorthDRAFT: CONCEPT IN DEVELOPMENTNote: This image represents a planning concept based on cursory engineering work. If this concept advances, significant additional design would be required.
MnDOT Examples16MN 43 Bridge– WinonaMN 61– Hastings
CR 81 Traffic Volumes Annual average daily traffic (AADT) is the estimated average daily traffic volume experienced in both directions of a roadway segment considering the seasonal variation in traffic in a one‐year period. Segment 2005 AADT1(vehicles/day) 2015 AADT2(vehicles/day) 2019 AADT3 (vehicles/day) 2021 AADT4 (vehicles/day) 2030 Forecast5(vehicles/day) 2040 Forecast6 (vehicles/day) A CR 81, 63rd Ave to Bass Lake Rd 23,900 26,500 28,500 26,500 35,000 34,000 B CR 81, Bass Lake Rd to Wilshire Blvd 23,900 27,000 31,000 26,700 36,000 32,000 C CR 81, Wilshire Blvd to Corvallis Ave 28,100D CR 81, Corvallis Ave to 47th Ave 29,900E CR 81, 47th Ave to TH 100 ramps 28,500 32,500 38,000 33,10039,000 1. Existing volumes during the design phase for the CR 81reconstruction.2.Volumes after the CR 81 reconstruction but before therestriping to 6 lanes between 47th Ave and Wilshire Blvd.3.Volumes after the CR 81 restriping to 6 lanes between 47th Aveand Wilshire Blvd.4.Volumes collected in October 2021.5.Forecasts used in the design phase for the CR 81reconstruction.6.Forecasts in the current Hennepin County Transportation Plan.ATTACHMENT 3
Interchange Option
4-6-4 Option
Right of Way ATTACHMENT 4
Bass Lake Road: 4-6-4 Option
Aerial View of Station Area Looking North
Bass Lake Road: Interchange Option
Aerial View of Station Area Looking North
Bass Lake Road: 4-6-4 Option
Aerial View of Station Area Looking North
Bass Lake Road: Interchange Option
Aerial View of Station Area Looking North
ATTACHMENT 5
Bass Lake Road: 4-6-4 Option
Ground View of Station Area – Pedestrian Crossing
Bass Lake Road: Interchange Option
Ground View of Station Area Looking East
4141 Douglas Drive North • Crystal, Minnesota 55422-1696
Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov
CITY MANAGER WORK PLAN
MONTHLY CHECK IN – DECEMBER 2021
Objective 1 – Policy Facilitation – strategic planning for continued
implementation of Council priorities:
o Thriving Business Climate
▪ Open To Business assistance available
▪ Hennepin County façade improvement pilot grant approved
o Create Strong Neighborhoods
▪ Code enforcement – on-going
▪ Implementation of Master Parks System Plan improvements –
on going
▪ Home improvement loans/rebates available through CEE
o Fiscally sound and stable policies and practices
▪ Long term financial planning on-going; updated Long Term Plan
reviewed 11/2/21 and on agenda for 12/21/21 acceptance
▪ 2022 budget and levies approved 12/7/21
o Build inclusive community so all feel welcome
▪ Just Deeds initiative in place for residents to remove
discriminatory covenants from property titles
Objective 2 - Continue to invest in long term plan/saving for capital projects
o Planning for use of ARPA funds – still waiting for guidance from
Treasury
o Police station project – new construction underway; finalizing State
grant agreement requirements so reimbursements can be requested
Objective 3 - Coordinate community conversations regarding equity and
inclusion
o Draft work plan discussed at November work session; additional
discussion in early 2022
Objective 4 - Evaluate operational expectations in light of lessons learned from
pandemic adjustments
o Elected officials and commissions back to in-person meetings, public
still can access virtually or in person
Working on 2022 Work Plan, based on 2021 performance evaluation
Page 1 of 3
4141 Douglas Drive North • Crystal, Minnesota 55422-1696
Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov
Posted: Dec. 17, 2021
City Council Meeting Agenda
Tuesday, Dec. 21, 2021
7 p.m.
Council Chambers/Zoom Meeting
The city manager’s comments are bolded.
1. Call to Order, Roll Call and Pledge of Allegiance
2. Approval of Agenda
The Council will consider approval of the agenda.
3. Presentation
3.1 Police Chief Stephanie Revering will introduce Officer Jon Beck.*
4. Consent Agenda
The Council will consider the following items, which are routine and non-controversial in
nature, in a single motion:
4.1 Approval of the minutes from the following meetings:
a. The City Council work session on Dec. 2, 2021.
b. The City Council work session on Dec. 7, 2021.
c. The City Council meeting on Dec. 7, 2021.
4.2 Approval of the list of license applications submitted by the city clerk to the City Council, a
list that is on file in the office of the city clerk.
4.3 Approval of a resolution accepting donations.
4.4 Approval of a resolution accepting additional funds from the Coronavirus Local Fiscal
Recovery Funds established under the American Rescue Plan Act.
4.5 Reappointments of Walker MacBeath to the Employee Review Board, Terri Schultz to the
Environmental Quality Commission, David Anderson, Lynn Haney and Jesse McCaffrey to
the Parks and Recreation Commission, and Ron Johnson and Michelle Strand to the
Planning Commission.
4.6 Approval of a resolution appointing Jeff Kolb as Citizen Representative to the West Metro
Fire-Rescue District Board.
4.7 Approval of a resolution making annual elections for the City’s 2022 insurance policy.
Page 2 of 3
5. Open Forum
(The City Council appreciates hearing from citizens about items of concern and desires to set
aside time during each meeting for Open Forum. To provide ample opportunity for all, speaking
time is limited to three minutes and topic discussion is limited to ten minutes. The Mayor may,
as presiding officer, extend the total time allowed for a topic. By rule, no action may be taken
on any item brought before the Council during Open Forum. The Council may place items
discussed during Open Forum onto subsequent council meeting agendas).
6. Regular Agenda
6.1 The Council will consider approval of disbursements over $25,000 submitted by the finance
department to the City Council, a list that is on file in the office of the finance department.
Recommend approval of disbursements over $25,000.
6.2 The Council will consider adoption of the 2022 fee schedule, including utilities.
During budget discussions, the City Council reviewed several iterations of the 2022 fee
schedule which includes utility rates consistent with the 2018 rate study. Recommend
approval of the 2022 fee schedule, including utilities.
6.3 The Council will consider acceptance of the 2022 – 2031 Long-Term Plan.
As part of the budget process, the Long-Term Plan is reviewed and updated. The City
Council discussed the Long-Term Plan at recent work sessions. Prior to any of the
projects in the Long-Term Plan proceeding, Council approval is required. Recommend
acceptance of the 2022 – 2031 Long-Term Plan.
6.4 The Council will consider a resolution authorizing the purchase and installation of a
pedestrian bridge at Bassett Creek Park.
The Parks Fund includes funds for replacement of the pedestrian bridge in Bassett Creek
Park in 2022. Recommend approval of the resolution authorizing this replacement.
6.5 The Council will consider a resolution authorizing the purchase of a replacement dump
truck.
The Fleet Fund includes funds for replacement of a dump truck in 2022. Recommend
approval of the resolution authorizing this replacement purchase.
6.6 The Council will consider approval of an employment agreement with the city manager for
2022.
The City Council conducted my annual performance evaluation at a work session on
Dec. 2 and provided direction for terms for my employment agreement for 2022.
Thanks so much; recommend approval of the employment agreement.
7. Announcements
a. The next City Council meeting is Tuesday, Jan. 4 at 7 p.m. in the Council Chambers at City
Hall and via Zoom.
Page 3 of 3
b. City offices will be closed Friday, Dec. 24 in observance of the Christmas Day holiday.
c. City offices will be closed Friday, Dec. 31 in observance of the New Year’s Day holiday.
d. City Council meetings and work sessions are open to the public. Current and previous
meetings are available for viewing and listening at www.crystalmn.gov.
8. Adjournment
Have a great weekend; see you at Tuesday’s meeting.
Crystal City Council work session minutes Dec. 2, 2021
Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the
work session of the Crystal City Council was held at 6:30 p.m. on Dec. 2, 2021 in the Council Chambers
at City Hall, 4141 Douglas Dr. N., Crystal, Minnesota, and via Zoom. Mayor Adams called the meeting to
order.
I.Attendance
The city manager recorded the attendance for city council members and staff:
Council members present: LaRoche, Adams, Banks, Budziszewski, Cummings, and Kiser.
Council Member Parsons was absent.
City staff present: City Manager A. Norris, Assistant City Manager/HR Manager K. Therres,
Recreation Director J. Elholm, Finance Director J. McGann, Public Works Director M. Ray, Police
Chief S. Revering, Community Development Director J. Sutter, and West Metro Fire-Rescue District
Chief S. Larson.
Also present was Karen DeYoung of DeYoung Consulting Services, LLC.
II.Agenda
The Council and staff discussed the following agenda items:
1.Review recreation, community center and pool budgets and future capital projects.
2.Continued discussion of SAFER grant.
Mayor Adams closed the meeting at 7:43 p.m. pursuant to Minnesota Statutes, Section 13D.05,
Subd. 3(a) for the purpose of evaluating the performance of the city manager.
Mayor Adams re-opened the meeting after discussion of the city manager’s performance
evaluation.
III.Adjournment
The work session adjourned at 8:27 p.m.
Jim Adams, Mayor
ATTEST:
Anne Norris, City Manager
4.1(a)
Crystal City Council work session minutes Dec. 7, 2021
Pursuant to due call and notice given in the manner prescribed by Sectio n 3.01 of the City Charter, the
work session of the Crystal City Council was held at 6 p.m. on Dec. 7, 2021 in the Council Chambers at
City Hall, 4141 Douglas Dr. N., Crystal, Minnesota, and via Zoom. Mayor Adams called the meeting to
order.
I.Attendance
The city clerk recorded the attendance for city council members and staff:
Council members present: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Council Member Parsons observed the meeting remotely via Zoom, but did not participate as a
voting member.
City staff present: City Manager A. Norris, City Attorney T. Gilchrist, Public Works Director M. Ray,
Police Chief S. Revering, Community Development Director J. Sutter, and City Clerk C. Serres.
Also present were commission applicants Walker MacBeath, Dave Anderson, and Jeff Kolb.
II.Agenda
The Council and staff discussed the following agenda items:
1.Commission applicant interviews.
2.Snowplowing update.
3.Constituent issues update.
4.New business.
5.Announcements.
III.Adjournment
The work session adjourned at 6:28 p.m.
Jim Adams, Mayor
ATTEST:
Chrissy Serres, City Clerk
4.1(b)
Crystal City Council meeting minutes Dec. 7, 2021
Page 1 of 4
1.Call to Order
Pursuant to due call and notice thereof, the regular meeting of the Crystal City Council was held on
Dec. 7, 2021 at 7 p.m. in the Council Chambers at City Hall, 4141 Douglas Dr. N. in Crystal, Minnesota
and via Zoom. Mayor Adams called the meeting to order.
Roll Call
Mayor Adams asked the city clerk to call the roll for elected officials. Upon roll call, the following
attendance was recorded:
Council members present: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Council Member Parsons observed the meeting remotely via Zoom, but did not participate as a
voting member.
City staff present: City Manager A. Norris, Assistant City Manager/HR Manager K. Therres, City
Attorney T. Gilchrist, Recreation Director J. Elholm, West Metro Fire-Rescue District Chief S. Larson,
Finance Director J. McGann, Public Works Director M. Ray, Police Chief S. Revering, Community
Development Director J. Sutter, and City Clerk C. Serres.
Pledge of Allegiance
Mayor Adams led the Council and audience in the Pledge of Allegiance.
2.Approval of Agenda
The Council considered approval of the agenda.
Moved by Council Member LaRoche and seconded by Council Member Banks to approve the agenda.
Motion carried.
3.Consent Agenda
The Council considered the following items, which are routine and non-controversial in nature, in a
single motion:
3.1 Approval of the minutes from the following meetings:
a. The City Council work session on Nov. 16, 2021.
b. The City Council meeting on Nov. 16, 2021.
c.The City Council work session on Nov. 18, 2021.
3.2 Approval of the list of license applications submitted by the city clerk to the City Council, a
list that is on file in the office of the city clerk.
3.3 Approval of Resolution No. 2021-100, accepting a donation.
3.4 Acceptance of the resignation of Craig Gottschalk from the Blue Line Extension Citizen Advisory
Committee.
3.5 Approval of Resolution No. 2021-101, designating 2022 polling places.
3.6 Approval of the summary of the Dec. 2, 2021 closed City Council work session.
Moved by Council Member Budziszewski and seconded by Council Member Banks to approve the
consent agenda.
Motion carried.
4.1(c)
Crystal City Council meeting minutes Dec. 7, 2021
Page 2 of 4
4. Open Forum
No public comment was given during open forum.
5. Public Hearing
5.1 Mayor Adams announced the purpose of the public hearing:
To receive comment, and Council consideration of a resolution approving the 2022 budget, 2022
property tax levy and 2022 Economic Development Authority property tax levy.
Finance Director Jean McGann and Community Development Director John Sutter addressed the
Council.
Mayor Adams opened the public hearing for testimony. The following persons addressed the
Council:
• Gabriella Gauthies, 6617 59th Ave. N.
• ReNae Bowman, 3916 Edgewood Ave. N.
• Melanie Kelly, 4813 Xenia Ave. N.
• Ron LaMotte, 6526 45th Ave. N.
There being no one else wishing to appear before the Council to give testimony, Mayor Adams
declared the public hearing closed.
Moved by Council Member Budziszewski and seconded by Council Member Cummings to adopt
the following resolution:
RESOLUTION NO. 2021 – 103
RESOLUTION APPROVING 2022 BUDGET, 2022 PROPERTY TAX LEVY
AND 2022 ECONOMIC DEVELOPMENT AUTHORITY PROPERTY TAX LEVY
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
6. Regular Agenda
6.1 The Council considered approval of disbursements over $25,000 submitted by the finance
department to the city council, a list that is on file in the office of the finance department.
Moved by Council Member Banks and seconded by Council Member Kiser to approve the
list of disbursements over $25,000.
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried.
6.2 The Council considered a resolution awarding the contract for the police building audio-visual
equipment.
City Manager Anne Norris, Police Chief Stephanie Revering, and Melissa Stein from Wold
Architects and Engineers addressed the Council.
4.1(c)
Crystal City Council meeting minutes Dec. 7, 2021
Page 3 of 4
Moved by Council Member LaRoche and seconded by Council Member Banks to adopt the
following resolution:
RESOLUTION NO. 2021 – 104
AWARD CONTRACT FOR THE AUDIO-VISUAL PORTION OF THE
NEW POLICE STATION PROJECT
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
6.3 The Council considered the following resolutions related to the Gaulke Pond storm water project.
Public Works Director Mark Ray addressed the Council.
Moved by Council Member Banks and seconded by Council Member LaRoche to adopt the
following resolution:
RESOLUTION NO. 2021 – 105
AWARD CONTRACT FOR CENTRAL CORE STORM WATER PROJECT
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
Moved by Council Member Banks and seconded by Council Member LaRoche to adopt the
following resolution:
RESOLUTION NO. 2021 – 106
AUTHORIZING THE CONTRACT FOR FIBER OPTIC INSTALLATION
TO ADAIR AVE STORM WATER LIFT STATION
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
6.4 The Council considered a resolution authorizing the cooperative and subgrant agreement for the
soluble reactive phosphorus (SRP) channel extension project with the Shingle Creek Watershed
Management Commission.
Public Works Director Mark Ray addressed the Council.
Moved by Council Member Budziszewski and seconded by Council Member Cummings to adopt
the following resolution:
RESOLUTION NO. 2021 – 107
AUTHORIZING COOPERATIVE AND SUBGRANT AGREEMENT
FOR SRP CHANNEL EXTENSION PROJECT
4.1(c)
Crystal City Council meeting minutes Dec. 7, 2021
Page 4 of 4
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
6.5 The Council considered a resolution awarding the contract for lawn mowing services.
Public Works Director Mark Ray addressed the Council.
Moved by Council Member LaRoche and seconded by Council Member Budziszewski to adopt the
following resolution:
RESOLUTION NO. 2021 – 108
AWARDING THE CONTRACT FOR LAWN MOWING SERVICES
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
6.6 The Council considered a resolution authorizing the purchase of a replacement sidewalk snow
removal machine.
Public Works Director Mark Ray addressed the Council.
Moved by Council Member Budziszewski and seconded by Council Member Cummings to adopt
the following resolution:
RESOLUTION NO. 2021 – 109
APPROVING THE PURCHASE OF A REPLACEMENT SIDEWALK MACHINE
Voting aye: Adams, Banks, Budziszewski, Cummings, Kiser, and LaRoche.
Absent, not voting: Parsons.
Motion carried, resolution declared adopted.
7. Announcements
The Council made announcements about upcoming events.
8. Adjournment
Moved by Council Member Budziszewski and seconded by Council Member LaRoche to adjourn
the meeting.
Motion carried.
The meeting adjourned at 8:11 p.m.
_____________________________________
Jim Adams, Mayor
ATTEST:
_____________________________________
Chrissy Serres, City Clerk
4.1(c)
City of Crystal Council Meeting
Dec. 21, 2021
Applications for City License
Fireworks
Super Valu, Inc. dba Cub Foods #30124, 5301 36th Ave. N., Crystal, MN 55422
Massage Therapy Enterprise
CuiPing Li (Natural Wellness Spa), 5524 West Bdwy, Crystal, MN 55428
Gregory Johnson, 3437 Kyle Ave. N., Crystal, MN 55422
Theresa Johnson (MTJ Enterprises, Inc. dba Terry Jacobson Therapeutic Massage), 7215 58th Ave. N.,
Crystal, MN 55428
Karen Sathre (Therapeutic Massage by Karen), 5108 Bernard Ave. N., Crystal, MN, 55429
Massage Therapist
CuiPing Li (Natural Wellness Spa), 5524 West Bdwy, Crystal, MN 55428
Gregory Johnson, 3437 Kyle Ave. N., Crystal, MN 55422
Theresa Johnson (MTJ Enterprises, Inc. dba Terry Jacobson Therapeutic Massage), 7215 58th Ave. N.,
Crystal, MN 55428
YiPeng Yan (Natural Wellness Spa), 5524 West Bdwy, Crystal, MN 55428
Karen Sathre (Therapeutic Massage by Karen), 5108 Bernard Ave. N., Crystal, MN, 55429
Pawnbroker
EZPAWN Minnesota, Inc. dba Max It Pawn, 5445 Lakeland Ave. N., Crystal, MN 55429
Secondhand Goods Dealers Exempt
Bibles for Missions Thrift Store, 4713 36th Ave. N., Crystal, MN 55422
Second Hand Dealer Non-Exempt
Gamestop, Inc. #5392, 349 Willow Bend, Crystal, MN 55428
Tobacco
Advancer Mercantile, LLC dba Liquor Barrel Wine and Spirits, 5628 West Bdwy, Crystal, MN 55428
Almsted Enterprises, Inc. dba Almsteds Fresh Market, 4200 Douglas Dr. N., Crystal, MN 55422
Cousins, LLC dba Adair Liquor, 6001 42nd Ave. N., Crystal, MN 55422
Crystal Tobacco and Cigar Inc. dba Tobacco Outlet, 123 Willow Bend, Crystal, MN 55428
Dark Horse Vapors, 5522 West Bdwy, Crystal, MN 55428
DKK, LLC dba Crystal Wine and Spirits, 4920 West Bdwy, Crystal, MN 55429
Down in the Valley, 5586 West Bdwy, Crystal, MN 55428
Himalaya, LLC dba 36th Avenue Smoke Shop, 5101 36th Ave. N., Crystal, MN 55422
Holiday Station Stores #300, 5410 Lakeland Ave. N., Crystal, MN 55429
Klever Liquor, 5120 56th Ave. N., Crystal, MN 55429
Liquor Barrel, 2728 Douglas Dr. N., Crystal, MN 55422
Stino, Inc, dba Big Louie’s Bar and Grill, 5216 West Bdwy, Crystal, MN 55429
Super Valu, Inc. dba Cub Foods #30124, 5301 36th Ave. N., Crystal, MN 55422
Super Valu, Inc. dba Cub Wine and Spirits, 5201 36th Ave. N., Crystal, MN 55422
Tara Foods, Inc. dba Mini Grocery, 2708 Douglas Dr. N., Crystal, MN 55422
Times Tobacco 1 dba Times Tobacco, 6016 42nd Ave. N. Crystal, MN 55422
4.2
Trilogy, LLC, 2712 Douglas Dr. N., Crystal, MN 55422
VFW Post #494, 5222 56th Ave. N., Crystal, MN 55429
Walgreens #5883, 6800 56th Ave. N., Crystal, MN 55428
Zahid Beverage Group dba Crystal Liquor Warehouse, 6200 56th Ave. N., Crystal, MN 55429
Tree Trimmer
All Metro Service Companies, 3134 California St. N.E., #117 Minneapolis, MN 55418
Arbor Design Tree Service, P.O. Box 290298, Brooklyn Center, MN 55429
Eagle Tree Service, 8637 225th Ave. N.W., Burns Township, MN 55330
Neighborhood Tree Care, 6271 Central Ave. N.E., Fridley, MN 55432
Precision Landscape and Tree, 50 S. Owasso Blvd, E., Little Canada, MN 55117
Urban Foresters, LLC, 4656 Hillsboro Ave. N., New Hope, MN 55428
Rental – New
5656 Adair Ave. N. – The Berkley Group
5115 Edgewood Ave. N. – Mario Chauca
5141 Edgewood Ave. N. – Rumeal Harris
3537 Major Ave. N. – Vertical Capital Group, LLC
5716 36th Ave. N. – Amber Brown
Rental – Renewal
4031-4033 Adair Ave. N. – James Rolsing
4601 Brunswick Ave. N. – Yvonne Hegedus
4608 Brunswick Ave. N. – Chen Zhou (Conditional)
3817-3819 Colorado Ave. N. – True Home Twin Cities, LLC
3141 Douglas Dr. N. – Mike Halek
3219 Douglas Dr. N. – Robert Glorvick (Conditional)
3246 Douglas Dr. N. – Bassett Creek Apartments (Conditional)
3317 Douglas Dr. N. – Four Seasons c/o Commonbond Communities (Conditional)
4550 Douglas Dr. N. – Lancelot Properties, LLC (Conditional)
4134 Hampshire Ave. N. – IH2 Property Illinois LP 2MNC3083 (Conditional)
4609 Hampshire Ave. N. – Maggie Majewski (Conditional)
5913 Hampshire Ave. N. – Lance Rosenberg (Conditional)
2947 Jersey Ave. N. – Thayalan Suntharalingam (Conditional)
4041 Kentucky Ave. N. – Reid Kinde
2916 Louisiana Ave. N. – Hennepin RP Funding, LLC
3501 Major Ave. N. – IH2 Property Illinois LP 2MNC3061 (Conditional)
3522 Major Ave. N. – Premium Property Group
5448 Orchard Ave. N. – Brian Gustafson
5525 Regent Ave. N. – Cheng Lor
3317 Welcome Ave. N. – Daniel Gil (Conditional)
5755 West Broadway – 5755 West Broadway, LLC (Conditional)
4712 Yates Ave. N. – Hawkeye Real Estate (Conditional)
8004 34th Pl. N. – IH2 Property Illinois LP 2MNC2846 (Conditional)
7201 36th Ave. N. – Valley Place Apartments (Conditional)
6928 45th Pl. N. – HPA II Borrower 2020-1 ML, LLC (Conditional)
5920 46th Ave. N. – 3 Rivers St. Paul, LLC (Conditional)
5014 56th Ave. N. – Christina Duong
7206 58th Ave. N. – Kurt Faber (Conditional)
4.2
CITY OF CRYSTAL
RESOLUTION NO. 2021 –
RESOLUTION ACCEPTING DONATIONS
WHEREAS, Minnesota Statute §465.03 requires that all gifts and donations of real or personal
property be accepted only with the adoption of a resolution; and
WHEREAS, said donations must be accepted by a resolution adopted by the City Council.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Crystal to accept the
following donations:
Donor Purpose Amount
Crystal Business Association Shop with a Cop $250
Leon Purcell General Parks Fund $20
AND, BE IT FURTHER RESOLVED that the Crystal City Council sincerely thanks the above-
named for their generous donations.
Dated: Dec. 21, 2021
By: __________________________
Jim Adams, Mayor
ATTEST:
______________________________
Chrissy Serres, City Clerk
4.3
4.4
4.4
4.4
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
CITY OF CRYSTAL
RESOLUTION NO. 2021 - ______
APPOINTING A CITIZEN REPRESENTATIVE TO
THE BOARD OF DIRECTORS FOR
THE WEST METRO FIRE-RESCUE DISTRICT
WHEREAS, in 1997 the cities of Crystal and New Hope approved a Joint and
Cooperative Agreement to consolidate all aspects of their fire safety programs and
created the West Metro Fire-Rescue District, and
WHEREAS, in accordance with Article IV of the Joint and Cooperative
Agreement, Crystal-New Hope Joint Fire District, members are to be appointed by
Council resolution, and
WHEREAS, the term of Crystal’s current Citizen Representative Jeff Kolb
expires December 31, 2021; and
WHEREAS, Citizen Representative Kolb is seeking reappointment and the City
Council interviewed him on December 7, 2021; and
NOW, THEREFORE, BE IT RESOLVED that the Crystal City Council appoints
Jeff Kolb as Crystal’s Citizen Representative member of the West Metro Fire-Rescue
District’s Board of Directors for a two-year term, effective January 1, 2022 – December
31, 2023.
Adopted by the Crystal City Council this 21st day of December, 2021.
________________________________
Jim Adams, Mayor
ATTEST:
________________________________
Chrissy Serres, City Clerk
4.6
4.7
4.7
4.7
DATE:December 14, 2021
TO:Anne Norris, City Manager
City of Crystal City Council
FROM:Jean McGann, Contracted Finance Director
RE:Expenditures over $25,000
Payee Amount
HealthPartners, Inc.December health insurance premiums $117,492.50
Mansfield Oil Company Fuel inventory for fleet $26,323.92
Ryan Contracting 2021 Utility Reconstruction project final payment $97,390.87
West Metro Fire Rescue District December contribution to West Metro Fire $110,140.56
BCWMC Basset Creet WMC dues for 2022 $30,206.00
Golden Valley JWC October water costs $186,497.19
Nick's Tree Service, Inc.Removal of city trees, EDA trimming $81,800.00
Total Control Systems, Inc.Maryland lift station parts $36,684.00
MN PERA Employee & city required contributions for 12/10/21 pay date $61,624.35
$748,159.39
Description
6.1
Memorandum
DATE: December 7, 2021
TO: Mayor and City Council
FROM: Anne Norris, City Manager
SUBJECT: 2022 Fee Schedule
____________________________________________________________________
BACKGROUND:
The 2022 Fee Schedule is essentially as presented during recent work sessions and
the 2022 revenues incorporates the changes. There are modest increases for some
fees; most are staying the same. The 2022 utility rates reflect those recommended in
the 2018 Rate Study.
During the 2023-24 budget process, a comprehensive review of the fees will be
completed. A new 5-year utility rate study will also be completed in 2022, in time for the
2023-24 budget process.
Attached for the Council’s formal approval is the 2022 Fee Schedule, including 2022
utility rates.
RECOMMENDATION:
Adopt the 2022 Fee Schedule as presented.
Attach:
6.2
Approved by the City Council on December 21, 2021
City of Crystal
Effective January 1, 2022
Adopted by the City Council on October 15, 2019
2019 - 2022 Proposed Fee Schedules
Appendix IV, Exhibit 1 of the Crystal City Code
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
Administration 1135 0100.4105 Adult establishment initial license 12/31 8,000.00$ 8,000.00$ 0.00%8,000.00$ 0.00%8,000.00$ 0.00%8,000.00$ 0.00%
Administration 1135 0100.4105 Adult establishment renewal license 12/31 5,000.00$
Administration 1135 0100.4605 Adult establishment initial background investigation (in
state all of last 10 years)
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Administration 1135 0100.4605 Adult establishment initial background investigation (out
of state any of last 10 years)
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
Administration 1135 0100.4605 Adult establishement renewal background investigation 50.00$
Administration 1100 0100.4105 Consumer fireworks initial and renewal license for retail
store sales
12/31 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Administration 1100 0100.4105 Consumer firewords initial and renewal license for retail
retail stand sales
12/31 350.00$ 350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%
Administration 1130 0100.4605 Lawful gambling initial background investigation for
premises permit
250.00$ 250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%
Administration 1130 3709.4950 Lawful gambling contribution fund 0.10$ 0.10$ 0.00%0.10$ 0.00%0.10$ 0.00%0.10$ 0.00%10% per year or organization's net profits
dervied within the City
Administration 1130 3709.4950 Lawful gambling trade area expenditures 0.15$ 0.15$ 0.00%0.15$ 0.00%0.15$ 0.00%0.15$ 0.00%15% per year of organization's lawful
purpose expenditures that must be
expended within the trade area
Administration 1200 0100.4140 Liquor: initial and renewal consumption and display
annual permit
3/31 300.00$ 300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%
Administration 1200 0100.4165 Liquor: initial and renewal off-sale 3.2% malt liquor 6/30 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Administration 1200 0100.4165 Liquor: initial and renewal off-sale small brewer license 6/30 380.00$ 380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%
Administration 1200 0100.4165 Liquor: initial and renewal off-sale brewpub license 6/30 380.00$ 380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%
Administration 1200 0100.4165 Liquor: initial and renewal off-sale liquor license 6/30 380.00$ 380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%
Administration 1200 0100.4165 Liquor: initial and renewal off-sale microdistillery license 6/30 380.00$ 380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%
Administration 1200 0100.4115 Liquor: initial and renewal club on-sale 3.2% malt liquor
license
6/30 66.00$ 66.00$ 0.00%66.00$ 0.00%66.00$ 0.00%66.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale wine license (up to
200 members)
6/30 150.00$ 150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale wine license (over
200 members)
6/30 250.00$ 250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale wine and 3.2%
malt liquor licenses (up to 200 members)
6/30 216.00$ 216.00$ 0.00%216.00$ 0.00%216.00$ 0.00%216.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale wine and 3.2%
malt liquor licenses (over 200 members)
6/30 316.00$ 316.00$ 0.00%316.00$ 0.00%316.00$ 0.00%316.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale, full liquor license
(up to 200 members)
6/30 300.00$ 300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale, full liquor license
(201-500 members)
6/30 500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale, full liquor license
(501-1,000 members)
6/30 650.00$ 650.00$ 0.00%650.00$ 0.00%650.00$ 0.00%650.00$ 0.00%
Administration 1200 0100.4115 Liquor: initial and renewal on-sale 3.2% malt liquor
license
6/30 550.00$ 550.00$ 0.00%550.00$ 0.00%550.00$ 0.00%550.00$ 0.00%
Administration 1200 0100.4115 Liquor: initial and renewal on-sale wine license 6/30 2,000.00$ 2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%
Administration 1200 0100.4115 Liquor: initial and renewal on-sale wine and 3.2% malt
liquor licenses
6/30 2,550.00$ 2,550.00$ 0.00%2,550.00$ 0.00%2,550.00$ 0.00%2,550.00$ 0.00%
Administration 1200 0100.4167 Liquor: initial and renewal on-sale brewer
taproom/Sunday sales license
6/30 600.00$ 600.00$ 0.00%600.00$ 0.00%600.00$ 0.00%600.00$ 0.00%
Administration 1200 0100.4140 Liquor: initial and renewal club on-sale culinary class
license
6/30 100.00$ 100.00$ 100.00$
Administration 1200 0100.4167
Liquor: initial and renewal on-sale, full liquor license
6/30 6,500.00$ 6,500.00$ 0.00%6,500.00$ 0.00%6,500.00$ 0.00%6,500.00$ 0.00%May be prorated dependent upon time of
license issuance.
Administration 1200 0100.4167 Liquor: initial and renewal on-sale microdistillery, cocktail
room license
6/30 600.00$ 600.00$ 0.00%600.00$ 0.00%600.00$ 0.00%600.00$ 0.00%
Administration 1200 0100.4140
Liquor: initial and renewal on-sale Sunday sales license
6/30 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
Administration 1200 0100.4115 Liquor - temporary consumption and display daily permit 25.00$ 25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%
Administration 1200 0100.4167 Liquor - temporary on-sale (full liquor, wine,
microdistillery, small brewer and 3.2% malt liquor) license
50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%Per event
Administration 1200 0100.4605 Liquor initial background investigation (club on-sale,
3.2% malt liquor)
100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%$50 for additional applicants
Administration 1200 0100.4605 Liquor initial background investigation (off-sale 3.2% malt
liquor)
100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%$50 for additional applicants
Administration 1200 0100.4605 Liquor initial background investigation (off-sale and on-
sale - in state all of last 10 years)
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Administration 1200 0100.4605 Liquor initial background investigation fee (off-sale and
on-sale - out of state, any of last 10 years)
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Administration 1200 Res. No.
2018-160
0100.4715 Liquor administrative penalty for liquor business: First
violation
N/A 750.00$ 750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%One-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1201 Res. No.
2018-160
0100.4715 Liquor administrative penality for liquor business: Second
violation within two years of first violation.
N/A 1,500.00$ 1,500.00$ 0.00%1,500.00$ 0.00%1,500.00$ 0.00%1,500.00$ 0.00%Three-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1202 Res. No.
2018-160
0100.4715 Liquor administrative penalty for liquor busienss: Third
violation within three years of second violation.
N/A 2,000.00$ 2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%10-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1203 Res. No.
2018-160
0100.4715 Liquor administrative penality for liquor business: Fourth
violation within three years of third violation.
N/A Revocation of license. Administrative
penalties determined by the City Council.
Administration 910 0100.4145 Multiple animal initial commerical license 4/30 150.00$ 150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%
Administration 910 0100.4145 Multiple animal renewal commerical license 4/30 130.00$ 130.00$ 0.00%130.00$ 0.00%130.00$ 0.00%130.00$ 0.00%
Administration 910 0100.4145 Multiple animal initial noncommerical license 4/30 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Administration 910 0100.4145 Multiple animal renewal noncommerical license 4/30 80.00$ 80.00$ 0.00%80.00$ 0.00%80.00$ 0.00%80.00$ 0.00%
Administration 1125 0100.4105 Pawnbroker initial license 12/31 12,050.00$ 12,050.00$ 0.00%12,050.00$ 0.00%12,050.00$ 0.00%12,050.00$ 0.00%Bond = $5,000 in addition to monthly
charges for billable transactions (see" pawn
services" tranaction fees noted in Police
section of this schedule)
Administration 1125 0100.4105 Pawnbroker renewal license 12/31 6,000.00$ 6,000.00$ 0.00%6,000.00$ 0.00%6,000.00$ 0.00%6,000.00$ 0.00%Bond = $5,000 in addition to monthly
charges for billable transactions (see" pawn
services" tranaction fees noted in Police
section of this schedule)
Administration 1125 0100.4605 Pawnbroker initial background investigation (in state all of
last 10 years)
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Administration 1125 0100.4605 Pawnbroker initial background investigation (out of state
any of last 10 years)
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
Administration 1125 0100.4105 Pawnbroker renewal background invetigation 50.00$ 100.00%50.00$ 0.00%
Administration 1125 Res. No.
2018-126
0100.4725 Pawnbroker administrative penalty for business: First
violation
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%10-day license suspension in addition to
fine. Administrative penalties determined
by the City Council.
Administration 1125 Res. No.
2018-126
0100.4725 Pawnbroker administrative penalty for business: Second
violation within two years of first violation.
750.00$ 750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%20-day license suspension in addition to
fine. Administrative penalties determined
by the City Council.
Administration 1125 Res. No.
2018-126
0100.4725 Pawnbroker administrative penalty for business: Third
violation within three years of second violation.
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%30-day license suspension in addition to
fine. Administrative penalties determined
by the City Council.
Administration 1125 Res. No.
2018-126
0100.4725 Pawnbroker administrative penalty for business: Fourth
violation within three years of third violtaion.
Revocation of license. Administrative
penalties determined by the City Council.
Administration 1110 0100.4105 Peddler and solicitorlicense per day 15.00$ 15.00$ 0.00%15.00$ 0.00%15.00$ 0.00%15.00$ 0.00%
Administration 1110 0100.4105 Peddler and solicitor license per month 175.00$ 175.00$ 0.00%175.00$ 0.00%175.00$ 0.00%175.00$ 0.00%
Administration 1110 0100.4105 Peddler and solicitor license per year 12/31 300.00$ 300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%
Administration 1110 0100.4105 Transient merchant license per day 15.00$ 15.00$ 0.00%15.00$ 0.00%15.00$ 0.00%15.00$ 0.00%Limited to four events (one to four days per
event)
Administration 1110 0100.4605 Peddler/solicitors/transient merchant background
investigation for first applicant (in state all of last 10
years)
N/A 120.00$ 120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%
Administration 1110 0100.4605 Peddler/solicitors/transient merchant background
investigation for first applicant (out of state any of last 10
years)
N/A 125.00$ 125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%
Administration 1110 0100.4605 Peddler/solicitors/transient merchant background
investigation for each additional applicant (in state all of
last 10 years)
N/A 25.00$ 25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%
Administration 1110 0100.4605 Peddler/solicitors/transient merchant background
investigation for each additional applicant (out of state
any of last 10 years)
N/A 125.00$ 125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%
Administration 605 0100.4155 Refuse hauler initial and renewal business license 9/30 120.00$ 124.00$ 3.33%128.00$ 3.23%132.00$ 3.13%136.00$ 3.03%Insurance = $1,000,000
Administration 605 0100.4155 Refuse hauler initial and renwal vehicle license (per
vehicle)
9/30 57.00$ 59.00$ 3.51%61.00$ 3.39%63.00$ 3.28%65.00$ 3.17%Insurance = $1,000,000
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Administration 1120 0100.4105 Secondhand goods dealer initial and reneawl nonexempt
license
12/31 275.00$ 275.00$ 0.00%275.00$ 0.00%275.00$ 0.00%275.00$ 0.00%Bond = $3,000
Administration 1120 0100.4105 Secondhand goods dealer initial and renewal exempt
license
12/31 75.00$ 75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%
Administration 1120 0100.4105 Secondhand goods dealer multiple sales sites 12/31 564.00$ 564.00$ 0.00%564.00$ 0.00%564.00$ 0.00%564.00$ 0.00%Bond = $3,000
Administration 1120 0100.4105 Secondhand goods dealer background investigation 12/31 -$ -$ 0.00%-$ 0.00%50.00$ 100.00%50.00$ 0.00%
Administration 1120 0100.4605 Secondhand goods dealer background investigation (in
state all of last 10 years)
N/A 500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Administration 1120 0100.4605 Secondhand goods dealer background investigation (out
of state any of last 10 years)
N/A 1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
Administration 1120 Res. No.
2018-126
100.4725 Secondhand goods dealer administrative penalty for
nonexempt business:
First violation.
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%10-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1120 Res. No.
2018-126
100.4725 Secondhand goods dealer administrative penalty for
nonexempt business:
Second violation within two years of first violation.
750.00$ 750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%750.00$ 0.00%20-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1120 Res. No.
2018-126
100.4725 Secondhand goods dealer administrative penalty for
nonexempt business:
Third violation within three years of second violation.
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%30-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1120 Res. No.
2018-126
100.4725 Secondhand goods dealer administrative penalty for
nonexempt business:
Fourth violation within three years of third violation.
Revocation of license. Administrative
penalties determined by the City Council.
Administration 1140 0100.4105 Theraputic massage enterprise initial and renewal license 12/31 120.00$ 124.00$ 3.33%128.00$ 3.23%128.00$ 0.00%128.00$ 0.00%Insurance = $1,000,000
Administration 1140 0100.4105 Theraputic massage therapist initial and renewal license
12/31 60.00$ 62.00$ 3.33%64.00$ 3.23%64.00$ 0.00%64.00$ 0.00%
Insurance = $1,000,000
Administration 1140 0100.4605 Theraputic massage enterprise or therapist initial
background investigation 120.00$ 100.00$ -16.67%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Insurance = $1,000,000
Administration 1140 0100.4605 Theraputic massage enterprise or therapist renewal
background investgation 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%
Insurance = $1,000,000
Administration 1105 0100.4135 Tobacco and related products initial and renewal license 12/31 325.00$ 325.00$ 0.00%325.00$ 0.00%325.00$ 0.00%325.00$ 0.00%
Administration 1105 0100.4605 Tobacco investigation fee - initial license N/A N/A 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Administration 1105 0100.4605 Tobacco background investigation - renewal license N/A N/A 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for a
business: First violation.
$75 - $750 $75 - $750 0.00%$75 - $750 0.00%$75 - $750 0.00%$75 - $750 0.00%One-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for a
business: Second violation within two years of first
violation.
$200 - $1,500 $200 - $1,500 0.00%$200 - $1,500 0.00%$200 - $1,500 0.00%$200 - $1,500 0.00%Five-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for a
business: Third violation within two years of first violation.
$250 - $2,000 $250 - $2,000 0.00%$250 - $2,000 0.00%$250 - $2,000 0.00%$250 - $2,000 0.00%Seven-day license suspension in addition to
fine. Administrative penalties determined by
the City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for a
business: Fourth violation within three years of first
violation.
Revocation of license. Administrative
penalties determined by the City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for
an individual: First violation.
$50 - $750 $50 - $750 0.00%$50 - $750 0.00%$50 - $750 0.00%$50 - $750 0.00%Administrative penalties determined by the
City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for
an individual: Second violation within two years of first
violation.
$50 - $1,500 $50 - $1,500 0.00%$50 - $1,500 0.00%$50 - $1,500 0.00%$50 - $1,500 0.00%Administrative penalties determined by the
City Council.
Administration 1105 Res. No.
2018-126
100.472 Tobacco and related products administrative penalty for
an individual: Third violation within two years of first
violation.
$50 - $2,000 $50 - $2,000 0.00%$50 - $2,000 0.00%$50 - $2,000 0.00%$50 - $2,000 0.00%Administrative penalties determined by the
City Council.
Administration 1115 0100.4191 Tree trimmer initial and renewal license 12/31 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%Bond = $2,500; Insurance = $500,000
Administration 1000 0100.XXXX License late fees
Administration 1000 0100.XXXX License late fees
Administration 0100.4430 Certification of documents N/A cost incurred cost incurred cost incurred cost incurred actual costs
Administration 0100.4430 City code book N/A cost incurred cost incurred cost incurred cost incurred actual costs
Administration 0100.4430 Copies of property deeds and liens N/A cost incurred cost incurred cost incurred cost incurred actual costs
Administration 0100.4430 Copy of City Council or Economic Development Authority
meeting
N/A cost incurred cost incurred cost incurred cost incurred actual costs
Administration 0100.4430 Data practices processing fee N/A cost incurred cost incurred cost incurred cost incurred actual costs
Administration 340 0100.4414 Domestic partner registration N/A 40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%
Administration 340 0100.4414 Domestic partner registration amendments and/or
terminiations
N/A 10.00$ 10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%
25% of license fee if one to seven days late
50% of license fee if over seven days late
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Administration 0100.4902 Candidate filing N/A 25.00$ 25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%Per City Charter
Administration 0100.4420 Notary N/A 5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%
Administration 0100.4430 Photocopying N/A 0.25$ 0.25$ 0.00%0.25$ 0.00%0.25$ 0.00%0.25$ 0.00%Per page: letter-size
Administration 0100.4430 Photocopying N/A 0.50$ 0.50$ 0.00%0.50$ 0.00%0.50$ 0.00%0.50$ 0.00%Per page: legal-size; ledger-size
Administration 0100.4420 Special assessment record request N/A 25.00$ 25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%
Building 0100.4220 Address change administrative fee N/A 100.00$ 103.00$ 3.00%106.00$ 2.91%106.00$ 0.00%106.00$ 0.00%
Building Permit 0100.4210 Building - basic 6 mo.6 mo.Table 1-A Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A has been added at the end of the Fee
Schedule
Building Permit 0100.4210 Building - grading permit 6 mo.Table 1-A Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A has been added at the end of the Fee
Schedule
Building Permit 0100.4210 Building - permit minimum 60.00$ 63.00$ 5.00%63.00$ 0.00%63.00$ 0.00%63.00$ 0.00%plus state surcharge
Building 0100.2210 Building - Construction Mgmt. Agmt. Escrow (new
construct.)
2,000.00$ 2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%
Building 0100.2210 Building - Construction Mgmt. Agmt. Escrow (major
addition)
1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
Building Permit 0100.4210 Building - minor moving bldgs, one location to another /
diff. lot
6 mo.63.00$ 63.00$ 0.00%63.00$ 0.00%63.00$ 0.00%65.00$ 3.17%plus deposit
Building Permit 0100.4210 Building - moving 1 bldg. location to another location or
diff. / lot
6 mo.158.00$ 158.00$ 0.00%158.00$ 0.00%158.00$ 0.00%163.00$ 3.16%plus deposit
Building Permit 0100.4210 Building - moving building on same lot 6 mo.33.00$ 33.00$ 0.00%33.00$ 0.00%33.00$ 0.00%34.00$ 3.03%plus deposit
Building Permit 0100.4210 Building - plan check - Residential - % of bldg permit 6 mo.50%50%0.00%50%0.00%50%0.00%50%0.00%Percentage of the applicable permit fee per table 1-A
Building Permit 0100.4210 Building - plan check - Commercial/Industrial - % of bldg
permit fee
6 mo.65%65%0.00%65%0.00%65%0.00%65%0.00%Percentage of the applicable permit fee per table 1-A
Building Permit 0100.4210 Building - state contractors license surcharge 6 mo.5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%
Building Permit 0100.4210 Building - wrecking (minimum fee)6 mo.65.00$ 65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%flat fee, includes state surcharge
Building Permit 0100.4210 Building - draintile 6 mo.115.00$ 115.00$ 0.00%115.00$ 0.00%115.00$ 0.00%118.00$ 2.61%flat fee, includes state surcharge
Building Permit 0100.4210 Building - window replacement, 1-3 windows 6 mo.87.00$ 90.00$ 3.45%92.00$ 2.22%92.00$ 0.00%95.00$ 3.26%flat fee, includes state surcharge
Building Permit 0100.4210 Building - window replacement, 4 or more windows 6 mo.169.00$ 174.00$ 2.96%178.00$ 2.30%178.00$ 0.00%182.00$ 2.25%flat fee, includes state surcharge
Building Permit 0100.4210 Building - patio door replacement 6 mo.115.00$ 118.00$ 2.61%121.00$ 2.54%121.00$ 0.00%125.00$ 3.31%flat fee, includes state surcharge
Building Permit 0100.4210 Building - egress window replacement/install, 1 window 6 mo.87.00$ 90.00$ 3.45%92.00$ 2.22%92.00$ 0.00%95.00$ 3.26%flat fee, includes state surcharge
Building Permit 0100.4210 Building - egress window replacement/install, 2 or more
windows
6 mo.115.00$ 118.00$ 2.61%121.00$ 2.54%121.00$ 0.00%125.00$ 3.31%flat fee, includes state surcharge
Building Permit 0100.4210 Building - siding new or replacement 6 mo.158.00$ 163.00$ 3.16%167.00$ 2.45%167.00$ 0.00%172.00$ 2.99%flat fee, includes state surcharge
Building Permit 0100.4210 Building - tearoff and reroof 6 mo.136.00$ 140.00$ 2.94%144.00$ 2.86%144.00$ 0.00%148.00$ 2.78%flat fee, includes state surcharge
Building Permit 0100.4210 Building - reroofing, add second layer 6 mo.103.00$ 106.00$ 2.91%109.00$ 2.83%109.00$ 0.00%112.00$ 2.75%flat fee, includes state surcharge
Building Permit 0100.4210 Building - investigation fee see comments see comments 0.00%see comments 0.00%see comments 0.00%see comments 0.00%1 X applicable permit fee
Building Permit 0100.4210 Building - working without a permit see comments see comments 0.00%see comments 0.00%see comments 0.00%see comments 0.00%1 X applicable permit fee
Building Permit 0100.4210 Building - reinspection fee 65.00$ 65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%
Building Permit 0100.4210 Building - administrative fee on refund of a building
permit
20%20%0.00%20%0.00%20%0.00%20%0.00%of permit application fee
Building Permit 0100.4210 Building - lead certification verification 5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%per statute 326B.815, subd. 2
Building Permit 0100.4220 Driveway construction 6 mo.93.00$ 96.00$ 3.23%98.00$ 2.08%98.00$ 0.00%98.00$ 0.00%
Building Permit 0100.4220 Driveway reconstruction/replacement/modification 6 mo.93.00$ 96.00$ 3.23%98.00$ 2.08%98.00$ 0.00%98.00$ 0.00%
Building Permit 0100.4220 Sidewalk or curb and gutter construction 6 mo.65.00$ 67.00$ 3.08%69.00$ 2.99%69.00$ 0.00%69.00$ 0.00%
Building Permit 0100.4222 Electrical - new service/power supply 0-200 amp 100.00$ 105.00$ 5.00%105.00$ 0.00%110.00$ 4.76%110.00$ 0.00%add $15 for each additional 100 amps
Building Permit 0100.4222 Electrical - replace existing main panel with new panel in
same location
100.00$ 105.00$ 5.00%105.00$ 0.00%110.00$ 4.76%110.00$ 0.00%
Building Permit 0100.4222 Electrical - replace existing sub panel with new panel in
same location
40.00$ 42.00$ 5.00%42.00$ 0.00%44.00$ 4.76%44.00$ 0.00%
Building Permit 0100.4222 Electrical - transformers up to 10 KVA 10.00$ 10.50$ 5.00%10.50$ 0.00%11.00$ 4.76%11.00$ 0.00%
Building Permit 0100.4222 Electrical - transformers 11 to 74 KVA 40.00$ 42.00$ 5.00%42.00$ 0.00%44.00$ 4.76%44.00$ 0.00%
Building Permit 0100.4222 Electrical - transformers 75 to 299 KVA 60.00$ 63.00$ 5.00%63.00$ 0.00%66.00$ 4.76%66.00$ 0.00%
Building Permit 0100.4222 Electrical - transformers 300 KVA or more 150.00$ 158.00$ 5.33%158.00$ 0.00%166.00$ 5.06%166.00$ 0.00%
Building Permit 0100.4222 Electrical - retro fit lighting 0.65$ 0.69$ 6.15%0.69$ 0.00%0.72$ 4.35%0.72$ 0.00%per fixture
Building Permit 0100.4222 Electrical - sign transformers 8.00$ 8.50$ 6.25%8.50$ 0.00%9.00$ 5.88%9.00$ 0.00%per unit
Building Permit 0100.4222 Electrical - swimming pools 80.00$ 84.00$ 5.00%84.00$ 0.00%88.00$ 4.76%88.00$ 0.00%includes two trips, doesn't include circuits
Building Permit 0100.4222 Electrical - feeders/circuits 0 to 30 amp 8.00$ 8.50$ 6.25%8.50$ 0.00%9.00$ 5.88%9.00$ 0.00%
Building Permit 0100.4222 Electrical - feeders/circuits 31 to 100 amp 10.00$ 10.50$ 5.00%10.50$ 0.00%11.00$ 4.76%11.00$ 0.00%add $5 for each additional 100 amps
Building Permit 0100.4222 Electrical - apartment buildings 70.00$ 74.00$ 5.71%74.00$ 0.00%78.00$ 5.41%78.00$ 0.00%per unit, doesn't include service/house
Building Permit 0100.4222 Electrical - traffic signals 7.00$ 7.50$ 7.14%7.50$ 0.00%8.00$ 6.67%8.00$ 0.00%per standard
Building Permit 0100.4222 Electrical - street lights and lot lights 4.00$ 4.25$ 6.25%4.25$ 0.00%4.50$ 5.88%4.50$ 0.00%per pole
Building Permit 0100.4222 Electrical - remote control or signal wiring 0.75$ 0.79$ 5.33%0.79$ 0.00%0.84$ 6.33%0.84$ 0.00%per device
Building Permit Electrical - minimum fee per trip.40.00$ 42.00$ 5.00%42.00$ 0.00%44.00$ 4.76%44.00$ 0.00%Residential maximum fee is $195 with a
service of 200 amps or less; no maximum if
service is larger than 200 amps
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Building Permit 0100.4225 Fire - suppression 6 mo.Table 1-A Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A 0.00%Table 1-A has been added at the end of the Fee
Schedule
Building Permit 0100.4225 Fire - vent hood cleaning 60.00$ 63.00$ 5.00%63.00$ 0.00%63.00$ 0.00%63.00$ 0.00%flat fee, no state surcharge
Building Permit 0100.4240 Mechanical 6 mo.60.00$ 63.00$ 5.00%63.00$ 0.00%63.00$ 0.00%65.00$ 3.17%plus 2% of valuation over $2,900
Building Permit 0100.4240 Mechanical - residential garage heater 6 mo.65.00$ 67.00$ 3.08%69.00$ 2.99%69.00$ 0.00%65.00$ -5.80%flat fee, includes state surcharge
Building Permit 0100.4240 Mechanical - residential gas range installation 6 mo. n/a - new flat
fee items
67.00$ N/A 69.00$ 2.99%69.00$ 0.00%65.00$ -5.80%flat fee, includes state surcharge (new flat
fee permit)
Building Permit 0100.4240 Mechanical - residential gas dryer installation 6 mo. n/a - new flat
fee items
67.00$ N/A 69.00$ 2.99%69.00$ 0.00%65.00$ -5.80%flat fee, includes state surcharge (new flat
fee permit)
Building Permit 0100.4240 Mechanical - residential gas fireplace installation 6 mo.65.00$ 67.00$ 3.08%69.00$ 2.99%69.00$ 0.00%65.00$ -5.80%flat fee, includes state surcharge
Building Permit 0100.4240 Mechanical - residential air conditioning new/replace 6 mo.65.00$ 67.00$ 3.08%69.00$ 2.99%69.00$ 0.00%65.00$ -5.80%flat fee, includes state surcharge
Building Permit 0100.4240 Mechanical - residential vent fan 32.00$ -49.21%
Building Permit 0100.4240 Mechanical - residential furnace new/replace 6 mo.87.00$ 89.00$ 2.30%92.00$ 3.37%92.00$ 0.00%95.00$ 3.26%flat fee, includes state surcharge
Building Permit 0100.4240 Mechanical - residential furnace and air conditioning
new/replace
6 mo.130.00$ 133.00$ 2.31%137.00$ 3.01%137.00$ 0.00%142.00$ 3.65%flat fee, includes state surcharge
Building Permit 0100.4240 Bldg. - administrative fee on refund of a mechanical
permit
6 mo.20%20%0.00%20%0.00%20%0.00%20%0.00%of permit application fee
Building Permit 0100.4205 Misc. - beer dispenser/ connected with water supply (6
mo.)
6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%
Building Permit 0505.4250 Plumbing - abandoning/repair water service 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%plus state surcharge
Building Permit 0100.4250 Plumbing - blowoff basin 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - catch basin 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - extension of water pipe or system 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - hydraulic sewer valve 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - new fixtures opening 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - permit minimum 6 mo.60.00$ 63.00$ 5.00%63.00$ 0.00%63.00$ 0.00%65.00$ 3.17%plus state surcharge
Building Permit 0100.4250 Plumbing - water heater 6 mo.50.00$ 51.00$ 2.00%52.00$ 1.96%52.00$ 0.00%65.00$ 25.00%flat fee, includes state surcharge
Building Permit 0100.4250 Plumbing - dishwasher 6 mo./a-new flat fee ite 51.00$ N/A 52.00$ 1.96%31.00$ -40.38%32.00$ 3.23%flat fee, includes state surcharge (new flat
fee permit)
Building Permit 0100.4250 Plumbing - rainwater leader up to 10 stories 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%flat fee, includes state surcharge
Building Permit 0100.4250 Plumbing - rainwater leader each additional 15 stories
after the first 10
6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - alterations over $500 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%for each $500 of value, plus state surcharge
Building Permit 0100.4250 Plumbing - replace water distribution piping or system 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - rough in fixtures/set in fixtures 6 mo.18.00$ 18.00$ 0.00%19.00$ 5.56%19.00$ 0.00%20.00$ 5.26%per fixture, plus state surcharge
Building Permit 0100.4250 Plumbing - sewage ejector 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - sump or receiving tank 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - vacuum breaker 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - water piping, first 100 lineal feet 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - water piping, additional 100 lineal feet 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%plus state surcharge
Building Permit 0100.4250 Plumbing - water treating or softening device 6 mo.29.00$ 30.00$ 3.45%31.00$ 3.33%31.00$ 0.00%32.00$ 3.23%flat fee, includes state surcharge
Building Permit 0100.4250 Plumbing - administrative fee on refund of a plumbing
permit
6 mo.20.00%20.00%0.00%20.00%0.00%20.00%0.00%20.00%0.00%
Building Permit 0100.4255 Sewer - permit minimum 6 mo.67.00$ 69.00$ 2.99%71.00$ 2.90%71.00$ 0.00%73.00$ 2.82%plus state surcharge
Building Permit 0100.4255 Sewer - new connection charge 6 mo.67.00$ 69.00$ 2.99%71.00$ 2.90%71.00$ 0.00%73.00$ 2.82%plus state surcharge
Building Permit 0100.4255 Sewer - storm sewer connection 6 mo.67.00$ 69.00$ 2.99%71.00$ 2.90%71.00$ 0.00%73.00$ 2.82%plus state surcharge
Building Permit 0100.4260 Signs - temporary 1 week 50.00$ 51.00$ 2.00%52.00$ 1.96%52.00$ 0.00%52.00$ 0.00%
Building Permit 530 0100.4260 Signs - other than temporary 6 mo.80.00$ 82.00$ 2.50%85.00$ 3.66%85.00$ 0.00%88.00$ 3.53%plus $1.15 per square foot
Building Permit 0100.4440 State surcharge (no valuation)6 mo.1.00$ 1.00$ 0.00%1.00$ 0.00%1.00$ 0.00%1.00$ 0.00% effective July 1, 2015
Building Permit 0100.4440 State surcharge/work with value 6 mo..0005 x val .0005 x value 0.00%.0005 x value 0.00%.0005 x value 0.00%.0005 x value 0.00%
Building Permit 0100.4270 Water - new connection charge 6 mo.67.00$ 69.00$ 2.99%71.00$ 2.90%71.00$ 0.00%73.00$ 2.82%plus state surcharge
Building Permit 0100.4270 Water - water meter, fire meter 6 mo.67.00$ 69.00$ 2.99%71.00$ 2.90%71.00$ 0.00%73.00$ 2.82%plus state surcharge
New flat fee item (currently subject to 63.00 mechanical permit base fee)
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Code Enforcement 0100.4403 Administrative charge for nuisance elimination/abatement N/A 100.00$ 103.00$ 3.00%106.00$ 2.91%106.00$ 0.00%106.00$ 0.00%per incident plus actual costs
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level One Violation - 1st
violation
75.00$ 75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level One Violation - 2nd
violation
90.00$ 90.00$ 0.00%90.00$ 0.00%90.00$ 0.00%90.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level One Violation - 3rd
violation
110.00$ 110.00$ 0.00%110.00$ 0.00%110.00$ 0.00%110.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level One Violation - 4th
violation
130.00$ 130.00$ 0.00%130.00$ 0.00%130.00$ 0.00%130.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Two Violation - 1st
violation
120.00$ 120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Two Violation - 2nd
violation
140.00$ 140.00$ 0.00%140.00$ 0.00%140.00$ 0.00%140.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Two Violation - 3rd
violation
170.00$ 170.00$ 0.00%170.00$ 0.00%170.00$ 0.00%170.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Two Violation - 4th
violation
220.00$ 220.00$ 0.00%220.00$ 0.00%220.00$ 0.00%220.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Three Violation - 1st
violation
180.00$ 180.00$ 0.00%180.00$ 0.00%180.00$ 0.00%180.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Three Violation - 2nd
violation
220.00$ 220.00$ 0.00%220.00$ 0.00%220.00$ 0.00%220.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Three Violation - 3rd
violation
260.00$ 260.00$ 0.00%260.00$ 0.00%260.00$ 0.00%260.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Three Violation - 4th
violation
340.00$ 340.00$ 0.00%340.00$ 0.00%340.00$ 0.00%340.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Four Violation - 1st
violation
260.00$ 260.00$ 0.00%260.00$ 0.00%260.00$ 0.00%260.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Four Violation - 2nd
violation
320.00$ 320.00$ 0.00%320.00$ 0.00%320.00$ 0.00%320.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. enforcement, Level Four Violation - 3rd
violation
380.00$ 380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%380.00$ 0.00%
Code Enforcement Other 306 0100.4725 Fine - admin. Enforcement, Level Four Violation - 4th
violation
500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Gymnasiums (limited set-up)
CCC Other 2721.4513 1 Gym: Per Hour Max Fee (Non-Resident)weekday 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%
CCC Other 2721.4513 1 Gym: Per Hour Max Fee (Non-Resident)weekend 60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
CCC Other 2721.4513 2 Gyms: Per Hour Max Fee (Non-Resident)weekday 75.00$ 75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%
CCC Other 2721.4513 2 Gyms: Per Hour Max Fee (Non-Resident)weekend 85.00$ 85.00$ 0.00%85.00$ 0.00%85.00$ 0.00%85.00$ 0.00%
CCC Other 2721.4513 3 Gyms: Per Hour Max Fee (Non-Resident)weekday 90.00$ 90.00$ 0.00%90.00$ 0.00%90.00$ 0.00%90.00$ 0.00%
CCC Other 2721.4513 3 Gyms: Per Hour Max Fee (Non-Resident)weekend 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
CCC Other 2721.4513 1 Gym: 7+ hours (up to 100 people)weekday 350.00$ 350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%
CCC Other 2721.4513 1 Gym: 7+ hours (up to 100 people)weekend 420.00$ 420.00$ 0.00%420.00$ 0.00%420.00$ 0.00%420.00$ 0.00%
CCC Other 2721.4513 2 Gyms: 7+ hours (101 to 250 people)weekday 525.00$ 525.00$ 0.00%525.00$ 0.00%525.00$ 0.00%525.00$ 0.00%
CCC Other 2721.4513 2 Gyms: 7+ hours (101 to 250 people)weekend 595.00$ 595.00$ 0.00%595.00$ 0.00%595.00$ 0.00%595.00$ 0.00%
CCC Other 2721.4513 3 Gyms: 7+ hours (251 to 400 people)weekday 630.00$ 630.00$ 0.00%630.00$ 0.00%630.00$ 0.00%630.00$ 0.00%
3 Gyms: 7+ hours (251 to 400 people)weekend 700.00$ 700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%
2730.4462 Forest gym - Same Rates as Community Center (different
code)
Rental fee adjustments
CCC Other 2721.4513 Event Set-up/Clean-up Fee, Meeting / Show (each gym)60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
CCC Other 2721.4513 Event Set-up/Clean-up Fee, Food / Banquet Event (each
room or gym)
250.00$ 250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%
CCC Other 2721.4513 Alcohol Permit Fee 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%
CCC Other 2721.4513 Alcohol Security Fee (Crystal Police) - per room / per
hour (minimum 3 hours)
70.00$ 70.00$ 0.00%70.00$ 0.00%70.00$ 0.00%70.00$ 0.00%
CCC Other 2721.4513 Crystal Resident (or non-Crystal service organization)
Gym Rental Discount
20%20%0.00%20%0.00%20%0.00%20%0.00%
CCC Other 2721.4513 Crystal Youth or Service Organization Gym Rental
Discount
50%50%0.00%50%0.00%50%0.00%50%0.00%
CCC Other 2721.4520 Open gym - Adult 5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%per time
CCC Other 2721.4523 Open gym - Youth 2.00$ 2.00$ 0.00%2.00$ 0.00%2.00$ 0.00%2.00$ 0.00%per time
2730.4462 Forest Gym - Same rates as Community Center (different
code)
same rates as Community Center
same rates as Community Center
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Meeting Rooms (includes set-up)
CCC Other 2721.4513 Large Room (Minnesota) - Per Hour weekday 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
CCC Other 2721.4513 Large Room (Minnesota) - Per Hour weekend 115.00$ 115.00$ 0.00%115.00$ 0.00%115.00$ 0.00%115.00$ 0.00%
CCC Other 2721.4513 Large Room (Minnesota) - 7+ hours weekday 700.00$ 700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%
CCC Other 2721.4513 Large Room (Minnesota) - 7+ hours weekend 805.00$ 805.00$ 0.00%805.00$ 0.00%805.00$ 0.00%805.00$ 0.00%
CCC Other 2721.4513 Medium Room (Combined Crystal) - Per Hour weekday 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%capacity 100
CCC Other 2721.4513 Medium Room (Combined Crystal) - Per Hour weekend 60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%capacity 100
CCC Other 2721.4513 Medium Room (Combined Crystal) - 7+ hours weekday 350.00$ 350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%capacity 100
CCC Other 2721.4513 Medium Room (Combined Crystal) - 7+ hours weekend 420.00$ 420.00$ 0.00%420.00$ 0.00%420.00$ 0.00%420.00$ 0.00%capacity 100
CCC Other 2721.4513 Small room (Activity or Game) - Per Hour weekday 40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%capacity 50-70
CCC Other 2721.4513 Small room (Activity or Game) - Per Hour weekend 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%capacity 50-70
CCC Other 2721.4513 Small room (Activity or Game) - 7+ Hours weekday 280.00$ 280.00$ 0.00%280.00$ 0.00%280.00$ 0.00%280.00$ 0.00%capacity 50-70
CCC Other 2721.4513 Small room (Activity or Game) - 7+ Hours weekend 350.00$ 350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%350.00$ 0.00%capacity 50-70
CCC Other 2721.4513 Small room - Youth birthday party weekend 60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%2 hours, includes 1 hour gym time if
available
CCC Other 2721.4513 Very Small Room (Creek) - Per Hour weekday 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%capacity 12
CCC Other 2721.4513 Very Small Room (Creek) - Per Hour weekend 30.00$ 30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%capacity 12
CCC Other 2721.4513 Very small room (Creek) - 7+ Hours weekday 140.00$ 140.00$ 0.00%140.00$ 0.00%140.00$ 0.00%140.00$ 0.00%capacity 12
CCC Other 2721.4513 Very small room (Creek) - 7+ Hours weekend 210.00$ 210.00$ 0.00%210.00$ 0.00%210.00$ 0.00%210.00$ 0.00%capacity 12
Rental Fee Adjustments
CCC Other 2721.4513 Crystal Resident (or non-Crystal service organization)
Room Rental Discount
20%20%0.00%20%0.00%20%0.00%20%0.00%
CCC Other 2721.4513 Crystal Youth or Service Organization Room Rental
Discount
50%50%0.00%50%0.00%50%0.00%50%0.00%
CCC Other 2721.4523 Youth Group Overnights (no discount)weekend 1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%no discount
Add-On Items (no discount)
CCC Other 2721.4513 Kitchen (with rental) - Flat Fee (no discount)weekday 40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%
CCC Other 2721.4513 Kitchen (with rental) - Flat Fee (no discount)weekend 60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
CCC Other 2721.4513 Kitchen - (outside room rental time) - Per Hour any day 40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%
CCC Other 2721.4513 Coffee service varies varies varies varies varies
CCC Other 2721.4513 Electronic Equipment, Lectern, etc. varies varies varies varies varies
CCC Other 2721.4513 Building early opening - Per Hour weekday 30.00$ 30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%
CCC Other 2721.4513 Building early opening - Per Hour weekend 40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%
Damage Deposits (no discount)
CCC Other 2721.2210 All Day Events - Per Gym or Room 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
CCC Other 2721.2210 Kitchen Use 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
CCC Other 2721.2210 Group Overnights 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Engineering Permit 0100.4265 Right of way permit-Temporary Obstruction Varies N/A Examples include: Little Free Library, Block
Party Closure, Temporary Street Closure
(for forestry)
Engineering Permit 0100.4265 Right of way permit 6 mo.65.00$ 67.00$ 3.08%70.00$ 4.48%70.00$ 0.00%70.00$ 0.00%
Engineering Permit 0100.4265 ROW User Registration Annual N/A 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%Annual registration fee for companies that
have permanent facilities in ROW
Engineering Permit 0100.4265 Street Right of Way - utility/telecommunication - first 500
lineal feet
34.00$ 35.00$ 2.94%37.00$ 5.71%37.00$ 0.00%37.00$ 0.00%plus right of way permit
Engineering Permit 0100.4265 Street Right of Way - utility/telecommunication - after first
500 lineal feet
0.10$ 0.10$ 0.00%0.12$ 20.00%0.12$ 0.00%0.12$ 0.00%per foot, plus right of way permit and first
500 feet
Engineering Permit 0100.4265 Street right-of-way (telecommunication) - small cell
wireless facility permit
65.00$ 67.00$ 3.08%70.00$ 4.48%70.00$ 0.00%70.00$ 0.00%plus other management costs
Engineering Permit 0100.4265 Street right-of-way (telecommunication) - small cell
wireless facility agreement (rent)
150.00$ per statute per statute per statute per statute Per State Statute 237.163 Subd 6 per year
(to collocate on the city structure)
Engineering Permit 0100.4265 Street right-of-way (telecommunication) - small cell
wireless facility agreement (maintenance)
25.00$ per statute per statute per statute per statute Per State Statute 237.163 Subd 6 per year
(for maintenance associated with
collocation)
Engineering Permit 0100.4265 Street right-of-way (telecommunication) - small cell
wireless facility agreement (electrical service)
73.00$ per statute per statute per statute per statute Per State Statute 237.163 Subd 6 less than
or equal to 100 max. watts; per month/per
node; plus actual costs of electricity, if
applicable
Engineering Permit 0100.4265 Street right-of-way (telecommunication) - small cell
wireless facility agreement (electrical service)
182.00$ per statute per statute per statute per statute Per State Statute 237.163 Subd 6 per radio
node over 100 max. watts; per month; plus
actual costs of electricity, if applicable
Engineering Other 0100.4430 Copies (on engineering copier; 3' wide paper)3.50$ 3.75$ 7.14%3.75$ 0.00%3.75$ 0.00%3.75$ 0.00%per lineal foot
Engineering Other 0100.4430 Map - City streets 4.50$ 4.50$ 0.00%4.50$ 0.00%4.50$ 0.00%4.50$ 0.00%
Engineering Other 0100.4430 Map - City streets, including house numbers 8.50$ 8.50$ 0.00%8.50$ 0.00%8.50$ 0.00%8.50$ 0.00%
Engineering Other 0100.4430 Map - Zoning 6.50$ 6.50$ 0.00%6.50$ 0.00%6.50$ 0.00%6.50$ 0.00%
Engineering Other 0100.4430 Plan specifications and bid packets varies varies varies varies varies depends on number of pages and size of
sheets
Engineering Other 0100.4627 Public Works birthday party package 150.00$ 155.00$ 3.33%160.00$ 3.23%160.00$ 0.00%160.00$ 0.00%plus optional supply items
EDA Other 0220.4402 Tax Increment Financing application fee 2,000.00$ 2,060.00$ 3.00%2,120.00$ 2.91%2,120.00$ 0.00%2,120.00$ 0.00%non-refundable
EDA Other 0220.2210 Tax Increment Financing application deposit 10,000.00$ 10,000.00$ 0.00%10,000.00$ 0.00%10,000.00$ 0.00%10,000.00$ 0.00%balance refunded or additional amount to be
billed to actual expenses
EDA Other 0220.2210 Bond financing application deposit 10,000.00$ 10,000.00$ 0.00%10,000.00$ 0.00%10,000.00$ 0.00%10,000.00$ 0.00%
EDA Other 0220.4425 Bond financing administrative fee, payable prior to bond
delivery
1%1%0.00%1%0.00%1%0.00%1%0.00%percent of the principal of the bonds issued
EDA Other 0220.4425 Deemed refunding of bonds creating a reissuance for
Federal tax purposes
2,000.00$ 2,060.00$ 3.00%2,120.00$ 2.91%2,120.00$ 0.00%2,120.00$ 0.00%non-refundable
EDA Other 0220.4425 Issuance of bonds for another political subdivision for a
project in the city
2,000.00$ 2,060.00$ 3.00%2,120.00$ 2.91%2,120.00$ 0.00%2,120.00$ 0.00%non-refundable
Finance Other 0100.4403 Admin. charge for billing city provided services (non-UB)60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
Finance Other 0100.4402 Admin. charge for certification of delinquent accounts
(non-UB)
35.00$ 35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%
Finance Other 0100.4402 Admin. charge for delinquent accounts turned over for
collection (non-UB)
60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
Finance Other 0100.4430 Budget, copy 25.00$ 30.00$ 20.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%
Finance Other 0100.4430 Annual Financial Report, copy 25.00$ 30.00$ 20.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%
Finance Other 0100.21XX COBRA premiums for health/dental/life insurance actual cost actual cost actual cost actual cost actual cost
Finance Other 0100.4402 COBRA 2% administration charge 2% of premium
Finance Other 0100.4075 Interest rate for certification of delinquent accounts (non-
UB)
12%12%0.00%12%0.00%12%0.00%12%0.00%per year
Finance Other 0100.4430 Mailing list printed on address labels 22.00$ 25.00$ 13.64%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%for up to 500 labels, then $0.04 per label
Finance Other 0100.4430 Mailing list printed on computer disc 22.00$ N/A N/A N/A N/A Computer disc is no longer an option
Finance Other 0100.4430 Mailing list printed on paper 0.25$ 0.30$ 20.00%0.30$ 0.00%0.30$ 0.00%0.30$ 0.00%per page
Finance Other 0100.4430 New resident list 33.00$ 35.00$ 6.06%$35 0.00%$35 0.00%$35 0.00%fee for 12-month subscription
Finance Other 0100.4402 Returned check fee 30.00$ 30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%per check
Fire Other 955 0100.4711 False alarms fourth call per year 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%first three false alarms are no charge
Fire Other 955 0100.4711 False alarms fifth call per year 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
Fire Other 955 0100.4711 False alarms sixth call per year 400.00$ 400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%
Fire Other 955 0100.4711 False alarms each additional call beyond the sixth call 400.00$ 400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%possible imposition of fire watch
Cost varies
Cobra is outsourced to 3rd party
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Forestry Other 2015 0100.4403 Admin. charge for tree trimming and/or removal 118.45$
Forestry Other 615, 515.13, 800 0100.4403 Admin fee 46.35$ 46.35$ 0.00%$47.28 2.01%$47.28 0.00%$47.28 0.00%one admin fee for each incident
Forestry Other 2015 Diseased Tree Test actual cost actual cost actual cost actual cost
Forestry Other 615 0100.4403 Charge for grass and/or weed mowing cost incurred
Forestry Other 515.13 0100.4403 Admin. charge to clear intersection and/or driveway site
triangles
46.35$
Forestry Other 800.00 0100.4403 Admin. charge to clear plantings in street and/or sidewalk
easements
46.35$
Forestry Permit 0100.4205 Natural vegetation landscape 72.10$ -$ -100.00%$0.00 $0.00 $0.00 per PID
Health Permit 0100.4205 Licensed facility plan review - new facility 1 x license fee 1 x license fee 1 x license fee 1 x license fee 1 x license fee
Health Permit 0100.4205 Licensed facility plan review - remodeling ½ x license fee ½ x license fee ½ x license fee ½ x license fee ½ x license fee
Fee at last
increase
(2016)
Annualized
increase
2022 vs. 2016
Fee at
previous
increase
(2010)
Annualized
increase
2022 vs. 2010
Housing License 425 0100.4285 Rental license fee - single family homes 1 year 170.00$ 170.00$ 0.00%170.00$ 0.00%170.00$ 0.00%180.00$ 5.88%170.00$ 0.98%150.00$ 1.67%
Housing License 425 0100.4285 Rental license fee - duplexes 1 year 240.00$ 240.00$ 0.00%240.00$ 0.00%240.00$ 0.00%250.00$ 4.17%240.00$ 0.69%200.00$ 2.08%expires one year from date of issuance
Housing License 425 0100.4285 Rental license fee - triplexes 1 year 300.00$ 300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%310.00$ 3.33%300.00$ 0.56%250.00$ 2.00%expires one year from date of issuance
Housing License 425 0100.4285 Rental license fee - four plexes 1 year 360.00$ 360.00$ 0.00%360.00$ 0.00%360.00$ 0.00%370.00$ 2.78%360.00$ 0.46%300.00$ 1.94%expires one year from date of issuance
Housing License 425 0100.4285 Rental license fee - 5+ units, per building 1 year 360.00$ 360.00$ 0.00%360.00$ 0.00%360.00$ 0.00%370.00$ 2.78%360.00$ 0.46%300.00$ 1.94%
Housing License 425 0100.4285 Rental license fee - 5+ units, per unit 1 year 15.00$ 18.00$ 20.00%20.00$ 11.11%20.00$ 0.00%22.00$ 10.00%12.00$ 13.89%8.00$ 14.58%
Housing License 425 0100.4285 Rental license fee - late fee/ penalty 1x license fee see comments see comments see comments see comments 25% surcharge if 11-20 days late; 50% if 21-
30 days late; 100% if >30 days late
Housing License 425 0100.4285 Rental license fee - suspended license reinstatement fee 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%
Housing License 425 0100.4285 Administrative fee on refund of application fee 20%20%0.00%20%0.00%20%0.00%20%0.00%of application fee
Housing License 425 0100.4285 Rental license fee - failure to demonstrate financial resp.1x license fee see comments see comments see comments see comments 25% surcharge if 11-20 days late; 50% if 21-
30 days late; 100% if >30 days late
Housing License 425 0100.4285 Rental reinspection fees - single family homes 60.00$ 60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%60.00$ 0.00%
Housing License 425 0100.4285 Rental reinspection fees - duplexes, triplexes 75.00$ 75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%75.00$ 0.00%
Housing License 425 0100.4285 Rental reinspection fees - multiples 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%per building, plus $5 per unit
Housing Other 435 0100.4276 Vacant building registration fee 1 year 600.00$ 600.00$ 0.00%700.00$ 16.67%700.00$ 0.00%700.00$ 0.00%expires one year from date of issuance
Housing Other 435 0100.4276 Administrative Fee for vacant building registration 60.00$ 60.00$ 0.00%70.00$ 16.67%70.00$ 0.00%70.00$ 0.00%
Planning Other 0100.4418 Administrative appeal 200.00$ 205.00$ 2.50%210.00$ 2.44%210.00$ 0.00%220.00$ 4.76%
Planning Other 0100.4418 Telecommunication towers 2,000.00$ 2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%2,100.00$ 5.00%plus escrow of 500% of fee for the City's
expenses
Planning Other 0100.4418 Comprehensive plan amendment 600.00$ 615.00$ 2.50%630.00$ 2.44%630.00$ 0.00%660.00$ 4.76%plus escrow of 100% of fee for the City's
expenses
Planning Other 0100.4430 Comprehensive plan copy 20.00$ 20.00$ 0.00%20.00$ 0.00%
Planning Other 0100.4418 Conditional use permit 600.00$ 615.00$ 2.50%630.00$ 2.44%630.00$ 0.00%660.00$ 4.76%plus escrow of 100% of fee for the City's
Planning Other 0100.4418 Environmental assessment worksheet 1,000.00$ 1,025.00$ 2.50%1,050.00$ 2.44%1,050.00$ 0.00%1,100.00$ 4.76%plus escrow of 500% of fee for the City's
Planning Other 0100.4418 Flood plain/wetland alteration 500.00$ 515.00$ 3.00%530.00$ 2.91%530.00$ 0.00%550.00$ 3.77%plus escrow of 500% of fee for the City's
Planning Other 0100.4418 Planned development 1,200.00$ 1,230.00$ 2.50%1,260.00$ 2.44%1,260.00$ 0.00%1,320.00$ 4.76%plus escrow of 100% of fee for the City's
Planning Other 0100.4418 Adjacent parcel land conveyance (shifting a lot line)200.00$ 205.00$ 2.50%210.00$ 2.44%210.00$ 0.00%220.00$ 4.76%plus escrow of 100% of fee for the City's
expenses
Planning Other 0100.4418 Lot combination (of previously platted lots)400.00$ 410.00$ 2.50%420.00$ 2.44%420.00$ 0.00%440.00$ 4.76%plus escrow of 100% of fee for the City's
expenses
Planning Other 0100.4418 Plat - includes 2 lots 600.00$ 615.00$ 2.50%630.00$ 2.44%630.00$ 0.00%660.00$ 4.76%plus escrow of 100% of fee for City's
expense
Planning Other 0100.4418 Plat - each lot over 2 60.00$ 62.00$ 3.33%62.00$ 0.00%62.00$ 0.00%66.00$ 6.45%plus escrow of 100% of fee for City's
expenses
Planning Other 0100.4418 Park Dedication upon Subdivision of Land - Commercial varies 5,000.00$ 5,000.00$ 5,000.00$ 0.00%5,000.00$ 0.00%per acre (see City Code 525.05 Subd. 12)
Planning Other 0100.4418 Park Dedication upon Subdivision of Land - Residential varies 1,000.00$ 1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%per dwelling unit (see City Code 525.05
Subd. 12)
Planning Other 0100.4418 Zoning amendment (ordinance text or map rezoning)600.00$ 615.00$ 2.50%630.00$ 2.44%630.00$ 0.00%660.00$ 4.76%plus escrow of 100% of fee for the City's
expenses
Planning Other 0100.4418 Site plan review 600.00$ 615.00$ 2.50%630.00$ 2.44%630.00$ 0.00%660.00$ 4.76%plus escrow of 50% of fee for the City's
Planning Other 0100.4418 Vacations of a public street or easement 500.00$ 515.00$ 3.00%530.00$ 2.91%530.00$ 0.00%550.00$ 3.77%plus escrow of 100% of fee for the City's
Planning Other 0100.4418 Variance 500.00$ 515.00$ 3.00%530.00$ 2.91%530.00$ 0.00%550.00$ 3.77%plus escrow of 50% of fee for the City's
Planning Other 0100.4418 Zoning certificate 100.00$ 100.00$ 0.00%105.00$ 5.00%105.00$ 0.00%110.00$ 4.76%
Planning Other 0100.4430 Zoning book 10.00$ 10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%
actual cost, plus one admin fee for each incident
actual cost, plus one admin fee for each incident
actual cost, plus one admin fee for each incident
actual cost, plus one admin fee for each incident
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Police Permit 1310 0100.4205 Parking seasonal 35.00$ 35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%if more than one vehicle
Police Other 910 0100.4603 Animal - animal boarding per day 32.00$ 32.00$ 0.00%32.00$ 0.00%32.00$ 0.00%33.00$ 3.13%plus sales tax
Police Other 0100.4603 Animal - animal impound (1st offense)40.00$ 40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%40.00$ 0.00%
Police Other 0100.4603 Animal - animal impound (2nd offense)80.00$ 80.00$ 0.00%80.00$ 0.00%80.00$ 0.00%80.00$ 0.00%
Police Other 0100.4603 Animal - animal impound (3rd offense)120.00$ 120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%120.00$ 0.00%
Police Other 0100.4145 Animal - rabies release deposit 35.00$ 35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%
Police Other 0100.4604 Animal - dangerous dog registration fee 250.00$ 250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%250.00$ 0.00%
Police Other 0100.4604 Animal - potentially dangerous animal appeal fee 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%
Police Other 0100.4604 Animal - dangerous animal appeal fee 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%and up to $1,000 of actual expense
Police Other 0100.4610 Copy of state accident report varies varies varies varies varies fee per state statute
Police Other 0100.4610 Copy of police report varies varies varies varies varies fee per state statute
Police Other 0100.4615 Digital Copies (of incidents filmed from squar cars)50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%each
Police Other 0100.4615 Digital Copies (of incidents filmed by body cameras)50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%each
Police Other 0100.4615 Copy of electronic data (digital, audio & video)28.00$ 28.00$ 0.00%28.00$ 0.00%28.00$ 0.00%28.00$ 0.00%per request
Police Other 0100.4615 Copy of electronic jail video 55.00$ 55.00$ 0.00%55.00$ 0.00%55.00$ 0.00%55.00$ 0.00%each
Police Other 955 0100.4710 False alarms (3-5 calls per year)80.00$ 85.00$ 6.25%85.00$ 0.00%85.00$ 0.00%85.00$ 0.00%
Police Other 955 0100.4710 False alarms (6-10 calls per year)120.00$ 125.00$ 4.17%125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%
Police Other 955 0100.4710 False alarms (11-15 calls per year)160.00$ 165.00$ 3.13%165.00$ 0.00%165.00$ 0.00%165.00$ 0.00%
Police Other 955 0100.4710 False alarms (16 or more calls per year)200.00$ 205.00$ 2.50%205.00$ 0.00%205.00$ 0.00%205.00$ 0.00%
Police Other 0100.4611 Fingerprinting fee (resident)30.00$ 30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%for first card; each additional card $5
Police Other 0100.4612 Pawn services - transaction fee 4.00$ 4.00$ 0.00%4.00$ 0.00%4.00$ 0.00%4.00$ 0.00%per transaction
Police Other 0100.4612 Pawn services - failure to report penalty 50.00$ 50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%50.00$ 0.00%per day
Police Other 0100.4615 Photos of accidents 37.00$ 37.00$ 0.00%37.00$ 0.00%37.00$ 0.00%37.00$ 0.00%plus cost of processing pictures
Police Other 1310.13 Shared Mobility Device Impoundment Reclamation fee 150.00$ New in 2022
Youth Programming
Recreation Other 2010.4455 Youth - basketball $45-$65 $45-$65 $45-$65 $60-$80 $60-$80 per session
Recreation Other 2030.4455 Youth - dance $45-$150 $48-200 $48-200 $48-$200 $48-$200 per session
Recreation Other 2035.4455 Youth - flag football $59-$75 $59-$75 $59-$75 $59-$75 $59-$75 per session
Recreation Other 2040.4455 Youth - grade school (other)$20-125 $20-140 $20-140 $20-$140 $20-$140 per class
Recreation Other 2050.4455 Youth - indoor sports seasonal cost + $1.50 cost + $1.50 cost + $1.50 cost + $1.50 cost + $1.50 depends on activity
Recreation Other 2060.4455 Youth - tickets seasonal cost + $1.50 cost + $1.50 cost + $1.50 cost + $1.50 cost + $1.50 depends on activity
Recreation Other 2070.4455 Youth - playgrounds $23-$27 $23-$30 $23-$30 $23-$30 $23-$30 per session
Recreation Other 2080.4455 Youth - preschool - open gym / per time 3.00$ 3.00$ 0.00%3.00$ 0.00%3.00$ 0.00%3.00$ 0.00%
Recreation Other 2080.4455 Youth - preschool - open gym / 10-punch card 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%10 punches
Recreation Other 2090.4455 Youth - preschool - special events/other seasonal $14-$65 $4-$65 $4-$65 $4-$65 $4-$65 per session
Recreation Other 22100.4455 Youth - preschool - summer seasonal $25-$65 $25-$65 $25-$65 $25-$65 $25-$65 per session
Recreation Other 2110.4455 Youth - soccer $50-$60 $50-$65 $50-$65 $50-$65 $50-$65 per session
Recreation Other 2130.4455 Youth - T-Ball/ mite ball $45-$55 $45-$55 $45-$55 $45-$55 $59-$75 per session
Recreation Other 2140.4455 Youth - teen activities varies varies varies varies varies for specific event
Recreation Other 2150.4455 Youth - tennis instruction $40-$70 $40-$70 $40-$70 $40-$70 per session
Recreation Other 2170.4455 Youth - unscheduled $20-$125 $20-$125 $20-$125 $20-$140 $20-$140 per session
Adult Programming
Recreation Other 2215.4460 Adult - exercise - other seasonal $32-$80 $32-$80 $32-$80 $32-$80 $32-$80 $5 for drop ins
Recreation Other 2250.4460 Adult - softball - co-rec seasonal $510-$850 $520-$860 $520-$860 $520-$860 $520-$860 per team, per session
Recreation Other 2260.4460 Adult - softball - mens seasonal $510-$850 $520-$860 $520-$860 $520-$860 $520-$860 per team, per session
Recreation Other 2290.4460 Adult - tennis league seasonal 25.00$ 25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%25.00$ 0.00%cooperative program
Recreation Other 2338.4460 Adult - pickleball drop in seasonal 3.00$ 3.00$ 0.00%3.00$ 0.00%3.00$ 0.00%3.00$ 0.00%per time
Recreation Other 2338.4460 Adult - pickleball punch card seasonal 12.00$ $30 - $60 $30 - $60 $50-$60 $50-$60 $50 for 20 visits
Recreation Other 2300.4460 Adult - unscheduled - resident seasonal $4-$11 $4-$11 $4-$11 $4-$11 $4-$11 per hour of instruction
Recreation Other 2310.4460 Adult - volleyball - co-rec seasonal $290-$310 $290-$310 $290-$310 $300-$330 $300-$330 per team, per session
Recreation Other 2320.4460 Adult - volleyball - mens seasonal $290-$310 $290-$310 $290-$310 $300-$330 $300-$330 per team, per session
Recreation Other 2350.4460 Adult - volleyball - womens seasonal $290-$310 $290-$310 $290-$310 $300-$330 $300-$330 per team, per session
Recreation Other 2340.4460 Adult - open volleyball seasonal 50.00$ 50.00$ 0.00%50.00$ 0.00%55.00$ 10.00%55.00$ 0.00%
Senior Programming
Recreation Other 2405.4465 Seniors - art classes - resident seasonal varies varies varies varies varies fee determined by contracted instructor
Recreation Other 2410.4465 Seniors - defensive driving - AARP course fee seasonal varies varies varies varies varies fee determined by AARP
Recreation Other 2410.4465 Seniors - defensive driving - local service fee seasonal $2 R/$4 $2 R/$4 $2 R/$4 $2 R/$4 $2 R/$4
Recreation Other 2420.4465 Seniors - membership dues seasonal 12.00$ 12.00$ 0.00%12.00$ 0.00%12.00$ 0.00%12.00$ 0.00%
Recreation Other 2420.4465 Seniors - membership dues - non-resident seasonal 19.00$ 19.00$ 0.00%19.00$ 0.00%19.00$ 0.00%19.00$ 0.00%
Recreation Other 2425.4465 Seniors - fitness seasonal 5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%per class; $5 for drop ins
Recreation Other 2435.4465 Seniors - miscellaneous classes seasonal cost + $3.50 cost + $3.50 cost + $3.50 cost + $3.50 cost + $3.50
Recreation Other 2440.4465 Seniors - special events seasonal varies varies varies varies varies plus direct cost of event cooperative
program
Recreation Other 2445.4465 Seniors - trips seasonal cost + $3.50 cost + $3.50 cost + $3.50 cost + $3.50 cost + $3.50
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Park Facilities
Recreation Other 2710.4485 Community Park Shelter - 5 hours weekday 65.00$ 65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%
Recreation Other 2710.4485 Community Park Shelter - 5 hours weekend 70.00$ 70.00$ 0.00%70.00$ 0.00%75.00$ 7.14%75.00$ 0.00%
Recreation Other 2710.4485 Park building (except Valley Place)- 5 hours with Park
Shelter
any day 30.00$ 30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%30.00$ 0.00%
Recreation Other 2710.4485 Valley Place Park Building - 5 hours - weekday weekday 100.00$ 0.00%
Recreation Other 2710.4485 Valley Place Park Building - 5 hours - weekend weekend 125.00$ 0.00%
Recreation Other 2710.4485 Becker Park Amphitheater - 5 hours - NEW weekday n/a n/a n/a 200.00$ 125.00$ -37.50%
Recreation Other 2710.4485 Becker Park Amphitheater - 5 hours - NEW weekend n/a n/a n/a 250.00$ 175.00$ -30.00%
Recreation Other 2710.4485 Becker Park Oval - 5 hours weekday n/a n/a n/a 100.00$ 65.00$ -35.00%
Recreation Other 2710.4485 Becker Park Oval - 5 hours weekend/holiday n/a n/a n/a 125.00$ 75.00$ -40.00%
Recreation Other 2710.4485 Sports Field Rental - Youth - Per Hour any day 10.00$ 10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%10.00$ 0.00%
Recreation Other 2710.4485 Sports Field Rental - Adult - Per Hour any day 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Sports Field Rental - All Day Tournament any day 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
Recreation Other 2710.4485 One Day Non-Event Food Truck - weekday weekday 40.00$ 40.00$ 0.00%
Recreation Other 2710.4485 One Day Non-Event Food Truck - weekend weekend 100.00$ 50.00$ -50.00%
Recreation Other 2710.4485 Park Rental Permit - Space Only (no shelter) - 5 hours weekday 25.00$
Recreation Other 2710.4485 Park Rental Permit - Space Only (no shelter) - 5 hours weekend 35.00$
Recreation Other 2710.4485 Neighborhood Park Shelter - 5 hours weekday 35.00$ 40.00$ 14.29%
Recreation Other 2710.4485 Neighborhood Park Shelter - 5 hours weekend 45.00$ 50.00$ 11.11%
Rental Fee Adjustments
Recreation Other 2710.4485 Crystal Resident (or non-Crystal service organization)
Park Facility Rental Discount
20%20%0.00%20%0.00%20%0.00%20%0.00%
Recreation Other 2710.4485 Crystal Youth or Service Organization Park Facility Rental
Discount
50%50%0.00%50%0.00%50%0.00%50%0.00%
Facility Add-On (no discount)
Recreation Other 2710.4485 Additional Sport Field Preparation - Per Hour any day 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Field Attendant - per hour any day 15.00$ 20.00$ 33.33%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Sports Field Lights - Per Hour any day 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Disc Golf Course Rental - Per Hour any day 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Party Equipment Use Fee any day 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4485 Sporting Equipment any day varies varies varies varies varies
Recreation Other 2710.4485 Beer / Wine with Shelter Rental any day -$ insurance required
Facility Damage/Compliance Deposit (no discount)
Recreation Other 2610.4470 Picnic Pavillion & Becker Stage 100.00$ 100.00$ #REF!$100 0.00%100.00$ 0.00%100.00$ 0.00%
Park Special Events
Recreation Other 2610.4470 Community events seasonal varies varies varies varies varies Vary Depending on Activity
Recreation Other 2620.4470 Special - Frolics - other seasonal varies varies varies varies varies
Recreation Other 2630.4470 Special - Frolics - softball seasonal 300.00$ 300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%300.00$ 0.00%
Recreation Other 2630.4470 Special - Frolics - CoRec softball seasonal 150.00$ 150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%150.00$ 0.00%
Recreation Other 2640.4470 Special - Frolics - Vendor - Standard Rate seasonal $80 - $250 $80-$250 0.00%$80-$250
Recreation Other 2640.4470 Special - Frolics - Vendor - CBA Members seasonal $40 - $125 $40-$125 0.00%$40-$125
Recreation Other 2640.4470 Special - Frolics - Vendor - Non-Profit/Volunteer seasonal $64 - $200 $64-$200 0.00%$64-$200
Recreation Other 2640.4470 Special - Frolics - Vendor - Artist/Handmade/Craft seasonal 50.00$ 50.00$ 0.00%50.00$
Recreation Other 2610.4470 Special Event - under 250 persons attending per event 200.00$ 200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%200.00$ 0.00%
Recreation Other 2610.4470 Special Event - 251 to 500 persons attending per event 400.00$ 400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%400.00$ 0.00%
Recreation Other 2610.4470 Special Event - 501 to 700 persons attending per event 700.00$ 700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%700.00$ 0.00%
Recreation Other 2610.4470 Special Event - over 700 persons attending per event 1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%limited to capacity determined by City of
Rental Fee Adjustments
Recreation Other 2610.4470 Crystal Resident (or non-Crystal service organization)
Special Event Discount
20%20%0.00%20%0.00%20%0.00%20%0.00%
Recreation Other 2610.4470 Crystal Youth or Service Organization Special Event
Discount
50%50%0.00%50%0.00%50%0.00%50%0.00%
Recreation Other Special events permit application fee, non-refundable per event 100.00$ 100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%100.00$ 0.00%$50 applied to rental if accepted
Recreation Other 2610.4470 Event cancellation fee - by renter per event 25% of fee 25% of fee 25% of fee 25% of fee 25% of fee No refunds due to weather conditions
Recreation Other 2610.4470 Event cancellation fee - by city per event 100% of fee 100% of fee 100% of fee 100% of fee 100% of fee Full refund of fees paid to the City, the City
is not responsible for any other expenses
for the event
Park Damage/Compliance Deposit
Recreation Other 2710.4470 Damage deposit - under 250 persons attending per event 500.00$ 500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%500.00$ 0.00%
Recreation Other 2710.4470 Damage deposit - 251 to 500 persons attending per event 1,000.00$ 1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%1,000.00$ 0.00%
Recreation Other 2710.4470 Damage deposit - 501 to 700 persons attending per event 1,500.00$ 1,500.00$ 0.00%1,500.00$ 0.00%1,500.00$ 0.00%1,500.00$ 0.00%
Recreation Other 2710.4470 Damage deposit - over 700 persons attending per event 2,000.00$ 2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%2,000.00$ 0.00%
Recreation Other 2710.4470 Excessive Clean-up/Damages to Park Property per event actual actual actual actual actual charged to damage deposit, excess billed
6.2
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type
City Code
Section
Resolution
No.
Accounting
Code Description Expires 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase
Comments
City of Crystal 2019 - 2022 Proposed Fee Schedule
Main Section
Additional Special Event Fees
Recreation Other 2710.4470 Food booth registration fee per event 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%Also need Hennepin County food license
Recreation Other 2710.4470 Vendor booth registration fee per event 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4470 Amplified sound (PA/speakers) fee per event 20.00$ 20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%20.00$ 0.00%
Recreation Other 2710.4470 Misc. equipment - trash barrels/liners per event 5.00$ 5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%5.00$ 0.00%per barrel
Recreation Other 2710.4470 Misc. equipment - dumpster per event actual actual actual actual actual city rate, varies depending on year
Recreation Other 2710.4470 Misc. equipment - outdoor restrooms per event actual actual actual actual actual city rate, varies depending on year
Park Use Fees
Recreation Other 2710.4485 Park Use Permit - 3 Hours weekday 25.00$
Recreation Other 2710.4485 Park Use Permit - 3 Hours weekend 35.00$
Recreation Other 2710.4485 Park Use Permit - Commercial Video Per Day any day 100.00$ plus expenses
Recreation Other 2710.4485 Inflatable device - each anyday -$ insurance required
Recreation Other 2710.4485 Large temp. shade structure - each anyday -$ insurance required
Recreation Other 2710.4485 Use of City's electricity anyday 10.00$
Pool Daily Admission
Pool Other 2722.4556 Coupon books - 10 admissions seasonal 65.00$ 65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%65.00$ 0.00%
Pool Other 2722.4556 Swimming pool admission 1 day 8.00$ 8.00$ 0.00%8.00$ 0.00%8.00$ 0.00%8.00$ 0.00%
Pool Other 2722.4556 Swimming pool senior admission, age 55+6.00$ 6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%No senior rate for annual
Pool Other 2722.4556 Swimming pool twilight admission, after 5 p.m.6.00$ 6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%
Pool Other 2722.4556 Swimming pool admission, adult lap swim 2.00$ 2.00$ 0.00%2.00$ 0.00%2.00$ 0.00%2.00$ 0.00%free with season pass
Pool Season Passes - Early Bird Rate (earlier -
through Tuesday after Labor Day)
Pool Other 2722.4562 Non-Resident Season pass - per person seasonal 38.00$ 43.00$ 13.16%43.00$ 0.00%45.00$ 4.65%45.00$ 0.00%
Pool Other 2722.4562 Resident Season pass - per person ($10 discount)seasonal 30.00$ 33.00$ 10.00%33.00$ 0.00%35.00$ 6.06%35.00$ 0.00%
Pool Season Passes - Regular Rate
Pool Other 2722.4562 Non-Resident Season pass - per person seasonal 44.00$ 50.00$ 13.64%50.00$ 0.00%53.00$ 6.00%53.00$ 0.00%
Pool Other 2722.4562 Resident Season pass - per person ($10 discount)seasonal 36.00$ 40.00$ 11.11%40.00$ 0.00%43.00$ 7.50%43.00$ 0.00%
Swimming Lessons
Pool Other 2722.4565 Red Cross swimming lessons - Water Tot/Parent - non-
resident
seasonal 53.00$ 55.00$ 3.77%55.00$ 0.00%57.00$ 3.64%57.00$ 0.00%
Pool Other 2722.4565 Red Cross swimming lessons - Levels I to VII - non-
resident
seasonal 58.00$ 60.00$ 3.45%60.00$ 0.00%62.00$ 3.33%62.00$ 0.00%
Pool Other 2722.4565 Red Cross lifeguard training - non-resident seasonal 230.00$ 230.00$ 0.00%230.00$ 0.00%230.00$ 0.00%230.00$ 0.00%
Pool Other 2722.4565 Resident Discount seasonal 7.00$ 7.00$ 0.00%7.00$ 0.00%7.00$ 0.00%7.00$ 0.00%
Pool Special Rates
Pool Other 2722.4569 Groups seasonal 6.00$ 6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%6.00$ 0.00%per person, minimum size (15)
Pool Other 2722.4569 Rentals - after hours seasonal 85.00$ 85.00$ 0.00%85.00$ 0.00%85.00$ 0.00%85.00$ 0.00%per hour, plus $4 per person
Pool Other 2722.4569 Rentals - swim clubs seasonal 45.00$ 45.00$ 0.00%45.00$ 0.00%47.00$ 4.44%47.00$ 0.00%per hour
Permits not covered by a specific fee listed in the Fee Schedule shall be based on the value of work as follows:
Up to 2,000
2,001 to 25,000
25,001 to 50,000
50,001 to 100,000
100,001 to 500,000
500,001 to 1,000,000
Greater than 1,000,000
63.00 for the first 1,500 plus 3.27 for each additional 100, or fraction thereof, to and including 2,000
79.35 for the first 2,000 plus 15.40 for each additional 1,000, or fraction thereof, to and including 25,000
433.55 for the first 25,000 plus 11.11 for each additional 1,000, or fraction thereof, to and including 50,000
711.30 for the first 50,000 plus 7.70 for each additional 1,000, or fraction thereof, to and including 100,000
1,096.30 for the first 100,000 plus 6.16 for each additional 1,000, or fraction thereof, to and including 500,000
3,560.30 for the first 500,000 plus 5.23 for each additional 1,000, or fraction thereof, to and including 1,000,000
6,175.30 for the first 1,000,000 plus 4.02 for each additional 1,000, or fraction thereof
No Changes 2018 - 2022
Park Use Add-On (no discount/one charge per day)
6.2
City of Crystal 2019 - 2022 Proposed Fee Schedule
Utility Section
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type Accounting
Code Description 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase Comments
Water Other 0505.4655 Water service base fee -$ 11.54$ 13.04$ 13.00%14.47$ 10.97%15.78$ 9.05%per 1,000 gallons
Water Other 0505.4655 Water consumption per 1,000 gallons in tier 1 5.70$ 5.70$ 0.00%6.44$ 12.98%7.15$ 11.02%7.79$ 8.95%per 1,000 gallons
Water Other 0505.4655 Water consumption per 1,000 gallons in tier 2 6.30$ 6.30$ 0.00%7.12$ 13.02%7.90$ 10.96%8.61$ 8.99%per 1,000 gallons
Water Other 0505.4655 Water consumption per 1,000 gallons in tier 3 6.60$ 6.60$ 0.00%7.46$ 13.03%8.28$ 10.99%9.02$ 8.94%per 1,000 gallons
Water Other 0505.4655 Water consumption for water used for irrigation 6.30$ 6.60$ 4.76%7.46$ 13.03%8.28$ 10.99%9.02$ 8.94%per 1,000 gallons
Water Other 0505.4656 Water consumption for water used through a hydrant meter 6.30$ 6.60$ 4.76%7.46$ 13.03%8.28$ 10.99%9.02$ 8.94%per 1,000 gallons
Water Other 0505.4655 City owned water fountains will no longer be metered, but will be
charged for one unit of water per year. Past experience with
metered fountains showed usage of less than one unit per year.
5.70$ 5.70$ 0.00%6.44$ 12.98%7.15$ 11.02%7.79$ 8.95%per 1,000 gallons
Water Other 0505.4644 Emergency well surcharge 0.21$ 0.21$ 0.00%0.21$ 0.00%0.21$ 0.00%0.21$ 0.00%per 1,000 gallons
Residential Tier Sizes
Tier 1: 1,000 gallon units in tier (0 to 30 units)
Tier 2: 1,000 gallon units in tier (31 to 60 units)
Tier 3: 1,000 gallon units in tier (over 60 units)
Commercial/Industrial/Institutional Tier Sizes
Tier 1: 1,000 gallon units in tier (0 to 30 units)
Tier 2: 1,000 gallon units in tier (31 to 60 units)
Tier 3: 1,000 gallon units in tier (over 60 units)
Meter Size 2022
Proposed
Meter Fee
Equilvalent
meter Ratio
Increase
(decrease)
Water Other 0505.4655 Minnesota safe water testing fee 1.59 1.59$ 0.00%2.43$ 52.83%2.43$ 0.00%2.43$ 0.00%per quarter
Water Other 0505.4655 Water meter fee for meters of 5/8 inch 4.80 5.85$ 21.88%6.61$ 12.99%7.34$ 11.04%-$ -100.00%per quarter 5/8-Inch 8.00$ 1.00 0.66$
Water Other 0505.4655 Water meter fee for meters of 3/4 inch 4.80 6.44$ 34.17%7.27$ 12.90%8.07$ 10.99%8.00$ -0.87%per quarter 3/4-Inch 8.00 1.00 (0.07)
Water Other 0505.4655 Water meter fee for meters of 1 inch 4.80 8.19$ 70.63%9.25$ 12.99%11.30$ 22.11%12.80$ 13.27%per quarter 1-Inch 12.80 1.60 1.50
Water Other 0505.4655 Water meter fee for 1 1/2 inch meters 15.30 10.53$ -31.18%11.90$ 12.99%20.35$ 71.04%74.40$ 265.60%per quarter 1 1/2-Inch 74.40 9.30 54.05
Water Other 0505.4655 Water meter fee for 2 inch meters 19.15 16.97$ -11.41%19.17$ 12.99%59.00$ 207.79%86.40$ 46.44%per quarter 2-Inch 86.40 10.80 27.40
Water Other 0505.4655 Water meter fee for 3 inch meters 38.30 64.35$ 68.02%72.71$ 12.99%72.71$ 0.00%108.80$ 49.64%per quarter 3-Inch 108.80 13.60 36.09
Water Other 0505.4655 Water meter fee for 4 inch meters 76.60 81.90$ 6.92%92.54$ 12.99%92.54$ 0.00%188.80$ 104.02%per quarter 4-Inch 188.80 23.60 96.26
Water Other 0505.4655 Water meter fee for 6 inch meters 153.20 122.85$ -19.81%138.81$ 12.99%138.81$ 0.00%236.80$ 70.59%per quarter 6-Inch 236.80 29.60 97.99
Water Other 0505.4655 Fire line - 2 inches 12.12 13.00$ 7.26%13.50$ 3.85%13.50$ 0.00%13.50$ 0.00%per quarter
Water Other 0505.4655 Fire line - 3 inches 19.05 20.43$ 7.24%21.22$ 3.87%21.22$ 0.00%21.22$ 0.00%per quarter
Water Other 0505.4655 Fire line - 4 inches 28.00 30.03$ 7.25%31.19$ 3.86%31.19$ 0.00%31.19$ 0.00%per quarter
Water Other 0505.4655 Fire line - 6 inches 37.90 40.65$ 7.26%42.22$ 3.86%42.22$ 0.00%42.22$ 0.00%per quarter
Water Other 0505.4655 Fire line - 8 inches 46.75 50.14$ 7.25%52.07$ 3.85%52.07$ 0.00%52.07$ 0.00%per quarter
Water Other 0505.4655 Fire line - 10 inches 56.35 60.44$ 7.26%62.77$ 3.86%62.77$ 0.00%62.77$ 0.00%per quarter
Sewer Other 0510.4655 Sewer service base fee 61.22 10.06$ -83.57%11.26$ 11.93%12.39$ 10.04%13.38$ 7.99%per quarter
Sewer Other 0510.4655 Sewer charge: non-metered (residential; minimum)51.46 51.46$ 0.00%51.46$ 0.00%51.46$ 0.00%51.46$ 0.00%per quarter
Sewer Other 0510.4655 Sewer charge: non-metered (non-residential; minimum)61.22 24.05$ -60.72%26.94$ 12.02%26.94$ 0.00%26.94$ 0.00%per quarter
Sewer Other 0510.4902 Sewer: failed sump pump inspection 100.00 100.00$ 0.00%100.00$ 0.00%per month
Sewer Other Sewer consumption fee (based on winter water consumption)
Residential Tier Sizes
Tier 1: 1,000 gallon units in tier (0 to 30 units)- 4.14 4.64 12.08%5.10 9.91%5.51 8.04%per quarter
Tier 2: 1,000 gallon units in tier (31 to 60 units)- 5.07 5.68 12.03%6.25 10.04%6.75 8.00%per quarter
Tier 3: 1,000 gallon units in tier (over 60 units)- 6.00 6.72 12.00%7.40 10.12%7.99 7.97%per quarter
Commercial/Industrial/Institutional Tier Sizes
Tier 1: 1,000 gallon units in tier (0 to 30 units)2.67 7.00 162.17%7.84 12.00%8.62 9.95%9.31 8.00%per quarter
Tier 2: 1,000 gallon units in tier (31 to 60 units)2.67 7.96 198.13%8.88 11.56%9.77 10.02%10.55 7.98%per quarter
Tier 3: 1,000 gallon units in tier (over 60 units)2.67 8.86 231.84%9.92 11.96%10.92 10.08%11.79 7.97%per quarter
6.2
City of Crystal 2019 - 2022 Proposed Fee Schedule
Utility Section
Effective January 1, 2022
Appendix IV, Exhibit 1 of the Crystal City Code
Adopted by the City Council on October 15, 2019 Approved by the City Council on December 21, 2021
Department Type Accounting
Code Description 2018 Fee 2019 Fee Percent
Increase 2020 Fee Percent
Increase 2021 Fee Percent
Increase 2022 Fee Percent
Increase Comments
Storm Other 0515.4655 Single-family residential 18.15 19.15$ 5.51%20.15$ 5.22%21.15$ 4.96%22.15$ 4.73%per quarter
Storm Other 0515.4655 Two-family residential 18.15 19.15$ 5.51%20.15$ 5.22%21.15$ 4.96%22.15$ 4.73%per quarter
Storm Other 0515.4655 Cemeteries and vacant land (=Fee*REF*acre)4.54 4.79$ 5.51%5.04$ 5.22%5.04$ 0.00%5.04$ 0.00%per quarter
Storm Other 0515.4655 Parks and railroads (=Fee*REF*acre)13.62 14.36$ 5.43%15.11$ 5.22%15.11$ 0.00%15.11$ 0.00%per quarter
Storm Other 0515.4655 Schools, institutional uses and airport (=Fee*REF*acre)22.69 23.94$ 5.51%25.19$ 5.22%25.19$ 0.00%25.19$ 0.00%per quarter
Storm Other 0515.4655 Multi-family residential and churches (=Fee*REF*acre)54.45 57.45$ 5.51%60.45$ 5.22%60.45$ 0.00%60.45$ 0.00%per quarter
Storm Other 0515.4655 Commercial (=Fee*REF*acre)90.75 95.75$ 5.51%100.75$ 5.22%100.75$ 0.00%100.75$ 0.00%per quarter
Street Lights Other 0520.4655 Street lights: commercial (per business)5.00 5.00 0.00%5.00 0.00%5.00 0.00%5.00 0.00%per quarter
Street Lights Other 0520.4655 Street lights: residential (single-family) 5.00 5.00 0.00%5.00 0.00%5.00 0.00%5.00 0.00%per quarter
Street Lights Other 0520.4655 Street lights: residential (multi-family; per unit)3.75 3.75 0.00%3.75 0.00%3.75 0.00%3.75 0.00%per quarter
Recycle Other 0525.4655 Recycling: single-family residential 10.75 10.95 1.86%11.25 2.74%11.25 0.00%12.00 6.67%per quarter
Utility Other 0505.4902 Access to property denied 120.00 125.00$ 4.17%125.00$ 0.00%125.00$ 0.00%125.00$ 0.00%per incident;
maximum of once
per quarter
Utility Other 0505.4955 Administrative charge for certification of delinquent utilities 35.00 35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%35.00$ 0.00%
Utility Other 0505.4902 Charge for unlawful water use 150.00 150.00 0.00%150.00 0.00%150.00 0.00%150.00 0.00%per day
Utility Other 0505.4902 Hydrant rental (other)46.50 50.00$ 7.53%72.71$ 45.42%72.71$ 0.00%72.71$ 0.00%
Utility Other 0505.2210 Hydrant rental (meter deposit)850.00 900.00$ 5.88%1,300.00$ 44.44%1,300.00$ 0.00%1,300.00$ 0.00%deposit against water
use charges
Utility Other 0505.4075 Interest rate for certification of delinquent utilities 12%12%0.00%12%0.00%12%0.00%12%0.00%per year
Utility Other 0505.4902 Meter testing (when meter within 2% of accurate)actual cost actual cost actual cost actual cost actual cost based on billing rate
for hours worked
Utility Other various.4902 Penalty for late payment 10%10%0.00%10%0.00%10%0.00%10%0.00%of amount past due
Utility Other 0505.4902 Rental property: duplicate bill to occupant 1.00 1.00 0.00%1.00 0.00%1.00 0.00%1.00 0.00%added to each
quarter bill
Utility Other 0505.4902 Rental property: restart duplicate bill 5.00 5.00 0.00%5.00 0.00%5.00 0.00%5.00 0.00%once when duplicate
billing is restarted
Utility Other 0505.4902 Rental property: pro-rata bill when occupant changes 15.00 15.00 0.00%15.00 0.00%15.00 0.00%15.00 0.00%once at time of billing
Utility Other 0505.4902 Service fee for water shut off/turn on (for code enforcement
purposes)
55.00 55.00 0.00%55.00 0.00%55.00 0.00%55.00 0.00%per trip; shut off and
turn on per hour; $55
minimum
Utility Other 0505.4902 Service fee (after hour call)overtime rate; 2 hour
minimum
Utility Other 0505.4902 Service abandonment fee actual cost actual cost actual cost actual cost actual cost water service
disconnected and
plugged
Utility Other 0505.4902 Alternative service abandonment fee 6,200.00$ 8,000.00$ 29.03%8,000.00$ 0.00%8,000.00$ 0.00%8,000.00$ 0.00%deposit for the city to
disconnect service in
the future, if needed
Utility Other 0505.4947 3/4S IPERL 1G 3-TERM SCREW SM 147.00$ New in 2022
Utility Other 0505.4947 1 IPERL 1G 3-TERM SCREW MN 231.00$ New in 2022
Utility Other 0505.4947 OMNI 1-1/2" C2 MTR 1G W/INT'L 1,370.25$ New in 2022
Utility Other 0505.4947 OMNI 2" C2 MTR 1GAL METER 1,585.50$ New in 2022
Utility Other 0505.4947 OMNI 3" C2 MTR 1G MTR W/INTRNL 2,005.50$ New in 2022
Utility Other 0505.4947 OMNI 4" C2 MTR 10GAL METER W/3,470.25$ New in 2022
Utility Other 0505.4947 OMNI 1-1/2" T2 MTR 1 GAL 13"LL 955.50$ New in 2022
Utility Other 0505.4947 OMNI 2" T2 METER 1 GAL 17"LL 1,113.00$ New in 2022
Utility Other 0505.4947 3" OMNI T2 MTR 1GAL 8WHL 19"LL 1,396.50$ New in 2022
Utility Other 0505.4947 OMNI 4 T2 MTR 10 GAL 2,735.25$ New in 2022
Utility Other 0505.4947 510M S/POINT M2 WIRED SP HR&LD 155.40$ New in 2022
Utility Other 0505.4947 510M S/POINT M2 TC SP W/HR&LD 160.65$ New in 2022
Utility Other 0505.4947 40N2 5/8X3/4 MEYER INSETTER 78.04$ New in 2022
Utility Other 0505.4947 740-3S3 3/4 SOLDER SWIVEL NL 9.39$ New in 2022
Utility Other 0505.4947 740-3M4 1 MIP SWIVEL NO LEAD 15.08$ New in 2022
Utility Other 0505.4947 740N4 INSETTER 1 METER C STYLE 160.36$ New in 2022
Utility Other 0505.4947 740-4M4 1 MIP SWIVEL NO LEAD 15.08$ New in 2022
Utility Other 0505.4947 740-4S4-1 SOLDER SWIVEL NL 15.08$ New in 2022
6.2
Long Term Plan
City of Crystal
Crystal, Minnesota
December 21, 2021
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
6.3
City of Crystal, Minnesota
Long Term Plan
Table of Contents
Page No.
Compilation Disclosure 5
Introductory Section
Transmittal Letter 8
Financial Section
Schedule of Property Taxes Levied and Tax Rates 12
Schedule of Annual Fund Cash Balances 16
Outstanding Debt Schedule 18
Capital Improvement Plan
Street Capital Fund 415
Schedule of Planned Capital Outlay 2019 to 2030 20
Schedule of Projected Revenue, Expenditures and Debt 24
Police Equipment Revolving Fund 235
Schedule of Planned Capital Outlay 2019 to 2030 26
Schedule of Projected Revenue, Expenditures and Debt 30
Park Improvements 420
Schedule of Planned Capital Outlay 2019 to 2030 32
Schedule of Projected Revenue, Expenditures and Debt 36
Water Fund 505
Schedule of Planned Capital Outlay 2019 to 2030 38
Statement of Cash Flows 40
Sanitary Sewer Fund 510
Schedule of Planned Capital Outlay 2019 to 2030 42
Statement of Cash Flows 44
Storm Drainage Fund 515
Schedule of Planned Capital Outlay 2019 to 2030 46
Statement of Cash Flows 48
Street Light Fund 520
Schedule of Planned Capital Outlay 2019 to 2030 50
Statement of Cash Flows 52
Fleet Fund 615
Schedule of Planned Capital Outlay 2019 to 2030 54
Statement of Cash Flows 58
Major Building Replacement Fund 408/625
Schedule of Planned Capital Outlay 2019 to 2030 60
Schedule of Projected Revenue, Expenditures and Debt 66
Information Technology Fund 620
Schedule of Planned Capital Outlay 2019 to 2030 68
Statement of Cash Flows 74
Selected Graphical Data from Projections 76
Appendix A
Internal Loan Schedule for Public Safety Facility Renovation/Construction 80
Appendix B
Internal Service Summary Schedule 85
3
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
4
6.3
COMPILATION DISCLOSURE
Honorable Mayor and City Council
City of Crystal
4141 Douglas Drive North
Crystal, Minnesota 55422
We have compiled the accompanying forecasted long -term plan that includes property tax, tax rate, fund balance and debt
projections based on input from the City Council and City staff. This projection incorporates estimates through
December 31, 2031, for all presented funds. This forecast was compiled in accordance with attestation standards
established by the American Institute of Certified Public Accountants.
A compilation is limited to presenting in the form of forecast information that is the representation of management and
does not include evaluation of the support for the assumptions underlying the forecast. We have not examined the
forecast and, accordingly, do not express an opinion or any other form of assurance on the accompanying statements or
assumptions. Furthermore, there will usually be differences between the fo recasted and actual results because events
and circumstances frequently do not occur as expected, and those differences may be material. We have no responsibility
to update this report for events and circumstances occurring after the date of this report.
Sincerely,
Abdo Financial Solutions
5
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
6
6.3
INTRODUCTORY SECTION
CITY OF CRYSTAL, MINNESOTA
LONG TERM PLAN
7
6.3
Honorable Mayor and City Council
City of Crystal
4141 Douglas Drive North
Crystal, Minnesota 55422
Introduction
As discussed in prior communications to the City Council, we have been preparing a long-term plan for the City that is
intended to give a big picture view of the status now and five years from now. We have measured and projected
operations, capital and debt for the city based on assumptions made by management. The City’s assumptions made are
as follows:
Assumptions
The following assumptions have been used to calculate the projections in this report:
Rates
Interest Earnings 1.00%
Governmental Fund Revenue Growth 3.00%
Governmental Fund Expenditure Growth 3.00%
Water and Sanitary Sewer Funds
2020 - 2022 11.00%
2023 - 2024 5.50%
2025 - 2030 3.00%
Storm Drainage Fund Expense Growth (1) 5.00%
Street Lighting 2.00%
General Fund Levy Growth 3.00%
EDA Fund Levy Growth 2.00%
Population Growth 0.49%
Median Home Value Growth 3.00%
Tax Capacity Growth Rate (Including Fiscal Disparities)3.00%
Estimated Market Value
2022 - 2024 3.00%
2025 - 2031 1.00%
Governmental Fund Debt Interest Rate 3.00%
Governmental Fund Debt Term 15
(1) Specific enterprise fund assumptions are noted in the Financial Section.
8
6.3
Assumptions with Future Action
• General Fund property tax revenue has been increased for 2022 based on the results of the long-term plan, Park
System Master Plan and increased funding for Streets.
• PERF Fund 235 will need additional analysis and policy review to ensure capital needs are met.
• Building Fund 408/625 will receive internal loans for the renovation/construction of a Public Safety Facility and
for other capital needs. These loans are from the Street Improvement Fund, Police Revolving Fund, Water Fund,
Storm Water Fund, Fleet Fund and IT Fund. All loans will be repaid by 2032 and the repayment schedule is
included on page 78.
Key Highlights
• As of December 31, 2020 the General fund had a 44.0 percent operating reserve. The Minnesota Office of the
State Auditor defines an adequate reserve as 35-50 percent of the General fund expenditures. A 45 percent fund
balance reserve has been assumed in the long-term plan. The projected General Fund reserve balance is
anticipated to remain at or above 45 percent rage throughout the life of this Plan. We anticipate the General fund
levy will grow by an average of 3 percent to maintain the desired reserve level.
• The tax levy is projected to increase from $13.1 million (2021 adopted) to $23.8 million (2031 projected) over the
duration of this Plan based on the anticipated construction of a public safety facility along with other capital levy
needs. The levy increase will result in an increase in the projected city tax rate, ranging from 48.370 percent
(2021) to 64.392 percent throughout the life of this Plan. A decrease in the tax levy or applicable tax rate is not
anticipated, given the capital needs outlined in our report.
o Tax capacity is assumed to grow at a rate of 3 percent during the duration of this Plan. A growth in tax
rate in excess of these projections may result in lower tax rates in future years.
o The future captured tax increment capacity has not been analyzed for this report and is assumed to
remain the same as it is projected in 2021.
• Beginning in 2022, the Street fund will receive an additional 1% overall levy increase annually to assist in
preserving/maintaining and reconstructing streets within the city.
• Total debt outstanding is projected to decrease from $12.5 million (2020 actual) to $750,000 (2031 projected)
over the duration of this Plan. As a result, the debt per capita will fall from an estimated $505 (2020 actual) per
household to an estimated $29 (2031 projected) over the duration of this Plan.
• Due to planned capital projects, the total cash position of the city is projected to increase from $43.1 million
(2020 actual) to $36.4 million over the duration of this Plan.
• The Police Department facility has been allocated $4,000,000 based on the 2020 state bonding bill. This
allocation is anticipated to be received in 2021 and 2022.
• Several funds were not analyzed for the purposes of this report and include a 1 percent interest rate earnings
assumption the cash balance. These funds include: TIF Districts, Special Projects, Cable TV Equipment,
Recycling, Self Insurance and Hennepin Recycling Group. The actual cash results for the years 2021 - 2031 will
vary from the results estimated in this report.
9
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
10
6.3
FINANCIAL SECTION
CITY OF CRYSTAL, MINNESOTA
LONG TERM PLAN
11
6.3
City of Crystal, Minnesota
Schedule of Property Taxes Levied and Tax Rates
For the Years Ended December 31, 2020 (Actual) and 2021 to 2031 (Estimated)
NOTE: 1% additional levy to street fund 2020 2021 2022 2023 2024
Actual Budgeted Proposed Estimated Estimated
Amounts Amounts Amounts Amounts Amounts
Property Taxes Levied for General Purposes
100 General 11,407,848$ 12,084,489$ 12,508,518$ 13,133,944$ 13,790,641$
220 EDA/HRA Funds 283,935 300,000 310,000 316,200 322,524
415 Street Capital 110,144 114,550 245,926 384,252 529,047
235 PERF Fund 154,938 158,037 161,197 164,421 167,709
420 Park Improvements 359,138 480,511 606,999 741,057 882,753
Total Taxes Levied 12,316,003 13,137,587 13,832,640 14,739,874 15,692,674
Percent Levy Increase 6.67%5.29%6.56%6.46%
Less: Value of Market Value Levies - - - - -
Less: Distribution from fiscal disparities (2,336,753) (2,269,837) (2,572,319) (2,649,489) (2,728,973)
City Net Levy 9,979,250$ 10,867,750$ 11,260,321$ 12,090,386$ 12,963,701$
Market Value Tax Levy to be Spread 10,567,750$ 10,950,321$ 11,774,186$ 12,641,177$
Tax Capacity
Personal and Real Estate 22,411,718$ 23,617,970$ 25,658,448$ 26,428,201$ 27,221,047$
Other assumed net growth factors - - - - -
Less: Contribution to fiscal disparities (1,297,703) (1,481,700) (1,661,902) (1,711,759) (1,763,112)
Less: Tax Increment (278,074) (288,561) (288,561) (288,561) (288,561)
Adjusted net tax capacity 20,835,941$ 21,847,709$ 23,707,985$ 24,427,881$ 25,169,375$
Estimated Market Value 2,122,999,500$ 2,213,904,900$ 2,280,322,047$ 2,348,731,708$ 2,419,193,660$
Maximum EDA/HRA Levy 392,755 409,572 421,860 434,515 447,551
12
6.3
2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts
14,480,173$ 15,204,182$ 15,964,391$ 16,762,610$ 17,600,741$ 18,480,778$ 19,404,817$
328,974 335,554 342,265 349,110 356,093 363,214 370,479
681,972 843,439 1,013,883 1,193,758 1,383,542 1,583,737 1,794,871
171,064 174,485 177,975 181,534 185,165 188,868 192,645
1,032,515 1,190,758 1,357,911 1,534,431 1,720,792 1,917,497 2,125,070
16,694,699 17,748,417 18,856,425 20,021,443 21,246,332 22,534,095 23,887,882
6.39%6.31%6.24%6.18%6.12%6.06%6.01%
- - - - - - -
(2,810,842) (2,895,168) (2,982,023) (3,071,483) (3,163,628) (3,258,537) (3,356,293)
13,883,856$ 14,853,250$ 15,874,402$ 16,949,960$ 18,082,704$ 19,275,558$ 20,531,589$
13,554,882$ 14,517,696$ 15,532,137$ 16,600,849$ 17,726,612$ 18,912,343$ 20,161,111$
28,037,679$ 28,878,809$ 29,745,174$ 30,637,529$ 31,556,655$ 32,503,354$ 33,478,455$
- - - - - - -
(1,816,005) (1,870,485) (1,926,600) (1,984,398) (2,043,930) (2,105,248) (2,168,405)
(288,561) - - - - - -
25,933,113$ 27,008,324$ 27,818,574$ 28,653,131$ 29,512,725$ 30,398,107$ 31,310,050$
2,443,385,596$ 2,467,819,452$ 2,492,497,647$ 2,517,422,623$ 2,542,596,849$ 2,568,022,818$ 2,593,703,046$
452,026 456,547 461,112 465,723 470,380 475,084 479,835
13
6.3
City of Crystal, Minnesota
Schedule of Property Taxes Levied and Tax Rates (Continued)
For the Years Ended December 31, 2020 (Actual) and 2021 to 2031 (Estimated)
2020 2021 2022 2023 2024
Actual Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts
Tax Rates
General 45.37%45.53%42.72%43.89%45.06%
Capital levies 2.48%2.84%3.46%4.31%5.16%
Scheduled debt levies 0.00%0.00%0.00%0.00%0.00%
Total City Levy Tax Rate 47.855%48.370%46.188%48.200%50.224%
Total EDA Tax Rate 1.070%1.136%1.053%1.047%1.041%
Population 24,712 24,833 24,833 24,955 25,077
Taxes per Capita 498$ 529$ 557$ 591$ 626$
Tax Levy ($)
General 11,407,848$ 12,084,489$ 12,508,518$ 13,133,944$ 13,790,641$
Capital 624,220 753,098 1,014,122 1,289,730 1,579,509
Economic Development Authority 283,935 300,000 310,000 316,200 322,524
Debt service - - - - -
Tax Levy (%)
General 92.63%91.98%90.43%89.10%87.88%
Capital 5.07%5.73%7.33%8.75%10.07%
Economic Development Authority 2.31%2.28%2.24%2.15%2.06%
Debt Service 0.00%0.00%0.00%0.00%0.00%
14
6.3
2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts
46.25%46.93%48.14%49.37%50.61%51.86%53.13%
6.02%6.82%7.69%8.57%9.46%10.36%11.26%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
52.269%53.753%55.834%57.937%60.064%62.216%64.392%
1.036%1.019%1.013%1.008%1.002%0.996%0.990%
25,200 25,323 25,448 25,572 25,698 25,824 25,950
662$ 701$ 741$ 783$ 827$ 873$ 921$
14,480,173$ 15,204,182$ 15,964,391$ 16,762,610$ 17,600,741$ 18,480,778$ 19,404,817$
1,885,551 2,208,682 2,549,769 2,909,722 3,289,499 3,690,102 4,112,586
328,974 335,554 342,265 349,110 356,093 363,214 370,479
- - - - - - -
86.74%85.66%84.66%83.72%82.84%82.01%81.23%
11.29%12.44%13.52%14.53%15.48%16.38%17.22%
1.97%1.89%1.82%1.74%1.68%1.61%1.55%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
15
6.3
City of Crystal, Minnesota
Schedule of Annual Fund Cash Balances
For the Years Ended December 31, 2020 (Actual) and 2021 to 2031 (Estimated)
NOTE: 1% additional levy to street fund 2020 2021 2022 2023
Actual Estimated Estimated Estimated
Amounts Amounts Amounts Amounts
Government-Type
General Operations
101 General 8,638,151$ 8,638,151$ 8,638,151$ 8,858,151$
Special Revenue
220 Economic Development Authority 2,159,000 2,097,202 2,030,812 1,959,330
*206-210 TIF Districts Special Revenue 1,049,041 1,059,531 1,070,127 1,080,828
*240-245 Special Projects 148,919 148,920 148,921 148,922
Subtotal 3,356,960 3,305,653 3,249,860 3,189,080
Debt Service
329-337 Debt Service 4,492,080 4,305,042 4,175,558 4,045,145
Capital Projects
405 Permanent Improvement Revolving - - - -
415 Street Reconstruction 7,761,272 6,803,911 1,007,147 691,771
409 Fire Equipment Revolving - 100,000 202,750 308,326
235 Police Equipment Revolving 2,778,653 1,597,111 1,575,800 414,039
420 Park Improvement 1,185,687 1,241,174 975,173 239,982
*404 Cable TV Equipment 238,405 240,789 243,197 245,629
Subtotal 11,964,017 9,982,985 4,004,066 1,899,747
Total - Governmental-type Funds 28,451,208 26,231,832 20,067,635 17,992,123
Internal Service
620 Information Technology 538,420 696,705 459,450 293,522
408/625 Building 4,735,240 4,883,220 1,774,511 184,221
615 Fleet 2,457,309 2,321,888 2,001,485 520,379
*605 Self Insurance 604,584 610,630 616,736 622,903
Total - Internal Service-type Funds 8,335,553 8,512,442 4,852,181 1,621,026
Business-Type
Enterprise Funds
505 Water 1,537,557 1,810,311 1,864,988 488,448
510 Sewer 1,160,442 1,134,360 1,083,642 833,254
515 Storm Drainage 2,149,587 366,523 782,912 177,891
520 Street Lights 776,217 815,076 852,914 388,272
*525 Recycling 135,533 136,888 138,257 139,640
Total - Business-type Funds 5,759,336 4,263,158 4,722,713 2,027,505
Agency Fund
*250 Hennepin Recycling Group 509,263 514,356 519,499 524,694
Grand Total - City 43,055,360$ 39,521,788$ 30,162,029$ 22,165,348$
*Annual growth in fund balance of 1% assumed
Trend indicator
Adequate for reserve levels
Adequate as of 2020 but decreasing balance, watch
Below targeted reserve levels and should have a plan to address
The fund has events in the future that need addressing now
16
6.3
2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Trend
9,234,751$ 9,622,649$ 10,122,184$ 10,636,705$ 11,166,662$ 11,712,517$ 12,274,748$ 12,853,846$
1,882,542 1,800,225 1,712,149 1,618,075 1,517,756 1,410,936 1,297,351 1,109,310
1,091,636 1,102,553 1,113,578 1,124,714 1,135,961 1,147,321 1,158,794 1,170,382
148,923 148,924 148,925 148,926 148,927 148,928 148,929 148,930
3,123,101 3,051,702 2,974,652 2,891,715 2,802,644 2,707,185 2,605,074 2,428,622
4,125,360 4,183,548 4,209,724 4,184,075 4,134,938 4,073,230 4,012,383 3,931,319
- - - - - - - -
3,800,038 3,296,811 4,300,020 4,883,705 5,743,101 6,430,875 6,998,722 8,253,383
416,805 528,267 642,794 760,471 881,384 1,005,622 1,133,276 1,264,442
312,573 513,446 414,749 507,555 975,849 896,456 895,028 1,411,624
939,135 100,041 135,799 244,069 144,940 979,820 786,049 922,340
248,085 250,566 253,072 255,602 258,158 260,740 263,347 265,981
5,716,635 4,689,132 5,746,435 6,651,402 8,003,432 9,573,513 10,076,423 12,117,769
22,199,847 21,547,031 23,052,994 24,363,896 26,107,675 28,066,444 28,968,628 31,331,556
275,931 361,621 446,849 531,491 616,284 802,240 841,006 792,967
1,084,849 767,452 851,000 735,654 197,576 241,694 (93,013) 224,822
419,474 289,182 294,567 155,166 419,604 551,363 367,461 1,224,032
629,133 635,424 641,778 648,196 654,678 661,225 667,837 674,515
2,409,387 2,053,679 2,234,194 2,070,506 1,888,143 2,256,522 1,783,290 2,916,336
262,191 197,841 402,120 632,250 758,724 972,465 1,092,346 2,870,686
637,366 262,562 150,900 (117,178) (505,416) (769,397) (1,064,836) (1,392,314)
500,230 1,058,884 923,953 865,844 1,445,531 176,899 348,039 (527,805)
414,133 435,039 450,561 460,240 463,592 460,104 449,232 455,402
141,036 142,447 143,871 145,310 146,763 148,230 149,713 151,210
1,954,956 2,096,772 2,071,405 1,986,465 2,309,193 988,301 974,494 1,557,179
529,941 535,241 540,593 545,999 551,459 556,973 562,543 568,169
27,094,130$ 26,232,722$ 27,899,186$ 28,966,867$ 30,856,469$ 31,868,240$ 32,288,955$ 36,373,240$
17
6.3
City of Crystal, Minnesota
Outstanding Debt Schedule
For the Years Ended December 31, 2020 (Actual) and 2021 to 2031 (Estimated)
2020 2021 2022 2023
Original Issue Maturity Interest Actual Estimated Estimated Estimated
Fund Issue Issue Date Date Rate Balance Balance Balance Balance
Government-Type
General Obligation Bonds
330 2009A Special Assessment 3,360,000$ 7/21/2009 2/1/2030 2.00 - 4.50 %485,000$ 320,000$ 160,000$ -$
332 2011A Special Assessment 1,705,000 7/19/2011 2/1/2027 0.50 - 3.55 685,000 575,000 470,000 370,000
333 2012A Special Assessment 2,635,000 7/16/2013 2/1/2028 0.50 - 3.55 1,250,000 1,080,000 915,000 750,000
334 2013A Special Assessment 3,235,000 6/17/2015 2/1/2029 0.50 - 3.55 1,825,000 1,605,000 1,390,000 1,180,000
335 2015A Special Assessment 2,550,000 7/16/2015 2/1/2031 2.50 - 3.00 1,755,000 1,575,000 1,400,000 1,230,000
336 2016A Special Assessment 3,330,000 8/25/2016 2/1/2032 2.00 - 2.50 2,550,000 2,310,000 2,075,000 1,845,000
337 2017A Special Assessment 4,665,000 9/14/2017 2/1/2033 2.00 - 3.00 3,920,000 3,595,000 3,280,000 2,965,000
Total G.O. Tax Bonds 29,360,000 12,470,000 11,060,000 9,690,000 8,340,000
Total Government-Type 29,360,000$ 12,470,000$ 11,060,000$ 9,690,000$ 8,340,000$
Population 24,712 24,833 24,955 25,077
Debt Per Capita - Total 505$ 445$ 388$ 333$
18
6.3
2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Balance Balance Balance Balance Balance Balance Balance Balance
-$ -$ -$ -$ -$ -$ -$ -$
270,000 175,000 85,000 - - - - -
590,000 435,000 285,000 140,000 - - - -
975,000 770,000 570,000 375,000 185,000 - - -
1,065,000 900,000 740,000 585,000 435,000 285,000 140,000 -
1,620,000 1,400,000 1,185,000 975,000 770,000 570,000 375,000 185,000
2,655,000 2,345,000 2,040,000 1,740,000 1,440,000 1,145,000 855,000 565,000
7,175,000 6,025,000 4,905,000 3,815,000 2,830,000 2,000,000 1,370,000 750,000
7,175,000$ 6,025,000$ 4,905,000$ 3,815,000$ 2,830,000$ 2,000,000$ 1,370,000$ 750,000$
25,200 25,323 25,448 25,572 25,698 25,824 25,950 26,078
285$ 238$ 193$ 149$ 110$ 77$ 53$ 29$
19
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Street Capital Fund 415
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Public works 0415.6305 TBA 2020 In house mill and overlay 52,500$ 52,500$ -$ -$
Public works 0415.6305 TBA 2020 Sidewalk shaving (trip hazard removal)20,000 20,000 - -
Public works 0415.6305 TBA 2020 Misc concrete work 56,650 56,650 - -
Public works 0415.6305 TBA 2020 Contract mill and overlay 1,478,000 1,478,000 - -
Public works 0415.6305 TBA 2020 Flashing yellow arrows 26,000 26,000 - -
Public works 0415.6305 TBA 2020 ADA Ped Ramp replacements 41,200 41,200 - -
Public works 0415.6305 TBA 2020 Utility Reconstruction 300,000 300,000 - -
Public works 0415.6305 TBA 2021 Replace retaining wall Douglas and 36th 50,000 - 50,000 -
Public works 0415.6305 TBA 2021 In house mill and overlay 55,125 - 55,125 -
Public works 0415.6305 TBA 2021 Sidewalk shaving (trip hazard removal)20,000 - 20,000 -
Public works 0415.6305 TBA 2021 Misc concrete work 58,350 - 58,350 -
Public works 0415.6305 TBA 2021 Contract mill and overlay 1,276,000 - 1,276,000 -
Public works 0415.6305 TBA 2021 Flashing yellow arrows 35,000 - 35,000 -
Public works 0415.6305 TBA 2021 ADA Ped Ramp replacements 42,436 - 42,436 -
Public works 0415.6305 TBA 2021 Utility Reconstruction 300,000 - 300,000 -
Public works 0415.6305 TBA 2022 In house mill and overlay 57,881 - - 57,881
Public works 0415.6305 TBA 2022 Sidewalk shaving (trip hazard removal)20,000 - - 20,000
Public works 0415.6305 TBA 2022 Misc concrete work 60,100 - - 60,100
Public works 0415.6305 TBA 2022 Contract mill and overlay 846,000 - - 846,000
Public works 0415.6305 TBA 2022 ADA Ped Ramp replacements 43,709 - - 43,709
Public works 0415.6305 TBA 2022 Utility Reconstruction 550,000 - - 550,000
Public works 0415.6305 TBA 2023 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2023 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2023 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2023 Contract mill and overlay 882,000 - - -
Public works 0415.6305 TBA 2023 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2023 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2024 Contract mill and overlay 1,120,000 - - -
Public works 0415.6305 TBA 2024 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2024 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2024 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2024 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2024 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2025 36th Ave Recon & Regent mini-RB 750,000 - - -
Public works 0415.6305 TBA 2025 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2025 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2025 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2025 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2025 Contract mill and overlay 882,000 - - -
Public works 0415.6305 TBA 2025 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2026 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2026 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2026 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2026 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2026 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2026 Contract mill and overlay 882,000 - - -
Public works 0415.6305 TBA 2026 Retaining wall replacement 4009 Douglas Dr N 200,000 - - -
Public works 0415.6306 TBA 2026 42nd Street Reconstruction 4,000,000 - - -
Public works 0415.6305 TBA 2027 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2027 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2027 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2027 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2027 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2027 Contract mill and overlay 882,000 - - -
20
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
60,775 - - - - - - - -
20,000 - - - - - - - -
61,903 - - - - - - - -
882,000 - - - - - - - -
45,020 - - - - - - - -
300,000 - - - - - - - -
- 1,120,000 - - - - - - -
- 60,775 - - - - - - -
- 20,000 - - - - - - -
- 61,903 - - - - - - -
- 45,020 - - - - - - -
- 300,000 - - - - - - -
- - 750,000 - - - - - -
- - 60,775 - - - - - -
- - 20,000 - - - - - -
- - 61,903 - - - - - -
- - 45,020 - - - - - -
- - 882,000 - - - - - -
- - 300,000 - - - - - -
- - - 300,000 - - - - -
- - - 60,775 - - - - -
- - - 20,000 - - - - -
- - - 61,903 - - - - -
- - - 45,020 - - - - -
- - - 882,000 - - - - -
- - - 200,000 - - - - -
- - - 4,000,000 - - - - -
- - - - 300,000 - - - -
- - - - 60,775 - - - -
- - - - 20,000 - - - -
- - - - 61,903 - - - -
- - - - 45,020 - - - -
- - - - 882,000 - - - -
21
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Street Capital Fund 415
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Public works 0415.6305 TBA 2028 In house mill and overlay 60,775$ -$ -$ -$
Public works 0415.6305 TBA 2028 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2028 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2028 Crack sealing 10,000 - - -
Public works 0415.6305 TBA 2028 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2028 Contract mill and overlay 882,000 - - -
Public works 0415.6305 TBA 2028 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2029 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2029 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2029 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2029 Crack sealing 10,000 - - -
Public works 0415.6305 TBA 2029 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2029 Contract mill and overlay 882,000 - - -
Public works 0415.6305 TBA 2029 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2030 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2030 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2030 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2030 Crack sealing 10,000 - - -
Public works 0415.6305 TBA 2030 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2030 Contract mill and overlay 1,230,000 - - -
Public works 0415.6305 TBA 2030 Utility Reconstruction 300,000 - - -
Public works 0415.6305 TBA 2031 In house mill and overlay 60,775 - - -
Public works 0415.6305 TBA 2031 Sidewalk shaving (trip hazard removal)20,000 - - -
Public works 0415.6305 TBA 2031 Misc concrete work 61,903 - - -
Public works 0415.6305 TBA 2031 Crack sealing 10,000 - - -
Public works 0415.6305 TBA 2031 ADA Ped Ramp replacements 45,020 - - -
Public works 0415.6305 TBA 2031 Contract mill and overlay 1,230,000 - - -
Public works 0415.6305 TBA 2031 Utility Reconstruction 300,000 - - -
1,974,350$ 1,836,911$ 1,577,690$
22
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ 60,775$ -$ -$ -$
- - - - - 20,000 - - -
- - - - - 61,903 - - -
- - - - - 10,000 - - -
- - - - - 45,020 - - -
- - - - - 882,000 - - -
- - - - - 300,000 - - -
- - - - - - 60,775 - -
- - - - - - 20,000 - -
- - - - - - 61,903 - -
- - - - - - 10,000 - -
- - - - - - 45,020 - -
- - - - - - 882,000 - -
- - - - - - 300,000 - -
- - - - - - - 60,775 -
- - - - - - - 20,000 -
- - - - - - - 61,903 -
- - - - - - - 10,000 -
- - - - - - - 45,020 -
- - - - - - - 1,230,000 -
- - - - - - - 300,000 -
- - - - - - - - 60,775
- - - - - - - - 20,000
- - - - - - - - 61,903
- - - - - - - - 10,000
- - - - - - - - 45,020
- - - - - - - - 1,230,000
- - - - - - - - 300,000
1,369,699$ 1,607,699$ 2,119,699$ 5,569,699$ 1,369,699$ 1,379,699$ 1,379,699$ 1,727,699$ 1,727,699$
23
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Street Capital Fund 415
Schedule of Projected Revenue, Expenditures and Debt
NOTE: 1% additional levy to street fund 2020 2021 2022
Actual Adopted Proposed
Revenues
Property taxes (1% overall levy increase, annually, beginning in 2022) *110,144$ 114,550$ 245,926$
Special assessments 600,322 460,000 230,000
Interest on investments 319,054 75,000 75,000
Franchise fees - - -
Miscellaneous 28,933 - -
Total Revenues 1,058,453 649,550 550,926
Expenditures
Capital outlay
Public works 2,794,624 1,836,911 1,577,690
Total Expenditures 2,794,624 1,836,911 1,577,690
Excess (Deficiency) of Revenues
Over (Under) Expenditures (1,736,171) (1,187,361) (1,026,765)
Other Financing Sources
Transfers in - - -
Intergovernmental revenue (Municipal State Aid - MSA)1,013,257 230,000 230,000
Internal loan to Building (5,000,000)
Bond proceeds - - -
Sale of Fixed Asset - - -
Total Other Financing Sources 1,013,257 230,000 (4,770,000)
Net Change in Fund Balances (722,914) (957,361) (5,796,765)
Cash Balance, January 1 8,484,186 7,761,272 6,803,911
Cash Balances, December 31 7,761,272$ 6,803,911$ 1,007,147$
Capital Project Fund Projected Activity
24
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
384,252$ 529,047$ 681,972$ 843,439$ 1,013,883$ 1,193,758$ 1,383,542$ 1,583,737$ 1,794,871$
230,000 150,000 166,500 166,500 166,500 166,500 166,500 167,500 167,500
10,071 6,918 38,000 32,968 43,000 48,837 57,431 64,309 69,987
- - - - - - - - -
- - - - - - - - -
624,323 685,965 886,472 1,042,907 1,223,383 1,409,095 1,607,473 1,815,546 2,032,359
1,369,699 1,607,699 2,119,699 5,569,699 1,369,699 1,379,699 1,379,699 1,727,699 1,727,699
1,369,699 1,607,699 2,119,699 5,569,699 1,369,699 1,379,699 1,379,699 1,727,699 1,727,699
(745,375) (921,734) (1,233,226) (4,526,791) (146,316) 29,396 227,774 87,848 304,660
- - - - - - - - -
230,000 3,330,000 230,000 4,230,000 230,000 230,000 230,000 230,000 230,000
200,000 700,000 500,000 1,300,000 500,000 600,000 230,000 250,000 720,000
- - - - - - - - -
- - - - - - - - -
430,000 4,030,000 730,000 5,530,000 730,000 830,000 460,000 480,000 950,000
(315,375) 3,108,266 (503,226) 1,003,209 583,684 859,396 687,774 567,848 1,254,660
1,007,147 691,771 3,800,038 3,296,811 4,300,020 4,883,705 5,743,101 6,430,875 6,998,722
691,771$ 3,800,038$ 3,296,811$ 4,300,020$ 4,883,705$ 5,743,101$ 6,430,875$ 6,998,722$ 8,253,383$
Capital Project Fund Projected Activity
25
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Police Equipment Revolving Fund 235
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Police 3500.6930 N/A 2020 2016 Ford Interceptor Utility (SUV)50,000$ 50,000$ -$ -$
Police 3500.6930 N/A 2020 2016 Ford Interceptor utility 50,000 50,000 - -
Police 3500.6930 N/A 2020 2016 Ford Interceptor Utility 50,000 50,000 - -
Police 3500.6930 N/A 2020 Mobile data tablets ($5,000 each)15,000 15,000 - -
Police 3500.6930 N/A 2020 Rifle replacement /Replace Sniper Rifle 16,500 16,500 - -
Police 3500.6930 N/A 2020 Bulletproof vests - mass replacement ($1,000 a piece)15,000 15,000 - -
Police 3500.6930 N/A 2020 Tactical vests ($3,600 each)7,200 7,200 - -
Police 3500.6931 N/A 2020 2020 Dodge Durango Investigations 40,000 40,000 - -
Police 3500.6930 N/A 2021 Lease Vehicle (10) and Equipment 92,379 - 92,379 -
Police 3500.6930 N/A 2021 Mobile data tablets ($5,000 each)15,000 - 15,000 -
Police 3500.6930 N/A 2021 Mobile radar/lidar replacement ($4,000-5,000 each)8,000 - 8,000 -
Police 3500.6930 N/A 2021 Bulletproof vests - mass replacement ($1,000 a piece)10,000 - 10,000 -
Police 3500.6930 N/A 2021 Tactical vests ($3,600 each)7,200 - 7,200 -
Police 3500.6930 N/A 2021 SWAT Gas Masks (7) @$1,000 a piece 7,000 - 7,000 -
Police 3500.6930 N/A 2021 SWAT Helmets (7) @$1,000 a piece 7,000 - 7,000 -
Police 3500.6930 N/A 2021 Body cameras 28,000 - 28,000 -
Police 3500.6930 N/A 2022 Lease Vehicle (4) and Equipment 139,308 - - 139,308
Police 3500.6930 N/A 2022 Mobile data tablets ($5,000 each)20,000 - - 20,000
Police 3500.6930 N/A 2022 Bulletproof vests - mass replacement ($1,000 a piece)6,000 - - 6,000
Police 3500.6930 N/A 2022 Tactical vests ($3,600 each)7,200 - - 7,200
Police 3500.6930 N/A 2022 Upgrade FATS 30,000 - - 30,000
Police 3500.6930 N/A 2022 Upgrade Cellbrite 15,000 - - 15,000
Police 3500.6930 N/A 2023 Lease Vehicle (3) and Equipment 175,740 - - -
Police 3500.6930 N/A 2023 Mobile data tablets ($5,000 each)10,000 - - -
Police 3500.6930 N/A 2023 Bulletproof vests - mass replacement ($1,000 a piece)4,000 - - -
Police 3500.6930 N/A 2023 Tactical vests ($3,600 each)7,200 - - -
Police 3500.693 N/A 2024 SWAT Robot 15,000 - - -
Police 3500.6930 N/A 2024 Lease Vehicle (5) and Equipment 241,116 - - -
26
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
175,740 - - - - - - - -
10,000 - - - - - - - -
4,000 - - - - - - - -
7,200 - - - - - - - -
- 15,000 - - - - - - -
- 241,116 - - - - - - -
27
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Police Equipment Revolving Fund 235
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Year to Year to Budgeted Proposed Proposed
Department Replace Subledger Replace Item Cost Amounts Amounts Amounts
Police 3500.6930 N/A 2024 Mobile data tablets ($5,000 each)15,000$ -$ -$ -$
Police 3500.6930 N/A 2024 Body cameras 30,000 - - -
Police 3500.6930 N/A 2024 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2025 Lease Vehicle (1) and Equipment 241,116 - - -
Police 3500.6930 N/A 2025 Mobile data tablets ($5,000 each)20,000 - - -
Police 3500.6930 N/A 2025 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2026 Lease Vehicle (10) and Equipment 241,116 - - -
Police 3500.6930 N/A 2026 1999 Ford ambulance 150,000 - - -
Police 3500.6930 N/A 2026 Mobile data tablets ($5,000 each)15,000 - - -
Police 3500.6930 N/A 2026 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2026 SWAT Pole Cam 35,000 - - -
Police 3500.6930 N/A 2027 Lease Vehicle (4) and Equipment 241,116 - - -
Police 3500.6930 N/A 2027 Mobile data tablets ($5,000 each)5,000 - - -
Police 3500.6930 N/A 2027 Mobile radar/lidar replacement ($4,000-5,000 each)10,000 - - -
Police 3500.6930 N/A 2027 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2027 SWAT Gas Launcher 6,000 - - -
Police 3500.6930 N/A 2028 Lease Vehicle (3) and Equipment 241,116 - - -
Police 3500.6930 N/A 2028 Mobile radios ($5,000 each)75,000 - - -
Police 3500.6930 N/A 2028 Mobile data tablets ($5,000 each)15,000 - - -
Police 3500.6930 N/A 2028 Mobile radar/lidar replacement ($4,000-5,000 each)15,000 - - -
Police 3500.6930 N/A 2028 Portable radios ($3,000 each)150,000 - - -
Police 3500.6930 N/A 2028 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2029 Lease Vehicle (5) and Equipment 241,116 - - -
Police 3500.6930 N/A 2029 Mobile data tablets ($5,000 each)20,000 - - -
Police 3500.6930 N/A 2029 Handgun Replacement 55,000 - - -
Police 3500.6930 N/A 2029 Rifle replacement /Replace Sniper Rifle 30,000 - - -
Police 3500.6930 N/A 2029 Tactical vests ($3,600 each)7,200 - - -
Police 3500.6930 N/A 2029 Police Bicycles (3)6,000 - - -
Police 3500.6930 N/A 2030 Estimate based on average 294,260 - - -
243,700$ 174,579$ 217,508$
28
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ 15,000$ -$ -$ -$ -$ -$ -$ -$
- 30,000 - - - - - - -
- 7,200 - - - - - - -
- - 241,116 - - - - - -
- - 20,000 - - - - - -
- - 7,200 - - - - - -
- - - 241,116 - - - - -
- - - 150,000 - - - - -
- - - 15,000 - - - - -
- - - 7,200 - - - - -
- - - 35,000 - - - - -
- - - - 241,116 - - - -
- - - - 5,000 - - - -
- - - - 10,000 - - - -
- - - - 7,200 - - - -
- - - - 6,000 - - - -
- - - - - 241,116 - - -
- - - - - 75,000 - - -
- - - - - 15,000 - - -
- - - - - 15,000 - - -
- - - - - 150,000 - - -
- - - - - 7,200 - - -
- - - - - - 241,116 - -
- - - - - - 20,000 - -
- - - - - - 55,000 - -
- - - - - - 30,000 - -
- - - - - - 7,200 - -
- - - - - - 6,000 - -
- - - - - - - 294,260 -
196,940$ 308,316$ 268,316$ 448,316$ 269,316$ 503,316$ 359,316$ 294,260$ -$
29
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Police Equipment Revolving Fund 235
Schedule of Projected Revenue, Expenditures and Debt
2020 2021 2022
Actual Adopted Proposed
Revenues
Property taxes 154,938$ 158,037$ 161,197$
Additional levy to balance - - -
Interest on investments 110,668 20,000 20,000
Intergovernmental 2,339 - -
Total Revenues 267,945 178,037 181,197
Expenditures
Capital outlay
Public safety 443,534 174,579 217,508
Total Expenditures 443,534 174,579 217,508
Excess (Deficiency) of Revenues
Over (Under) Expenditures (175,589) 3,458 (36,311)
Other Financing Sources
Transfer in - - -
Bond proceeds - - -
Internal Loan to Building Fund - (1,200,000) -
Sale of Fixed Asset 27,030 15,000 15,000
Transfers out - - -
Total Other Financing Sources 27,030 (1,185,000) 15,000
Net Change in Fund Balances (148,559) (1,181,542) (21,311)
Unrestricted Cash Balance - (159,626) (1,343,168)
Assigned Cash Balance 2,915,448 2,938,279 2,940,279
Cash Balance, January 1 2,915,448 2,778,653 1,597,111
Unrestricted Cash Balance (159,626) (1,343,168) (1,366,479)
Assigned Cash Balance 2,938,279 2,940,279 2,942,279
Cash Balances, December 31 2,778,653$ 1,597,111$ 1,575,800$
Capital Project Fund Projected Activity
30
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
164,421$ 167,709$ 171,064$ 174,485$ 177,975$ 181,534$ 185,165$ 188,868$ 192,645$
10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000
15,758 4,140 3,126 5,134 4,147 5,076 9,758 8,965 8,950
- - - - - - - - -
190,179 191,850 204,189 219,619 232,122 246,610 264,923 277,833 291,596
196,940 308,316 268,316 448,316 269,316 503,316 359,316 294,260 -
196,940 308,316 268,316 448,316 269,316 503,316 359,316 294,260 -
(6,761) (116,466) (64,127) (228,697) (37,194) (256,706) (94,393) (16,428) 291,596
- - - - - - - - -
- - - - - - - - -
(1,170,000) - 250,000 115,000 115,000 710,000 - - 210,000
15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000
- - - - - - - - -
(1,155,000) 15,000 265,000 130,000 130,000 725,000 15,000 15,000 225,000
(1,161,761) (101,466) 200,873 (98,697) 92,806 468,294 (79,393) (1,428) 516,596
(1,366,479) (2,529,816) (2,631,696) (2,431,135) (2,530,346) (2,437,954) (1,970,168) (2,050,537) (2,052,861)
2,942,279 2,943,855 2,944,269 2,944,581 2,945,095 2,945,510 2,946,017 2,946,993 2,947,889
1,575,800 414,039 312,573 513,446 414,749 507,555 975,849 896,456 895,028
(2,529,816) (2,631,696) (2,431,135) (2,530,346) (2,437,954) (1,970,168) (2,050,537) (2,052,861) (1,537,161)
2,943,855 2,944,269 2,944,581 2,945,095 2,945,510 2,946,017 2,946,993 2,947,889 2,948,784
414,039$ 312,573$ 513,446$ 414,749$ 507,555$ 975,849$ 896,456$ 895,028$ 1,411,624$
Capital Project Fund Projected Activity
31
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Park Improvements 420
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Recreation 0420.6937 TBA 2020 New Park Name Signage 10,000$ 10,000$ -$ -$
Recreation 0420.6937 TBA 2020 ALL Pavement (Parking @ Trails)25,000 25,000 - -
Recreation 0420.6937 TBA 2020 NP Fair Play Area (1999)125,000 125,000 - -
Recreation 0420.6937 TBA 2020 Hockey Rink - North Lions 100,000 100,000 - -
Recreation 0420.6937 TBA 2021 New Park Name Signage 10,000 - 10,000 -
Recreation 0420.6937 TBA 2021 ALL Pavement (Sidewalks @ Trails)50,000 - 50,000 -
Recreation 0420.6937 TBA 2021 Large Play Area - Valley Place (2001)325,000 - 325,000 -
Recreation 0420.6937 TBA 2021 NP Yunkers (2001)175,000 - 175,000 -
Recreation 0420.6937 TBA 2021 Picnic Shelter - Bass Lake 70,000 - 70,000 -
Recreation 0420.6937 TBA 2021 NP Basketball Court - Yunkers 10,000 - 10,000 -
Recreation 0420.6937 TBA 2021 NP Basketball Court - Bass Lake 10,000 - 10,000 -
Recreation 0420.6937 TBA 2022 New Park Name Signage 10,000 - - 10,000
Recreation 0420.6937 TBA 2022 ALL Pavement (Sidewalks @ Trails)50,000 - - 50,000
Recreation 0420.6937 TBA 2022 CP Dog Park - Bassett Creek 100,000 - - 100,000
Recreation 0420.6937 TBA 2022 Parking Lot at Basset Creek Dog Park 300,000 - - 300,000
Recreation 0420.6937 TBA 2022 Soccer Field - Fair School Park 50,000 - - 50,000
Recreation 0420.6937 TBA 2022 Becker Tennis Court Lights/Surfacing 200,000 - - 200,000
Recreation 0420.6937 TBA 2022 Ped Bridge - Bassett Creek 200,000 - - 200,000
Recreation 0420.6937 TBA 2023 Large Play Area - Welcome (1997)325,000 - - -
Recreation 0420.6937 TBA 2023 New Park Name Signage 10,000 - - -
Recreation 0420.6937 TBA 2023 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2023 NP Basketball Court - Broadway 10,000 - - -
Recreation 0420.6937 TBA 2023 BP Basketball Court - Crystal Highlands 10,000 - - -
Recreation 0420.6937 TBA 2023 Picnic Shelter - Broadway 70,000 - - -
Recreation 0420.6937 TBA 2023 Play Area - Broadway (1999)175,000 - - -
Recreation 0420.6937 TBA 2023 Valley Place Tennis Court Lights/Surfacing 400,000 - - -
Recreation 0420.6937 TBA 2023 Picnic Shelter - Crystal Highlands 70,000 - - -
Recreation 0420.6937 TBA 2023 Parking Lot - Valley Place Park (Near Play Area)390,000 - - -
Recreation 0420.6937 TBA 2024 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2024 New Park Name Signage 10,000 - - -
Recreation 0420.6937 TBA 2024 Disc Gold Course - Bassett Creek Park 150,000 - - -
Recreation 0420.6937 TBA 2025 Community Park Building - Bassett Creek 1,350,000 - - -
Recreation 0420.6937 TBA 2025 Fiber & Technology at Basset Creek Park Building 50,000 - - -
Recreation 0420.6937 TBA 2025 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2025 Play Area - Sunnyview (2000)175,000 - - -
Recreation 0420.6937 TBA 2025 Picnic Shelter - Cavanagh 75,000 - - -
Recreation 0420.6937 TBA 2025 Maintenance Binder - Play Area PIP Surfacing - Becker & Fair 30,000 - - -
Recreation 0420.6937 TBA 2025 Play Area - Cavanaugh (2001)175,000 - - -
Recreation 0420.6937 TBA 2026 Soccer Field - Bassett Creek 530,000 - - -
Recreation 0420.6937 TBA 2026 Parking Lot at Basset Creek Building 525,000 - - -
Recreation 0420.6937 TBA 2026 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2026 Sm. Picnic Shelter - Twin Oak 75,000 - - -
Recreation 0420.6937 TBA 2027 Play Area - Lee (2000)175,000 - - -
Recreation 0420.6937 TBA 2027 Picnic Shelter - Lee 75,000 - - -
Recreation 0420.6937 TBA 2027 Med. Shelter - Valley Place 150,000 - - -
Recreation 0420.6937 TBA 2027 Med. Shelter - North Lions 150,000 - - -
Recreation 0420.6937 TBA 2027 Play Area - Twin Oak (2003)175,000 - - -
Recreation 0420.6937 TBA 2027 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2027 Large Play Area - North Lions (2006)325,000 - - -
Recreation 0420.6937 TBA 2027 Play Area - Iron Horse (2004)175,000 - - -
Recreation 0420.6937 TBA 2028 Park Building - Welcome 1,400,000 - - -
Recreation 0420.6937 TBA 2028 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2028 Med. Shelter - Welcome 160,000 - - -
Recreation 0420.6937 TBA 2028 Fiber & Technology at Welcome Park Building 50,000 - - -
Recreation 0420.6937 TBA 2029 Parking Lot at Welcome Park Building 325,000 - - -
Recreation 0420.6937 TBA 2029 Med. Shelter - Bassett Creek (lake)175,000 - - -
Recreation 0420.6937 TBA 2029 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2029 Play Area - Bass Lake (2004)175,000 - - -
32
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
325,000 - - - - - - - -
10,000 - - - - - - - -
50,000 - - - - - - - -
10,000 - - - - - - - -
10,000 - - - - - - - -
70,000 - - - - - - - -
175,000 - - - - - - - -
400,000 - - - - - - - -
70,000 - - - - - - - -
390,000 - - - - - - - -
- 50,000 - - - - - - -
- 10,000 - - - - - - -
- 150,000 - - - - - - -
- - 1,350,000 - - - - - -
- - 50,000 - - - - - -
- - 50,000 - - - - - -
- - 175,000 - - - - - -
- - 75,000 - - - - - -
- - 30,000 - - - - - -
- - 175,000 - - - - - -
- - - 530,000 - - - - -
- - - 525,000 - - - - -
- - - 50,000 - - - - -
- - - 75,000 - - - - -
- - - - 175,000 - - - -
- - - - 75,000 - - - -
- - - - 150,000 - - - -
- - - - 150,000 - - - -
- - - - 175,000 - - - -
- - - - 50,000 - - - -
- - - - 325,000 - - - -
- - - - 175,000 - - - -
- - - - - 1,400,000 - - -
- - - - - 50,000 - - -
- - - - - 160,000 - - -
- - - - - 50,000 - - -
- - - - - - 325,000 - -
- - - - - - 175,000 - -
- - - - - - 50,000 - -
- - - - - - 175,000 - -
33
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Park Improvements 420
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Budgeted Proposed Proposed
Cost Amounts Amounts Amounts
Recreation 0420.6937 TBA 2030 ALL Pavement (Sidewalks @ Trails)50,000$ -$ -$ -$
Recreation 0420.6937 TBA 2030 Fiber & Technology at North Lions Building 50,000 - - -
Recreation 0420.6937 TBA 2030 Park Building - North Lions 1,450,000 - - -
Recreation 0420.6937 TBA 2030 Replace Play Area PIP Surfacing - Becker 125,000 - - -
Recreation 0420.6937 TBA 2030 Replace Play Area Structure Sun Sails - Becker 12,000 - - -
Recreation 0420.6937 TBA 2030 Replace Patio Sun Sails - Becker 25,000 - - -
Recreation 0420.6937 TBA 2030 Replace Play Area PIP Surfacing - FAIR School 50,000 - - -
Recreation 0420.6937 TBA 2031 CP Soccer Field - North Lions 530,000 - - -
Recreation 0420.6937 TBA 2031 ALL Pavement (Sidewalks @ Trails)50,000 - - -
Recreation 0420.6937 TBA 2031 Med. Shelter - Becker 115,000 - - -
Recreation 0420.6937 TBA 2031 Play Area - Forest (2005)175,000 - - -
Recreation 0420.6937 TBA 2031 Replace Play Area PIP Surfacing - Valley Place & Yunkers 35,000 - - -
Recreation 0420.6937 TBA 2031 Parking Lot at North Lions Park Building 350,000 - - -
Recreation 0420.6937 TBA 2031 Play Area - Crystal Highlands (2007)175,000 - - -
Recreation 0420.6937 TBA 2032 ALL Pavement (Sidewalks @ Trails)60,000 - - -
Recreation 0420.6937 TBA 2032 Play Area - Grogan Park (2008)185,000 - - -
Recreation 0420.6937 TBA 2032 Play Area - Skyway Park (2008)185,000 - - -
Recreation 0420.6937 TBA 2032 Play Area - Kentucky Park (2010)185,000 - - -
Recreation 0420.6937 TBA 2032 Picnic Shelter - Skywalk Park 80,000 - - -
Recreation 0420.6937 TBA 2032 Medium Shelter - Bassett Creek (woods)190,000 - - -
Recreation 0420.6937 TBA 2032 Medium Shelter - North Lions (picnic area)190,000 - - -
Recreation 0420.6937 TBA 2032 Building - Becker 1,650,000 - - -
Recreation 0420.6937 TBA 2033 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2034 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2035 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2036 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2037 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2038 Parks replacements 1,500,000 - - -
Recreation 0420.6937 TBA 2039 Parks replacements 1,500,000 - - -
260,000$ 650,000$ 910,000$
34
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ 50,000$ -$
- - - - - - - 50,000 -
- - - - - - - 1,450,000 -
- - - - - - - 125,000 -
- - - - - - - 12,000 -
- - - - - - - 25,000 -
- - - - - - - 50,000 -
- - - - - - - - 530,000
- - - - - - - - 50,000
- - - - - - - - 115,000
- - - - - - - - 175,000
- - - - - - - - 35,000
- - - - - - - - 350,000
- - - - - - - - 175,000
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
1,510,000$ 210,000$ 1,905,000$ 1,180,000$ 1,275,000$ 1,660,000$ 725,000$ 1,762,000$ 1,430,000$
35
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Park Improvements 420
Schedule of Projected Revenue, Expenditures and Debt
2020 2021 2022
Actual Adopted Proposed
Revenues
Property taxes (1% overall levy increase, annually, 2022-2029)359,138$ 480,511$ 606,999$
Interest on investments 57,118 13,000 13,000
Intergovernmental revenue (HCYSPG grants)200,617 - -
Miscellaneous 14,432 - -
Total Revenues 631,305 493,511 619,999
Expenditures
Capital outlay
Recreation 663,473 650,000 910,000
Total Expenditures 663,473 650,000 910,000
Excess (Deficiency) of Revenues
Over (Under) Expenditures (32,168) (156,489) (290,001)
Other Financing Sources (Uses)
Transfers in
Sale of fixed assets - 24,000 24,000
Transfers out - - -
Total Other Financing Sources - 24,000 24,000
Net Change in Fund Balances (32,168) (132,489) (266,001)
Cash Balances, January 1 1,405,831 1,373,663 1,241,174
Cash Balances, December 31 1,373,663$ 1,241,174$ 975,173$
Capital Project Fund Projected Activity
36
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
741,057$ 882,753$ 1,032,515$ 1,190,758$ 1,357,911$ 1,534,431$ 1,534,431$ 1,534,431$ 1,534,431$
9,752 2,400 9,391 1,000 1,358 2,441 1,449 9,798 7,860
- - - - - - - - -
- - - - - - - - -
750,809 885,152 1,041,907 1,191,758 1,359,269 1,536,871 1,535,880 1,544,229 1,542,291
1,510,000 210,000 1,905,000 1,180,000 1,275,000 1,660,000 725,000 1,762,000 1,430,000
1,510,000 210,000 1,905,000 1,180,000 1,275,000 1,660,000 725,000 1,762,000 1,430,000
(759,191) 675,152 (863,093) 11,758 84,269 (123,129) 810,880 (217,771) 112,291
24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000
- - - - - - - - -
24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000
(735,191) 699,152 (839,093) 35,758 108,269 (99,129) 834,880 (193,771) 136,291
975,173 239,982 939,135 100,041 135,799 244,069 144,940 979,820 786,049
239,982$ 939,135$ 100,041$ 135,799$ 244,069$ 144,940$ 979,820$ 786,049$ 922,340$
Capital Project Fund Projected Activity
37
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Water Fund 505
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Water 0090.6935 TBA 2020 6207 - Upgrade Sensus meter software 30,000$ 30,000$ -$ -$
Water 0090.6935 TBA 2020 Utility Reconstruction 600,000 600,000 - -
Water 0090.6935 TBA 2021 6235 -Gate Valve and Hydrant replacement 75,000 - 75,000 -
Water 0090.6935 TBA 2021 Utility Reconstruction 600,000 - 600,000 -
Water 0090.6935 TBA 2022 Utility Reconstruction 1,100,000 - - 1,100,000
Water 0090.6935 TBA 2022 6235 -Gate valve and hydrant replacements 75,000 - - 75,000
Water 0090.6935 TBA 2023 6235 -Gate Valve and Hydrant replacement 75,000 - - -
Water 0090.6935 TBA 2023 Utility Reconstruction 1,000,000 - - -
Water 0090.6935 TBA 2024 Utility Reconstruction 1,500,000 - - -
Water 0090.6935 TBA 2024 6235 -Gate Valve and Hydrant replacement 75,000 - - -
Water 0090.6935 TBA 2025 Utility Reconstruction 1,500,000 - - -
Water 0090.6935 TBA 2025 6235 -Gate Valve and Hydrant replacement 30,000 - - -
Water 0090.6935 TBA 2026 Utility Reconstruction 1,500,000 - - -
Water 0090.6935 TBA 2026 6235 -Gate Valve and Hydrant replacement 75,000 - - -
Water 0090.6935 TBA 2027 Utility Reconstruction 1,600,000 - - -
Water 0090.6935 TBA 2027 6235 -Gate Valve and Hydrant replacement 30,000 - - -
Water 0090.6935 TBA 2028 Utility Reconstruction 1,750,000 - - -
Water 0090.6935 TBA 2028 6235 -Gate Valve and Hydrant replacement 75,000 - - -
Water 0090.6935 TBA 2029 Utility Reconstruction 1,850,000 - - -
Water 0090.6935 TBA 2029 6235 -Gate Valve and Hydrant replacement 30,000 - - -
Water 0090.6935 TBA 2030 Utility Reconstruction 2,000,000 - - -
Water 0090.6935 TBA 2030 6235 -Gate Valve and Hydrant replacement 75,000 - - -
Water 0090.6935 TBA 2031 Utility Reconstruction 1,300,000 - - -
Water 0090.6935 TBA 2031 Gate Value and Hydrant Replacement 75,000 - - -
Water 0090.6935 TBA 2032 Utility Reconstruction 1,200,000 - - -
Water 0090.6935 TBA 2032 Gate Value and Hydrant Replacement 75,000 - - -
630,000$ 675,000$ 1,175,000$
38
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
75,000 - - - - - - - -
1,000,000 - - - - - - - -
- 1,500,000 - - - - - - -
- 75,000 - - - - - - -
- - 1,500,000 - - - - - -
- - 30,000 - - - - - -
- - - 1,500,000 - - - - -
- - - 75,000 - - - - -
- - - - 1,600,000 - - - -
- - - - 30,000 - - - -
- - - - - 1,750,000 - - -
- - - - - 75,000 - - -
- - - - - - 1,850,000 - -
- - - - - - 30,000 - -
- - - - - - - 2,000,000 -
- - - - - - - 75,000 -
- - - - - - - - 1,300,000
- - - - - - - - 75,000
- - - - - - - - -
- - - - - - - - -
1,075,000$ 1,575,000$ 1,530,000$ 1,575,000$ 1,630,000$ 1,825,000$ 1,880,000$ 2,075,000$ 1,375,000$
39
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Water Fund 505
Statement of Cash Flows
2020 2021 2022
Actual Adopted Proposed
Cash Flows from Operating Activities
Receipts from customers and users (based on utility rate analysis)3,623,424$ 4,769,442$ 5,195,116$
Payments to suppliers (based on utility rate analysis)(2,644,949) (3,046,278) (3,155,313)
Payments to employees (based on utility rate analysis)(405,374) (398,702) (418,631)
Net Cash Provided (Used) by Operating Activities 573,101 1,324,462 1,621,172
Cash Flows from Noncapital Financing Activities
Transfers to other funds (198,427) (200,621) (211,367)
Net Cash Provided (Used) by Noncapital Financing Activities (198,427) (200,621) (211,367)
Cash Flows from Capital and Related Financing Activities
Infrastructure improvements (547,321) (675,000) (1,175,000)
Contribution to internal service funds (123,887) (127,928)
Intergovernmental (Joint Water Commission)- .-
Interest expense (6,000) (7,200) (7,200)
Advance to/(from) building fund
Advances to/(from) other funds (60,000) (60,000) (60,000)
Net Cash Provided (Used) by Capital and Related Financing Activities (613,321) (866,087) (1,370,128)
Cash Flows from Investing Activities
Investment earnings 65,998 15,000 15,000
Net Increase (Decrease) in Cash and Cash Equivalents (172,649) 272,754 54,677
Cash and Cash Equivalents, January 1 1,710,206 1,537,557 1,810,311
Cash and Cash Equivalents, December 31 1,537,557$ 1,810,311$ 1,864,988$
New projected rates
Average quarterly bill (9,000 gallons)77.62$ 86.16$ 93.91$
Average quarterly dollar increase 8.93$ 8.54$ 7.75$
Average annual dollar increase 35.72$ 34.15$ 31.02$
Enterprise Fund Projected Activity
40
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
5,369,944$ 5,653,634$ 5,838,893$ 6,030,178$ 6,227,686$ 6,539,070$ 6,866,024$ 7,209,325$ 7,569,791$
(3,232,494) (3,329,468) (3,429,352) (3,532,233) (3,638,200) (3,747,346) (3,859,766) (3,975,559) (4,094,826)
(482,400) (506,520) (531,846) (558,438) (586,360) (615,678) (646,462) (678,785) (712,724)
1,655,050 1,817,646 1,877,695 1,939,507 2,003,126 2,176,046 2,359,796 2,554,981 2,762,241
(231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778)
(231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778)
(1,075,000) (1,575,000) (1,530,000) (1,575,000) (1,630,000) (1,825,000) (1,880,000) (2,075,000) (1,375,000)
(180,433) (178,981) (179,860) (177,399) (162,211) (146,088) (138,835) (135,017) (135,017)
- - - - - - - - -
(3,029) (3,029) (3,029) (3,029) (3,029) (3,029) (3,029) (3,029) (3,029)
(1,500,000) - - 250,000 250,000 150,000 100,000 - 750,000
(60,000) (60,000) - - - - - - -
(2,818,462) (1,817,010) (1,712,889) (1,505,428) (1,545,240) (1,824,117) (1,921,864) (2,213,046) (763,046)
18,650 4,884 2,622 1,978 4,021 6,322 7,587 9,725 10,923
(1,376,540) (226,257) (64,350) 204,280 230,129 126,474 213,741 119,881 1,778,340
1,864,988 488,448 262,191 197,841 402,120 632,250 758,724 972,465 1,092,346
488,448$ 262,191$ 197,841$ 402,120$ 632,250$ 758,724$ 972,465$ 1,092,346$ 2,870,686$
100.49$ 105.51$ 108.68$ 111.94$ 115.29$ 118.75$ 122.31$ 125.98$ 125.98$
6.57$ 5.02$ 3.17$ 3.26$ 3.36$ 2.74$ 2.74$ 2.74$ 2.74$
26.30$ 20.10$ 12.66$ 13.04$ 13.43$ 10.94$ 10.94$ 10.94$ 10.94$
Enterprise Fund Projected Activity
41
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Sanitary Sewer Fund 510
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Sewer 0092.6935 TBA 2020 Install Pad mount Generator at West Lift Station 85,000$ 85,000$ -$ -$
Sewer 0092.6935 TBA 2020 Utility Reconstruction 1,200,000 1,200,000 - -
Sewer 0092.6935 TBA 2021 Utility Reconstruction 400,000 - 400,000 -
Sewer 0092.6935 TBA 2021 Sanitary sewer lining (non-recon area)150,000 - 150,000 -
Sewer 0092.6935 TBA 2021 Fiber to lift stations 100,000 - 100,000 -
Sewer 0092.6935 TBA 2022 Equipment Replacement - South Lift Building/Generator and Pump #2 350,000 - - 350,000
Sewer 0092.6935 TBA 2022 Utility Reconstruction 250,000 - - 250,000
Sewer 0092.6935 TBA 2023 Utility Reconstruction 800,000 - - -
Sewer 0092.6935 TBA 2023 Sanitary Sewer Lining (outside of Recon)100,000 - - -
Sewer 0092.6935 TBA 2024 Utility Reconstruction 800,000 - - -
Sewer 0092.6935 TBA 2024 Perry Lift Station Panel Replacement 70,000 - - -
Sewer 0092.6935 TBA 2025 Utility Reconstruction 800,000 - - -
Sewer 0092.6935 TBA 2025 Sanitary Sewer Lining (outside of Recon)100,000 - - -
Sewer 0092.6935 TBA 2025 East Lift Generator Replacement 150,000 - - -
Sewer 0092.6935 TBA 2026 Utility Reconstruction 850,000 - - -
Sewer 0092.6935 TBA 2027 Utility Reconstruction 950,000 - - -
Sewer 0092.6935 TBA 2027 Sanitary Sewer Lining (outside of Recon)100,000 - - -
Sewer 0092.6935 TBA 2028 Utility Reconstruction 1,250,000 - - -
Sewer 0092.6935 TBA 2029 Utility Reconstruction 950,000 - - -
Sewer 0092.6935 TBA 2029 Add Generator at Maryland lift 150,000 - - -
Sewer 0092.6935 TBA 2029 Sanitary Sewer Lining (outside of Recon)100,000 - - -
Sewer 0092.6935 TBA 2030 Utility Reconstruction 1,300,000 - - -
Sewer 0092.6935 TBA 2031 Sanitary Sewer Lining (outside of Recon)100,000 - - -
Sewer 0092.6935 TBA 2031 Utility Reconstruction 1,300,000 - - -
Sewer 0092.6935 TBA 2032 Utility Reconstruction 1,200,000 - - -
1,285,000$ 650,000$ 600,000$
42
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
800,000 - - - - - - - -
100,000 - - - - - - - -
- 800,000 - - - - - - -
- 70,000 - - - - - - -
- - 800,000 - - - - - -
- - 100,000 - - - - - -
- - 150,000 - - - - - -
- - - 850,000 - - - - -
- - - - 950,000 - - - -
- - - - 100,000 - - - -
- - - - - 1,250,000 - - -
- - - - - - 950,000 - -
- - - - - - 150,000 - -
- - - - - - 100,000 - -
- - - - - - - 1,300,000 -
- - - - - - - - 100,000
- - - - - - - - 1,300,000
- - - - - - - - -
900,000$ 870,000$ 1,050,000$ 850,000$ 1,050,000$ 1,250,000$ 1,200,000$ 1,300,000$ 1,400,000$
43
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Sanitary Sewer Fund 510
Statement of Cash Flows
2020 2021 2022
Actual Adopted Proposed
Cash Flows from Operating Activities
Receipts from customers and users 2,671,477$ 3,350,725$ 3,251,948$
Payments to suppliers (based on utility rate analysis)(1,817,136) (2,018,520) (1,917,853)
Payments to employees (based on utility rate analysis)(386,049) (398,702) (457,649)
Net Cash Provided (Used) by Operating Activities 468,292 933,503 876,446
Cash Flows from Noncapital Financing Activities
Transfers to other funds (198,427) (200,621) (211,367)
Net Cash Provided (Used) by Noncapital Financing Activities (198,427) (200,621) (211,367)
Cash Flows from Capital and Related Financing Activities
Acquisition of capital assets (1,112,989) (650,000) (600,000)
Contribution to internal service funds (156,964) (163,797)
Advances to/(from) other funds 30,000 30,000 30,000
Grants and contributions - - -
Net Cash Provided (Used) by Capital and Related Financing Activities (1,082,989) (776,964) (733,797)
Cash Flows from Investing Activities
Investment earnings 70,567 18,000 18,000
Net Increase (Decrease) in Cash and Cash Equivalents (742,557) (26,082) (50,718)
Cash and Cash Equivalents, January 1 1,902,999 1,160,442 1,134,360
Cash and Cash Equivalents, December 31 1,160,442$ 1,134,360$ 1,083,642$
Projected rates
Average quarterly bill (9,000 gallons)53.01$ 58.31$ 62.97$
Average quarterly dollar increase 5.68$ 5.30$ 4.66$
Average annual dollar increase 22.74$ 21.20$ 18.64$
Enterprise Fund Projected Activity
44
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
3,537,548$ 3,643,674$ 3,752,985$ 3,865,574$ 3,981,541$ 4,180,618$ 4,389,649$ 4,609,131$ 4,839,588$
(1,975,389) (2,034,651) (2,095,690) (2,158,561) (2,223,318) (2,334,484) (2,451,208) (2,573,768) (2,702,457)
(480,531) (504,558) (529,786) (556,275) (584,089) (613,293) (643,958) (676,156) (709,964)
1,081,628 1,104,465 1,127,509 1,150,738 1,174,134 1,232,841 1,294,483 1,359,207 1,427,167
(231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778)
(231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778) (231,778)
(900,000) (870,000) (1,050,000) (850,000) (1,050,000) (1,250,000) (1,200,000) (1,300,000) (1,400,000)
(244,918) (243,255) (235,216) (195,302) (175,114) (153,981) (141,366) (137,548) (137,548)
30,000 30,000 - - - - - - -
- - - - - - - - -
(1,114,918) (1,083,255) (1,285,216) (1,045,302) (1,225,114) (1,403,981) (1,341,366) (1,437,548) (1,537,548)
14,680 14,680 14,680 14,680 14,680 14,680 14,680 14,680 14,680
(250,388) (195,888) (374,805) (111,662) (268,078) (388,238) (263,981) (295,439) (327,479)
1,083,642 833,254 637,366 262,562 150,900 (117,178) (505,416) (769,397) (1,064,836)
833,254$ 637,366$ 262,562$ 150,900$ (117,178)$ (505,416)$ (769,397)$ (1,064,836)$ (1,392,314)$
66.75$ 69.42$ 71.50$ 73.65$ 75.86$ 78.14$ 80.48$ 82.89$ 82.89$
3.78$ 2.67$ 2.08$ 2.15$ 2.21$ 2.28$ 2.34$ 2.41$ 2.41$
15.12$ 10.68$ 8.32$ 8.60$ 8.84$ 9.10$ 9.38$ 9.66$ 9.66$
Enterprise Fund Projected Activity
45
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Storm Drainage Fund 515
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Storm water 0094.6935 TBA 2020 Central Core storm water model and flood analysis 125,000$ 125,000$ -$ -$
Storm water 0094.6935 TBA 2020 Rate Control, water quality, structure Rehab projects 50,000 50,000 - -
Storm water 0094.6935 TBA 2020 W. Broadway and Kentucky Infiltration (2)450,000 450,000 - .
Storm water 0094.6935 TBA 2020 Utility Reconstruction 50,000 50,000 - -
Storm water 0094.6935 TBA 2021 6804 - Gaulke Pond design, dredging, lift station rehab 2,000,000 - 2,000,000 -
Storm water 0094.6935 TBA 2021 Rate Control, water quality, structure Rehab projects 450,000 - 450,000 -
Storm water 0094.6935 TBA 2021 Utility Reconstruction 50,000 - 50,000 -
Storm water 0094.6935 TBA 2022 Utility Reconstruction 50,000 - - 50,000
Storm water 0094.6936 TBA 2022 SCWMC 639W Wetland Project (reimbursed by watershed)200,000 - - 200,000
Storm water 0094.6935 TBA 2022 Rate Control, water quality, structure Rehab projects 75,000 - - 75,000
Storm water 0094.6935 TBA 2023 Rate Control, water quality, structure Rehab projects 50,000 - - -
Storm water 0094.6935 TBA 2023 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2023 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2024 Rate Control, water quality, structure Rehab projects 150,000 - - -
Storm water 0094.6935 TBA 2024 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2024 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2025 Rate Control, water quality, structure Rehab projects 100,000 - - -
Storm water 0094.6935 TBA 2025 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2025 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2026 Bassett Creek Park Streambank Stabilization and 29th culvert replacement (3)1,000,000 - - -
Storm water 0094.6935 TBA 2026 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2026 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2026 Rate Control, water quality, structure Rehab projects 150,000 - - -
Storm water 0094.6935 TBA 2027 Pond dredging - TBD 750,000 - - -
Storm water 0094.6935 TBA 2027 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2027 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2028 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2028 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2028 Rate Control, water quality, structure Rehab projects 150,000 - - -
Storm water 0094.6935 TBA 2029 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2029 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2029 Bass Lake Road storm water pipe 2,000,000 - - -
Storm water 0094.6935 TBA 2030 Storm Pipe Rehabilitation 420,000 - - -
Storm water 0094.6935 TBA 2030 Utility Reconstruction 50,000 - - -
Storm water 0094.6935 TBA 2030 Rate Control, water quality, structure Rehab projects 150,000 - - -
Storm water 0094.6935 TBA 2031 Yunkers Park storage project 1,500,000 - - -
Storm water 0094.6935 TBA 2031 Rate Control, water quality, structure Rehab projects 250,000 - - -
Storm water 0094.6935 TBA 2031 Saving for flood control structure replacement 200,000 - - -
Storm water 0094.6935 TBA 2031 Utility Reconstruction 50,000 - - -
675,000$ 2,500,000$ 325,000$
46
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
50,000 - - - - - - - - -
200,000 - - - - - - - - -
50,000 - - - - - - - - -
- 150,000 - - - - - - - -
- 200,000 - - - - - - - -
- 50,000 - - - - - - - -
- - 100,000 - - - - - - -
- - 200,000 - - - - - - -
- - 50,000 - - - - - - -
- - - 1,000,000 - - - - - -
- - - 200,000 - - - - - -
- - - 50,000 - - - - - -
- - - 150,000 - - - - - -
- - - - 750,000 - - - - -
- - - - 200,000 - - - - -
- - - - 50,000 - - - - -
- - - - - 200,000 - - - -
- - - - - 50,000 - - - -
- - - - - 150,000 - - - -
- - - - - - 200,000 - - -
- - - - - - 50,000 - - -
- - - - - - 2,000,000 - - -
- - - - - - - 420,000 - -
- - - - - - - 50,000 - -
- - - - - - - 150,000 - -
- - - - - - - - 1,500,000 -
- - - - - - - - 250,000 -
- - - - - - - - 200,000 -
- - - - - - - - 50,000 -
-
300,000$ 400,000$ 350,000$ 1,400,000$ 1,000,000$ 400,000$ 2,250,000$ 620,000$ 2,000,000$ -$
47
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Storm Drainage Fund 515
Statement of Cash Flows
2020 2021 2022
Actual Adopted Proposed
Cash Flows from Operating Activities
Receipts from customers and users 2,395,664$ 1,267,764$ 1,331,152$
Payments to suppliers and employees (5% growth assumption)(375,173) (420,512) (467,595)
Net Cash Provided (Used) by Operating Activities 2,020,491 847,252 863,557
Cash Flows from Noncapital Financing Activities
Transfers out (53,395) (53,985) (56,876)
Net Cash Provided (Used) by Noncapital Financing Activities (53,395) (53,985) (56,876)
Cash Flows from Capital and Related Financing Activities
Acquisition of capital assets (811,677) (2,500,000) (325,000)
Contribution to internal service funds (82,331) (71,292)
Advance (to) and repayment from building fund (200,000)
Intergovernmental revenue (Watershed, Met Council, MNDNR and other)53,500 - 200,000
Net Cash Provided (Used) by Capital and Related Financing Activities (758,177) (2,582,331) (396,292)
Cash Flows from Investing Activities
Investment earnings 82,948 6,000 6,000
Net Increase (Decrease) in Cash and Cash Equivalents 1,291,867 (1,783,064) 416,389
Cash and Cash Equivalents, January 1 857,720 2,149,587 366,523
Cash and Cash Equivalents, December 31 2,149,587$ 366,523$ 782,912$
Projected rates
Quarterly bill 20.15$ 21.15$ 22.15$
Annual dollar increase 1.00$ 1.00$ 1.00$
Percent increase 5%5%
Enterprise Fund Projected Activity
48
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
1,391,249$ 1,451,346$ 1,511,443$ 1,541,492$ 1,571,541$ 1,601,589$ 1,631,638$ 1,661,686$ 1,691,735$ 1,721,784$
(490,975) (515,523) (541,300) (568,365) (596,783) (626,622) (657,953) (690,851) (725,393) (761,663)
900,274 935,823 970,144 973,127 974,758 974,967 973,685 970,836 966,342 960,121
(59,720) (62,706) (65,841) (69,133) (72,590) (76,219) (80,030) (84,032) (88,233) (92,645)
(59,720) (62,706) (65,841) (69,133) (72,590) (76,219) (80,030) (84,032) (88,233) (92,645)
(300,000) (400,000) (350,000) (1,400,000) (1,000,000) (400,000) (2,250,000) (620,000) (2,000,000) -
(153,405) (152,557) (150,651) (149,514) (139,516) (97,720) (96,741) (97,433) (97,433)
(1,000,000) - 150,000 - 170,000 170,000 170,000 - 340,000 200,000
- - - 500,000 - - - - -
(1,453,405) (552,557) (350,651) (1,049,514) (969,516) (327,720) (2,176,741) (717,433) (1,757,433) 200,000
7,829 1,779 5,002 10,589 9,240 8,658 14,455 1,769 3,480 (5,278)
(605,021) 322,339 558,654 (134,931) (58,109) 579,686 (1,268,631) 171,140 (875,844) 1,062,197
782,912 177,891 500,230 1,058,884 923,953 865,844 1,445,531 176,899 348,039 (527,805)
177,891$ 500,230$ 1,058,884$ 923,953$ 865,844$ 1,445,531$ 176,899$ 348,039$ (527,805)$ 534,392$
23.15$ 24.15$ 25.15$ 25.65$ 26.15$ 26.65$ 27.15$ 27.65$ 28.15$ 28.65$
1.00$ 1.00$ 1.00$ 0.50$ 0.50$ 0.50$ 0.50$ 0.50$ 0.50$ 0.50$
5%4%4%2%2%2%2%2%2%2%
Enterprise Fund Projected Activity
49
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Street Light Fund 520
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Street light 0096.6915 TBA 2020 HPS to LED conversion 25,000$ 25,000$ -$ -$
Street light 0096.6915 TBA 2021 HPS to LED conversion 25,000 - 25,000 -
Street light 0096.6915 TBA 2022 HPS to LED conversion 25,000 - - 25,000
Street light 0096.6915 TBA 2023 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2023 Underground utility poles (42nd)1,000,000 - - -
Street light 0096.6915 TBA 2024 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2025 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2026 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2027 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2028 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2029 HPS to LED conversion 25,000 - - -
Street light 0096.6915 TBA 2030 HPS to LED conversion 25,000 - - -
25,000$ 25,000$ 25,000$
50
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
25,000 - - - - - - - -
1,000,000 - - - - - - - -
- 25,000 - - - - - - -
- - 25,000 - - - - - -
- - - 25,000 - - - - -
- - - - 25,000 - - - -
- - - - - 25,000 - - -
- - - - - - 25,000 - -
- - - - - - - 25,000 -
1,025,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ -$
51
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Street Light Fund 520
Statement of Cash Flows
Enterprise Fund Projected Activity
2020 2021 2022
Actual Proposed Proposed
Cash Flows from Operating Activities
Receipts from customers and users (2% growth assumption)192,080$ 194,200$ 194,200$
Payments to suppliers and employees (5% growth assumption)(163,942) (151,590) (151,764)
Net Cash Provided (Used) by Operating Activities 28,138 42,610 42,436
Cash Flows from Noncapital Financing Activities
Transfers out (15,084) (15,251) (16,098)
Net Cash Provided (Used) by Noncapital Financing Activities (15,084) (15,251) (16,098)
Cash Flows from Capital and Related Financing Activities
Acquisition of capital assets (1,030) (25,000) (25,000)
Intergovernmental revenue - - -
Advances to/(from) other funds 30,000 30,000 30,000
Net Cash Provided (Used) by Capital and Related Financing Activities 28,970 5,000 5,000
Cash Flows from Investing Activities
Investment earnings 30,168 6,500 6,500
Net Increase (Decrease) in Cash and Cash Equivalents 72,192 38,859 37,838
Cash and Cash Equivalents, January 1 704,025 776,217 815,076
Cash and Cash Equivalents, December 31 776,217$ 815,076$ 852,914$
52
6.3
Enterprise Fund Projected Activity
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
198,084$ 202,046$ 206,087$ 210,208$ 214,412$ 218,701$ 223,075$ 227,536$ 232,087$
(159,352) (167,320) (175,686) (184,470) (193,694) (203,378) (213,547) (224,225) (235,436)
38,732 34,726 30,401 25,738 20,719 15,322 9,528 3,312 (3,349)
(16,903) (17,748) (18,635) (19,567) (20,546) (21,573) (22,652) (23,784) (24,973)
(16,903) (17,748) (18,635) (19,567) (20,546) (21,573) (22,652) (23,784) (24,973)
(1,025,000) (25,000) (25,000) (25,000) (25,000) (25,000) (25,000) (25,000) -
500,000 - - - - - - - -
30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
(495,000) 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
8,529 3,883 4,141 4,350 4,506 4,602 4,636 4,601 4,492
(464,642) 25,861 20,907 15,521 9,679 3,352 (3,488) (10,871) 6,170
852,914 388,272 414,133 435,039 450,561 460,240 463,592 460,104 449,232
388,272$ 414,133$ 435,039$ 450,561$ 460,240$ 463,592$ 460,104$ 449,232$ 455,402$
53
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Fleet Fund 615
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Public Works 0615.6930 TBA 2020 Replace $=#153 Land Pride 72' Over Seeder 30,000$ 30,000$ -$ -$
Public Works 0615.6930 TBA 2020 Replace #341 - 2005 CAT 3 ton roller 60,000 60,000 - -
Public Works 0615.6930 TBA 2020 Replace #123 - 11' Large Area Mower (replacement)68,000 68,000 - -
Public Works 0615.6930 TBA 2020 Replace #339 Tack trailer 90,000 90,000 - -
Public Works 0615.6930 TBA 2020 Replace #327 - 2008 message board 20,000 20,000 - -
Public Works 0615.6930 TBA 2020 Replace # 125 Pickup 75,000 75,000 - -
Public Works 0615.6930 TBA 2020 6237- water utility Replace #434 - 1996 Air Compressor 60,000 60,000 - -
Public Works 0615.6930 TBA 2021 Replace #311 - 2007 Freightliner SA 260,000 - 260,000 -
Public Works 0615.6930 TBA 2021 Replace Aerator and seeder 35,000 - 35,000 -
Public Works 0615.6930 TBA 2021 Utility Water Main Break trailer 35,000 - 35,000 -
Public Works 0615.6930 TBA 2021 Replace #116 John Deere utility tractor w/ implement 55,000 - 55,000 -
Public Works 0615.6930 TBA 2021 Replace #326 Asphalt roller trailer 15,000 - 15,000 -
Public Works 0615.6930 TBA 2021 Replace homemade utility trailer (replace Z turn trailer)15,000 - 15,000 -
Public Works 0615.6930 TBA 2021 Replace #301 - 2011 Dodge Ram 75,000 - 75,000 -
Public Works 0615.6930 TBA 2021 Replace #439 20 Kw portable generator with light tower (replace existing 37kW)45,000 - 45,000 -
Public Works 0615.6930 TBA 2022 Replace #109 - 2003 Int'l 7400 Tandem drup truck (rehabbed in 2019)190,000 - - 190,000
Public Works 0615.6930 TBA 2022 Replace #303-1 - MTV Trackless MT-6 160,000 - - 160,000
Public Works 0615.6930 TBA 2022 Replace #144 - Kubota Zero-Turn Tractor w/Catcher 15,000 - - 15,000
Public Works 0615.6930 TBA 2022 Replace #158 (replace Z turn trailer)15,000 - - 15,000
Public Works 0615.6930 TBA 2022 Replace #309 - 2010 Freightliner TA 270,000 - - 270,000
Public Works 0615.6930 TBA 2022 Replace #307 - 2012 Ram 2500 (new is swap loader)75,000 - - 75,000
Public Works 0615.6930 TBA 2023 Replace #337 - 2013 Mauldin asphalt paver 195,000 - - -
Public Works 0615.6930 TBA 2023 Replace #364 - SPH-1.3 pre-mix heater hot box/patching 45,000 - - -
Public Works 0615.6930 TBA 2023 Replace #310 - 2010 Chevy 3500 75,000 - - -
Public Works 0615.6930 TBA 2023 Replace #314 - 2012 International SA 265,000 - - -
Public Works 0615.6930 TBA 2023 Replace #431 - Sterling Acterra w/jetter 275,000 - - -
Public Works 0615.6930 TBA 2023 Replace #110 - Chevy K3500 Silverado and 9' plow w/Tommy gate 54,520 - - -
Public Works 0615.6930 TBA 2024 Replace #108 Cushman Gas Truckster 4 Wheel (Replace with ToolCAT)75,000 - - -
Public Works 0615.6930 TBA 2024 Replace #178 Graco Fieldlazer @100 striper 10,000 - - -
Comm Dev 0615.6930 TBA 2024 Replace #56 - 2014 Ford Focus 21,587 - - -
Public Works 0615.6930 TBA 2024 Replace #351 - Rayco brush chipper 52,804 - - -
Public Works 0615.6930 TBA 2024 Replace #420 Tractor backhoe 250,000 - - -
Public Works 0615.6930 TBA 2024 Replace #428 - GMC Sierra 3500HD 1 ton dump truck 75,000 - - -
Public Works 0615.6930 TBA 2024 Replace #451 - SRECO easement machine (no title)44,590 - - -
Public Works 0615.6930 TBA 2024 Replace #457 - Broot utility trailer 11,000 - - -
Public Works 0615.6930 TBA 2025 Replace #102 Ford F350 Pickup 75,000 - - -
Public Works 0615.6930 TBA 2025 Aerator 35,000 - - -
Public Works 0615.6930 TBA 2025 Replace Engineering #42 40,000 - - -
Public Works 0615.6930 TBA 2025 Replace #340 - Tenco TCS-172A-LMM Snow Blower 181,732 - - -
Public Works 0615.6930 TBA 2025 Replace #390 - Veritec salt brine system/generator 96,924 - - -
Public Works 0615.6930 TBA 2025 Replace 3-yd grapple bucket for use w/front end loaders 30,289 - - -
Public Works 0615.6930 TBA 2025 Replace #106 - Ford F350 Pickup w/Henderson Dump body 90,000 - - -
Public Works 0615.6930 TBA 2025 Replace #401 - Chevy Silverado 2500 (white)46,674 - - -
Public Works 0615.6930 TBA 2026 Replace #453 Power Prime 6" trash pump 65,000 - - -
Public Works 0615.6930 TBA 2026 Replace #115 - GMC 1 ton; Sierra 3500 (gray)50,037 - - -
Public Works 0615.6930 TBA 2026 Replace #433-1 - John Deere 190D excavator 306,476 - - -
Public Works 0615.6930 TBA 2026 Replace #433-2 - 30" V-bottom frost bucket (for #433)6,255 - - -
Public Works 0615.6930 TBA 2026 Replace #433-3 - Empire excavator grapple (for #433)10,007 - - -
Public Works 0615.6930 TBA 2026 Replace #433-4 - Allied hydraulic hammer (for #433)50,037 - - -
Public Works 0615.6930 TBA 2027 Replace #111 - Chevy Silverado K2500 Pickup (blue)Utility box 77,495 - - -
Public Works 0615.6930 TBA 2027 Replace #316 - Chevrolet 1 ton Silverado 3500 4X4 (white)41,330 - - -
Public Works 0615.6930 TBA 2027 Replace #342 - TowMaster T-10DT Trailer 9,041 - - -
Public Works 0615.6930 TBA 2027 Replace #450-1 - Caterpillar 930K wheel loader (no title)245,400 - - -
Public Works 0615.6930 TBA 2027 Replace #462 - Elgin Pelican NP Sweeper 290,605 - - -
Public Works 0615.6930 TBA 2028 Replace #455 - MacLander trailer 6,668 - - -
Public Works 0615.6930 TBA 2028 Replace #306 - GMC Sierra 1500 Ext Cab 1/2 Ton (blue)42,674 - - -
Public Works 0615.6930 TBA 2028 Replace #332 - Wacker WP1550AW plate tamper 6,668 - - -
Public Works 0615.6930 TBA 2028 Replace #334 - Bobcat Skid loader Model A770 IT4 126,688 - - -
Public Works 0615.6930 TBA 2028 Replace #430 - Sreco sewer rodder 93,349 - - -
Public Works 0615.6930 TBA 2028 Replace #450-2 - 12 ft Plow & ACS Adapter (for #450)16,003 - - -
Public Works 0615.6930 TBA 2029 Replace #118 - Bear Cat truckloader leaf blower & vacuum w/trailer 34,422 - - -
Public Works 0615.6930 TBA 2029 Replace #312 - Int'l 7400 4x2 truck w/dump box, plow & sander 385,530 - - -
Comm Dev 0615.6930 TBA 2029 Replace car #27 - 2007 Chevy Malibu 21,587 - - -
Comm Dev 0615.6930 TBA 2029 Replace car #57 - 2006 Chevy Malibu 21,587 - - -
Department
54
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
195,000 - - - - - - - -
45,000 - - - - - - - -
75,000 - - - - - - - -
265,000 - - - - - - - -
275,000 - - - - - - - -
54,520 - - - - - - - -
- 75,000 - - - - - - -
- 10,000 - - - - - - -
- 21,587 - - - - - - -
- 52,804 - - - - - - -
- 250,000 - - - - - - -
- 75,000 - - - - - - -
- 44,590 - - - - - - -
- 11,000 - - - - - - -
- - 75,000 - - - - - -
- - 35,000 - - - - - -
- - 40,000 - - - - - -
- - 181,732 - - - - - -
- - 96,924 - - - - - -
- - 30,289 - - - - - -
- - 90,000 - - - - - -
- - 46,674 - - - - - -
- - - 65,000 - - - - -
- - - 50,037 - - - - -
- - - 306,476 - - - - -
- - - 6,255 - - - - -
- - - 10,007 - - - - -
- - - 50,037 - - - - -
- - - - 77,495 - - - -
- - - - 41,330 - - - -
- - - - 9,041 - - - -
- - - - 245,400 - - - -
- - - - 290,605 - - - -
- - - - - 6,668 - - -
- - - - - 42,674 - - -
- - - - - 6,668 - - -
- - - - - 126,688 - - -
- - - - - 93,349 - - -
- - - - - 16,003 - - -
- - - - - - 34,422 - -
- - - - - - 385,530 - -
- - - - - - 21,587 - -
- - - - - - 21,587 - -
55
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Fleet Fund 615
Schedule of Planned Capital Outlay 2018 to 2030 (Continued)
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Public Works 0615.6930 TBA 2030 Replace #101 - GMC Sierra 3500 4wd (white) w/V-Plow 54,022$ -$ -$ -$
Public Works 0615.6930 TBA 2030 Replace #113 - Chevy Silverado 3500 4X4 w/Crysteel dump body & hoist 65,396 - - -
Public Works 0615.6930 TBA 2030 Replace #145 - Toro Workman MDX w/ballfield groomer 25,590 - - -
Public Works 0615.6930 TBA 2030 Replace #305 - Dodge Ram 5500 4X4 Bucket Truck w/Dura-Lift (white)284,329 - - -
Public Works 0615.6930 TBA 2030 Replace #347 - TowMaster 10,000 LB trailer (Skidsteer, 3 TN Roller)14,216 - - -
Public Works 0615.6930 TBA 2030 Replace #350 - Tennant MS20GLP Floor Sweeper 78,190 - - -
Public Works 0615.6930 TBA 2030 Replace #352 - Coats Wheel Balancer 14,216 - - -
Public Works 0615.6930 TBA 2030 Replace #353 - Coats Tire Changer 21,325 - - -
Public Works 0615.6930 TBA 2030 Replace #363 - Toyota 5000-lb forklift w/sideshifting positioner 71,082 - - -
Public Works 0615.6930 TBA 2030 Replace #449 Chevy Silverado K2500 (white)40,000 - - -
Public Works 0615.6930 TBA 2030 Replace #459 Aries CCTV Pathfinder Command Ctr and trailer (no title)150,000 - - -
Public Works 0615.6930 TBA 2031 Replace #336 Cimline crack/joint sealer, Magma 150 75,000 - - -
Public Works 0615.6930 TBA 2031 Replace #447 Freightliner 114SD w/plow,wing,sander,controls 280,000 - - -
Public Works 0615.6930 TBA 2031 Replace #436 Landa portable hot water jetter w/trailer 8,000 - - -
Public Works 0615.6930 TBA 2031 Replace #103 GMC Sierra 2500 4WD (white)32,000 - - -
Public Works 0615.6930 TBA 2031 Replace #117 Case 321FHS Wheel Loader 125,000 - - -
Public Works 0615.6930 TBA 2031 Replace #120 J.D. Gator 5710M w/Ballfield Drag & Sun Cab 19,000 - - -
Public Works 0615.6930 TBA 2031 Replace #127 Toro Grounds Master 5910 (cab, leaft kit, road lights)125,000 - - -
Public Works 0615.6930 TBA 2031 Replace #152 Felling FT-10IT-E00260 Trailer 20,000 - - -
Public Works 0615.6930 TBA 2031 Replace #159 Felling FT-10 IT-E Trailer 20,000 - - -
Public Works 0615.6930 TBA 2031 Replace #346 TowMaster T-20T Trailer 8,000 - - -
Public Works 0615.6930 TBA 2031 Replace #365 Cimline asphalt crack router, PCR30 20,000 - - -
Public Works 0615.6930 TBA 2031 Replace #429 GMC Sierra 3500 C/CH 4WD 85,000 - - -
403,000$ 535,000$ 725,000$
Department
56
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ 54,022$ -$
- - - - - - - 65,396 -
- - - - - - - 25,590 -
- - - - - - - 284,329 -
- - - - - - - 14,216 -
- - - - - - - 78,190 -
- - - - - - - 14,216 -
- - - - - - - 21,325 -
- - - - - - - 71,082 -
- - - - - - - 40,000 -
- - - - - - - 150,000 -
- - - - - - - - 75,000
- - - - - - - - 280,000
- - - - - - - - 8,000
- - - - - - - - 32,000
- - - - - - - - 125,000
- - - - - - - - 19,000
- - - - - - - - 125,000
- - - - - - - - 20,000
- - - - - - - - 20,000
- - - - - - - - 8,000
- - - - - - - - 20,000
- - - - - - - - 85,000
909,520$ 539,980$ 595,619$ 487,812$ 663,871$ 292,048$ 463,127$ 818,366$ 817,000$
57
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Fleet Fund 615
Statement of Cash Flows
2020 2021 2022
Actual Adopted Proposed
Cash Flows from Operating Activities
Receipts from interfund services provided -$ 336,537$ 341,585$
Receipts from property taxes (1% increase, annually, beginning in 2020)- - -
Payments to suppliers and employees (2.5% growth annually)(7,156) (3,599) (3,628)
Net Cash Provided (Used) by Operating Activities (7,156) 332,939 337,957
Cash Flows from Noncapital Financing Activities
Transfers in/(out)- - -
Net Cash Provided (Used) by Noncapital Financing Activities - - -
Cash Flows from Capital and Related Financing Activities
Acquisition of capital assets (563,243) (535,000) (725,000)
Proceeds from sale of assets 89,293 46,640 46,640
Internal loan to Building Fund - - -
Net Cash Used by Capital and Related Financing Activities (473,950) (488,360) (678,360)
Cash Flows from Investing Activities
Investment earnings 88,158 20,000 20,000
Net Increase (Decrease) in Cash and Cash Equivalents (392,948) (135,422) (320,403)
Cash and Cash Equivalents, January 1 2,850,257 2,457,309 2,321,888
Cash and Cash Equivalents, December 31 2,457,309$ 2,321,888$ 2,001,485$
Internal Service Fund Projected Activity
58
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
365,496$ 391,081$ 418,456$ 447,748$ 479,091$ 512,627$ 548,511$ 586,907$ 627,990$
- - - - - - - - -
(3,737) (3,849) (3,964) (4,083) (4,206) (4,332) (4,462) (4,596) (4,734)
361,759 387,232 414,492 443,665 474,885 508,295 544,049 582,311 623,256
- - - - - - - - -
- - - - - - - - -
(909,520) (539,980) (595,619) (487,812) (663,871) (292,048) (463,127) (818,366) (817,000)
46,640 46,640 46,640 46,640 46,640 46,640 46,640 46,640 46,640
(1,000,000) - - - - - - - 1,000,000
(1,862,880) (493,340) (548,979) (441,172) (617,231) (245,408) (416,487) (771,726) 229,640
20,015 5,204 4,195 2,892 2,946 1,552 4,196 5,514 3,675
(1,481,106) (100,905) (130,292) 5,385 (139,400) 264,438 131,758 (183,902) 856,571
2,001,485 520,379 419,474 289,182 294,567 155,166 419,604 551,363 367,461
520,379$ 419,474$ 289,182$ 294,567$ 155,166$ 419,604$ 551,363$ 367,461$ 1,224,032$
Internal Service Fund Projected Activity
59
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Building Fund 408/625
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Actual Budgeted Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Fire Department 2021 Install exterior ladder to roof at South Fire 20,000$ -$ 20,000$ -$
Police 0625.6940 TBA 2021 Public Safety Facility 1,250,000 - 1,250,000 -
Police 0625.6940 TBA 2021 Public Safety Facility 4,000,000 - 4,000,000 -
Fire Department 0625.6940 TBA 2021 Replace roof at south fire station 150,000 - 150,000 -
Community Center 0625.6940 TBA 2021 Replace roll-up fire doors in kitchen(4)35,000 - 35,000 -
Community Center 0625.6940 TBA 2021 Parking Lot Improvements 819,000 - 819,000 -
Aquatic Building 0625.6940 TBA 2021 Install eyewash station 10,000 - 10,000 -
Community Center 0625.6940 TBA 2021 Security camera upgrade 40,000 - 40,000 -
Fire Department 0625.6940 TBA 2021 Irrigate campus (does not work currently) North Fire Station 25,000 - 25,000 -
North Lions Park 0625.6941 TBA 2021 Replace exterior lighting 15,000 - 15,000 -
North Lions Park 0625.6942 TBA 2021 Replace exterior lighting controls 5,000 - 5,000 -
Pool 0625.6940 TBA 2021 New water feature 25,000 - 25,000 -
Pool 0625.6940 TBA 2021 Fully replace umbrella (2)45,000 - 45,000 -
Community Center 0625.6941 TBA 2021 Tuckpointing 55,000 - 55,000 -
Community Center 0625.6941 TBA 2021 Install/replace Basketball scoreboard 35,000 - 35,000 -
Valley Place Park 0625.6941 TBA 2021 Replace Roofing and Fascia 50,000 - 50,000 -
Valley Place Park 0625.6942 TBA 2021 Replace Interior Lighting 15,000 - 15,000 -
Valley Place Park 0625.6943 TBA 2021 Replace Exterior Doors 25,000 - 25,000 -
Pool 0625.6940 TBA 2021 Replace smaller pump (main water slide)40,000 - 40,000 -
Welcome Park 0625.6941 TBA 2021 Replace Interior Lighting 10,000 - 10,000 -
Valley Place Park 0625.6940 TBA 2021 Paint interior 15,000 - 15,000 -
Welcome Park 0625.6940 TBA 2021 Replace water heater 10,000 - 10,000 -
Valley Place Park 0625.6940 TBA 2021 ADA drinking fountain upgrades 15,000 - 15,000 -
Valley Place Park 0625.6940 TBA 2021 ADA park shelter restroom upgrades 10,000 - 10,000 -
Welcome Park 0625.6940 TBA 2021 ADA restroom upgrades 10,000 - 10,000 -
City Buildings 0625.6940 TBA 2022 City Hall - office cubes and desks 200,000 - - 200,000
Police 0625.6940 TBA 2022 Public Safety Facility 8,000,000 - - 8,000,000
City Buildings 0625.6940 TBA 2022 Parking lot replacement 250,000 - - 250,000
City Buildings 0625.6940 TBA 2022 Investigate drainage in boiler room 10,000 - - 10,000
City Buildings 0625.6940 TBA 2022 Make cell phone boost system typical install 50,000 - - 50,000
City Buildings 0625.6940 TBA 2022 Replace alarms and sensors 50,000 - - 50,000
City Buildings 0625.6940 TBA 2022 Replace control panel 18,000 - - 18,000
City Buildings 0625.6940 TBA 2022 Upgrade system to code 10,000 - - 10,000
City Buildings 0625.6940 TBA 2022 Replace VFD on air handlers 10,000 - - 10,000
Old Utilities Bldg 0625.6940 TBA 2022 Replace garage door obstruction sensors 5,000 - - 5,000
Public Works 0625.6940 TBA 2022 Re-seal garage doors - PW 12,000 - - 12,000
Community Center 0625.6940 TBA 2022 Refinish Crystal Room Floors 50,000 - - 50,000
Community Center 0625.6940 TBA 2022 Replace South Parking lot 1,000,000 - - 1,000,000
Community Center 0625.6940 TBA 2022 Replace gym windows 125,000 - - 125,000
Community Center 0625.6940 TBA 2022 Parking lot lighting 35,000 - - 35,000
Community Center 0625.6940 TBA 2022 Replace windows 220,000 - - 220,000
Bassett Creek Park 0625.6940 TBA 2022 Replace Parking lot 385,000 - - 385,000
North Lions Park 0625.6940 TBA 2022 Replace furnace/thermostat and chimney 15,000 - - 15,000
Public Works 0625.6940 TBA 2022 Interior touch up paint 20,000 - - 20,000
City Buildings 0625.6940 TBA 2022 Replace carpeting 100,000 - - 100,000
Community Center 0625.6940 TBA 2022 Replace Air Handler 45,000 - - 45,000
Police 0625.6941 TBA 2023 Public Safety Facility 4,000,000 - - -
Community Center 0625.6940 TBA 2023 Replace flooring- Valley room 10,000 - - -
Pool 0625.6940 TBA 2023 Replace pool structure 2,600,000 - - -
Community Center 0625.6940 TBA 2023 Replace dishwasher and on demand heater 30,000 - - -
Valley Place Park 0625.6940 TBA 2023 Replace parking lot (West)250,000 - - -
Aquatic building 0625.6940 TBA 2023 Replace fasade and replace building louvers 250,000 - - -
Aquatic building 0625.6940 TBA 2023 Front Desk Security Improvement and siding repair 200,000 - - -
Aquatic building 0625.6940 TBA 2023 Replace staff lockers 15,000 - - -
Welcome Park 0625.6941 TBA 2023 Replace Building Fascia and Soflits 25,000 - - -
Welcome Park 0625.6942 TBA 2023 Replace Building Doors 20,000 - - -
Welcome Park 0625.6943 TBA 2023 Replace Building Sidewalk Entry 10,000 - - -
City Buildings 0625.6940 TBA 2023 Evaluate city hall system for space heater use 60,000 - - -
City Buildings 0625.6940 TBA 2023 Parking lot lighting upgrade 14,000 - - -
City Buildings 0625.6940 TBA 2023 Replace cabinets in copy room 10,000 - - -
City Buildings 0625.6940 TBA 2023 Replace cabinets in Council Chambers 15,000 - - -
City Buildings 0625.6940 TBA 2023 City Hall fire extinguisher mounts/cabinets 15,000 - - -
City Buildings 0625.6940 TBA 2023 Install boiler for heater at PW 35,000 - - -
City Buildings 0625.6940 TBA 2023 Fob access all doors - City Hall 25,000 - - -
City Buildings 0625.6940 TBA 2023 Replace/improve to upstairs IT room 15,000 - - -
Salt Building 0625.6940 TBA 2023 Paint exterior building, light panel replacement 10,000 - - -
Community Center 0625.6940 TBA 2023 ADA and security update Front desk 50,000 - - -
Community Center 0625.6940 TBA 2023 HVAC/mechanical updates 100,000 - - -
Community Center 0625.6940 TBA 2023 Tile floor update/repair 5,000 - - -
Pool 0625.6940 TBA 2023 Replaster Zero depth pool and replace play feature - from leak report 290,000 - - -
Pool 0625.6940 TBA 2023 Replace water walk pads 15,000 - - -
Public Works 0625.6940 TBA 2023 Install boiler for heater 35,000 - - -
City Buildings 0625.6940 TBA 2023 HVAC cleaning 35,000 - - -
Pool 0625.6940 TBA 2023 Gel coat water slides and drop slide 95,000 - - -
60
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
4,000,000 - - - - - - - -
10,000 - - - - - - - -
2,600,000 - - - - - - - -
30,000 - - - - - - - -
250,000 - - - - - - - -
250,000 - - - - - - - -
200,000 - - - - - - - -
15,000 - - - - - - - -
25,000 - - - - - - - -
20,000 - - - - - - - -
10,000 - - - - - - - -
60,000 - - - - - - - -
14,000 - - - - - - - -
10,000 - - - - - - - -
15,000 - - - - - - - -
15,000 - - - - - - - -
35,000 - - - - - - - -
25,000 - - - - - - - -
15,000 - - - - - - - -
10,000 - - - - - - - -
50,000 - - - - - - - -
100,000 - - - - - - - -
5,000 - - - - - - - -
290,000 - - - - - - - -
15,000 - - - - - - - -
35,000 - - - - - - - -
35,000 - - - - - - - -
95,000 - - - - - - - -
61
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Building Fund 408/625
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Business Unit Year to Actual Budgeted Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Community Center 0625.6940 TBA 2024 Replace floor scrubber 15,000$ -$ -$ -$
Aquatic building 0625.6940 TBA 2024 Install fiberglass doors in chemical areas (3)25,000 - - -
City Buildings 0625.6940 TBA 2024 Lighting upgrade to LED at City Hall, including chambers 40,000 - - -
City Buildings 0625.6940 TBA 2024 Replace can lighting in entire building 60,000 - - -
City Buildings 0625.6940 TBA 2024 Replace popcorn ceiling in Council Chambers 30,000 - - -
City Buildings 0625.6940 TBA 2024 Replace/improve to downstairs IT room (AC unit)15,000 - - -
Community Center 0625.6940 TBA 2024 Replace Refrigerator/refrigerator 12,000 - - -
Community Center 0625.6940 TBA 2024 Building Automation updates 100,000 - - -
North Fire Station 0625.6940 TBA 2024 Replace generator 25,000 - - -
North Fire Station 0625.6940 TBA 2024 Upgrade emergency/exit lighting 5,000 - - -
Pool 0625.6940 TBA 2024 Replace waterwalk pads (5 floats)20,000 - - -
City Buildings 0625.6940 TBA 2024 Replace NO/CO sensors 5,000 - - -
South Fire Station 0625.6940 TBA 2024 Replace generator 15,000 - - -
City Buildings 0625.6940 TBA 2024 Replace NO/CO sensors 5,000 - - -
South Fire Station 0625.6940 TBA 2024 Replace Parking lot (concrete pad)60,000 - - -
North Lions Park 0625.6940 TBA 2024 Replace West Parking lot asphalt 290,000 - - -
City Buildings 0625.6940 TBA 2025 Replace water heater 25,000 - - -
Aquatic Building 0625.6940 TBA 2025 Replace bathroom fixtures 25,000 - - -
Aquatic Building 0625.6940 TBA 2025 Replace hand dryers 10,000 - - -
Aquatic Building 0625.6940 TBA 2025 Replace security lighting 10,000 - - -
Aquatic Building 0625.6940 TBA 2025 Replace staff office furniture 25,000 - - -
Aquatic Building 0625.6940 TBA 2025 Upgrade emergency/exit lighting 5,000 - - -
Bassett Creek Park 0625.6940 TBA 2025 ADA park building drinking fountain upgrades 15,000 - - -
Bassett Creek Park 0625.6940 TBA 2025 ADA park shelter restroom upgrades 25,000 - - -
Bassett Creek Park 0625.6940 TBA 2025 Electrical upgrades 25,000 - - -
Bassett Creek Park 0625.6940 TBA 2025 Paint exterior building 18,000 - - -
Bassett Creek Park 0625.6940 TBA 2025 Replace water heater 10,000 - - -
City Buildings 0625.6940 TBA 2025 Elevator rehab 100,000 - - -
City Buildings 0625.6940 TBA 2025 Replace Air Handler 150,000 - - -
City Buildings 0625.6940 TBA 2025 Replace toilets and urinals 35,000 - - -
Community Center 0625.6940 TBA 2025 Re-key building 100,000 - - -
Community Center 0625.6940 TBA 2025 Bring CCC restrooms up to ADA code 50,000 - - -
Old Utilities bldg 0625.6940 TBA 2025 Replace heating system and thermostat 51,000 - - -
Pool 0625.6940 TBA 2025 Concrete repairs 50,000 - - -
Pool 0625.6940 TBA 2025 Reline drop slides 75,000 - - -
Pool 0625.6940 TBA 2025 Replace flooring on zero depth 75,000 - - -
Public Works 0625.6940 TBA 2025 Fob access all doors 35,000 - - -
Fire Department 0625.6941 TBA 2025 Replace exterior doors- south Fire Station 50,000 - - -
Pool 0625.6940 TBA 2026 Replace cargo net 10,000 - - -
Aquatic building 0625.6940 TBA 2026 Paint interior 19,000 - - -
Aquatic building 0625.6940 TBA 2026 Replace heaters- building 45,000 - - -
Aquatic building 0625.6940 TBA 2026 Replace sound system 20,000 - - -
City Buildings 0625.6940 TBA 2026 Paint interior 60,000 - - -
City Buildings 0625.6940 TBA 2026 Upgrade Generator 250,000 - - -
Community Center 0625.6940 TBA 2026 Replace Carpet 30,000 - - -
Community Center 0625.6940 TBA 2026 Window film- heat reducing all building 30,000 - - -
City Buildings 0625.6940 TBA 2026 Replace restroom fixtures 10,000 - - -
City Buildings 0625.6940 TBA 2026 Replacing upstairs ceiling 25,000 - - -
Valley Place Park 0625.6940 TBA 2026 Replace furnace / thermostat 11,000 - - -
Becker Park 0625.6940 TBA 2026 Replace Parking lot 300,000 - - -
Community Center 0625.6940 TBA 2027 Divider Wall- gyms 40,000 - - -
Community Center 0625.6940 TBA 2027 Replace Volleyball Standards/ref stands 15,000 - - -
Pool 0625.6940 TBA 2028 Replace sun sail shade cover 19,000 - - -
Valley Place Park 0625.6940 TBA 2028 Replace water heater 10,000 - - -
Aquatic building 0625.6940 TBA 2028 Tuck pointing 25,000 - - -
City Buildings 0625.6940 TBA 2028 Building wide public address system 75,000 - - -
City Buildings 0625.6940 TBA 2028 Replace/relocate motion sensors for lights 10,000 - - -
City Buildings 0625.6940 TBA 2028 Upgrade life safety systems 100,000 - - -
Community Center 0625.6940 TBA 2028 Replace ovens 18,000 - - -
Community Center 0625.6940 TBA 2028 Bring kitchen up to current code at CCC 150,000 - - -
Pool 0625.6940 TBA 2028 Paint drop slide and water slide super structure 65,000 - - -
Pool 0625.6940 TBA 2028 Replace drain covers 25,000 - - -
Fire Department 0625.6940 TBA 2028 Replace exterior windows 200,000 - - -
Fire Department 0625.6940 TBA 2028 Replace roof at North Fire Station 100,000 - - -
62
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ 15,000$ -$ -$ -$ -$ -$ -$ -$
- 25,000 - - - - - - -
- 40,000 - - - - - - -
- 60,000 - - - - - - -
- 30,000 - - - - - - -
- 15,000 - - - - - - -
- 12,000 - - - - - - -
- 100,000 - - - - - - -
- 25,000 - - - - - - -
- 5,000 - - - - - - -
- 20,000 - - - - - - -
- 5,000 - - - - - - -
- 15,000 - - - - - - -
- 5,000 - - - - - - -
- 60,000 - - - - - - -
- 290,000 - - - - - - -
- - 25,000 - - - - - -
- - 25,000 - - - - - -
- - 10,000 - - - - - -
- - 10,000 - - - - - -
- - 25,000 - - - - - -
- - 5,000 - - - - - -
- - 15,000 - - - - - -
- - 25,000 - - - - - -
- - 25,000 - - - - - -
- - 18,000 - - - - - -
- - 10,000 - - - - - -
- - 100,000 - - - - - -
- - 150,000 - - - - - -
- - 35,000 - - - - - -
- - 100,000 - - - - - -
- - 50,000 - - - - - -
- - 51,000 - - - - - -
- - 50,000 - - - - - -
- - 75,000 - - - - - -
- - 75,000 - - - - - -
- - 35,000 - - - - - -
- - 50,000 - - - - - -
- - - 10,000 - - - - -
- - - 19,000 - - - - -
- - - 45,000 - - - - -
- - - 20,000 - - - - -
- - - 60,000 - - - - -
- - - 250,000 - - - - -
- - - 30,000 - - - - -
- - - 30,000 - - - - -
- - - 10,000 - - - - -
- - - 25,000 - - - - -
- - - 11,000 - - - - -
- - - 300,000 - - - - -
- - - - 40,000 - - - -
- - - - 15,000 - - - -
- - - - - 19,000 - - -
- - - - - 10,000 - - -
- - - - - 25,000 - - -
- - - - - 75,000 - - -
- - - - - 10,000 - - -
- - - - - 100,000 - - -
- - - - - 18,000 - - -
- - - - - 150,000 - - -
- - - - - 65,000 - - -
- - - - - 25,000 - - -
- - - - - 200,000 - - -
- - - - - 100,000 - - -
63
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Building Fund 408/625
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Business Unit Year to Actual Budgeted Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Community Center 0625.6940 TBA 2029 Update Minnesota room 75,000$ -$ -$ -$
City Buildings 0625.6940 TBA 2029 Re-key building 50,000 - - -
City Buildings 0625.6940 TBA 2029 Replace all window treatments 100,000 - - -
Fire Department 0625.6940 TBA 2029 Improve upstairs ventilation 40,000 - - -
Public Works 0625.6940 TBA 2029 Re-key building 25,000 - - -
Fire Department 0625.6940 TBA 2029 Replace exterior doors 50,000 - - -
Public Works 0625.6940 TBA 2029 Paint exterior building 25,000 - - -
Public Works 0625.6940 TBA 2029 Re-key building 50,000 - - -
Public Works 0625.6940 TBA 2029 Replace skylights 50,000 - - -
City Buildings 0625.6940 TBA 2029 Replace asphalt with concrete in bins 50,000 - - -
City Buildings 0625.6940 TBA 2029 Replace parking lot asphalt 50,000
Public Works 0625.6940 TBA 2029 Service door replacement 3,000 - - -
City Buildings 0625.6940 TBA 2029 Fob access all doors 25,000 - - -
Valley Place Park 0625.6940 TBA 2029 Re-key building 5,000 - - -
Valley Place Park 0625.6940 TBA 2029 Fob access all doors 25,000 - - -
Valley Place Park 0625.6940 TBA 2029 Replace exterior lighting controls 5,000 - - -
Valley Place Park 0625.6940 TBA 2029 Replace exterior windows 50,000 - - -
Welcome Park 0625.6940 TBA 2029 Re-key building 5,000 - - -
Welcome Park 0625.6940 TBA 2029 Fob access all doors 25,000 - - -
Pool 0625.6941 TBA 2029 Replace Diving Board 12,000 - - -
Pool 0625.6941 TBA 2029 Replace Diving Board stand 10,000
Pool 0625.6941 TBA 2029 Paint raised walkway/ dropslide structure 25,000 - - -
North Lions Park 0625.6940 TBA 2029 Fob access all doors 25,000 - - -
North Lions Park 0625.6940 TBA 2029 Paint exterior building 20,000 - - -
North Lions Park 0625.6940 TBA 2029 Re-key building 5,000 - - -
North Lions Park 0625.6940 TBA 2029 Tuck pointing 40,000 - - -
City Buildings 0625.6940 TBA 2030 Replace exterior windows 450,000 - - -
Aquatic building 0625.6940 TBA 2030 Fob access all doors 25,000 - - -
City Buildings 0625.6940 TBA 2030 Install building security system 50,000 - - -
City Buildings 0625.6940 TBA 2030 Paint exterior building 100,000 - - -
City Buildings 0625.6940 TBA 2030 Replace finance safe with building-integrated safe 10,000 - - -
City Buildings 0625.6940 TBA 2030 Re-roof entire building 250,000 - - -
Community Center 0625.6940 TBA 2030 Upgrade building safety systems 75,000 - - -
Community Center 0625.6940 TBA 2030 Paint interior- meeting rooms 30,000 - - -
Community Center 0625.6940 TBA 2030 Replace roof 225,000 - - -
Community Center 0625.6940 TBA 2030 Tuckpointing 50,000 - - -
Community Center 0625.6940 TBA 2030 Fob access all doors 25,000 - - -
Community Center 0625.6940 TBA 2030 Replace bathroom fixtures 50,000 - - -
Fire Department 0625.6940 TBA 2030 ADA restroom upgrades 25,000 - - -
City Buildings 0625.6940 TBA 2030 Paint interior 30,000 - - -
North Lions Park 0625.6940 TBA 2030 Replace exterior windows 75,000 - - -
Pool 0625.6940 TBA 2030 Replace lounge chairs 15,000 - - -
Pool 0625.6940 TBA 2030 Replace water play feature 50,000 - - -
Pool 0625.6940 TBA 2030 Replace main pumps (2)50,000 - - -
Pool 0625.6940 TBA 2030 Replace landscaping 50,000 - - -
Public Works 0625.6940 TBA 2030 Exterior touch up paint 35,000 - - -
Public Works 0625.6940 TBA 2030 Exterior touch up paint 25,000 - - -
Fire Department 0625.6940 TBA 2030 Do something in downstairs training area 50,000 - - -
Fire Department 0625.6940 TBA 2030 Exterior repair 125,000 - - -
Fire Department 0625.6940 TBA 2030 Upgrade life safety systems 100,000 - - -
Fire Department 0625.6940 TBA 2031 Install eyewash station at North Fire station 10,000 - - -
Fire Department 0625.6940 TBA 2031 Install railing on roof by access door at North Fire 15,000 - - -
Fire Department 0625.6940 TBA 2031 Replace entry door heater (in wall)15,000 - - -
Public Works 0625.6940 TBA 2031 Replace pressure washer 20,000 - - -
526,500$ 6,729,000$ 10,610,000$
64
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ 75,000$ -$ -$
- - - - - - 50,000 - -
- - - - - - 100,000 - -
- - - - - - 40,000 - -
- - - - - - 25,000 - -
- - - - - - 50,000 - -
- - - - - - 25,000 - -
- - - - - - 50,000 - -
- - - - - - 50,000 - -
- - - - - - 50,000 - -
- - - - - - 3,000 - -
- - - - - - 25,000 - -
- - - - - - 5,000 - -
- - - - - - 25,000 - -
- - - - - - 5,000 - -
- - - - - - 50,000 - -
- - - - - - 5,000 - -
- - - - - - 25,000 - -
- - - - - - 12,000 - -
- - - - - - 25,000 - -
- - - - - - 25,000 - -
- - - - - - 20,000 - -
- - - - - - 5,000 - -
- - - - - - 40,000 - -
- - - - - - - 450,000 -
- - - - - - - 25,000 -
- - - - - - - 50,000 -
- - - - - - - 100,000 -
- - - - - - - 10,000 -
- - - - - - - 250,000 -
- - - - - - - 75,000 -
- - - - - - - 30,000 -
- - - - - - - 225,000 -
- - - - - - - 50,000 -
- - - - - - - 25,000 -
- - - - - - - 50,000 -
- - - - - - - 25,000 -
- - - - - - - 30,000 -
- - - - - - - 75,000 -
- - - - - - - 15,000 -
- - - - - - - 50,000 -
- - - - - - - 50,000 -
- - - - - - - 50,000 -
- - - - - - - 35,000 -
- - - - - - - 25,000 -
- - - - - - - 50,000 -
- - - - - - - 125,000 -
- - - - - - - 100,000 -
- - - - - - - - 10,000
- - - - - - - - 15,000
- - - - - - - - 15,000
- - - - - - - - 20,000
8,234,000$ 722,000$ 964,000$ 810,000$ 55,000$ 797,000$ 785,000$ 1,970,000$ 60,000$
65
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Building Fund 408/625
Schedule of Projected Revenue, Expenditures and Debt
2020 2021 2022
Actual Budgeted Proposed
Revenues
Property taxes (4% increase annually in 2021 - 2026, 0% increase thereafter)1,072,295$ -$ -$
Internal charges (1% increase in 2022 - 2023, 0% increase thereafter)1,323,092 1,467,403
Interest on investments 155,733 30,000 10,000
Intergovernmental revenue 556,756 4,323,888 323,888
Miscellaneous 13,998 - -
Total Revenues 1,798,782 5,676,980 1,801,291
Expenditures
Capital outlay
City Buildings 1,287,263 - 698,000
Community Center - 984,000 1,475,000
Aquatic Building - 10,000 -
Public Safety - - -
Public Works - - 32,000
Salt Building - - -
Pool - 110,000 -
Fire Department - 195,000 -
Police - 5,250,000 8,000,000
Parks & Recreation - - -
Bassett Creek Park - - 385,000
Becker Park - - -
North Fire Station - - -
South Fire Station - - -
North Lions Park - 20,000 15,000
Valley Place Park - 130,000 -
Bass Lake - - -
Old utilities bldg - - 5,000
Welcome Park - 30,000 -
Total Expenditures 1,287,263 6,729,000 10,610,000
Excess (Deficiency) of Revenues
Over (Under) Expenditures 511,519 (1,052,020) (8,808,709)
Other Financing Sources
Internal Loan from Street Fund - - 5,000,000
Internal Loan from Police Revolving Fund - 1,200,000 -
Internal Loan from Storm Water - - 200,000
Internal Loan from IT - - 500,000
Internal Loan from Water
Internal Loan from Fleet
Transfers in - - -
Total Other Financing Sources - 1,200,000 5,700,000
Net Change in Fund Balances 511,519 147,980 (3,108,709)
Cash Balances, January 1 4,223,721 4,735,240 4,883,220
Cash Balances, December 31 4,735,240$ 4,883,220$ 1,774,511$
Internal Service Fund Projected Activity
66
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
-$ -$ -$ -$ -$ -$ -$ -$ -$
1,482,077 1,496,898 1,511,867 1,526,985 1,542,255 1,557,678 1,573,255 1,588,987 1,604,877
17,745 1,842 10,848 7,675 8,510 7,357 1,976 2,417 (930)
323,888 323,888 323,888 323,888 323,888 323,888 323,888 323,888 323,888
- - - - - - - - -
1,823,710 1,822,628 1,846,603 1,858,548 1,874,653 1,888,922 1,899,118 1,915,292 1,927,835
224,000 155,000 310,000 345,000 - 185,000 225,000 890,000 -
195,000 127,000 150,000 60,000 55,000 168,000 75,000 455,000 -
465,000 25,000 75,000 84,000 - 25,000 - 25,000 -
- - - - - - - - -
35,000 - 35,000 - - - 153,000 60,000 20,000
10,000 - - - - - - - -
3,000,000 20,000 200,000 10,000 - 109,000 37,000 165,000 -
- - 50,000 - - 300,000 90,000 300,000 40,000
4,000,000 - - - - - - - -
- - - - - - - - -
- - 93,000 - - - - - -
- - - 300,000 - - - - -
- 30,000 - - - - - - -
- 75,000 - - - - - - -
- 290,000 - - - - 90,000 75,000 -
250,000 - - 11,000 - 10,000 85,000 - -
- - - - - - - - -
- - 51,000 - - - - - -
55,000 - - - - - 30,000 - -
8,234,000 722,000 964,000 810,000 55,000 797,000 785,000 1,970,000 60,000
(6,410,290) 1,100,628 882,603 1,048,548 1,819,653 1,091,922 1,114,118 (54,708) 1,867,835
- (200,000) (700,000) (500,000) (1,300,000) (500,000) (600,000) (230,000) (250,000)
1,170,000 - (250,000) (115,000) (115,000) (710,000) - - (210,000)
1,000,000 - (150,000) - (170,000) (170,000) (170,000) - (340,000)
150,000 - (100,000) (100,000) (100,000) (100,000) (200,000) (50,000) -
1,500,000 - - (250,000) (250,000) (150,000) (100,000) - (750,000)
1,000,000
- - - - - - - - -
4,820,000 (200,000) (1,200,000) (965,000) (1,935,000) (1,630,000) (1,070,000) (280,000) (1,550,000)
(1,590,290) 900,628 (317,397) 83,548 (115,347) (538,078) 44,118 (334,708) 317,835
1,774,511 184,221 1,084,849 767,452 851,000 735,654 197,576 241,694 (93,013)
184,221$ 1,084,849$ 767,452$ 851,000$ 735,654$ 197,576$ 241,694$ (93,013)$ 224,822$
Internal Service Fund Projected Activity
67
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Information Technology Fund 620
Schedule of Planned Capital Outlay 2020 to 2031
2020 2021 2022
Business Unit Year to Budgeted Proposed Proposed
Department Object Code Subledger Replace Item Cost Amounts Amounts Amounts
Information Technology 0620.6940 TBA 2020 Robbinsdale SD - Potential Replacement 18,833$ 18,833$ -$ -$
Information Technology 0620.6940 TBA 2020 Computer Hardware & Software 57,500 57,500 - -
Information Technology 0620.6940 TBA 2020 Catalyst 3650 Fiber Switch 3,782 3,782 - -
Information Technology 0620.6940 TBA 2020 City Hall Switch 2 - 48 Port POE 9,133 9,133 - -
Information Technology 0620.6940 TBA 2020 City Hall Switch 3 - 48 port POE 9,133 9,133 - -
Information Technology 0620.6940 TBA 2020 City Hall Switch 4 - 48 Port POE 8,081 8,081 - -
Information Technology 0620.6940 TBA 2020 WiFi AP - PD Investigations 845 845 - -
Information Technology 0620.6940 TBA 2020 Multi-Function Printer - Copy Room 9,000 9,000 - -
Information Technology 0620.6940 TBA 2020 Multi-Function Printer - Finance 7,500 7,500 - -
Information Technology 0620.6940 TBA 2020 Networked Department Printers 800 800 - -
Information Technology 0620.6940 TBA 2020 Public Works Switch - 48 Port POE 9,133 9,133 - -
Information Technology 0620.6940 TBA 2020 PW Switch - 24 Port POE (Pumphouse)3,682 3,682 - -
Information Technology 0620.6940 TBA 2020 WiFi AP - PW Office 845 845 - -
Information Technology 0620.6940 TBA 2020 WiFi AP - PW Garage East 845 845 - -
Information Technology 0620.6940 TBA 2020 WiFi AP - PW Garage West 845 845 - -
Information Technology 0620.6940 TBA 2020 Networked Department Printers 800 800 - -
Information Technology 0620.6940 TBA 2020 Networked Department Printers 800 800 - -
Information Technology 0620.6940 TBA 2020 Door Readers - Public Works (7)10,000 10,000 - -
Information Technology 0620.6940 TBA 2020 Access Control Maintenance & Updates 6,000 6,000 - -
Information Technology 0620.6940 TBA 2020 Council Chamber Door Security 6,500 6,500 - -
Information Technology 0620.6940 TBA 2020 Audio Update - A/B Room 15,000 15,000 - -
Information Technology 0620.6940 TBA 2021 Robbinsdale SD - Potential Replacement 18,833 - 18,833 -
Information Technology 0620.6940 TBA 2021 Computer Hardware & Software 60,000 - 60,000 -
Information Technology 0620.6940 TBA 2021 WiFi AP - Emergency Ops Center 732 - 732 -
Information Technology 0620.6940 TBA 2021 Network Firewall ASA 5,365 - 5,365 -
Information Technology 0620.6940 TBA 2021 WiFi AP - Conference A 732 - 732 -
Information Technology 0620.6940 TBA 2021 WiFi AP - Cable Room 732 - 732 -
Information Technology 0620.6940 TBA 2021 WiFi AP - Server Room 732 - 732 -
Information Technology 0620.6940 TBA 2021 Multi-Function Printer - Police 12,000 - 12,000 -
Information Technology 0620.6940 TBA 2021 Networked Department Printers 800 - 800 -
Information Technology 0620.6940 TBA 2021 CCC Switch - 48 Port POE 6,937 - 6,937 -
Information Technology 0620.6940 TBA 2021 WiFi AP - CCC AB Room 732 - 732 -
Information Technology 0620.6940 TBA 2021 WiFi AP - CCC Activity Room 732 - 732 -
Information Technology 0620.6940 TBA 2021 Multi-Function Printer - CCC 15,000 - 15,000 -
Information Technology 0620.6940 TBA 2021 PW DVR Server 7,500 - 7,500 -
Information Technology 0620.6940 TBA 2021 Building Security Upgrade/Repair/Replace 17,500 - 17,500 -
Information Technology 0620.6940 TBA 2021 Building Access Control Upgrade/Repair/Rplc 25,000 - 25,000 -
Information Technology 0620.6940 TBA 2021 REC - Conf Room Camera 2,000 - 2,000 -
Information Technology 0620.6940 TBA 2021 REC - Mobile WebTrac 2,750 - 2,750 -
Information Technology 0620.6940 TBA 2021 Utility/Lift Station Fiber 100,000 - 100,000 -
Information Technology 0620.6940 TBA 2021 Canon Laserfiche Scanner 6,500 - 6,500 -
Information Technology 0620.6940 TBA 2022 Networked Department Printers 800 - - 800
Information Technology 0620.6940 TBA 2022 Multi-Function Printer - Public Works 7,500 - - 7,500
Information Technology 0620.6940 TBA 2022 Large Format Plotter/Scanner 10,000 - - 10,000
Information Technology 0620.6940 TBA 2022 Building Security Upgrade/Repair/Replace 25,000 - - 25,000
Information Technology 0620.6940 TBA 2022 Building Access Control Upgrade/Repair/Rplc 25,000 - - 25,000
Information Technology 0620.6940 TBA 2022 Robbinsdale SD - Potential Replacement 18,833 - - 18,833
Information Technology 0620.6940 TBA 2022 Computer Hardware & Software 62,500 - - 62,500
Information Technology 0620.6940 TBA 2022 City Hall Switch - 24 Port | LOGIS 4,703 - - 4,703
Information Technology 0620.6940 TBA 2022 WiFi AP's - Crystal Cove (New)6,000 - - 6,000
Information Technology 0620.6940 TBA 2022 FIN - Tungsten to Laserfiche 3,000 - - 3,000
Information Technology 0620.6940 TBA 2022 Utility/Lift Station Fiber 100,000 - - 100,000
Information Technology 0620.6940 TBA 2023 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2023 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2023 Computer Hardware & Software 65,000 - - -
Information Technology 0620.6940 TBA 2023 Multi-Function Printer - ComDev 7,500 - - -
Information Technology 0620.6940 TBA 2023 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2023 Network Firewall ASA 5,252 - - -
Information Technology 0620.6940 TBA 2023 Public Works Switch - 24 Port | LOGIS 4,703 - - -
Information Technology 0620.6940 TBA 2023 Police Cellebrite Hardware 3,000 - - -
Information Technology 0620.6940 TBA 2023 Building Security Upgrade/Repair/Replace 25,000 - - -
Information Technology 0620.6940 TBA 2023 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2024 Becker Park 24P POE Switch 3,715 - - -
Information Technology 0620.6940 TBA 2024 Becker Park Outdoor AP & Antennas 1,770 - - -
Information Technology 0620.6940 TBA 2024 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2024 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2024 Computer Hardware & Software 55,000 - - -
Information Technology 0620.6940 TBA 2024 City Hall Switch 1 - 48 Port POE 9,605 - - -
Information Technology 0620.6940 TBA 2024 City Hall Switch 5 - 48 Port POE 11,128 - - -
Information Technology 0620.6940 TBA 2024 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2024 Pool Switch - 24 Port POE 3,141 - - -
Information Technology 0620.6940 TBA 2024 WiFi AP - CCC Office 902 - - -
Information Technology 0620.6940 TBA 2024 CH & PD DVR Server 10,000 - - -
Information Technology 0620.6940 TBA 2024 Access Control Server 3,000 - - -
Information Technology 0620.6940 TBA 2024 Building Security Upgrade/Repair/Replace 15,000 - - -
Information Technology 0620.6940 TBA 2024 Building Access Control Upgrade/Repair/Rplc 22,000 - - -
Information Technology 0620.6940 TBA 2025 6612 41st Lift Station Switch 4,890 - - -
Information Technology 0620.6940 TBA 2025 4648 Tower Switch 4,360 - - -
Information Technology 0620.6940 TBA 2025 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2025 Fiber Improvement & Adds 20,000 - - -
68
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ -$ -$
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
18,833 - - - - - - - -
20,000 - - - - - - - -
65,000 - - - - - - - -
7,500 - - - - - - - -
800 - - - - - - - -
5,252 - - - - - - - -
4,703 - - - - - - - -
3,000 - - - - - - - -
25,000 - - - - - - - -
25,000 - - - - - - - -
- 3,715 - - - - - - -
- 1,770 - - - - - - -
- 18,833 - - - - - - -
- 20,000 - - - - - - -
- 55,000 - - - - - - -
- 9,605 - - - - - - -
- 11,128 - - - - - - -
- 800 - - - - - - -
- 3,141 - - - - - - -
- 902 - - - - - - -
- 10,000 - - - - - - -
- 3,000 - - - - - - -
- 15,000 - - - - - - -
- 22,000 - - - - - - -
- - 4,890 - - - - - -
- - 4,360 - - - - - -
- - 18,833 - - - - - -
- - 20,000 - - - - - -
69
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Information Technology Fund 620
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Year to Budgeted Proposed Proposed
Department Replace Item Cost Amounts Amounts Amounts
Information Technology 0620.6940 TBA 2025 VOIP & VM Server Replacement 100,000$ -$ -$ -$
Information Technology 0620.6940 TBA 2025 Computer Hardware & Software 57,500 - - -
Information Technology 0620.6940 TBA 2025 City Hall Switch 2 - 48 Port POE 8,021 - - -
Information Technology 0620.6940 TBA 2025 City Hall Switch 3 - 48 port POE 8,757 - - -
Information Technology 0620.6940 TBA 2025 City Hall Switch 4 - 48 Port POE 7,345 - - -
Information Technology 0620.6940 TBA 2025 WiFi AP - PD Investigations 845 - - -
Information Technology 0620.6940 TBA 2025 Multi-Function Printer - FINANCE 9,000 - - -
Information Technology 0620.6940 TBA 2025 Multi-Function Printer - CCC 7,500 - - -
Information Technology 0620.6940 TBA 2025 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2025 Public Works Switch - 48 Port POE 6,937 - - -
Information Technology 0620.6940 TBA 2025 PW Switch - 24 Port POE (Pumphouse)4,250 - - -
Information Technology 0620.6940 TBA 2025 WiFi AP - PW Office 845 - - -
Information Technology 0620.6940 TBA 2025 WiFi AP - PW Garage East 845 - - -
Information Technology 0620.6940 TBA 2025 WiFi AP - PW Garage West 845 - - -
Information Technology 0620.6940 TBA 2025 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2025 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2025 CCC DVR Server 10,000 - - -
Information Technology 0620.6940 TBA 2025 Building Security Upgrade/Repair/Replace 15,000 - - -
Information Technology 0620.6940 TBA 2025 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2026 Lift Station Switch HW (5825, 6125, 3203, 3000)19,600 - - -
Information Technology 0620.6940 TBA 2026 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2026 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2026 VOIP Phone Hardware 40,000 - - -
Information Technology 0620.6940 TBA 2026 Computer Hardware & Software 60,000 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - Emergency Ops Center 732 - - -
Information Technology 0620.6940 TBA 2026 Network Firewall ASA 5,365 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - Conference A 732 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - Cable Room 732 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - Server Room 732 - - -
Information Technology 0620.6940 TBA 2026 Multi-Function Printer - Police 12,000 - - -
Information Technology 0620.6940 TBA 2026 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2026 CCC Switch - 48 Port POE 6,937 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - CCC AB Room 732 - - -
Information Technology 0620.6940 TBA 2026 WiFi AP - CCC Activity Room 732 - - -
Information Technology 0620.6940 TBA 2026 Multi-Function Printer - City Hall 15,000 - - -
Information Technology 0620.6940 TBA 2026 PW DVR Server 7,500 - - -
Information Technology 0620.6940 TBA 2026 Building Security Upgrade/Repair/Replace 25,000 - - -
Information Technology 0620.6940 TBA 2026 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2027 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2027 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2027 Multi-Function Printer - Public Works 7,500 - - -
Information Technology 0620.6940 TBA 2027 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2027 Large Format Plotter/Scanner 10,000 - - -
Information Technology 0620.6940 TBA 2027 Building Security Upgrade/Repair/Replace 25,000 - - -
Information Technology 0620.6940 TBA 2027 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2027 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2027 Computer Hardware & Software 62,500 - - -
Information Technology 0620.6940 TBA 2027 City Hall Switch - 24 Port | LOGIS 4,703 - - -
Information Technology 0620.6940 TBA 2027 WiFi AP's - Crystal Cove (New)6,000 - - -
Information Technology 0620.6940 TBA 2027 WiFi AP - PD External 3,693 - - -
Information Technology 0620.6940 TBA 2028 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2028 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2028 Computer Hardware & Software 65,000 - - -
Information Technology 0620.6940 TBA 2028 Multi-Function Printer - ComDev 7,500 - - -
Information Technology 0620.6940 TBA 2028 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2028 Network Firewall ASA 5,252 - - -
Information Technology 0620.6940 TBA 2028 Public Works Switch - 24 Port | LOGIS 4,703 - - -
Information Technology 0620.6940 TBA 2028 Police Cellebrite Hardware 3,000 - - -
Information Technology 0620.6940 TBA 2028 Building Security Upgrade/Repair/Replace 25,000 - - -
Information Technology 0620.6940 TBA 2028 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2029 Becker Park 24P POE Switch 3,715 - - -
Information Technology 0620.6940 TBA 2029 Becker Park Outdoor AP & Antennas 1,770 - - -
Information Technology 0620.6940 TBA 2029 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2029 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2029 Computer Hardware & Software 55,000 - - -
Information Technology 0620.6940 TBA 2029 City Hall Switch 1 - 48 Port POE 9,605 - - -
Information Technology 0620.6940 TBA 2029 City Hall Switch 5 - 48 Port POE 11,128 - - -
Information Technology 0620.6940 TBA 2029 Wireless Controller - 25 AP License 5,459 - - -
Information Technology 0620.6940 TBA 2029 Large Format Scanner 7,300 - - -
Information Technology 0620.6940 TBA 2029 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2029 Pool Switch - 24 Port POE 3,141 - - -
Information Technology 0620.6940 TBA 2029 WiFi AP - CCC Office 902 - - -
Information Technology 0620.6940 TBA 2029 CH & PD DVR Server 10,000 - - -
Information Technology 0620.6940 TBA 2029 Access Control Server 3,000 - - -
Information Technology 0620.6940 TBA 2029 Building Security Upgrade/Repair/Replace 15,000 - - -
Information Technology 0620.6940 TBA 2029 Building Access Control Upgrade/Repair/Rplc 22,000 - - -
Information Technology 0620.6940 TBA 2030 6612 41st Lift Station Switch 4,890 - - -
Information Technology 0620.6940 TBA 2030 4648 Tower Switch 4,360 - - -
Information Technology 0620.6940 TBA 2030 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2030 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2030 Computer Hardware & Software 57,500 - - -
70
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ 100,000$ -$ -$ -$ -$ -$ -$
- - 57,500 - - - - - -
- - 8,021 - - - - - -
- - 8,757 - - - - - -
- - 7,345 - - - - - -
- - 845 - - - - - -
- - 9,000 - - - - - -
- - 7,500 - - - - - -
- - 800 - - - - - -
- - 6,937 - - - - - -
- - 4,250 - - - - - -
- - 845 - - - - - -
- - 845 - - - - - -
- - 845 - - - - - -
- - 800 - - - - - -
- - 800 - - - - - -
- - 10,000 - - - - - -
- - 15,000 - - - - - -
- - 25,000 - - - - - -
- - - 19,600 - - - - -
- - - 18,833 - - - - -
- - - 20,000 - - - - -
- - - 40,000 - - - - -
- - - 60,000 - - - - -
- - - 732 - - - - -
- - - 5,365 - - - - -
- - - 732 - - - - -
- - - 732 - - - - -
- - - 732 - - - - -
- - - 12,000 - - - - -
- - - 800 - - - - -
- - - 6,937 - - - - -
- - - 732 - - - - -
- - - 732 - - - - -
- - - 15,000 - - - - -
- - - 7,500 - - - - -
- - - 25,000 - - - - -
- - - 25,000 - - - - -
- - - - 18,833 - - - -
- - - - 20,000 - - - -
- - - - 7,500 - - - -
- - - - 800 - - - -
- - - - 10,000 - - - -
- - - - 25,000 - - - -
- - - - 25,000 - - - -
- - - - 18,833 - - - -
- - - - 62,500 - - - -
- - - - 4,703 - - - -
- - - - 6,000 - - - -
- - - - 3,693 - - - -
- - - - - 18,833 - - -
- - - - - 20,000 - - -
- - - - - 65,000 - - -
- - - - - 7,500 - - -
- - - - - 800 - - -
- - - - - 5,252 - - -
- - - - - 4,703 - - -
- - - - - 3,000 - - -
- - - - - 25,000 - - -
- - - - - 25,000 - - -
- - - - - - 3,715 - -
- - - - - - 1,770 - -
- - - - - - 18,833 - -
- - - - - - 20,000 - -
- - - - - - 55,000 - -
- - - - - - 9,605 - -
- - - - - - 11,128 - -
- - - - - - 5,459 - -
- - - - - - 7,300 - -
- - - - - - 800 - -
- - - - - - 3,141 - -
- - - - - - 902 - -
- - - - - - 10,000 - -
- - - - - - 3,000 - -
- - - - - - 15,000 - -
- - - - - - 22,000 - -
- - - - - - - 4,890 -
- - - - - - - 4,360 -
- - - - - - - 18,833 -
- - - - - - - 20,000 -
- - - - - - - 57,500 -
71
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Information Technology Fund 620
Schedule of Planned Capital Outlay 2020 to 2031 (Continued)
2020 2021 2022
Year to Budgeted Proposed Proposed
Department Replace Item Cost Amounts Amounts Amounts
Information Technology 0620.6940 TBA 2030 City Hall Switch 2 - 48 Port POE 8,021$ -$ -$ -$
Information Technology 0620.6940 TBA 2030 City Hall Switch 3 - 48 port POE 8,757 - - -
Information Technology 0620.6940 TBA 2030 City Hall Switch 4 - 48 Port POE 7,345 - - -
Information Technology 0620.6940 TBA 2030 WiFi AP - PD Investigations 845 - - -
Information Technology 0620.6940 TBA 2030 Multi-Function Printer - FINANCE 9,000 - - -
Information Technology 0620.6940 TBA 2030 Multi-Function Printer - CCC 7,500 - - -
Information Technology 0620.6940 TBA 2030 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2030 Public Works Switch - 48 Port POE 6,937 - - -
Information Technology 0620.6940 TBA 2030 PW Switch - 24 Port POE (Pumphouse)4,250 - - -
Information Technology 0620.6940 TBA 2030 WiFi AP - PW Office 845 - - -
Information Technology 0620.6940 TBA 2030 WiFi AP - PW Garage East 845 - - -
Information Technology 0620.6940 TBA 2030 WiFi AP - PW Garage West 845 - - -
Information Technology 0620.6940 TBA 2030 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2030 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2030 Access Control Maintenance & Updates 6,000 - - -
Information Technology 0620.6940 TBA 2030 CCTV System Adds & Improvements 6,500 - - -
Information Technology 0620.6940 TBA 2030 CCC DVR Server 10,000 - - -
Information Technology 0620.6940 TBA 2030 Building Security Upgrade/Repair/Replace 15,000 - - -
Information Technology 0620.6940 TBA 2030 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2031 Lift Station Switch HW (5825, 6125, 3203, 3000)19,600 - - -
Information Technology 0620.6940 TBA 2031 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2031 Fiber Improvement & Adds 20,000 - - -
Information Technology 0620.6940 TBA 2031 VOIP Phone Hardware 40,000 - - -
Information Technology 0620.6940 TBA 2031 Computer Hardware & Software 60,000 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - Emergency Ops Center 732 - - -
Information Technology 0620.6940 TBA 2031 Network Firewall ASA 5,365 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - Conference A 732 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - Cable Room 732 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - Server Room 732 - - -
Information Technology 0620.6940 TBA 2031 Multi-Function Printer - Police 12,000 - - -
Information Technology 0620.6940 TBA 2031 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2031 CCC Switch - 48 Port POE 6,937 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - CCC AB Room $732 - - -
Information Technology 0620.6940 TBA 2031 WiFi AP - CCC Activity Room 732 - - -
Information Technology 0620.6940 TBA 2031 Multi-Function Printer - City Hall 15,000 - - -
Information Technology 0620.6940 TBA 2031 PW DVR Server 7,500 - - -
Information Technology 0620.6940 TBA 2031 Building Security Upgrade/Repair/Replace 15,000 - - -
Information Technology 0620.6940 TBA 2031 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2032 Networked Department Printers 800 - - -
Information Technology 0620.6940 TBA 2032 Multi-Function Printer - Public Works 7,500 - - -
Information Technology 0620.6940 TBA 2032 Large Format Plotter/Scanner 10,000 - - -
Information Technology 0620.6940 TBA 2032 Building Security Upgrade/Repair/Replace 25,000 - - -
Information Technology 0620.6940 TBA 2032 Building Access Control Upgrade/Repair/Rplc 25,000 - - -
Information Technology 0620.6940 TBA 2032 Robbinsdale SD - Potential Replacement 18,833 - - -
Information Technology 0620.6940 TBA 2032 Computer Hardware & Software 64,000 - - -
Information Technology 0620.6940 TBA 2032 City Hall Switch - 24 Port | LOGIS 4,703 - - -
Information Technology 0620.6940 TBA 2032 WiFi AP's - Crystal Cove 6,000 - - -
Information Technology 0620.6940 TBA 2032 Fiber Improvement & Adds 20,000 - - -
183,097$ 288,619$ 180,247$
72
6.3
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts Amounts
-$ -$ -$ -$ -$ -$ -$ 8,021$ -$
- - - - - - - 8,757 -
- - - - - - - 7,345 -
- - - - - - - 845 -
- - - - - - - 9,000 -
- - - - - - - 7,500 -
- - - - - - - 800 -
- - - - - - - 6,937 -
- - - - - - - 4,250 -
- - - - - - - 845 -
- - - - - - - 845 -
- - - - - - - 845 -
- - - - - - - 800 -
- - - - - - - 800 -
- - - - - - - 6,000 -
- - - - - - - 6,500 -
- - - - - - - 10,000 -
- - - - - - - 15,000 -
- - - - - - - 25,000 -
- - - - - - - - 19,600
- - - - - - - - 18,833
- - - - - - - - 20,000
- - - - - - - - 40,000
- - - - - - - - 60,000
- - - - - - - - 732
- - - - - - - - 5,365
- - - - - - - - 732
- - - - - - - - 732
- - - - - - - - 732
- - - - - - - - 12,000
- - - - - - - - 800
- - - - - - - - 6,937
- - - - - - - - 732
- - - - - - - - 732
- - - - - - - - 15,000
- - - - - - - - 7,500
- - - - - - - - 15,000
- - - - - - - - 25,000
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
179,134$ 178,942$ 317,223$ 264,479$ 206,916$ 179,144$ 191,711$ 229,733$ 254,489$
73
6.3
City of Crystal, Minnesota
Capital Improvement Plan - Information Technology Fund 620
Statement of Cash Flows
2020 2021 2022
Actual Proposed Proposed
Cash Flows from Operating Activities
Receipts from interfund services provided (3% growth annually)604,332$ 552,917$ 554,792$
Receipts from property taxes (1% increase, annually, beginning in 2020)- - -
Payments to suppliers and employees (2.5% inflation annual starting in 2021)(671,401) (112,013) (117,800)
Net Cash Provided (Used) by Operating Activities (67,069) 440,904 436,992
Cash Flows from Noncapital Financing Activities
Transfers in - - -
Net Cash Provided (Used) by Noncapital Financing Activities - - -
Cash Flows from Capital and Related Financing Activities
Acquisition of capital assets (38,603) (288,619) (180,247)
Intergovernmental revenue - - -
Proceeds from sale of assets - - -
Internal loan to Building Fund (500,000)
Internal loan repayment from Building Fund
Proceeds from bonds and notes issued - - -
Net Cash Provided (Used) by Capital and Related Financing Activities (38,603) (288,619) (680,247)
Cash Flows from Investing Activities
Investment earnings 19,885 6,000 6,000
Net Increase (Decrease) in Cash and Cash Equivalents (85,787) 158,285 (237,255)
Cash and Cash Equivalents, January 1 624,207 538,420 696,705
Cash and Cash Equivalents, December 31 538,420$ 696,705$ 459,450$
Internal Service Fund Projected Activity
74
6.3
Internal Service Fund Projected Activity
2023 2024 2025 2026 2027 2028 2029 2030 2031
Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated
592,641$ 612,335$ 751,602$ 701,023$ 669,888$ 655,264$ 683,824$ 707,895$ 707,895$
- - - - - - - - -
(434,029) (453,920) (451,448) (454,932) (482,799) (496,642) (512,320) (497,419) (509,854)
158,612 158,416 300,154 246,091 187,089 158,623 171,504 210,476 198,041
- - - - - - - - -
- - - - - - - - -
(179,134) (178,942) (317,223) (264,479) (206,916) (179,144) (191,711) (229,733) (254,489)
- - - - - - - - -
- - - - - - - - -
(150,000)
- 100,000 100,000 100,000 100,000 200,000 50,000
- - - - - - - - -
(329,134) (178,942) (217,223) (164,479) (106,916) (79,144) 8,289 (179,733) (254,489)
4,594 2,935 2,759 3,616 4,468 5,315 6,163 8,022 8,410
(165,927) (17,591) 85,690 85,228 84,641 84,794 185,956 38,766 (48,038)
459,450 293,522 275,931 361,621 446,849 531,491 616,284 802,240 841,006
293,522$ 275,931$ 361,621$ 446,849$ 531,491$ 616,284$ 802,240$ 841,006$ 792,967$
75
6.3
Tax Rates
Tax Rates:
General Fund Operations and All Funds Cash Balances
General Fund Balance as a Percent of Expenditures:Cash Balance by Planned Use (000's):
Tax rates are a function of the levy and total tax base. The city tax rate is computed by dividing the city levy by the taxable tax capacity. Future tax rates are
based on the assumption of 3.0% growth in tax capacity (see Assumptions). Comparable communities are provided for reference.
The General fund fund balance should be maintained at a level to provide for
adequate working capital reserves. The MN State Auditor recommends a 35-50%
reserve. As the expenditure budget grows, the required reserve should increase
accordingly. The City can build to this target by adding to contingency each year.
This can be accomplished by reducing expenditures and maintaining the same
level of revenue or increasing tax levy.
The balances represented in this graph are categorized by the planned
use and/or limitations determined by statute.
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
Total Fund Balance
Budget (calculation based on next years budget)
Target Fund Balance (45%)
General Fund Balance as a Percent of Expenditures
2020 (Actual) 2021 -2031 (Estimated)
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
City Tax Capacity Rates
2020 (Actual) and 2021 -2031 (Estimated)
General Capital levies
Scheduled debt levies Total EDA Tax Rate
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Cash Balance by Planned Use
2020 (Actual) and 2021 -2031 (Estimated)
General fund Debt service
Capital projects Special revenue
Enterprise Internal service
Agency (pass-through grant)
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
2015 2016 2017 2018 2019 2020
Tax Capacity Tax Rate -Comparison Cities
2015 -2020 (Actual)
New Hope Golden Valley Hopkins
Brooklyn Center Crystal
76
6.3
Property Taxes by Type
This graph highlights the percent of levy by planned use. Increases in the levy are
primarily attributed to the growth in scheduled and proposed debt levies as well
as growth in the City's General levy.
Percent of Property Taxes - General Levy and Bonds
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
202020212022202320242025202620272028202920302031Property Taxes -General Levy, EDA,
Debt Service and Capital
2020 (Actual) and 2021 -2031 (Estimated)
General Capital Economic Development Authority Debt service
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Debt Per Capita -Comparison Cities
2016 -2019 (Actual) 2020 -2030 (Estimated)
New Hope Golden Valley Hopkins
Brooklyn Center Crystal
77
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
78
6.3
Appendix A
INTERNAL LOAN SCHEDULE FOR
PUBLIC SAFETY FACILITY
RENOVATION / CONSTRUCTION
79
6.3
City of Crystal, Minnesota
Internal Loan Schedule for Public Safety Facility Renovation/Construction
Internal Loan From 2021 2022 2023 Total
Street Improvement -$ 5,000,000$ -$ 5,000,000$
Police Revolving 1,200,000 - 1,170,000 2,370,000
Fleet - - 1,000,000 1,000,000
IT - 500,000 150,000 650,000
Water fund - - 1,500,000 1,500,000
Storm Water - 200,000 1,000,000 1,200,000
1,200,000$ 5,700,000$ 4,820,000$ 11,720,000$
Internal Loan To 2021 2022 2023 Total
Building 1,200,000$ 5,700,000$ 4,820,000$ 11,720,000$
Crystal Internal Loans 2021 2022 2023 2024 2025
Amounts Amounts Amounts Amounts Amounts Amounts
Building Fund Internal Loans
Street Improvement -$ 5,000,000$ -$ (200,000)$ (700,000)$
Police Revolving Fund 1,200,000 - 1,170,000 - (250,000)
Fleet 1,000,000
IT - 500,000 150,000 - (100,000)
Water - - 1,500,000 - -
Storm Water - 200,000 1,000,000 - (150,000)
1,200,000$ 5,700,000$ 4,820,000$ (200,000)$ (1,200,000)$
Repayment
Fund Loan Amount Period
Street Improvement 5,000,000$ 2024 - 2032
Police Revolving 2,370,000 2025 - 2032
IT 650,000 2025 - 2029
Fleet 1,000,000 2031
Water 1,500,000 2026 - 2031
Storm Water 1,200,000 2025 - 2032
Total Internal Loans 11,720,000$
80
6.3
2026 2027 2028 2029 2030 2031 2032 Total
Amounts Amounts Amounts Amounts Amounts Amounts Amounts Repayments
(500,000)$ (1,300,000)$ (500,000)$ (600,000)$ (230,000)$ (250,000)$ (720,000)$ (5,000,000)$
(115,000) (115,000) (710,000) - - (210,000) (970,000) (2,370,000)
(1,000,000) (1,000,000)
(100,000) (100,000) (100,000) (200,000) (50,000) - (650,000)
(250,000) (250,000) (150,000) (100,000) - (750,000) (1,500,000)
- (170,000) (170,000) (170,000) - (340,000) (200,000) (1,200,000)
(965,000)$ (1,935,000)$ (1,630,000)$ (1,070,000)$ (280,000)$ (2,550,000)$ (1,890,000)$ (11,720,000)$
81
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
82
6.3
Appendix B
INTERNAL SERVICE SUMMARY SCHEDULE
83
6.3
THIS PAGE IS LEFT
BLANK INTENTIONALLY
84
6.3
City of Crystal, Minnesota
Internal Service Summary Schedule
2020 2021 2022
Allocation to:
Building -$ 1,323,092$ 1,467,403$
Fleet - 336,537 341,585
IT 604,332 552,917 554,792
Total Allocations IN 604,332 2,212,546 2,363,780
Allocation from:
General
Mayor and Council 220 12,419 13,135
Administration 43,755 81,234 88,088
Human resources 6,563 9,525 10,037
Assessing 46,158 50,488 53,225
Legal - 1,957 2,301
Election - 11,079 13,152
Finance 44,123 50,568 53,019
Police 205,428 595,427 656,476
Fire 855 107,707 117,460
Engineering 1,265 24,990 27,701
Street Maintenance 14,195 250,393 257,770
Park Maintenance 30,160 201,790 205,654
Forestry - 3,839 4,273
Community Center 7,395 266,552 276,938
Pool 14,085 84,466 85,343
EDA - 4,568 5,186
Community Development 65,059 68,630 67,807
Recreation 32,379 64,555 69,961
Total General Fund 511,420 1,890,188 2,007,526
Water 54,918 123,887 126,768
Sewer 74,384 156,964 158,509
Storm 30,474 82,331 70,977
Street Lights 9,180 1,773 -
Total Enterprise Fund 168,956 364,955 356,254
85
6.3
4141 Douglas Drive North • Crystal, Minnesota 55422-1696
Tel: (763) 531-1000 • Fax: (763) 531-1188 • www.crystalmn.gov
Memorandum
DATE: December 16, 2021
TO: Mayor and City Council
Anne Norris, City Manager
FROM: John Elholm, Recreation Director
SUBJECT: Bassett Creek Park Pedestrian Bridge
The 2022 capital budget includes funds for improvements at Bassett Creek Park. One
proposed feature is the replacement of the pedestrian bridge near the center of the park. The
bridge connects the paved trail near the volleyball courts with the gravel trail on the other side
of the creek; and serves as the return route for the disc golf course. The current bridge is
approximately 40 years old and is in poor condition. In addition, the bridge cannot support the
weight of maintenance equipment, so snow is not removed from the bridge in the winter.
Quotes were solicited from three pedestrian bridge vendors, however, only one of them was
able to propose a bridge that could support the specified load limit. The proposal is for an 80’
long Arched/Spliced bridge x 10’ wide that has a 12,000 lb. load limit, which will allow for winter
maintenance. The proposal also includes installation of the bridge. The city of Crystal is
responsible for removing the old bridge. The quote received to complete the work is:
• Custom Manufacturing, Inc. $ 95,800
The budget for the project; including old bridge removal and new bridge installation, is $200,000.
Staff recommends approval of the attached resolution to enter into an agreement with Custom
Manufacturing, Inc. to furnish and install an 80’ pedestrian bridge in the amount of $95,800.
6.4
CITY OF CRYSTAL
RESOLUTION 2021 -
RESOLUTION IN SUPPORT OF CONSTRUCTING AN
80’ LONG PEDESTRIAN BRIDGE IN BASSETT CREEK PARK
WHEREAS, the City of Crystal owns and operates Bassett Creek Park, and
WHEREAS, the 2022 capital budget includes funds to replace a pedestrian bridge over the creek in
Bassett Creek Park, and
WHEREAS, quotes were requested from three vendors to supply and install the pedestrian bridge, and
WHEREAS, only one vendor was able to supply a bridge that could support the specified load limit of the
bridge, and
WHEREAS, a quote was received from Custom Manufacturing in the amount of $95,800 to supply and
install the pedestrian bridge.
THEREFORE, BE IT RESOLVED:
A. That the Crystal City Council wishes to enter into an agreement with Custom Manufacturing in
the amount of $95,800; for the purchase and installation of an 80’ pedestrian bridge in Bassett
Creek Park.
B. That the Crystal City Council hereby authorizes the mayor and city manager to sign the
agreements with Custom Manufacturing, Inc. for this project.
Adopted by the Crystal City Council this 21st day of December, 2021.
________________________
Jim Adams, Mayor
ATTEST:
___________________________
Christina Serres, City Clerk
6.4
1
CR225-431-769187.v2
PEDESTRIAN BRIDGE INSTALLATION AGREEMENT
THIS PEDESTRIAN BRIDGE INSTALLATION AGREEMENT (“Agreement”) is made
and entered into this 21st day of December, 2021, by and between the City of Crystal, a Minnesota
municipal corporation, located at 4141 Douglas Drive North, Crystal, Minnesota 55422 (“City”), and
Custom Manufacturing, a Wisconsin company, located at 606 Delco Drive, P. O. Box 279, Clinton,
WI 52525 (“Contractor”). The City and the Contractor may hereinafter be referred to individually
as a “party” or collectively as the “parties.”
RECITALS
A. The City desires to have a pedestrian bridge installed at Bassett Creek Park, which is a City
Park located at 5609 32nd Avenue North (“Park”).
B. The Contractor provided the City written quotes to provide the materials and to construct an
80’ Arched/Spliced Bridge x 10’ Wide at the Park in accordance with the specifications
established by the City (“Project”).
C. The Contractor desires to undertake and complete the Project for the City in accordance with
the terms and conditions of this Agreement.
AGREEMENT
In consideration of the mutual promises and agreements contained herein, and intending to
be legally bound, the City and the Contractor hereby agree as follows:
1. Scope of Work.
a. The Contractor agrees to furnish all materials, all necessary tools, and equipment, and to
perform all the work and labor necessary to complete the Project. The Project shall be
completed in accordance with the terms and conditions of this Agreement, the
Contractor’s quote, and scope of work contained in the attached Exhibit A (all work,
materials and equipment set forth in this paragraph and contained in Exhibit A are
hereinafter collectively referred to as the “Specifications”). Said Specifications are
hereby fully incorporated as part of this Agreement.
b. The Contractor agrees to diligently perform all work required to complete the Project and
to comply in all respects with the Specifications. The City may conduct such inspections
of the Project, work, and materials used as it may determine is needed. The City has the
right to reject any work or materials it reasonably determines is defective or unsuitable, or
that otherwise does not comply with the Specifications or the terms of this Agreement. If
the City rejects any work or materials, the Contractor is responsible for, at its own cost,
promptly removing and replacing such defective work or materials with approved work
or materials as needed to comply with the Specifications.
6.4
2
CR225-431-769187.v2
c. The Contractor agrees to make good, replace, and renew at the Contractor’s own cost and
expense any loss or damage to the work and Project occurring during the installation or
prior to the final acceptance thereof by the City, by reason of fire, tornado, theft, or any
cause whatsoever, and to be wholly responsible for the installation, completion and
delivery of the Project in its entirety for the final acceptance by the City; and any payment
or payments made to the Contractor hereunder, shall not be construed as operating to
relieve the Contractor from responsibility for the construction and delivery of the Project
as provided and agreed through this Agreement.
2. Schedule; Liquidated Damages.
a. The Contractor agrees to commence the work on the Project at the earliest practicable date
and to prosecute the same diligently and without delay and to have the work entirely
completed in every respect to the satisfaction and approval of the City on or before August
15, 2022. In case of the failure on the part of the Contractor, for any reason except with
the written consent of the council of the City, to complete the Project on or before said
date, the City shall have the right to deduct from any money due or which may become
due to the Contractor, the amount of two hundred dollars ($200.00) per day for each and
every day elapsing between the time stipulated for the completion and the actual date of
completion, in accordance with the terms thereof; or if no moneys shall be due the
Contractor, the City shall have the right to recover such sum; such deduction to be made
or such sum to be recovered not as a penalty, but as liquidated damages. The Contractor
agrees that it will be difficult for the City to determine the amount of all damages that the
City would incur as a result of delay and that the liquidated damages set forth in this
paragraph are reasonable.
b. The Contractor agrees to notify the City in writing of any and all causes of delay of work,
or any part thereof, within 24 hours after such cause of delay shall arise, and in case of the
failure of the Contractor to perform this Agreement and complete the work at the time
hereinafter specified, the City may immediately, or at any time thereafter, proceed to
complete the work at the cost and expense of the Contractor. Upon receipt of written
notice from the Contractor of the existence of causes over which the Contractor has no
control and which must delay the completion of the work, including without limitation,
fire, flood, epidemic, strikes, wars, acts of God, acts of public authorities, or delays or
defaults caused by public carriers, the City shall reasonably extend the date previously
specified for the completion of the work and in such case the Contractor shall only become
liable for such liquidated damages for failure to perform during any delay after the time
is so extended.
3. Compensation.
a. This is a lump sum agreement. The City agrees to pay the Contractor the lump sum
identified in the Contractor’s quote, which is attached hereto as Exhibit A. If the
Contractor properly performs the work, the City shall, from month to month before
completion of the work and pursuant to invoices from the Contractor, pay the Contractor
up to 95 percent of the amount already earned under the Agreement. When the work is
6.4
3
CR225-431-769187.v2
95 percent or more completed, upon the sole determination of City staff, such portions of
the retained price shall be released only as the City determines it need not be retained to
protect the interest of the City in the satisfactory completion of the Agreement. The
balance shall be retained by the City until the final performance and completion of this
Agreement by the Contractor to the satisfaction, approval, and acceptance of the City
including provision by the Contractor of Minn. Dept. of Revenue Form IC-134 or other
authorized proof of the Contractor’s compliance with applicable state laws.
b. No claim for extra work done or materials furnished by the Contractor will be made by
the Contractor or allowed by the City, nor shall the Contractor do any work or furnish any
materials not covered by the Specifications, unless such work or materials is ordered in
writing by the City. Any such work or materials which may be done or furnished by the
Contractor without such written order first being given, shall be at the Contractor's own
risk and expense.
4. Non-Discrimination. The Contractor agrees that in the hiring of common or skilled labor for
the performance of any work under this Agreement or any subcontract hereunder, no contractor,
material supplier, or vendor, shall, by reason of race, color, sex, creed, national origin, disability,
age, sexual orientation, status with regard to public assistance, or religion, discriminate against
any person or persons who are qualified and available to perform the work to which such
employment relates; that neither the Contractor nor any subcontractor, material supplier, or
vendor, shall in any manner discriminate against, or intimidate, or prevent the employment of
any such person or persons from the performance of work under this Agreement or any
subcontract hereunder on account of race, color, sex, creed, national origin, disability, age,
sexual orientation, status with regard to public assistance, or religion.
5. Insurance. The Contractor shall maintain commercial general liability coverage for all work
covered under the Agreement in at least the amounts of $1,500,000.00 per occurrence for
combined bodily injury and property damage, and $2,000,000 in the general aggregate, and
commercial automobile liability insurance in at least the amount of $1,000,000 per occurrence
for combined bodily injury and property damage covering owned, non-owned, and hired
automobiles. The Contractor shall provide the City with a current certificate of insurance listing
the City as an additional insured with respect to the aforementioned policies. To meet the
requirements herein, the Contractor may use a combination of excess and umbrella coverage.
The Contractor also agrees to keep in force during the entire term of this Agreement statutory
workers’ compensation insurance.
6. Indemnification. The Contractor hereby agrees to protect, defend and hold the City and its
officers, elected and appointed officials, employees, administrators, commissioners, agents, and
representatives harmless from and indemnified against any and all loss, costs, fines, charges,
damage and expenses, including, without limitation, reasonable attorneys’ fees, consultants’
and expert witness fees, and travel associated therewith, due to claims or demands of any kind
whatsoever (including those based on strict liability) only to the extent caused by and arising
out of (i) the activities contemplated by this Agreement, (ii) including, without limitation, any
claims for any lien imposed by law for services, labor or materials, or (iii) by reason of the
execution of this Agreement or the performance of this Agreement. The Contractor, and the
6.4
4
CR225-431-769187.v2
Contractor’s successors or assigns, agree to protect, defend and save the City, and its officers,
agents, and employees, harmless from all such claims, demands, damages, and causes of action
and the costs, disbursements, and expenses of defending the same, including but not limited to,
attorneys’ fees, consulting engineering services, and other technical, administrative or
professional assistance. The Contractor further agrees to indemnify the City and hold it harmless
from and against any and all claims, suits, and actions against, and all loss, damage, costs, or
expense to the City occasioned by or arising from any infringement or claim of infringement of
any letters patent, or patent rights upon or covering any patented article or articles furnished or
installed by the Contractor under this Agreement for the City, of from or by reason of the use
by the City of any patented article or articles furnished or installed by the Contractor for the
City under this Agreement. The indemnity contained in this paragraph shall be continuing and
shall survive the performance or cancellation of this Agreement. Nothing in this Agreement
shall be construed as a limitation of or waiver by the City of any immunities, defenses, or other
limitations on liability to which the City is entitled by law, including but not limited to the
maximum monetary limits on liability established by Minnesota Statutes, Chapter 466, or
otherwise.
7. Independent Contractor. The Contractor and its employees are not employees of the City.
Nothing in the Agreement is intended or should be construed in any manner as creating or
establishing the relationship as employer/employee, co-partners, or a joint venture between the
City and the Contractor. It is agreed that the Contractor and its employees will act as an
independent contractor and acquire no rights to tenure, workers’ compensation benefits,
unemployment compensation benefits, medical and hospital benefits, sick and vacation leave,
severance pay, pension benefits or other rights or benefits offered to employees of the City. The
manner in which the Project is to be performed shall be controlled by the Contractor; however,
the nature of the services and the results to be achieved shall be specified by the City.
8. Termination. The City may terminate this Agreement upon 30 days’ written notice, except
that if the Contractor is in default and fails to cure the default within ten days following written
notice by the City, the City has the right to terminate this Agreement immediately upon written
notice of termination. The Contractor will be paid for services properly rendered and equipment
property installed prior to the effective date of termination. The following provisions of this
Agreement shall survive expiration, termination, or cancellation of this Agreement:
Indemnification; Insurance; Governing Law; Data Practices; and Audit.
9. Amendments. Any amendment to this Agreement must be in writing and signed by both
parties.
10. Assignment. No assignment or attempted assignment of this Agreement or of any rights
hereunder shall be effective without the prior written consent of the City.
11. Authority. Each of the undersigned parties warrants it has the full authority to execute this
Agreement.
6.4
5
CR225-431-769187.v2
12. No Personal Liability. No officer, agent or employee of the City shall be personally liable to
the Contractor, or any successor in interest, in the event of any default or breach by the City on
any obligation or term of this Agreement.
13. Notices. Any notice, demand, or other communication under this Agreement by either party to
the other shall be sufficiently given or delivered if it is dispatched by registered or certified mail,
postage prepaid, return receipt requested, or delivered personally to the addresses listed in the
preamble to this Agreement, or at such other address with respect to either such party as that
party may, from time to time, designate in writing and forward to the other as provided in this
section.
14. No Agency. The Contractor acknowledges that nothing contained in this Agreement nor any
act by the City or the Contractor shall be deemed or construed by the Contractor or by any third
person to create any relationship of third-party beneficiary, principal and agent, limited or
general partner, or joint venture between the City and the Contractor.
15. Counterparts. This Agreement may be executed in any number of counterparts, each of which
shall constitute one and the same instrument.
16. Governing Law. This Agreement shall be governed by and construed in accordance with the
laws of the state of Minnesota. Any disputes, controversies, or claims arising out of this
Agreement shall be heard in the state or federal courts of Minnesota, and all parties to this
Agreement waive any objection to the jurisdiction of these courts, whether based on
convenience or otherwise.
17. Compliance with Laws. The Contractor warrants that all work performed pursuant to this
Agreement shall be in compliance with all federal, state and local laws, ordinances, regulations,
rules, and standards.
18. Entire Agreement. This Agreement, any attached exhibits and any addenda or amendments
signed by the parties shall constitute the entire Agreement between the City and Contractor, and
supersedes any other written or oral agreements between and City and Contractor.
19. Severability. In the event that any one or more of the provisions of this Agreement, or any
application thereof, shall be found to be invalid, illegal or otherwise unenforceable, the validity,
legality, and enforceability of the remaining provisions in any application thereof shall not in
any way be affected or impaired thereby.
20. Waivers. No failure by any party to insist upon the strict performance of any covenant, duty,
agreement, or condition of this Agreement or to exercise any right or remedy consequent upon
a breach thereof, shall constitute a waiver of any such breach of any other covenant, agreement,
term, or condition, nor does it imply that such covenant, agreement, term or condition may be
waived again.
21. Data Practices. Any and all data created, collected, received, stored, used, maintained, or
disseminated by the parties pursuant to this Agreement shall be administered in accordance
6.4
6
CR225-431-769187.v2
with, and is subject to the requirements of the Minnesota Government Data Practices Act,
Minnesota Statutes, Chapter 13.
22. Audit. The Contractor agrees that the City, the Minnesota State Auditor, and Minnesota
Legislative Auditor, or any of their duly authorized representatives, at any time during normal
business hours and as often as they may reasonably deem necessary, shall have access to and
the right to examine, audit, excerpt and transcribe any books, documents, papers, and records
that are relevant and involve transactions relating to this Agreement for six years following
termination of this Agreement.
IN WITNESS THEREOF, the parties hereto have executed this Agreement as of the day
and year written above.
CITY: CONTRACTOR:
By: _____________________________ By: ___________________________
Jim Adams
Its: Mayor
By: ______________________________ Its: ___________________________
Anne Norris
Its: City Manager
6.4
Appendix A
CR225-431-769187.v2
EXHIBIT A
Contractor’s Quote
6.4
Appendix A
CR225-431-769187.v2
EXHIBIT A
Contractor’s Quote
6.4
Memorandum
DATE: December 21, 2021
TO: City Council
FROM: Mark Ray, PE, Director of Public Works
Bill Bowman, Streets Superintendent
SUBJECT: Purchase of replacement dump truck
Background
The 2022 Fleet Maintenance Fund includes the replacement purchase of a dump truck. The proposed tandem
axle dump truck will be replacing the existing tandem axle dump truck (#109) in the public works fleet that
was purchased in 2003. The Fleet Maintenance Fund has $190,000 allocated for this purchase. This truck does
not plow snow but is used exclusively as a hauling truck (snow, water main break material, trees, etc.) which is
why it is significantly older than the usual replacement timeline and the replacement cost is less. The Vehicle
Condition Index (VCI) for the existing 109 is 34. 23 is the minimum to consider for replacement.
The tandem axle dump truck chassis will be purchased off of the state contract from Nuss Truck and
Equipment for $127,716. Truck attachments (warning lights, etc) will be purchased off of the state contract
from Towmaster Truck Equipment for $44,541. The total cost of the truck will be $172,257. The existing
tandem axle dump truck will be sold at auction.
Attachment
•Quote from Nuss Truck and Equipment for the chassis
•Quote from Towmaster Truck Equipment for the attachments
Recommended Action
•Motion to approve the resolution authorizing the purchase of the replacement dump truck and
attachments.
6.5
Price quote for:TANDEM AXLE CAB/CHASSIS
Vendor Name:
Contact Person:
Street Address:
P.O. Box:
City, State, Zip
Phone #:
Toll Free #:
Fax #:
Email Address:
2013
Spec #Information Requested Answer
1.0 Make & Model 2022 MACK GRANITE 64 BR TA
C.A. & W.B. dimension 189" WB, 123" CA
Front Axle Location (Set Forward, Set Back) SET BACK
Frame, Steel PSI 120,000 PSI
Frame, Section Modulus 17.7 SM
Frame, Resistance to Bending Moment 2,120,000 RBM
Frame overhang length 62" AF
Type of fasteners used on frame members HUCK
Front bumper description Swept Back Steel
Front Axle Type & Size Mack FXL12, 12,000 lbs.
Front Spring length 55"
Front brake size 16.5" x 5" Bendix ES165-05D
Front Brake chamber size 24"
U Joint Make, Model & Type (1/2 round, etc.)
Meritor 17 MXL Extended Life
Rear Axle Type & Size Mack SS38, 38,000 lbs.
ROSEVILLE, MN 55113
Exhibit D: Price Schedule
Nuss Truck and Equipment
Brian Selvy
2195 WEST COUNTY ROAD C2
612-202-7259
800-704-0935
651-635-0928
bselvy@nussgrp.com
Version of Excel used:
6.5
Rear brake size 16.5" x 7" Bendix ES165-07D
Rear brake chamber size 30/30
Parking Brake Type & Model #Haldex/Anchorlok
Front Tire Make & Size 11R22.5 14 Ply Bridgestone R283A
Front Rim Size & Rating 22.5 x 8.25 7,800 lbs
Rear tire make & size 11R22.5 14 PLY Bridgestone M726EL
Rear rim size & rating 22.5 X 8.25 7,800 LBS
Air compressor type & size Meritor/Wabco 18.7 CFM
Air dryer info Meritor 1200
Engine type, HP & torque Mack MP7-325M - 325HP @ 1400 - 1900
RPM 1260/LB/FT Max Torque
Type of engine fan drive Behr Fan And Electronic Modulating Fan
Drive
Exhaust description Cleartech one DPF/SCR right hand under
cab
Starter motor Make & Model Delco 39MT-MXT
Right side steering assist (Auxiliary gear, hydraulic
ram or none)None
Transmission Make & Model, # of Speeds Eaton Fuller FRO-14210C
Clutch size and # of plates 15.5" Two Plate
Battery CCA, # of batteries, CCA of each battery
Three Mack 650/1950 CCA
Fuel tank size, shape and material 66 Gallon Alum Sleeved D-Shaped
Alternator Type & Size Delco 12V 130A (24SI Brush Type)
Radiator Sq in & Material Aluminum Core
Type and number of horns One Mack Rectangle Air
6.5
Cab ride (type of mounting)Air Ride Cab
Cab size door to door, floor to ceiling 78", 62"
Distance of cab floor to ground 47"
Description of seats supplied with base cab &
chassis
Bostrum Talladaga 915 Mid-Back Air Driver
Seat, Fixed Mack Mid-Back Passenger
Seat
Windshield washer nozzle location Mounted on Wiper Arm
Interior package (Low, Med or Premium) Purebred - Low
Does unit include cruise control Yes
How is dome light activated Door & Cab Switch
Steering wheel adjustment (tilt, telescoping, etc.)Tilt & Telescoping
Cab grab handle locations RH & LH Behind Door
Storage pocket description Two Storage Compartment & Net
Retainers with Center Mounting for CB
Provisions
Cab Gauges, List Air Pressure, Voltmeter, Engine Coolant
Temperature, Engine Oil Pressure,
Speedometer, and Tachometer, Exhaust
Pyrometer, and Tranwmission Oil
Temperature
Dimmer switch location Turn Signal
Paint description Mach White
Cab & chassis warranty (time & mileage)One Year or 100,000 Miles
Engine warranty (time & mileage) Two Years or 250,000 miles
Transmission warranty (time & mileage)Mack - Five Years or 500,000 Miles
Rear end warranty (time & mileage)Mack - Five Years or 500,000 Miles
Delivery of chassis starting point Roseville, MN 55113
Estimated weight on front axle of base unit 8,421
6.5
Estimated weight on rear axle of base unit 8,077
6.5
Print Date & Time 12/16/2021 9:29
VENDOR NAME
MAKE AND MODEL
This section for use when ordering
WB 190"
CA 132" Verify with Towmaster Grand Total 127,716.00$
AF 62"
Rear Ratio 4.19
Cab Color White
Wheel
Color Alum
Notes
Code Spec #Description Qty 2022 Price Subtotal
1.0 Price for Base Unit:1 92,924.00$ 92,924.00$
2.0 FRAME OPTIONS 1 -$
AOXF3X 2.1 Front frame extension 1 886.00$ 886.00$
12XCNX 2.2 Custom hole punching in frame 100.00$ -$
2.3 Deduct for no front bumper (60.00)$ -$
4YAAX 2.4 Frame fastener option (bolt or huck spun)STD
2.5 Frame, R.B.M., S.M., PSI, CT -$
MC 2.6 2,120,000 17.7 120,000 87 - 112 CA (64.00)$ -$
MC 2.7 2,120,000 17.7 120,000 113 - 133 CA STD
MC 2.8 2,120,000 17.7 120,000 134 - 152 CA 107.00$ -$
MC 2.9 2,120,000 17.7 120,000 153 - 199 CA 406.00$ -$
MC 2.10 2,120,000 17.7 120,000 200 - 236 CA 482.00$ -$
MC 2.11 2,470,000 20.6 120,000 87 - 112 CA 176.00$ -$
MC 2.12 2,470,000 20.6 120,000 113 - 133 CA 240.00$ -$
MC 2.13 2,470,000 20.6 120,000 134 - 152 CA 347.00$ -$
MC 2.14 2,470,000 20.6 120,000 153 - 199 CA 646.00$ -$
MC 2.15 2,470,000 20.6 120,000 200 - 236 CA 722.00$ -$
MC 2.16 2.820,000 23.5 120,000 87 - 112 CA 521.00$ -$
MC 2.17 2.820,000 23.5 120,000 113 - 133 CA 1 585.00$ 585.00$
MC 2.18 2.820,000 23.5 120,000 134 - 152 CA 692.00$ -$
MC 2.19 2.820,000 23.5 120,000 153 - 199 CA 991.00$ -$
MC 2.20 2.820,000 23.5 120,000 200 - 236 CA 1,067.00$ -$
MC 2.21 3,160,000 26.3 120,000 87 - 112 CA 744.00$ -$
MC 2.22 3,160,000 26.3 120,000 113 - 133 CA 808.00$ -$
MC 2.23 3,160,000 26.3 120,000 134 - 152 CA 915.00$ -$
MC 2.24 3,160,000 26.3 120,000 153 - 199 CA 1,214.00$ -$
MC 2.25 3,160,000 26.3 120,000 200 - 236 CA 1,290.00$ -$
2.26 DOUBLE FRAME - PARTIAL IC REINFORCEMENT -$
MC 2.27 3,230,000 26.9 120,000 87 - 112 CA 801.00$ -$
MC 2.28 3,230,000 26.9 120,000 113 - 133 CA 865.00$ -$
MC 2.29 3,230,000 26.9 120,000 134 - 152 CA 972.00$ -$
MC 2.30 3,230,000 26.9 120,000 153 - 199 CA 1,214.00$ -$
MC 2.31 3,230,000 26.9 120,000 200 - 236 CA 1,290.00$ -$
MC 2.32 3,580,000 29.8 120,000 87 - 112 CA 1,041.00$ -$
MC 2.33 3,580,000 29.8 120,000 113 - 133 CA 1,105.00$ -$
MC 2.34 3,580,000 29.8 120,000 134 - 152 CA 1,212.00$ -$
MC 2.35 3,580,000 29.8 120,000 153 - 199 CA 1,511.00$ -$
MC 2.36 3,580,000 29.8 120,000 200 - 236 CA 1,587.00$ -$
MC 2.37 3,920,000 32.7 120,000 87 - 112 CA 1,376.00$ -$
MC 2.38 3,920,000 32.7 120,000 113 - 133 CA 1,450.00$ -$
MC 2.39 3,920,000 32.7 120,000 134 - 152 CA 1,657.00$ -$
MC 2.40 3,920,000 32.7 120,000 153 - 199 CA 1,856.00$ -$
MC 2.41 3,920,000 32.7 120,000 200 - 236 CA 1,932.00$ -$
MC 2.42 4,260,000 35.5 120,000 87 - 112 CA 1,832.00$ -$
MC 2.43 4,260,000 35.5 120,000 113 - 133 CA 1,673.00$ -$
MC 2.44 4,260,000 35.5 120,000 134 - 152 CA 2,003.00$ -$
MC 2.45 4,260,000 35.5 120,000 154 - 199 CA 2,301.00$ -$
MC 2.46 4,260,000 35.5 120,000 200 - 236 CA 2,384.00$ -$
2.47 DOUBLE FRAME - FULL IC REINFORCEMENT -$
MC 2.48 3,230,000 26.9 120,000 87 - 112 CA 1,001.00$ -$
MC 2.49 3,230,000 26.9 120,000 113 - 133 CA 1,065.00$ -$
MC 2.50 3,230,000 26.9 120,000 134 - 152 CA 1,172.00$ -$
MC 2.51 3,230,000 26.9 120,000 153 - 199 CA 1,414.00$ -$
MC 2.52 3,230,000 26.9 120,000 200 - 236 CA 1,490.00$ -$
MC 2.53 3,580,000 29.8 120,000 87 - 112 CA 1,241.00$ -$
MC 2.54 3,580,000 29.8 120,000 113 - 133 CA 1,305.00$ -$
MC 2.55 3,580,000 29.8 120,000 134 - 152 CA 1,412.00$ -$
MC 2.56 3,580,000 29.8 120,000 153 - 199 CA 1,711.00$ -$
MC 2.57 3,580,000 29.8 120,000 200 - 236 CA 1,787.00$ -$
MC 2.58 3,580,000 29.8 120,000 87 - 112 CA 1,576.00$ -$
MC 2.59 3,580,000 29.8 120,000 113 - 133 CA 1,650.00$ -$
MC 2.60 3,580,000 29.8 120,000 134 - 152 CA 1,857.00$ -$
MC 2.61 3,580,000 29.8 120,000 153 - 199 CA 2,056.00$ -$
MC 2.62 3,580,000 29.8 120,000 200 - 236 CA 1,787.00$ -$
MC 2.63 3,920,000 32.7 120,000 87 - 112 CA 1,576.00$ -$
MC 2.64 3,920,000 32.7 120,000 113 - 133 CA 1,650.00$ -$
MC 2.65 3,920,000 32.7 120,000 134 - 152 CA 1,857.00$ -$
MC 2.66 3,920,000 32.7 120,000 153 - 199 CA 2,056.00$ -$
MC 2.67 3,920,000 32.7 120,000 200 - 236 CA 2,132.00$ -$
MC 2.68 4,260,000 35.5 120,000 87 - 112 CA 2,032.00$ -$
MC 2.69 4,260,000 35.5 120,000 113 - 133 CA 1,873.00$ -$
MC 2.70 4,260,000 35.5 120,000 134 - 152 CA 2,203.00$ -$
MC 2.71 4,260,000 35.5 120,000 153 - 199 CA 2,501.00$ -$
MC 2.72 4,260,000 35.5 120,000 200 - 236 CA 2,584.00$ -$
2.73 TRIPLE FRAME - FULL IC REINFORCEMENT -$
MC 2.74 5,688,000 47.4 120,000 87 - 112 CA 4,960.00$ -$
MC 2.75 5,688,000 47.4 120,000 113 - 133 CA 5,024.00$ -$
MC 2.76 5,688,000 47.4 120,000 134 - 152 CA 5,131.00$ -$
MC 2.77 5,688,000 47.4 120,000 153 - 199 CA 5,430.00$ -$
MC 2.78 5,688,000 47.4 120,000 200 - 236 CA 5,506.00$ -$
4DXM2X 2.79 Flush bright finish channel steel 113.00$ -$
4DXM6X 2.80 Extended stylized-silver-bright finish steel w/stone guard 1,495.00$ -$
4DXN8X 2.81 Extended - swept back steel, bright finish with stone guard - includes
center tow pin 1,139.00$ -$
4DXR1X 2.82 Mill finish, flush mounted, unpainted aluminum 68.00$ -$
4DXN4X 2.83 Extended swept back channel steel (includes center tow pin) w/stone
guard 805.00$ -$
5DXN5X 2.84 Extended swept back channel steel with bright finish w/painted center tow
pin 620.00$ -$
4DXN6X 2.85 Extended swept back steel channel w/bright finish 258.00$ -$
4DXM9X 2.86 Extended swept back painted steel STD
4DX16X 2.87 Flush painted steel (15.00)$ -$
TANDEM AXLE CAB/CHASSIS
Exhibit D: Price Schedule
NUSS TRUCK & EQUIPMENT
2023 MACk GRANITE 64BR TA
City of Crystal updated 7-28-21
6.5
4DXP1X 2.88 Flush stainless clad aluminum 143.00$ -$
5FXA1X 2.89 Plate type radiator guard 105.00$ -$
5FXA2X 2.90 Bright finish plate type radiator guard 258.00$ -$
B28018 2.91 Tectyl 185 GW pigmented compound between frame rails 110.00$ -$
281AA4 2.92 BOC crossmember, steel HD back to back channel intermediate 66.00$ -$
281AA6 2.93 BOC & intermediate crossmember, HD I-Beam 332.00$ -$
MC 2.94 Frame rail clearance 62.00$ -$
2.99 1 -$
3.0 FRONT AXLE/SUSPENSION/BRAKE/OPTION 1 -$
3.1 Set back front axle option STD
240AA6 3.2 12,000 front axle & matching suspension - Mack FXL12 STD
240AA7 3.3 14,600 front axle & matching suspension - Mack FXL14.6 771.00$ -$
3.4 16,000 front axle and matching suspension -$
240AA2 3.5 18,000 front axle and matching suspension - Mack FXL18 1,361.00$ -$
240AA3 3.6 20,000 front axle and matching suspension - Mack FXL20 1 2,147.00$ 2,147.00$
240AA5 3.7 23,000 front axle and matching suspension - Mack FXL23 2,448.00$ -$
1KAA1X 3.8 Heavy duty front axle shocks STD
3.9 Front stabilizer bar -$
3.10 Right hand air bag suspension per Spec 3.6, Driver controlled -$
3.11 Left air bag suspension per Spec 3.6, Driver controlled -$
3.12 Front axle lubrication cap with slotted venthole -$
UDXA1X 3.13 Front brake dust shields 1 18.00$ 18.00$
245AB0 3.14 Dual front auxiliary steering gear 569.00$ -$
YHXB1X 3.15 RH spring build up for wing plow application 30.00$ -$
YHXA1X 3.16 LH spring build up for wing plow application 30.00$ -$
MOD01D 3.17 All wheel drive front axle 43,000.00$ -$
PK7137 3.18 Twin Steer Front Axle 12,612.00$ -$
0KXB1X 3.19 Aluminum front hubs 53.00$ -$
U3XA5X 3.20 Centerfuse outboard mounted brake drums 217.00$ -$
MC 3.21 Multileaf front spring ILO taperleaf (2 leaf spring)35.00$ -$
MC 3.22 HD mulitileaf front spring ILO taperleaf (2 leaf spring)65.00$ -$
MC 3.23 HD taperleaf (3 leaf spring) ILO of taperleaf (2 leaf spring)65.00$ -$
2410L1 3.24 Meritor EX+ Air Disc Brakes requires Meritor rear brakes 653.00$ -$
U0AB1X 3.25 Meritor front slack adjustors - Need same slack on rear axle 1.00$ -$
U0AB8X 3.26 Meritor front slack with stainless steel pins 58.00$ -$
U0AA1X 3.27 Haldex front slack adjustors - Need same slack adjustor on rear axle STD
U0AA8X 3.28 Haldex front slack with stainless steel pins 1 57.00$ 57.00$
MC 3.29 Meritor front brakes ILO of Bendix - requires Meritor rear brakes 131.00$ -$
3NBB1X 3.30 Power steering reservoir with visible sight glass 30.00$ -$
3.99 1 -$
4.0 4.0 TANDEM REAR AXLE/SUSPENSION/BRAKE/OPTIONS 1 -$
MC 4.1 46,000# rear axle & matching suspension Make & Model - Mack SS462
Mack Camelback Suspension 2,240.00$ -$
MC 4.2 40,000# walking beam rear suspension and axle
Make & Model - Meritor MT-40-14X4D with Hendrickson HMX400 1,558.00$ -$
MC 4.3 46,000# walking beam rear suspension and axle Make & Model
Meritor RT-46-160 with Hendrickson HMX460 3,362.00$ -$
MC 4.4 40,000# air suspension and axle Make & Model Meritor MT-40-
14X4D with Mack AL461 46,000 lbs. air suspension 1,578.00$ -$
MC 4.5 46,000# air suspension and axle Make & Model Meritor RT-46-
160 with Mack AL461 46,000 lbs. air suspension 2,976.00$ -$
4.6 Dash mounted air dump system - With air ride suspension STD
MC 4.7 Driver activated differential lock on one rear axle (front axle ____
rear axle ____, check one)484.00$ -$
254AB5 4.8 Driver activated differential lock on both front and rear axles 1 968.00$ 968.00$
MC 4.9 Driver activated differential lock on both front and rear axles, and
lubrication pump and filter system 1,210.00$ -$
MC 4.10 Meritor MT-40-14X4DP, both axles driver differential lock and pump,
HMX400 40,000 # walking beam suspension 2,768.00$ -$
MC 4.11 Meritor RT-46-160P, both axles driver differential lock and pump, HMX460
46,000 # walking beam suspension 4,572.00$ -$
76AB1X 4.12 ½ round universal joints STD
195AB3 4.13 Spicer 1810 HD drive line with half round universal joints 126.00$ -$
UEX 4.14 Rear Dust Shields 1 34.00$ 34.00$
254AB7 4.15 Driver activated differential lock on both front and rear axles with individual
switches 1,102.00$ -$
195AB0 4.16 Meritor 18 MXL extended lube 1 31.00$ 31.00$
195AA9 4.17 Meritor 176 MXL extended lube 32.00$ -$
195AB5 4.18 Dana-spicer SPL170XL extended lube series 453.00$ -$
195AB6 4.19 Dana-spicer SPL250XL extended lube series 493.00$ -$
195AB7 4.20 Dana-spicer SPL250HDXL extended lube series 502.00$ -$
195025 4.21 Dana-spicer SPL350HDXL extended lube series 776.00$ -$
268AB1 4.22 Mack S38R fabricated steel housing STD
268AB5 4.23 Mack SB38 fabricated steel housing -40,000 # recertification 450.00$ -$
268AA4 4.24 Mack S40 40,000 # rear axle 450.00$ -$
268AB4 4.25 Mack S402 40,000 # cast iron housing 1 450.00$ 450.00$
268AA3 4.26 Mack S440 44,000# fabricated steel housing 1,350.00$ -$
268AB6 4.27 Mack S440-46 fabricated steel housing - recertification 1,350.00$ -$
268AA6 4.28 Mack S462 46,000# cast ductile iron housing 1,800.00$ -$
268AA9 4.29 Mack S462R 46,000# cast ductile iron housing 1,800.00$ -$
268AC9 4.30 Meritor 40,000# MT-40-14X4C Amboid (High Entry)765.00$ -$
268AD0 4.31 Meritor 40,000# MT-40-14X4C Hypoid (Low Entry)765.00$ -$
268AB7 4.32 Meritor 46,000# RT-46-160 2,163.00$ -$
268AC1 4.33 Meritor 46,000# Rt-46-164EH 2,163.00$ -$
268AD3 4.34 Spicer 46,000# DS405 2,628.00$ -$
268AE0 4.35 Spicer 46,000# D46-170H 4,305.00$ -$
1860F6 4.36 Mack SS38 Mack multileaf camelback spring without anti-sway springs (80.00)$ -$
1860G6 4.37 Mack SS38 multileaf camelback spring with anti-sway springs STD
186AA3 4.38 Mack SSB 38 multileaf camelback spring (boost-a-load)(40.00)$ -$
186AD2 4.39 Mack SSB 38 multileaf camelback spring 40,000# recertification 273.00$ -$
1860H6 4.40 Mack SS40 44,000# multileaf camelback suspension without anti sway 226.00$ -$
1860I6 4.41 Mack SS40 44,000# multileaf camelback suspension with anti sway 330.00$ -$
186AD3 4.42 Mack SS40 44,000# multileaf camelback suspension 46,000# -
recertification 228.00$ -$
1860J6 4.43 Mack SS462 44,000# multileaf camelback suspension without anti sway 336.00$ -$
186OK6 4.44 Mack SS462 44,000# multileaf camelback suspension with anti sway 440.00$ -$
186AB6 4.45 Mack AL-461 46,000# air ride 813.00$ -$
186AC6 4.46 Mack M-Ride 40 parabolic 2-leaf, 40,000# normal stiffness 959.00$ -$
186AG6 4.47 Mack M-Ride 40 parabolic 3-leaf, 40,000# stiffer than normal 1 959.00$ 959.00$
186AC7 4.48 Mack M-Ride 46 parabolic 3-leaf 46,000#1,289.00$ -$
186AE5 4.49 HMX 400 Hendrickson Haulmax rubber suspension 40,000#803.00$ -$
186AE6 4.50 HMX 460 Hendrickson Haulmax rubber suspension 46,000#1,199.00$ -$
186AF7 4.51 Chambers 46,000# L high stability W#29 can 3,798.00$ -$
186AE9 4.52 PAX 460 High Stability Hendrickson Primaxx Air Suspension 1,319.00$ -$
186AF1 4.53 PAX 462 High Stability Hendrickson Primaxx Air Suspension 1,319.00$ -$
6.5
186AF4 4.54 Neway AD-246 air ride suspension 1,825.00$ -$
186AF5 4.55 Neway AD-252 air ride suspension 2,287.00$ -$
3LAZ1X 4.56 Delete power divider lockout (153.00)$ -$
XZXC1X 4.57 Urethane bushing on Mack camelback suspension (58.00)$ -$
GWXACX 4.58 55" axle spacing 122.00$ -$
GWXJAX 4.59 60" axle spacing 317.00$ -$
ZAXA5X 4.60 Dual leveling valve air suspension height control 149.00$ -$
018AA7 4.61 Mack CRDP1501/1511 with interwheel power divider - both axles 2,735.00$ -$
U4XA5X 4.62 Outboard centrifuse rear brake drums 206.00$ -$
U1AA1X 4.63 Haldex automatic rear slack adjustor STD
U1AA8X 4.64 Haldex automatic rear slack adjustor with stainless steel pins 1 96.00$ 96.00$
U1AB1X 4.65 Meritor automatic rear slack adjustor 1.00$ -$
U1AB8X 4.66 Meritor automatic rear slack adjustor with stainless steel pins 231.00$ -$
U1AAAX 4.67 Haldex S-ABA slack adjustors 50.00$ -$
V1AC1X 4.68 30/36 rear brake chamber 156.00$ -$
OLXAEX 4.69 Comet aluminum hubs w/preset bearings & seals 385.00$ -$
0LX11X 4.70 Aluminum preset rear hubs with integrated spindle nut 37.00$ -$
1CXA3X 4.71 Chicago Rawhide (Scotseal Longlife) oil seal 59.00$ -$
1CXE1X 4.72 National/Federal Mogul 23.00$ -$
1CXC2X 4.73 Stemco-Grit Guard oil seals 63.00$ -$
1CXC3X 4.74 Stemco - Guardian oil seal 31.00$ -$
1CXC4X 4.75 Stemco (Voyager) oil seals (5.00)$ -$
1CXA3X 4.76 Scotseal longlife rear oil seals 59.00$ -$
253AB3 4.77 Air Disc Brake (17") H-Type - Require Air Disc Front Brakes & M-Ride 3
leaf suspension 2,430.00$ -$
253AB8 4.78 Bendix ES165-08D, 16.5" x 8 5/8" Cast Spider - Require M-Ride
suspension. N/A with dust shields 272.00$ -$
253AA4 4.79 Meritor rear brakes - 16.5"7" Q+115.00$ -$
253023 4.80 Meritor rear brakes - 16.5" x 8 5/8+ Q+ - N/A with dust shields 291.00$ -$
253005 4.81 Meritor rear brakes - 16.5" x 8"+ Q+ - N/A with dust shields 213.00$ -$
169009 4.82 13,500 lbs. Hendrickson steerable composite HLUC-2 pusher axle -
includes tires and rims 9,791.00$ -$
169010 4.83 10,000 lbs. Hendrickson steerable composite HLUC-2 pusher axle -
includes tires and rims 9,791.00$ -$
169103 4.84 20,000 lbs. Watson-Chalin steerable SL-2089 Thu Track Series pusher
axle - includes tire and rims 12,381.00$ -$
169104 4.85 13,200 lbs. Watson-Chalin steerable SL-1187 Thu Track Series pusher
axle - includes tire and rims 10,173.00$ -$
169106 4.86 20,000 lbs. Watson-Chalin non-steerable AL-2200 Atlas Series pusher
axle - includes tire and rims 9,198.00$ -$
169800 4.87 20,000 lbs. Hendrickson non - steerable composite HLM pusher axle -
includes tires and rims 9,091.00$ -$
169007 4.88 13,200 lbs. Hendrickson steerable HLUS2Z pusher axle - includes tires
and rims 9,791.00$ -$
169008 4.89
tires and rims 11,192.00$ -$
202009 4.90 13,500 lbs. Hendrickson steerable composite HLUC-2 tag axle - includes
tires and rims 9,791.00$ -$
202010 4.91 10,000 lbs. Hendrickson steerable composite HLUC-2 tag axle - includes
tires and rims 9,791.00$ -$
202103 4.92 20,000 lbs. Watson-Chalin steerable SL-2089 Thu Track Series tag axle -
includes tire and rims 12,381.00$ -$
202104 4.93 13,200 lbs. Watson-Chalin steerable SL-1187 Thu Track Series tag axle -
includes tire and rims 10,173.00$ -$
202106 4.94 20,000 lbs. Watson-Chalin non-steerable AL-2200 Atlas Series tag axle -
includes tire and rims 9,198.00$ -$
202800 4.95 20,000 lbs. Hendrickson non - steerable composite HLM tag axle -
includes tires and rims 9,091.00$ -$
202007 4.96 13,200 lbs. Hendrickson steerable HLUS2Z tag axle - includes tires and
rims 9,791.00$ -$
202008 4.97 20,000 lbs. Hendrickson Paralift HLP20 steerable tag axle - includes tires
and rims 11,192.00$ -$
9GAACX 4.98 6S/6M systems sensing both rear axle wheel end sensors 440.00$ -$
6MAC1X 4.99 Furnish Meritor wide track axle option - Need for Super Singles 1,032.00$ -$
4.99 1 -$
5.0 Fifth Wheel options 1 -$
5.1 Frame end tapered and open -$
X6XB2X 5.2 Frame end tapered and closed 30.00$ -$
330AB7 5.3 Fixed fifth wheel - Holland FW-35 684.00$ -$
330AE7 5.4 Mechanical slide fifth wheel - Holland FW35 Travel -
24" slide 562.00$ -$
330AH4 5.5 Air operated slide fifth wheel - Holland FW35 Travel
24" slide 986.00$ -$
464AA5 5.6 Stainless 1/4 fenders, mounted front of tandems 109.00$ -$
464AA2 5.7 Plastic 1/4 fenders, mounted front of tandems 110.00$ -$
WHX01X 5.8 Tractor package hookup 297.00$ -$
7KXA3X 5.9 Behind cab deck plate 681.00$ -$
330AB8 5.10 Holland fixed with non-tilt 5th wheel 1,385.00$ -$
330AEF 5.11 Holland manual slide 5th wheel 537.00$ -$
69XD3X 5.12 Mack mud flaps with brackets 98.00$ -$
69XC3X 5.13 Betts B60 stainless steel angled mud flap brackets 161.00$ -$
51XD1X 5.14 Hose tender & towel bar assembly 48.00$ -$
5ZXB1X 5.15 Coiled trailer air hose 28.00$ -$
2UAB1X 5.16 Coiled trailer electrical hose 44.00$ -$
OBS04S 5.17 Air Weight AW5800 onboard scales 963.00$ -$
6HXBRX 5.18 Medium height 5th wheel ramp guide 192.00$ -$
322022 5.19 Trailer hook up light 37.00$ -$
5.99 1 -$
6.0 TIRES/RIMS OPTIONS:-$
MC 6.1 Nylon wafers or wheel guards on all wheels (10 ea.)1 44.00$ 44.00$
MC 6.2 Heavier 7500 lb. 22.5 x 8.25 Steel rims in lieu of standard 7300# rims (10
ea.) STD
MC 6.3 Heavier 7500 lb. 22.5 x 8.25 Steel rims in lieu of standard 7300# rims (8
ea.) in rear only 16.00$ -$
900AS0 6.4 11R 22.5 H front tires 39.00$ -$
9000A0 6.5 12R 22.5 H front tires 198.00$ -$
900AB0 6.6 9000 lb. 22.5 9” front steel rims, 315/80R 22.5 J front tires 187.00$ -$
900AC0 6.7 10,000 lb. 22.5 9” front steel rims, 315/80R 22.5 J front tires 1 407.00$ 407.00$
900AX0 6.8 10,500 lb. 22.5 x 12.25 front steel rims, 385/65R 22.5 J front tires 609.00$ -$
9001W0 6.9 10,500 lb. 22.5 x 12.25 front steel rims, 425/65R 22.5 J front tires 669.00$ -$
901AJ6 6.10 11R 22.5 H rear tires 656.00$ -$
531AF0 6.11 7,300 lb. 24.5” x 8.25” steel front rims 5.00$ -$
346AF5 6.12 7300 lb. 24.5” x 8.25” rear steel rims 44.00$ -$
531AF0 6.13 8,000 lb. 24.5” x 8.25" steel front rims 10.00$ -$
3460C6 6.14 8,000 lb. 24.5” x 8.25” steel rear rims 164.00$ -$
9002Q0 6.15 11R 24.5 G front tires 63.00$ -$
9002R0 6.16 11R 24.5 H front tires 105.00$ -$
901AK7 6.17 11R 24.5 G rear tires 164.00$ -$
901AK7 6.18 11R 24.5 H rear tires 480.00$ -$
NUS225 6.19 Steel spare rim, size 22.5 x 8.25 125.00$ -$
NUS245 6.20 Steel spare rim, size 24.5 x 8.25 148.00$ -$
NUS090 6.21 Steel spare rim, size 22.5 x 9.0 380.00$ -$
NUS225 6.22 Steel spare rim, size 22.5 x 12.25 430.00$ -$
900AB0 6.23 12R22.5 H front tires 439.00$ -$
901AK2 6.24 12R 22.5 H rear tires 1,752.00$ -$
6.5
7FXC1X 6.25 Wheel lug wrench - includes handle 48.00$ -$
5310C1 6.26 Aluminum front wheel - 22.5 x 8.25 141.00$ -$
531AI6 6.27 Aluminum front wheel - 24.5 x 8.25 156.00$ -$
5310N1 6.28 Aluminum front wheel - 22.5 x 9.0 1 329.00$ 329.00$
531AJ0 6.29 Aluminum front wheel - 22.5 x 12.25 387.00$ -$
49AA1X 6.30 Polished aluminum front wheel 48.00$ -$
49AB1X 6.31 Dura-bright bright finish front wheels 204.00$ -$
49AA5X 6.32 Wheel finishing with extra polished front wheels 76.00$ -$
346AI7 6.33 Aluminum rear wheels - 22.5 x 8.25 1 492.00$ 492.00$
3460G6 6.34 Aluminum rear wheels - 24.5 x 8.25 600.00$ -$
2350D5 6.35 Polished aluminum rear wheel four outboard of dual wheels 132.00$ -$
235095 6.36 Polished aluminum rear wheel all eight (8) wheels 265.00$ -$
2350A5 6.37 Dura-bright bright finish on all eight (8) rear wheels 1,334.00$ -$
2350C5 6.38 Dura-bright bright finish on all four (4) outboard rear wheels 667.00$ -$
900AA6 6.39 11R22.5 G Bridgestone M843 front tires 223.00$ -$
900AX9 6.40 11R22.5 G Michelin XZE2 front tires 296.00$ -$
900166 6.41 315/80R22.5 L Michelin XZA1 front tires 532.00$ -$
900AW2 6.42 385/65R22.5 J Michelin XZY3 front tires 712.00$ -$
900AW4 6.43 425/65R22.5 L Michelin XZY3 front tires 959.00$ -$
901AA9 6.44 11R22.5 G Bridgestone M843 rear tires 892.00$ -$
901BG1 6.45 11R22.5 G Michelin XDN2 rear tires 1,892.00$ -$
901BG0 6.46 11R22.5 H Michelin XDN2 rear tires 1,964.00$ -$
901AY7 6.47 11R22.5 G Goodyear G622RSD rear tires 2,504.00$ -$
901AY8 6.48 11R22.5 H Goodyear G622RSD rear tires 2,672.00$ -$
6.99 1 -$
7.0 BRAKE SYSTEM OPTIONS:1 -$
VHXBVX 7.1 Wabco System Saver 1200 E heated air dryer STD
UWXB1X 7.2 Manual cable drain valves on air tanks with lanyard on all tanks 24.00$ -$
7.3 Heated air tank -$
UWXE3X 7.4 Auto drain valves on air tanks 1 31.00$ 31.00$
300AD0 7.5 MGM type TR-T rear brake chambers 50.00$ -$
7.6 S.S. pins on slack adjuster yoke (2 ea. per yoke)
For all air brake chambers -$
7.7 Inverted rear brake chamber mounting in lieu of regular mounting -$
MC 7.8 Relocate air dryer 49.00$ -$
VHXBNX 7.9 Bendix AD9 heated air dryer 118.00$ -$
VHXBPX 7.10 Bendix AD-IP heated air dryer 164.00$ -$
VHXEAX 7.11 Meritor/Wabco system twin heated air dryer 539.00$ -$
UWXA1X 7.12 Auto heated drain valve- heated supply tank, manual petcock 42.00$ -$
UWXE1X 7.13 Auto heated drain valve- heated supply tank, with lanyard on all other
tanks 72.00$ -$
U2XA1X 7.14 Aluminum air reservoirs 1 192.00$ 192.00$
U2XA2X 7.15 Polished aluminum air reservoirs 252.00$ -$
VSXD1X 7.16 Increase air capacity for installation of extra axles 289.00$ -$
698AA7 7.17 MACK Road Stability Adv. Bendix ABS/ATC/RSA w/YAW control with
mud/snow switch 1,873.00$ -$
698AA2 7.18 Meritor/Wabco ABS system w/o automatic traction control 142.00$ -$
698AA5 7.19 Bendix ABS system with traction control 1 270.00$ 270.00$
698AA3 7.20 Meritor/Wabco ABS system w/auto traction control 357.00$ -$
H9CA1X 7.21 Furnish automatic traction control (ATC full disable switch)105.00$ -$
UWXB1X 7.22 Lanyard control on supply wet tank 16.00$ -$
300AA3 7.23 Haldex "Gold Seal" brake chamber 1.00$ -$
300AB1 7.24 Haldex "Life Seal" brake chamber STD
300AB3 7.25 MGM TR 30/30 LP3 (3" Stroke) brake chamber 105.00$ -$
300AB5 7.26 MGM LTR (3" Stroke) brake chamber 285.00$ -$
300AB8 7.27 MGM TR3030LP3THD 133.00$ -$
300AE0 7.28 MGM TR-T (Tamper Resistant brake chamber) reclock inlet ports for
optimum ground clearance 68.00$ -$
300AC2 7.29 Haldex "Gold Seal" 3.0" stroke brake chamber 399.00$ -$
3MBC1X 7.30 Electric horn sound when driver door open with park brake released 67.00$ -$
3MBA1X 7.31 Alarm to sound when driver door open & parking brake not on 43.00$ -$
2ZBC1X 7.32 Schreader valve located in supply tank 47.00$ -$
2ZBA1X 7.33 Schreader valve, secondary 47.00$ -$
1JAABX 7.34 Two (2) valve dual brake system-trailer supply and tractor-trailer park 42.00$ -$
141ABO 7.35 Relocate all air reservoir in frame 48.00$ -$
141OF1 7.36 Air reservoir in frame, one reservoir on the RH rail behind Cleartech 48.00$ -$
3FBA1X 7.37 Never-seize to brake shoes pins & cam rollers 33.00$ -$
7.99 1 -$
8.0 ENGINE/EXHAUST AND FUEL TANKS OPTIONS:1 -$ (List Make & Model, H.P., torque of engine and exhaust and fuel tank
options)-$
1000T0 8.1 Mack MP7-325M 325HP@1400-1900 RPM (Peak) 2100 RPM Gov 1250
LB-FT Torque STD
1000U0 8.2 Mack MP7-355A 355HP@1500-1800 RPM (Peak) 2100 RPM Gov 1250
LB-FT Torque 481.00$ -$
1000V0 8.3 Mack MP7-375M 375HP@1500-1900 RPM (Peak) 2100 RPM Gov 1360
LB-FT Torque 813.00$ -$
1000W0 8.4 Mack MP7-425M 425HP@1500-1800 RPM (Peak) 2100 RPM Gov 1560
LB-FT Torque 1 1,508.00$ 1,508.00$
1000P0 8.5 Mack MP7-345C 345HP@1450-1700 RPM (Peak) 1950 RPM Gov 1360
LB-FT Torque 300.00$ -$
1000Q0 8.6 Mack MP7-365C 365HP@1400-1700 RPM (Peak) 1950 RPM Gov 1460
LB-FT Torque 651.00$ -$
1000R0 8.7 Mack MP7-395A 395HP@1450-1700 RPM (Peak) 1950 RPMGov 1560
LB-FT Torque 1,112.00$ -$
1000Z0 8.8 Mack MP7-395C 395HP@1450-1700 RPM (Peak) 1950 RPM Gov 1560
LB-FT Torque 1,112.00$ -$
100100 8.9 Mack MP8-415C 415HP@1400-1700 RPM (Peak) 1950 RPM Gov 1660
LB-FT Torque 2,064.00$ -$
100110 8.10 Mack MP8-445C 445HP@1300-1700 RPM (Peak) 1950 RPM Gov 1860
LB-FT Torque 2,589.00$ -$
1001K0 8.11 Mack MP8-505C 505HP@1500-1700 RPM (Peak) 1950 RPM Gov 1860
LB-FT Torque 3,311.00$ -$
100140 8.12 Mack MP8-425M 425HP@1500-1900 RPM (Peak) 21000 RPM Gov
1560 LB-FT Torque 2,247.00$ -$
100150 8.13 Mack MP8-455M 455HP@1500-1900 RPM (Peak) 21000 RPM Gov
1760 LB-FT Torque 2,635.00$ -$
100160 8.14 Mack MP8-505M 5055HP@1500-1900 RPM (Peak) 21000 RPM Gov
1860 LB-FT Torque 3,759.00$ -$
MC 8.15 Clear Back of Cab - DPF & SCR Frame Mounted , RH Side under Cab 1 114.00$ 114.00$
PK70W7 8.16 PK7-17C2 93 gallon sleeved fuel tank, 20" clearance for outrigger/wing
plow 317.00$ -$
DPF0101 8.17 Cleartech, DPF RH side under cab w/SCR vertical RH side of cab 601.00$ -$
DPF0106 8.18 Cleartech with DPF vertical RH side BOC, w/SCR vertical LH side BOC 3,308.00$ -$
130AD7 8.19 No Muffler, Single (R/S) Vertical Exhaust Cab Mounted, Lower Ventura
Diffuser, Turned End 1 318.00$ 318.00$
130AEO 8.20 No Muffler, Single (R/S) Vertical Exhaust Cab Mounted, Lower Ventura
Diffuser, Plain End 318.00$ -$
130AB5 8.21 Single (R/S) Vertical Straight Exhaust Stack Plain End (16.00)$ -$
130AB6 8.22 Single (R/S) Vertical Straight Exhaust Stack Turned Out STD
130AB7 8.23 Single (R/S) Vertical Straight Exhaust Stack Plain End Perf Stack Diffuser 32.00$ -$
6.5
130AC7 8.24 Single (R/S) Vertical Straight Exhaust Stack Plain End Side Outlet
Diffuser 126.00$ -$
130AC8 8.25 Single (R/S) Vertical Straight Exhaust Stack Plain Top Outlet Diffuser 126.00$ -$
130AC3 8.26 Dual Vertical Straight Exhaust Stack Plain End - N/A with Allison
Transmission 1,065.00$ -$
130AC4 8.27 Dual Vertical Straight Exhaust Stack Turned Out End - N/A with Allison
Transmission 1,091.00$ -$
130AD1 8.28 Dual Vertical Straight Exhaust Stack Plain Side Outlet Diffuser - N/A with
Allison Transmission 1,507.00$ -$
130AD2 8.29 Dual Vertical Straight Exhaust Stack Plain Top Outlet Diffuser - N/A with
Allison Transmission 1,507.00$ -$
Q0AC1X 8.30 Single, Bright finish heat shield & stack 1 65.00$ 65.00$
Q0AF1X 8.31 Dual, Bright finish heat shield & stack 130.00$ -$
Q0AC2X 8.32 Single, Bright finish heat shield, stack & elbow 162.00$ -$
Q0AF2X 8.33 Dual, Bright finish heat shield, stack & elbow 344.00$ -$
Q0AC5X 8.34 Single, Bright finish stack only 50.00$ -$
Q0AF5X 8.35 Dual, Bright finish stack only 99.00$ -$
Q0AC3X 8.36 Single, Bright finish lower elbow & stack 148.00$ -$
Q0AF3X 8.37 Dual, Bright finish lower elbow & stack 294.00$ -$
Q0AC4X 8.38 Single, Bright finish heat shield only 16.00$ -$
Q0AF4X 8.39 Dual, Bright finish heat shield only 31.00$ -$
8NAB1X 8.40 Bright finish stainless steel heat shield for frame mounted Mack Cap DPF 171.00$ -$
288ABO 8.41 50 Gallon LH steel 22" Dia fuel tank (118.00)$ -$
288AA2 8.42 66 Gallon LH steel 22" Dia fuel tank (96.00)$ -$
288AA3 8.43 72 Gallon LH steel 26" Dia fuel tank (62.00)$ -$
288AA5 8.44 88 Gallon LH steel 22" Dia fuel tank 164.00$ -$
288AA6 8.45 93 Gallon LH steel 26" Dia fuel tank 267.00$ -$
288AA7 8.46 116 Gallon LH steel 22" Dia fuel tank 222.00$ -$
288AC2 8.47 50 Gallon LH aluminum 22" Dia fuel tank (64.00)$ -$
288AB3 8.48 66 Gallon LH aluminum 22" Dia fuel tank (45.00)$ -$
288AB4 8.49 72 Gallon LH aluminum 26" Dia fuel tank 24.00$ -$
288AB6 8.50 88 Gallon LH aluminum 22" Dia fuel tank 231.00$ -$
288AB7 8.51 93 Gallon LH aluminum 26" Dia fuel tank 272.00$ -$
288AB9 8.52 116 Gallon LH aluminum 22" Dia fuel tank 292.00$ -$
288AD2 8.53 50 Gallon LH Steel D-Shape (118.00)$ -$
288AC5 8.54 66 Gallon LH Steel D-Shape (68.00)$ -$
288AC7 8.55 88 Gallon LH Steel D-Shape 101.00$ -$
288AC9 8.56 116 Gallon LH Steel D-Shape 300.00$ -$
288AE3 8.57 50 Gallon LH Aluminum D-Shape (118.00)$ -$
288AD5 8.58 66 Gallon LH Aluminum D-Shape (27.00)$ -$
288AD8 8.59 88 Gallon LH Aluminum D-Shape 173.00$ -$
288AD9 8.60 93 Gallon LH Aluminum D-Shape 195.00$ -$
288AE0 8.61 116 Gallon LH Aluminum D-Shape 367.00$ -$
288AF9 8.62 66 Gallon LH Steel D-Shape with Integral DEF Tank (47.00)$ -$
288AG0 8.63 88 Gallon LH Steel D-Shape with Integral DEF Tank 213.00$ -$
288AG1 8.64 111 Gallon LH Steel D-Shape with Integral DEF Tank 325.00$ -$
288AF2 8.65 66 Gallon LH Aluminum D-Shape with Integral DEF Tank STD
288AF3 8.66 72 Gallon LH Aluminum D-Shape 26" Dia. with Integral DEF Tank 171.00$ -$
288AF5 8.67 88 Gallon LH Aluminum D-Shape with Integral DEF Tank 1 240.00$ 240.00$
288AF6 8.68 93 Gallon LH Aluminum D-Shape 26" Dia. with Integral DEF Tank 304.00$ -$
288AF7 8.69 111 Gallon LH Aluminum D-Shape with Integral DEF Tank 378.00$ -$
2880E8 8.70 111 & 66 Gallon Aluminum D-Shape tanks, 66 Gallon isolated for Hyd oil 839.00$ -$
290AB0 8.71 50 Gallon RH steel 22" Dia fuel tank 503.00$ -$
290AA2 8.72 66 Gallon RH steel 22" Dia fuel tank 529.00$ -$
290AA5 8.73 88 Gallon RH steel 22" Dia fuel tank 814.00$ -$
290AA7 8.74 116 Gallon RH steel 22" Dia fuel tank 871.00$ -$
290AC1 8.75 50 Gallon RH aluminum 22" Dia fuel tank 570.00$ -$
290AB3 8.76 66 Gallon RH aluminum 22" Dia fuel tank 593.00$ -$
290AB6 8.77 88 Gallon RH aluminum 22" Dia fuel tank 879.00$ -$
290AB8 8.78 116 Gallon RH aluminum 22" Dia fuel tank 849.00$ -$
290ADO 8.79 50 Gallon RH Steel D-Shape 503.00$ -$
290AC3 8.80 66 Gallon RH Steel D-Shape 566.00$ -$
290AC5 8.81 88 Gallon RH Steel D-Shape 751.00$ -$
290AH0 8.82 116 Gallon RH Steel D-Shape 950.00$ -$
290AE1 8.83 50 Gallon RH Aluminum D-Shape 569.00$ -$
290AD3 8.84 66 Gallon RH Aluminum D-Shape 617.00$ -$
290AD6 8.85 88 Gallon RH Aluminum D-Shape 822.00$ -$
290AD8 8.86 116 Gallon RH Aluminum D-Shape 1,016.00$ -$
R0AA1X 8.87 Single polished aluminum fuel tank 197.00$ -$
ROAA2X 8.88 Dual polished aluminum fuel tank 393.00$ -$
17XAFX 8.89 Isolate RH fuel tank from fuel system for hyd oil 30.00$ -$
12AC1X 8.90 Dual draw & return fuel system 82.00$ -$
852082 8.91 Filter neck screen for fuel tank 71.00$ -$
KFXB1X 8.92 Lockable fuel tank cap 31.00$ -$
8NAB1X 8.93 Bright finish DPF tank cover - Requires with bright finish tanks 171.00$ -$
U6BC1X 8.94 Bright finish DEF tank cover 29.00$ -$
223AA2 8.95 Bright Finish Aluminum steps & stainless steel bright finish straps 189.00$ -$
223AA3 8.96 Bright Finish Fuel Tank Straps - Single Tank 1 32.00$ 32.00$
HZXBAX 8.97 Flocs oil change system w/disconnecting fittings 114.00$ -$
HZXBEX 8.98 Engine oil drain kit, Flocs, SAE 100R2 hose 136.00$ -$
8.99 1 -$
9.0 ENGINE RELATED OPTIONS:1 -$
9.1 Oil fill and dipstick EZ access -$
132AB2 9.2 Delco 35 SI Brushless Alternator, 135 AMP 1 102.00$ 102.00$
132AB4 9.3 Delco 24 SI Alternator, 130 AMP STD
132AB5 9.4 Delco 24 SI Alternator, 145 AMP 18.00$ -$
132AA4 9.5 Leece-Neville Alternator, 145 AMP 70.00$ -$
9.6 Dual element air cleaner -$
1VAADX 9.7 Donaldson Single Stage Air cleaner per spec 12.1 1 278.00$ 278.00$
9.8 Thumb screws for Donaldson. Single stage Air Cleaner -$
9.9 Fuel/water separator/heated/ Thermostatically controlled, __ (Brand)-$
9.10 Davco 382 fuel/water separator, non heated -$
293AA2 9.11 Non-heated fuel/water separator, Mack w/manual drain valve (integral
w/primary fuel filter STD
HWXD1X 9.12 Coolant spin on filter/conditioner 1 47.00$ 47.00$
183AA2 9.13 Front engine powered take off adapter and radiator cut out 103.00$ -$
118048 9.14 Air applied fan drive, Kysor two speed K32 Duro speed fan 135.00$ -$
9.15 Air applied fan drive, ______(Brand)-$
118AA5 9.16 Viscous fan drive - Behr Electronically modulated STD
124AB3 9.17 Radiator hose package (Silicone) per Spec 12.2 240.00$ -$
130AB6 9.18 Curved exhaust pipe end STD
9.19 Fuel tank per specification 12.7 -$
5NXA1X 9.20 Engine block heater 1 65.00$ 65.00$
E8XH5X 9.21 In line fuel heater 407.00$ -$
E8XH5X 9.22 In tank fuel heater 351.00$ -$
9.23 Fuel cooler -$
6.5
121AA5 9.24 Radiator bug screen STD
MC 9.25 Engine brake system 604.00$ -$
MC 9.26 Relocate air dryer 66.00$ -$
119AA6 9.27 Extended life anti-freeze 1 20.00$ 20.00$
9.28 Starter motor options -$
NCX15X 9.29 Starter motor options - Delco 39MT-MXT STD
NCXD1X 9.30 Mitsubishi electric 105P planetary gear reduction 46.00$ -$
MC 9.31 Relocate fuel filter 38.00$ -$
293AA7 9.32 Non-heated fuel/water separator, Racor 1000 FH 349.00$ -$
124AA5 9.33 Silicone radiator & heater hose with gate valve on each heater hose 201.00$ -$
124AC4 9.34 Silicone radiator, spring clamps on radiator & heater, 1/4 turn ball valve
heater hose 212.00$ -$
124014 9.35 Mack brand EPDM radiator & heater hoses with 1/4 turn ball valve 79.00$ -$
124AB2 9.36 Mack brand EPDM radiator & heater hoses with constant torque clamps
on all coolant lines 22.00$ -$
132AA6 9.37 Leece-Neville Alternator, 200 AMP 464.00$ -$
132AA7 9.38 Leece-Neville Alternator, 270 AMP 659.00$ -$
132AA8 9.39 Leece-Neville Alternator, 160 AMP Brushless 106.00$ -$
132AB9 9.40 Delco 24 SI Alternator, 160 AMP 54.00$ -$
132AB6 9.41 Delco 36SI Alternator, 165A Amp Brushless 178.00$ -$
132AB8 9.42 Delco 36SI Alternator, 165A Amp Brushless, w/remote voltage sensing 166.00$ -$
132AA3 9.43 Leece-Neville Alternator, 140 Amp 49.00$ -$
132AA5 9.44 Leece-Neville Alternator, 160 AMP Brush 103.00$ -$
113AA5 9.45 Meritor/Wabco 636 (37.4 CFM) air compressor 783.00$ -$
121AA1 9.46 Without bug screen (22.00)$ -$
121AA8 9.47 Winterfront over radiator mtg bug screen 97.00$ -$
121AA4 9.48 Winter front cover only 52.00$ -$
QHXC1X 9.49 Corrosion resistant oil pan - Recommended for snow plow trucks 126.00$ -$
SSOILP 9.50 Stainless steel oil pan 1 1,950.00$ 1,950.00$
293AA3 9.51 Davco 382 heated fuel-water separator 1 387.00$ 387.00$
293AA6 9.52 Racor fuel filter 1000 FH, 12V electrical heater with Mack integral fuel-
water separator 374.00$ -$
EFXASX 9.53 120V, 1500W block heater with 150W oil pan heater wired to same
receptacle 137.00$ -$
NDXA1X 9.54 Electric preheater 1 53.00$ 53.00$
36AD1X 9.55 Tether device -furnish cap retainer for oil fill, radiator overflow tank, battery
box & tool box when furnish 23.00$ -$
P9ADAX 9.56 Electric primer pump (Mack engine) with momentary switch located LH
rail BOC 96.00$ -$
416AA2 9.57 Rear engine PTO (Repto)1,817.00$ -$
189AB8 9.58 Furnish transmission thru shaft for local installation of RMPTO for Fuller
transmission (lower left)28.00$ -$
189AB7 9.59 Provision for local installation of rear mounted PTO (lower center) includes
dash mounted indicator light 159.00$ -$
TYXC1X 9.60 Air operated PTO control - includes in cab control (RMPTO only)118.00$ -$
TYXE1X 9.61 PTO switch and light with wiring and piping 156.00$ -$
TYXG3X 9.62 PTO switch and light with wiring and piping - M-Drive transmission 156.00$ -$
9.999 1 -$
TRANSMISSION OPTIONS:1 -$
10.1 2 plate 14" ceramic clutch option for manual transmission -$
133AD5 10.2 2 plate 15½" ceramic clutch option for manual transmission -$ -$
RBXA1X 10.3 External grease fitting for throw out bearing 7.00$ -$
133AD6 10.4 Adjustment free option for 2 plate clutches 47.00$ -$
7RXAEX 10.5 Synthetic (TranSynd) lubrication for Automatic Transmission 1 301.00$ 301.00$
7RXB1X 10.6 Synthetic lubrication for manual transmission STD
7RXA1X 10.7 Factory option lube - transmission (56.00)$ -$
136AX6 10.8 Allison 3000-RDS 5/6 speed push button, PTO 178.00$ -$
136055 10.9 Allison 3000-RDS 5/6 speed push button, PTO, w/output retarder 2,278.00$ -$
136B06 10.10 Allison 3000-EVS 6 speed push button, PTO 2,108.00$ -$
136AP6 10.11 Allison 4000-RDS 5 speed push button, PTO 14,280.00$ -$
136AQ6 10.12 Allison 4000-RDS 5/6 speed push button, PTO 13,776.00$ -$
13605G 10.13 Allison 4000-RDS 6 speed push button, PTO, w/output retarder 13,536.00$ -$
136AU6 10.14 Allison 4000-EVS 6 speed push button, PTO 14,972.00$ -$
136AS6 10.15 Allison 4500-RDS 6 speed push button, PTO 1 13,776.00$ 13,776.00$
13605I 10.16 Allison 4500-RDS-R 6 speed, with retarder, push button, PTO 16,776.00$ -$
136AW6 10.17 Allison 4500-EVS 6 speed push button, PTO 14,972.00$ -$
1360Y6 10.18 Mack TMD12AFD-HD automated 12 speed transmission (direct drive)3,718.00$ -$
1360Z6 10.19 Mack TMD12AFD-HD automated 12 speed transmission (over drive)3,718.00$ -$
136146 10.20 Mack TMD13AFD-HD automated 13 speed. Transmission, creeper/multi-
speed reverse (direct drive)7,438.00$ -$
136156 10.21 Mack TMD13AFD-HD automated 13 speed. Transmission, creeper/multi-
speed reverse (over drive)7,438.00$ -$
136176 10.22 Mack TMD13AFD-HD automated 14 speed. Transmission, ultra-low
creeper/multi-speed reverse (over drive)7,839.00$ -$
136AD5 10.29 Fuller FRO-14210C, 10 speed manual transmission, PTO STD
136AD6 10.30 Fuller RTO-14908LL, 10 speed manual transmission, PTO 855.00$ -$
136AD4 10.31 Fuller FRO-15210C, 10 speed manual transmission, PTO 1,639.00$ -$
136AD3 10.32 Fuller FRO-16210C, 10 speed manual transmission, PTO 1,298.00$ -$
136AEO 10.33 Fuller RTO-16908LL, 10 speed manual transmission, PTO 1,585.00$ -$
136AF8 10.34 Fuller FRO-18210C, 10 speed manual transmission, PTO 1,614.00$ -$
136AG2 10.35 Fuller RTO-14909ALL, 11 speed manual transmission, PTO 1,390.00$ -$
136AG1 10.36 Fuller RTO-16908ALL, 11 speed manual transmission, PTO 2,102.00$ -$
136AF5 10.39 Fuller RTLO-16913A, 13 speed manual transmission, PTO 2,111.00$ -$
136AF9 10.40 Fuller RTLO-18913A, 13 speed manual transmission, PTO 2,848.00$ -$
136AD7 10.41 Fuller RTO-16915, 15 speed manual transmission, PTO 2,220.00$ -$
136AB1 10.42 Mack T318LR21, 18 speed manual transmission, PTO 1,561.00$ -$
136AB0 10.43 Mack T318LR, 18 speed manual transmission, PTO 1,277.00$ -$
136AB7 10.44 Mack T318, 18 speed manual transmission, PTO 1,306.00$ -$
136AF7 10.45 Fuller RTLO-16918B, 18 speed manual transmission, PTO 2,725.00$ -$
136AG0 10.46 Fuller RTLO-18918B, 18 speed manual transmission, PTO 3,407.00$ -$
1UXC1X 10.47 Air assist clutch 359.00$ -$
1UXD1X 10.48 Mechanical clutch cable 160.00$ -$
2XAA1X 10.49 Open grated clutch pedal 14.00$ -$
139049 10.50 Transmission oil cooler STD
83AA1X 10.51 Driveshaft guard for center bearing 27.00$ -$
5DAAAX 10.52 Transmission dust proofing 15.00$ -$
492008 10.53 T-Handle shift lever for Allison - Floor mounted 203.00$ -$
MC 10.54 Allison shift to neutral when park brake engaged STD
FSXWQX 10.55 3rd or 4th gear hold for Allison transmission 300.00$ -$
139019 10.56 Stainless steel transmission coolant pipes 1 175.00$ 175.00$
I9CA1X 10.57 Allison fill tune and dip stick under hood 1 138.00$ 138.00$
RBXD1X 10.58 Remote lube fittings: clutch release, brg & both cross-shaft; mounted
under LH door 50.00$ -$
8260E6 10.59 GP1-23 Parker gear pump - requires M-Drive transmission and RMPO 425.00$ -$
8260F6 10.60 GP1-41 Parker gear pump - requires M-Drive transmission and RMPO 434.00$ -$
8260G6 10.61 GP1-60 Parker gear pump - requires M-Drive transmission and RMPO 548.00$ -$
6.5
8260H6 10.62 GP1-80 Parker gear pump - requires M-Drive transmission and RMPO 588.00$ -$
826046 10.63 F1-61R Parker gear pump - requires M-Drive transmission and RMPO 637.00$ -$
826036 10.64 F1-81R Parker gear pump - requires M-Drive transmission and RMPO 710.00$ -$
826056 10.65 F1-101R Parker gear pump - requires M-Drive transmission and RMPO 857.00$ -$
10.999 1 -$
11.0 ELECTRICAL OPTIONS:1 -$
11.1 Resettable circuit breaker electrical protection -$
11.2 Automatic reset circuit breakers -$
11.3 Solid state circuit protection -$
11.4 Circuit box under hood or end of frame, each -$
318AA3 11.5 Battery disconnect off negative side in cab control 97.00$ -$
LLXC1X 11.6 Remote jump start terminals 111.00$ -$
11.7 Back up alarm (Preco Factory Model)-$
LSXH1X 11.8 OEM daytime running lights STD
316AA7 11.9 3000 CCA batteries in lieu of 1950CCA 1 66.00$ 66.00$
316AA6 11.10 3 each 650/1950 CCA batteries in lieu of 2 each batteries STD
11.11 Battery box aft of cab -$
11.12 Grote 44710 flasher -$
11.13 Signal Stat 935 turn signal per Spec 12.6 -$
11.14 Auxiliary customer access circuits -$
NJXA3X 11.15
Switch for snowplow lights mounted on instrumental panel. Includes wiring
terminated near headlights, for customer mounted auxiliary snowplow
lights.1 80.00$ 80.00$
11.16 Power source terminal-2 stud type-mounted on firewall or inside cab with
ground to frame rail and to starter, with 6 gauge wire.-$
11.17
10-position switch panel mounted on instrument panel. Includes 10 lighted
switches, ignition control; switches will control relays which will feed stud
type junction block mounted inside cab.-$
136SPD 11.18 Vehicle speed sensor with speed signal at fuse panel for sander ground
speed control system.1 20.00$ 20.00$
393AC4 11.19 Battery box left hand rail back of fuel tank 48.00$ -$
4SBB1X 11.20 Battery terminal cable with tall battery terminal nuts 8.00$ -$
3XAA1X 11.21 Dash mounted indicator body/hoist up body builder lamp 1 71.00$ 71.00$
O5AGAX 11.22 RH/LH led work light on both side of truck 113.00$ -$
L5XF1X 11.23 Polished aluminum battery box cover 1 52.00$ 52.00$
L5XL1X 11.24 Molded plastic with splash guard 29.00$ -$
L5XH1X 11.25 Painted steel battery box 23.00$ -$
L5XJ1X 11.26 Lockable steel battery box 69.00$ -$
MOXAAX 11.27 Battery shock pad 1 4.00$ 4.00$
B83083 11.28 Body Link w/cab floor pass thru hole/rubber boot 1.00$ -$
B83093 11.29 Body Link w/o cab floor pass thru hole/rubber boot STD
EAXB1X 11.30 2 Extra dash mounted illuminated toggle switches 16.00$ -$
EAXA2X 11.31 One extra dash mounted rocker switch thru battery for local installed items 10.00$ -$
EAXA1X 11.32 One extra dash mounted rocker switch thru ignition for local installed items 10.00$ -$
EAXD4X 11.33 Six extra switches 2-15A ignition, 1-20A ignition, 1-10A ignition, 1- 5A
battery, & 1-20A battery 111.00$ -$
EAXAUX 11.34 Eight switches - front strobe, rear strobes, wing light, wing strobe, sander
light, tail gate lock, and vibrator 1 237.00$ 237.00$
5RXA3X 11.35 Back up alarm with intermittent feature (Ambient noise sensitive)98.00$ -$
5RXA6X 11.36 Ecco back-up alarm 575 constant sound level 74.00$ -$
5RXA5X 11.37 Ecco back-up alarm SA917 ambient noise sensitive 1 98.00$ 98.00$
5RXA7X 11.38 Pollak 41-722 constant audible (mounted on rear crossmember)80.00$ -$
NGXB1X 11.39 Fog lights 93.00$ -$
NGXP1X 11.40 Fog lights provisions - includes dash control & wiring for local installation
of fog lights 13.00$ -$
NEXZ1X 11.41 Omit rear tail lights (38.00)$ -$
NEXD1X 11.42 Incandescent tail light module 91.00$ -$
JMXC1X 11.43 Brake lighting on with engine brake 84.00$ -$
NEXD2X 11.44 LED type tail lights 1 199.00$ 199.00$
316046 11.45 Two Mack M/F 925/1850 CCA batteries 56.00$ -$
316AA8 11.46 Three Mack 730/2190 CCA batteries 5.00$ -$
316AA9 11.47 Three Mack 800 CCA AGM Long Life Batteries 263.00$ -$
316AB2 11.48 Four Mack 1000/4000 CCA 182.00$ -$
N7XC1X 11.49 Switch in dash with wiring to cab roof, above LH & RH doors for local
installation of strobe lights 32.00$ -$
N7XB3X 11.50 LED strobe beacon lights mounted on top of cab with switch on D-panel 196.00$ -$
N4AA1X 11.51 LH roof mounted spot light 71.00$ -$
5FBB1X 11.52 Trucklite LED side marker light 102.00$ -$
11.999 1 -$
12.0 CAB EXTERIOR OPTIONS:1 -$
LXXD1X 12.1 Dual electric horns 6.00$ -$
154AC3 12.2 Air horns, dual, round, with snow shields 95.00$ -$
154AA3 12.3 Dual rectangular air horns 72.00$ -$
15H07H 12.4 Fender mirrors per Spec 12.4 133.00$ -$
152AA4 12.5 Heated mirrors per Spec 12.5 -West Coast 104.00$ -$
152AC3 12.6 Remote control for R.H. mirror & heated -Bulldog stylized mirrors 378.00$ -$
152AC4 12.7 Remote control for dual mirrors & heated - Bulldog stylized mirrors with
integral convex mirror 1 474.00$ 474.00$
12.8 Upcharge for cab extension or larger cab -$
12.9 Severe duty aluminum cab option -$
944AGO 12.10 Dupont Highway orange paint or equal 31.00$ -$
924034 12.11 Premium paint color option 233.00$ -$
924014 12.12 Imron paint option STD
996AA3 12.13 Imron and clear coat paint option STD
950045 12.14 Top of hood painted flat black 607.00$ -$
12.15 Cab Air Ride Suspension STD
MC 12.16 Tilting hood per Spec 12.8 STD
26XA1X 12.17 Butterfly option on hood 1 413.00$ 413.00$
12.18 Transverse hood opening w/setback axle -$
12.19 Front fender mounted turn signals -$
157027 12.20 Cab visor, external, painted to match cab color 1 184.00$ 184.00$
2KXA1X 12.21 Front fender extensions 1 105.00$ 105.00$
2HXA1X 12.22 Front fender mud flaps STD
148AA5 12.23 Arctic winter wiper blades 1 19.00$ 19.00$
JQXABX 12.24 Optional windshield washer tank 26.00$ -$
MC 12.25 Per truck charge for all trucks, key identical 20.00$ -$
Q4XACX 12.26 RH observation prism window in door 28.00$ -$
N4AA1X 12.27 Spotlight LH, RH, or roof mounted each 71.00$ -$
243043 12.28 Front tow hooks STD
6PXZ1X 12.29 Rear tow hooks 1 22.00$ 22.00$
MC 12.30 Per truck charge for all trucks, key identical - 4 keys 39.00$ -$
152AA5 12.31 Heated mirrors per Spec 12.5 -West Coast heated & illuminated 123.00$ -$
152AC2 12.32 Heated mirrors per Spec 12.5 -Bulldog Stylized mirrors w/integral convex
mirrors 272.00$ -$
152AA1 12.33 Heated mirrors per Spec 12.5 -Body color aero mirror with integrated
convex mirror (49.00)$ -$
6.5
152AA8 12.34 Remote control for R.H. mirror & heated -Aerodynamic 344.00$ -$
152AB9 12.35 Hadley/Kam 4-way mirrors with chrome steel - RH motorized & heated 214.00$ -$
152AC5 12.36 Remote control for dual mirrors & heated - Bulldog stylized mirrors
illuminated with integral convex mirror 502.00$ -$
152AA7 12.37 Remote control for dual mirrors & heated - Aerodynamic 444.00$ -$
152AB6 12.38 Remote control for dual mirrors & heated - Aerodynamic body color 134.00$ -$
152AC0 12.39 Hadley/Kam 4-way mirrors with chrome steel - RH/LH both motorized &
heated 252.00$ -$
Q4XACX 12.40 RH observation prism window in door 28.00$ -$
148AA5 12.41 Heated electric wiper blades 118.00$ -$
145AA5 12.42 Heated windshield 1 425.00$ 425.00$
WSXAAX 12.43 One piece windshield 1 83.00$ 83.00$
145AA4 12.44 Tinted windshield and sides w/50% transmittance gray, tinted rear window 50.00$ -$
OEAA1X 12.45 Bright finish hood intake 1 16.00$ 16.00$
400AA6 12.46 Bright finish bars with surround grille 1 240.00$ 240.00$
400AA5 12.47 Bright finish grille 32.00$ -$
512AA6 12.48 Bullet type chrome marker & clearance lights 1 75.00$ 75.00$
312AB5 12.49 Led type marker & clearance lights 75.00$ -$
7HX10X 12.50 RH tool box mounted on frame rail 221.00$ -$
153AA3 12.51 Heated convex mirrors 34.00$ -$
12AB1X 12.52 Electronic keyless entry 130.00$ -$
15H02H 12.53 Bright finish RH fender mirror 67.00$ -$
15H0GH 12.54 Bus style 1/4 round black finish fender mirrors 191.00$ -$
157037 12.55 Stainless steel exterior sun visor 247.00$ -$
4UAB1X 12.56 Bright Finish hood latches 89.00$ -$
15H0NH 12.57 10" round bright finish heated fender mirrors 1 234.00$ 234.00$
43X40X 12.58 Rect convex mirror above RH driver door window 23.00$ -$
-$
13.0 CAB INTERIOR OPTIONS:1 -$
13.1 Medium grade interior trim package -$
004AA4 13.2 Sandstone Color with woodgrain instrument panel 292.00$ -$
004AA5 13.3 Sandstone Color with brushed metallic instrument panel 292.00$ -$
004AA4 13.4 Slate Gray Color with woodgrain instrument panel 292.00$ -$
004AA5 13.5 Slate Gray Color with brushed metallic instrument panel 292.00$ -$
13.6 Premium grade interior trim package includes power
window and locks in package -$
004AB1 13.7 Sandstone Color with woodgrain instrument panel 1,087.00$ -$
004AB2 13.8 Sandstone Color with brushed metallic instrument panel 1,087.00$ -$
004AB1 13.9 Slate Gray Color with woodgrain instrument panel 1,087.00$ -$
004AB1 13.10 Slate Gray Color with brushed metallic instrument panel 1 1,087.00$ 1,087.00$
N6XR2X 13.11 Round universal gauge package STD
146AA4 13.12 Power window, passenger side 158.00$ -$
146AA3 13.13 Power window/both passenger and driver window 325.00$ -$
17400N 13.14 O.E.M factory installed, AM/FM Premium stereo, CD-Player,
Weatherboard, Handfree interface, Bluetooth STD
174054 13.15 O.E.M factory installed, AM/FM Premium stereo, CD-Player,
Weatherband, Handfree interface, Bluetooth, Sirius/XM Satellite 157.00$ -$
174AA2 13.16 Radio accommodation package includes antenna, power supply and two
speakers (No radio)(175.00)$ -$
17400M 13.17 O.E.M factory installed, AM/FM stereo, MP3, Weatherband, Handfree
interface, Bluetooth (45.00)$ -$
173AA4 13.18 O.E.M factory installed, air conditioning STD
13.19 Cab mounted non-resettable hour meter -$
PVXZ1X 13.20 Dash mounted air cleaner air restriction gauge - (Display in Co-Pilot only)STD
N6XR2X 13.21 Transmission temp gauges STD
3CAA1X 13.22 Windshield defroster fan w/switch dash mounted 87.00$ -$
IFXC1X 13.23 Between seats mounted console 308.00$ -$
13.24 Transmission oil sensor (check & fill)STD
1WAA1X 13.25 CB hot jacks dash mounted 13.00$ -$
XRXB1X 13.26 Tilt & telescope steering wheel STD
13.27 Tilt steering wheel -$
NPXB1X 13.28 Self canceling turn signals STD
List seating options for driver and passenger seats. Use as many options
as you need to offer seat variations customers have been buying. -$
1960H6 13.29 Bostrom Talladega 915 Hi-Back air driver seat 26.00$ -$
1960S6 13.30 Bostrom Talladega 915 wide ride Hi-Back air driver with 4 chamber air
lumbar 181.00$ -$
1960C6 13.31 Bostrom Talladega 915 Hi-Back air driver seat and air lumbar support 137.00$ -$
1960W6 13.32 Air-Sears Atlas 70 hi-back driver seat 246.00$ -$
1960Y6 13.33 Air-Sears Atlas 70 hi-back driver seat "Premium comfort with height adj.
Air lumbar 301.00$ -$
1960V6 13.34 Air-Sears Atlas 80 hi-back driver seat 4 chamber air lumbar 1 374.00$ 374.00$
1960L6 13.35 National 2000 hi-back air driver seat - single chamber air lumbar, 2
position front cushion adjustable 104.00$ -$
1960J6 13.36 National 2000 hi-back air driver seat - three chamber air lumbar, 2 position
front cushion adjustable front cushion with adjustable rear cushion 199.00$ -$
1970I7 13.37 Mack fixed rider seat mid-back with integral storage compartment 82.00$ -$
1970J7 13.38 Mack fixed rider seat hi-back with integral storage compartment 106.00$ -$
1970D7 13.39 Extended non suspension rider seat with seat belts (2)101.00$ -$
1970E7 13.40 Mack fixed hi-back rider seat 44.00$ -$
1970i7 13.41 Bostrom Talladega 900R mid-back non suspension rider seat 74.00$ -$
1970M7 13.42 Bostrom Talladega 900R hi-back non suspension rider seat 95.00$ -$
1970Q7 13.43 Bostrom Talladega 915 mid back air rider seat 200.00$ -$
1970R7 13.44 Bostrom Talladega 915 hi-back air rider seat 297.00$ -$
1970T7 13.45 Bostrom Talladega 915 hi-back air rider seat with air lumbar 297.00$ -$
1970U7 13.46 National 2000 mid-back air rider seat 214.00$ -$
1970V7 13.47 National 2000 hi-back air rider seat 1 250.00$ 250.00$
1970C7 13.48 Omit rider seat (40.00)$ -$
3PXA1X 13.49 Inboard mounted driver arm rest -$ -$
3PXC1X 13.50 Inboard mounted rider arm rest - Air Ride Seat Only -$ -$
4850K5 13.51 Cloth with vinyl driver & rider seat -$ -$
0HAA1X 13.52 Driver seat dust cover -$ -$
0HAB1X 13.53 Passenger seat dust cover - Not Available with fix passenger seat -$ -$
4850N5 13.54 All ultra leather drive and ride set 95.00$ -$
5920I2 13.55 Orange driver & rider seat belt 1 76.00$ 76.00$
D8XC1X 13.56 Light & buzzer for seat belt 1 35.00$ 35.00$
2QAB1X 13.57 Push button type starter 13.00$ -$
5870D7 13.58 Diagonal grab handle on inside of driver door 1 35.00$ 35.00$
C0J0022 13.59 Co-pilot driver display (enhanced 4.5" diagonal graphic LCD display w/4-
button stalk control - includes guard dog routine maintenance monitoring STD
PFXB1X 13.60 Roadwatch ambient air temp gauge for outside and road temps - requires
aero-dynamic mirrors 648.00$ -$
PFXC1X 13.61 Roadwatch ambient air temp gauge for outside and road temps without
display - includes cable to D panel with 6" extra wire 967.00$ -$
PFXD1X 13.62 Roadwatch ambient air temp gauge for outside and road temps with
display on dash panel 1,081.00$ -$
6.5
MC 13.63 5lb fire extinguisher between LH seat base and door with valve aimed
rearward 1 66.00$ 66.00$
MC 13.64 Reflector kit parallel to inside of rider base seat 1 27.00$ 27.00$
173AA5 13.65 Air conditioning blend air HVAC with ATC temp regulation 81.00$ -$
173AA6 13.66 Air conditioning blend air HVAC with ATC temp regulation & APADS 1 226.00$ 226.00$
173AA7 13.67 Air conditioning with air conditioning protection & diagnostic system
(APADS)132.00$ -$
I6AA1X 13.68 Cab cleanout - includes in cab pneumatic line 1 46.00$ 46.00$
3JAA2X 13.69 40 Channel CB Radio, 10 channel weather 205.00$ -$
73AC1X 13.70 48" Radio antenna right side mirror mounted 4.00$ -$
5BXB5X 13.71 48"CB Antenna left side mirror mounted 38.00$ -$
1WAC1X 13.72 CB hot jacks mounted on the dash and in header console 17.00$ -$
5JXAKX 13.73 CB mounting in console & external speakers 107.00$ -$
0LAA1X 13.74 Auto shutoff for radio when truck is in reverse 47.00$ -$
N6XR2X 13.75 Exhaust pyrometer & transmission oil temperature gauges STD
N6XR4X 13.76 Exhaust pyrometer, transmission oil temperature, manifold pressure and
air application gauges 75.00$ -$
N6XR5X 13.77 Exhaust pyrometer, transmission oil temperature, manifold pressure and
air application gauges, Air Suspension 100.00$ -$
E1AAAX 13.78 Rear Axle temperature gauge 91.00$ -$
I0XAJX 13.79 Red floor lighting w/switch plus (4) door lamps w/switches 103.00$ -$
IFXC1X 13.80 Interior storage console mounted on floor between seats w/12 volt power
outlet 308.00$ -$
IFXD1X 13.81 Bodybuilder interior console mounted to floor between seats 209.00$ -$
13.999 1 -$
14.0 MN/DOT OPTIONS:-$
14.10 Additional warranty coverage per spec 12.9 -$
M510B1 14.20 Engine Plan 1 60 months 250,000 miles 1,200.00$ -$
M510F1 14.30 Engine Plan 1 72 months 250,000 miles 2,200.00$ -$
M510G1 14.40 Engine Plan 1 84 months 250,000 miles 2,520.00$ -$
M510N1 14.50 Engine Plan 1 60 months 250,000 miles - HP over 460 horses 2,000.00$ -$
M510R1 14.60 Engine Plan 1 72 months 250,000 miles - HP over 460 horses 3,300.00$ -$
M510S1 14.70 Engine Plan 1 84 months 250,000 miles - HP over 460 horses 3,800.00$ -$
M510Z1 14.80 Engine Plan 2 60 months 250,000 miles 1,900.00$ -$
M51131 14.90 Engine Plan 2 72 months 250,000 miles 3,800.00$ -$
M51141 14.10 Engine Plan 2 84 months 250,000 miles 4,300.00$ -$
M511B1 14.11 Engine Plan 2 60 months 250,000 miles - HP over 460 horses 2,950.00$ -$
M511F1 14.12 Engine Plan 2 72 months 250,000 miles - HP over 460 horses 5,675.00$ -$
511G1 14.13 Engine Plan 2 84 months 250,000 miles - HP over 460 horses 6,450.00$ -$
M53083 14.14 Engine after-treatment systems (EATS) 60 months 250,000 miles 675.00$ -$
M530Y3 14.15 Engine after-treatment systems (EATS) 72 months 250,000 miles 825.00$ -$
M531O3 14.16 Engine after-treatment systems (EATS) 84 months 250,000 miles 950.00$ -$
M54174 14.17 M-Drive Transmission 48 months 500,000 miles 971.00$ -$
M54184 14.18 M-Drive Transmission 60 months 500,000 miles 2,067.00$ -$
M540I4 14.19 M-Drive HD Transmission 48 months 250,000 miles 775.00$ -$
M540J4 14.20 M-Drive HD Transmission 60 months 250,000 miles 1,150.00$ -$
M71051 14.21 M-Drive Clutch 48 months 250,000 395.00$ -$
M71061 14.22 M-Drive Clutch 60 months 250,000 695.00$ -$
M560A6 14.23 HVAC (Air Conditioning) 60 months 600.00$ -$
M59089 14.24 Starter 60 months 300,000 miles 203.00$ -$
M60080 14.25 Alternator 60 months 300,000 miles 231.00$ -$
M61071 14.26 Starter & Alternator 60 months 300,000 miles 315.00$ -$
14.27 Prebuild specification meeting (per person) to be held in St.
Paul/Minneapolis area. 1.00$ -$
14.28 Pilot inspection meeting (per person). 900.00$ -$
14.9 1 -$
14.9 1 -$
15.0 TRAILER TOW OPTIONS:1 -$
WHXQ2X 15.1 Trailer tow package extended to rear of frame 317.00$ -$
WHXG6X 15.2 Trailer package extend to rear of frame per Spec 12.12 417.00$ -$
321031 15.3 Single 7 pin SAE type, end of frame 117.00$ -$
3210M1 15.4 Dual 7 pins standard SAE type, end of frame (1) for trailer with electric
brakes, (1) for trailer with air brakes 158.00$ -$
WGXA1X 15.5 Hand control valve for trailer brakes 47.00$ -$
15.9 1 -$
16.0 MANUALS / TRADE-IN INTEREST FEE:1 -$
16.1
Percent interest per month (non-compounding) on unpaid cab & chassis
balance. Applies only to CPV Members. (Payable after trade-in is
delivered to vendor). Percentage/per month. 1.50$ -$
16.3 Manuals in CD form, parts repair and service, per set 500.00$ -$
16.4 Premium Tech Tool 3,800.00$ -$
16.9 1 -$
17.0 Delivery Charges:1 -$
Price per loaded mile Starting Point -$
17.1 Roseville, MN 55113 2.00$ -$
17.9 1 -$
18.0 Maintence/ Body Shop Labor Rates Per Hour 1 -$
18.1 Rate for Initial Inspection/Diagnostoce 167.00$ -$
18.2 Rate for Mechanical Work 167.00$ -$
18.3 Rate for Body Work 167.00$ -$
1.9 1
19.0 Quantity Discounts:1Enter the number of units that must be purchased and the corresponding
discount offered to the purchaser. More than one quantity discount may
be entered.
19.1 -$
19.2 -$
20.0 1
20.0 Next Model Year Upcharges 1
Enter the following Production Model Year here >>>>>>>>>2023
20.1 Percentage Upcharge for the following Model Year Base Unit 1 1.50%1,888.00$
20.2 Percentage Upcharge for the following Model Year Options 1.50%
Total Cost:127,716.00$
6.5
TRKQT3
Ship To: Cust: Phone:Bill To: Phone:
ATTN:
Reference No.
Accepted by Date
PO#Salesman Created Last Revised Appx CompTerms
Serial No.
Price:
Total Discounts:
Net Cost:
Freight
Total:
CRYSTAL, CITY OF
4141 DOUGLAS DRIVE NORTH
CRYSTAL
CRYSTAL, CITY OF
4141 DOUGLAS DRIVE NORTH
CRYSTAL
BILL BOWMAN 763-531-1164
JOSH PAULSON
QT 67086
NET 30 DAYS 7/20/21 7/21/21
3445
Qty Part No. Description Price Ea. Net Amt.
1 9900066 - Body 14'0" EDGE-RC/CS-56-46-46 - - 56" 3/16" Hardox 450 $11,248.00 $11,248.00
Front w/CS hoist doghouse, 46" 3/16" Hardox 450 radius sides (no
pockets), 46" 3/16" Hardox 450 Tailgate, 1/4" Hardox-450 Floor, 8"
I-Beam Longs ills, Air-trip ready linkage, unpainted.
1 9901704 - Painting of Dump Body; includes media blasting of entire $3,105.00 $3,105.00
exterior & understructure, Urethane Primed, & Urethane Top Coat
s applied. CAB MATCH (COLOR) CONTRAST (COLOR) Understructure is seam
sealed, and painted Gloss Black.
1 9901701 - Installation of Dump Body to hoist $1,548.00 $1,548.00
1 9900145 - Body acc'y TMTE Air trip kit, w/solenoid valve, $401.00 $401.00
1 9901702 - Installation of air operated tailgate latch kit, with $305.00 $305.00
solenoid valve in hydraulic valve enclosure.
1 9900147 - Body acc Box Vibrator - Cougar model DC3200 $703.00 $703.00
1 9901703 - Installation of Box Vibrator, with solenoid located in $355.00 $355.00
hydraulic valve enclosure.
1 9900155 - Cabshield, 1/2 type Stationary Free-Standing style, $2,080.00 $2,080.00
w/painted CARBON STEEL canopy, Hot-Dipped Galvanized tubing
tion support stand, (2) shovel holders, & reservior mounts,
Installed.
1 9900206 - Ladder Flip-A-Way Access ladder Pkg (Carbon Steel), $381.00 $381.00
Including Grab Handle above, and Interior Step, ea, Installed
LOCATED LH FRONT
1 9904246 - Light Warning TMTE1SS-3 PKG: (2) STAINLESS STEEL 23H $4,110.00 $4,110.00
3-light LED Micro-Edge, (2) 5M-400 Super-LED, (2) Side TIR3 LED, (2
*--- Continued ---*
MN 55422 USA MN 55422 USA
0/00/00
** QUOTATION **
6.5
TRKQT3
Ship To: Cust: Phone:Bill To: Phone:
ATTN:
Reference No.
Accepted by Date
PO#Salesman Created Last Revised Appx CompTerms
Serial No.
Price:
Total Discounts:
Net Cost:
Freight
Total:
CRYSTAL, CITY OF
4141 DOUGLAS DRIVE NORTH
CRYSTAL
CRYSTAL, CITY OF
4141 DOUGLAS DRIVE NORTH
CRYSTAL
BILL BOWMAN 763-531-1164
JOSH PAULSON
QT 67086
NET 30 DAYS 7/20/21 7/21/21
3445
$44,541.00
$44,541.00
) 400 Max B-T-T LED, & (2) 400 LED BU Lights, in Stainless M
Housings, (1) TIR3 LED Wing light, and (2) 4" LED work lights
Installed
1 9900267 - Fender set Minimizer M400, for Tandem Axle, black Poly, $1,323.00 $1,323.00
Installed
1 9900276 - Tarp Pulltarp (SGL or TDM) model S-9 Supershield tarp $2,174.00 $2,174.00
system w/A2F tarp, sideflaps & tiedowns,
installed
1 9900317 - Hoist Towmaster/MAILHOT CS130-5.5-3 DOUBLE ACTING $4,004.00 $4,004.00
1 9901711 - Installation of Telescopic DOUBLE acting hoist $989.00 $989.00
1 9900311 - Hoist TMTE 48" Stabilizer $1,663.00 $1,663.00
1 9902503 - Installation of TMTE Stabilizer & Safety Props $490.00 $490.00
1 9905465 - Hydraulic pkg Auto trans, Hoist only, air control, 30 gal $9,662.00 $9,662.00
reservior, Filter, 280 Hot Shift PTO and 102 Pump installed
Hydraulic pkg Auto trans, Hoist only, air control, 20 gal reservior,
Filter, HotShift 280 PTO and C102DPump installed complete
1 WARRANTY - TOWMASTER EXCLUSIVE WARRANTY: 5 yr Steel/Stainless Steel
Body Structure; 5 yr Whelen LED Light Systems; 3 yr Palfinger
Hoists; 4 yr SwapLoader Hoists; 1 year Swenson Spreaders, 2 yr Hyd,
FALLS Snow Equip, Tele Hoists, and all other items.
$44,541.00
MN 55422 USA MN 55422 USA
0/00/00
** QUOTATION **
6.5
RESOLUTION NO. 2021- _____
APPROVING THE PURCHASE OF A
REPLACEMENT DUMP TRUCK AND ATTACHMENTS
WHEREAS, the Crystal City Council is committed to providing and maintaining quality
infrastructure that is essential for everyday residential, commercial, industrial, and recreational
activities in the City; and
WHEREAS, a dump truck is used across all public works operations; and
WHEREAS, the existing dump truck scored as qualifying for replacement on the vehicle
condition index; and
WHEREAS, funds are allocated in the Fleet Maintenance Fund for this replacement
purchase;
NOW, THEREFORE, BE IT RESOLVED that the Crystal City Council hereby approves
the purchase of a dump truck from Nuss Truck and Equipment for $127,716 and the truck
attachments from Towmaster Truck Equipment for $44,541.
BE IT FURTHER RESOLVED that the Crystal City Council hereby authorizes the sale
of the existing dump truck at auction.
Adopted by the Crystal City Council this 21st day of December 2021.
Jim Adams, Mayor
ATTEST:
Chrissy Serres, City Clerk
6.5
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
please hand this Ntm ao the Clry Clerk Oebre the meetln8 begins.
To rtei@amem attendants fin all,ap"klnOml is limited
Cut three minutes and wpm dissmsdan is nmirea w ]a mim mus.
(Mfmmoliwl pauided an has form is We to IM prow
(please pnMekalrIlV)
Thus upm I Wish to address B.
1 I.
juldri 33
Zip Chief S�Date: ttClijzzl
Cars Ph", (opmnnl). I
Emall(opnnnol,: ✓1 fa Cf ^tr nnn�IJdK.LO
ihankyaufor Vom aXmEanceaN W/XrlPaekn