Loading...
2013.02.05 Work Session Packet (1st)Crrriof CRYSTAL CITY COUNCIL CRYSTAL FIRST WORK SESSION AGENDA _ i Tuesday, February 5, 2013 6:00 P.M. Conference Room A Pursuant to due call and notice given in the manner prescribed by Section 3.01 of the City Charter, the work session of the Crystal City Council was held at p.m. on Tuesday, February 5, 2013 in Conference Room A located at 4141 Douglas Drive, Crystal, Minnesota. I. Attendance Council members Deshler Hoffmann Libby Peak Selton Adams Budziszewski Staff Norris Therres Norton Revering Mathisen Serres II. Agenda The purpose of the work session is to discuss the following agenda item: ■ Phase 13 sidewalks and parking restrictions III. Adjournment The work session adjourned at p.m. ..................... C, - FROM: COUNCIL STAFF REPORT Phase 13 Becker Park Street Project #2012-13 AL Tom Mathisen, Public Works Director & City Engineer TO: Anne Norris, City Manager (for February 5 Council Work Session) DATE: January 28, 2013 RE: State Aid Street Sidewalks and 54th Ave. No Parking INTRODUCTION AND BACKGROUND On October 16, 2012, the Council adopted a resolution ordering the preparation of the plans and specifications for the Phase 13 Becker Park Street Reconstruction Project. That work has been completed and the Council is being requested to approve the plans and specifications and order the advertisement for bids at the February 5 Council meeting. These plans include the sidewalks shown in the Feasibility Study and the attached graphic. They are located as follows: 54th Avenue — West Broadway Avenue to Nevada Avenue — north side. Nevada Avenue — 54th Avenue to Bass Lake Road — west side. DISCUSSION Since Phase 3 in 1997, sidewalks constructed on one side of State Aid streets have been part of the Street Reconstruction Program. The purpose of this sidewalk construction program is to develop a basic network of sidewalks throughout the City's residential neighborhoods. The network connects to the county road sidewalk system. There have been two opportunities to date for property owners adjacent to the proposed sidewalks to comment. The first was at a neighborhood meeting September 12, 2012 (see attached meeting invitation). At that meeting there was no opposition to the proposed sidewalks. The second was at the January 10 project wide neighborhood plan review meeting. Once again, there were no negative comments regarding the sidewalks. Per the attached invitation, affected property owners have been notified that the Phase 13 sidewalks will be on the agenda for the February 5 Council meeting. The proposed sidewalks provide neighborhood access to both St. Rafael School, and also to the south pedestrian entrance to the city shopping area at Target and Michaels and other businesses. The cost of the sidewalks is covered by State Aid gas tax dollars. There is no cost to adjoining property owners, and the City maintains the sidewalks, all per City policy. In December the Council adopted a resolution establishing No Parking on the north side of 54th Avenue and the east side of Nevada Avenue. State Aid design rules require that on a 32 foot wide street that parking be allowed on only one side. At the time of the December meeting it was not known if the sidewalks would remain in the construction plans, but in order to meet State Aid project deadlines, it was necessary to establish no parking on one side or the other of both 54th and Nevada Avenues. If the Council approves the construction of the sidewalks, it will be necessary to rescind the 54th Avenue No Parking on the north side and move it to the south side. Per City policy the parking lane is located on the same side as the sidewalk to provide a buffer between pedestrians and traffic. If the Council approves the plans and specification at the February 5 Council meeting, the sidewalks will be constructed as described above. Respectfully submitted, Thomas A. Mathisen City Engineer I:pubworks/projects/phasel3/Sidewalk Reviewmem 4141 Douglas Drive North - Crystal, MN 55422-1696 Telephone: (763) 531-1000 - Fax: (763) 531-1188 Website: www.ci.crystal.mn.us TO: Property Owners and Residents adjacent to the following city streets in the 2013 — Phase 13 Becker Park Street Reconstruction Project Area: • 54th Avenue — West Broadway to Nevada Avenue • Nevada Avenue — 54th Avenue to Bass Lake Road FROM: Aaron Ditzler, SEH Project Manager Tom Mathisen, Crystal City Engineer DATE: January 22, 2013 RE: Phase 13 Sidewalks Agenda Item - Council Meeting 7 p.m., Tuesday February 5 at Crystal City Hall, 4141 Douglas Drive N. This past fall you were invited to a neighborhood meeting to discuss State Aid Street designations, sidewalks, and no parking on both Nevada Avenue and 54"' Avenues. A number of people attended that meeting as did many people attend the recent project open house meeting on January 10, also at City Hall. The purpose of this letter is to notify Nevada and 54`h Avenue property owners that the final plans and specifications for the Phase 13 project will be presented to the City Council for approval at the February 5 meeting. The plans show the following: Construction of a 5 -foot wide sidewalk adjacent to the curb on the north side of 54th Avenue. Construction of a 5 -foot wide sidewalk adjacent to the curb on the west side of Nevada Avenue. No Parking designation on the south side of 54th Avenue. No Parking designation on the east side of Nevada Avenue. If you have questions or comments regarding the above proposed construction plans, please plan to attend the above council meeting. If you have any questions or comments, do not hesitate to contact Aaron by telephone (952.912.2624), e-mail (aditzler@sehinc.com), or Tom Mathisen at the Crystal Engineering Department, by telephone (763.531.1160), e-mail (tom.mathisen@crystalmn.gov). I:pubworks/projects/phase 13/Sidewalk Mtg Notice Ph 13 4141 Douglas Drive North - Crystal, MN 55422-1696 Telephone: (763) 531-1000 - Fax: (763) 531-1188 Website: www.ci.crystal.mn.us TO: Property Owners and Residents adjacent to the following city streets in the 2013 — Phase 13 Becker Park Street Reconstruction Project Area: 54`h Avenue — West Broadway to Nevada Avenue Nevada Avenue — 54`h Avenue to Bass Lake Road FROM: Aaron Ditzler, SEH Project Manager Tom Mathisen, Crystal City Engineer DATE: August 29, 2012 RE: Neighborhood Meeting on Wednesday, September 12, 2012, 6:45 p.m. doors open, 7 p.m. meeting time. Crystal City Hall, 4141 Douglas Drive N. Major street reconstruction is programmed to occur in your neighborhood during the 2013 construction season. We cordially invite you to meet with the project team including city officials, to review the proposed improvements as they affect your property and street. The project team will be available to answer your questions and obtain your input. The purpose of this meeting is to inform you of the following: The City of Crystal's 2010 Comprehensive Plan guides 54`' and Nevada Avenues to be designated as part of the City's Municipal State Aid (MSA) street network at such time as the streets are reconstructed. This MSA designation is now open for discussion and may or may not happen as part of the Phase 13 Project. The options pertaining to street width, parking on one side only, and sidewalk placement on one side, currently being considered by the City Council, are based on recommendations generated during preparation of the Report on Feasibility for the project. The Municipal State Aid Street System is a program funded by your state gas tax dollars that brings funds back into the community to rebuild local streets. Cities can designate up to 20% of their local mileage as State Aid. When a MSA designated street is reconstructed, funding can be obtained that can be used to assist in the reconstruction of the designated and adjoining local streets. The only requirement is that the street be built to certain specifications relating to width, parking, and durability. The Phase 13 Report on Feasibility recommends the reconstruction of 54`h and Nevada Avenues to a 32 - foot wide street section, approximately two feet wider than the existing streets. Based on this width, the MSA specifications allow parking on one side only. The north side of 54`h and the west side of Nevada Avenue are currently proposed. 4. The Report also recommends the construction of a 5 -foot wide concrete sidewalk adjacent to the concrete curb on one side of both 54`' and Nevada Avenues. The north and west sides respectively, are currently proposed. As part of the City Street Reconstruction Program Policy, sidewalks are being built on one side of MSA streets when the street is reconstructed. The final decision on street reconstruction and sidewalk on 54th and Nevada Avenues will not be determined until after input from the adjoining residents at the neighborhood meeting, and subsequent approval by the City Council after a public hearing on the proposal. We invite you to provide input at this special neighborhood meeting on Wednesday evening, September 12, 2012. The meeting will include a review and discussion of the proposed improvement recommendations for 54"' and Nevada Avenues and the outcome of possible MSA designation. The meeting will begin with an informal gathering at 6:45 p.m. and the actual meeting starting at 7:00 p.m., continuing until approximately 8:00 p.m. If you have any questions or comments, please do not hesitate to contact Aaron by telephone (952.912.2624), e-mail (aditzler@sehinc.com), or Mick Cyert at the Crystal Engineering Department, by telephone (763.531.1161), e-mail (mick.cyert@crystalmn.gov). I:pubworks/projects/phase 13/Ph 13 MSA local Mtg Short Elliott Hendrickso s� 10901 Red Circle [ gi,lte 300 Minnetonka 34 B�A yBLLBZ N 52p0 9 A�JpT�DI/ m ° rersrrs`rs ry�1 5124 fP`�°� 5g25 srrs h^•,h � srs rets uS 1,6,1 r<r �s ers' e`rs sr JylS PSB Jp se/Bngp 8 m L£ZS g ° 41'19£c� si vRi' 6325 _BAypooAte P3 6333 g 6401 LEES � 647 6413 v N m Ng N All `3 R Ci � 8 C3 6426 0 p 8AB JO(� 6131 Od g c 5502 65216627 �84p�� BAt/B/ OAj 6605 U 6611 6617 is 2m w g e 6623 5537 �T �,' A A Ci R £X `ui m `'m" 6629 BAdB//I/ IUBfI 6635 8A vB/y a oo' 2 ^N m n r vma�M m i 6109 R m � 5 R G3 2 R 6Y � £� N 6715 6721 6ZL9 BAVoUBPI N cm A M 3 G3 s3 R �I I �I� I I IG�I I zes EOL BA l! BSLB/' 628 �J c3sss LE1oi-l' 61 ,VLH xnMuBJI soot loot o m o m m A A uoL 600E anyeue/s/no7 9 0 P EzoLN o m G3 " '�' `3 `� so 1LL Mil" A " � `u v 2 £LLL N N d N 0 z 'E y z 15 £ZLL y EZ LL ZZ 1L £ZlL ZZU ML N o N ML LLQZa LL Q U U G3G3 EE1LSA lop ■� EIZL oEss3 3 szzL _ 0 _ N o m L1EL 93 2 2 93 N SSES BAyu J $ v t N N N Y U N ` 604E a� a C V LOCI ML Q 1 � p3j � o U) 3 of a I v 0 E Y m m BAye/usA/ suued LL _ 3 0 0 0 - a E E loftm � � � � � JOEL BAt/aBQB 70 Z N/Z6/6:9190 pxw-AiewwnS deal laailS Z aLn61d\sdeW\SI9\OLl6Z6\lstiO\O\BV\:d :filed C:) LL N 0 Q r G W D U) U) Q � = W �— W F— U) W kA